20140179 05-13-2015-st -columban-church-addition-14s170-field-report-other-report-f65260 Materials Testing & Consulting, Inc.
Ge Wl nieai F PCWwerirlj dr Cwlmhing+Special klspKVw 0 Mairflah Tabinp•Fnrirnnmenlal C4mvlli4
$ ��rtrvao<+.Barra lftlP! Y
St. Columban Church Addition - 14S170 - Field Report: Other: Report#F65260
CLIENT St. Columban Catholic Church DATE 05/13/2015
PROJECT LOCATION 506 1 st Street S PERMIT# 20140179
Yelm WA 98597
Inspection Information:
Inspection Date: 05/13/2015 Time Onsite: 2:30 PM Weather Conditions: Inside,In service condition
Inspection Performed: Other
Comments:
MTC on site for concrete moisture emissions testing.
Placed 1 moisture emissions test in center of Men's bathroom and 1 in center of Women's bathroom.
Tests to be retrieved in 72hr,Saturday 5-16-15 with report to follow.
REPORTED BY:Sam Hyatt REVIEWED BY:Deane Ramsdell,Project Manager
M.�.rr,.,olo..,aK.,.w�t.•r,•a,rr•a.rl.,r,,..r.a,.lr,�.rr�r.r w.rrernerr�rder..��a.1,rl�r„t,lr.�..w..�-.a..-a.-..rw.�.-
mn frmmnpFdda mpr YaaarM filar%dm,r.0 3401 • 1113 MnarlLIN iuelq l C541MINlal.Ins. All r1010 rnarrrN.
Carp-►rsle ■ 777 Ckr1slor Drive + 0arlington, W A 918233 • Pknae 364.755.1990 * Fax 362.736.19R@
SV4 Region * 21 IS Black Lalm H1u4- S.W.• 0I)'mpla, w# 9$512 * phone 340.534.4777 * Fax 340,334.9774
NW Reolom * BIDS DuPOOL SUCCL, Suite 5 * kellisghom, WA 96225 * Phone 3d0.647.406L ' F¢r $60.fd7.$111
VisiI our we hsile: www.mic inc.Lc1
St.Columban Church Addition-14S170,0511312015,#F65260,Page I of]