20150238 (01-15-16) Field Report #02 �+ r rr <400 Valley Avenue NE
Construction Puyallup,WA1983772
Testing Laboratories, Inc 253-383-8 fax 253-770-8232 232
ib www.ctlwa.com
FIELD INSPECTION REPORT 1AGE i 1
DATE OF
CLIENT Yelm Community Schools INSPECTION January 95, 2096
PROJECT _ Mill Pond Elementary School Playshed REPORT TITT LE 02
-'DBSI 90605 Mill Road SE Yelm, WA - -NUMBER -
pDpRES S- - PROJECT 6 02 7
CONTRACTOR Western Washin ton Construction NUMBER
WORK CONTRACT PO I l o1500I I8 JOB
ORDER H. ODDER NO. HD. ORDER HO.
PEERMIT RMIT N0.NO permit Not Available on Jobsite
1 arrived on the jobsite to perform special inspection and field testing as scheduled for today.
1 performed a final inspection of the reinforcing steel for clearances prior to the concrete placement.
The re-steel clearances were correct. The placement inspection had been performed at an earlier
date and was maintained correctly according to the approved jobsite plans.
The contractor placed sixteen cubic yards of concrete from Miles Sand& Gravel mix#18400F, a 4.8
sack, 3000 psi mix into the footing. The slump was 4 %"and the concrete temperature was 66 OF
1 cast one set of five 4"x8"cylinders, for compressive strength test samples, to represent today's
placement. The cylinders were placed in an insulated cure box to protect the cylinder during the
initial curing.
See the concrete inspection report with today's date for the field and lab test results.
FIELD - Test specimens cast todag are stored in av1 ivlsutated curing box For proper initial curing at the Jobsite.
REMARKS;
I WEATHER CONDITIONS) 1 Z TEMPERATURE I TIME 1 b INSPECTOR d
<- CLEAR I SNOW 37" F 0 0900 1rj4i'f!
____ ___________ ______ -_____
OVERCAST_ I INDOORS) _ N/A 0 N/A 1 REVIEWEOHY L
+-- PARTLY
F COVERED
_ __CLOUDY AREA
F' CLOUDY OTHERP L
---- -----------
L TIME BOX b
-<— ._ - RAIN-_ i START TIME S l FINISH TIME 1
FOGGY -- N/A N/A y T'�
<— SHOWERS L<- N/A /;r N/A JT D.Smith
REPORT SHALL NOTE E REPRODUCED EXCEPT IN FULL,WITHOUT THE WRITTEN APPROVAL OF CONSTRUCTION TES7IAG LAB,INC. REPORT PERTAINS ONLY TO THE MATERIAL TESTED(,.V.03-22.2011
DATE REM 01-18-18
FIELD INSP(E- 'I REPORT/Mai Merge F9,J C.START 1 ca MAIL OEST.UST
1 r