20150238 (01-21-16) Field Report #05 400 Valley Avenue NE
A 1�0�1t+ &H 1 Ii�I�I�p��i Suite 102
u A ` I stu u c I �J11 Puyallup,WA 98372
` osting Laboratoriios, hic. fax 253-7780-8232
www'al wo.com
FIELD INSPECTION REPORT
CLIENT PATE OF
_____ Yelm Community Schools ,NSPECT,oH January 21, 2016
Mill Pond Elementary School Playshed REPORT 05
PROJECT
TITLE HUMBER
aDoR9ss
10605 Mill Road SE Yelm, WA
______________ PROJECT /�O'J'2I/
CONTRACTOR Erickson ISUMBER VVV/
WORK (CONTRACT -P0- JOB
ORDER HO. I ORDER NO. Hp. ORDER PTO.
ND
PEERMIT RMIT NO. permit Not Available on Jobsite
I arrived on the jobsite to perform special inspection and field testing for today's scheduled in place
density tests. Testing performed as follows:
As requested, in place density tests were performed on Holroyd CSBC, finish grade, for the play shed
stab.
All tests performed were found to be passing the 95.0% compaction requirement, as per attached
copy of in place density test report.
FIELD WA
REMARKS:
a
l WEATHER CONDITION(S) b 1 TEMPERATURE I TIME b 1 INSPECTOR S
-- 1400
- CLEAR -- Vr SHOW 450 F 0 7y�
F- OVERCAST +-- G INDOORS) N/A I.NIA J 1 REVIEWEDBY 1
PARTLY COVERED
-CLOUDY AREA
v +-- CLOUDY 1 OTmAp
---- -----------
1 TIME Box1
�- RAIN Z STARTTIME 1 1 FINISHTIME 1
- .___FOGGY___ N/A M N/A I,�,
SHOWERS N/A �., N/A , D.Si)dth
REPORT SHALL HOT BE REPRODUCED EXCEPT IN FULL,WITHOUT THE WRITTEN APPROVAL OF CONSTRUCTION TESTING LAB,INC. REPORT PERTAINS ONLY TO III MATERIAL TESTED 1rev.08-22-2011
DATE RECD: 02-01-16
FIELD I IJSPECT1Uy REPORT Dhl Merge FPQl C.SWAFiT I m IAML DIST.LIST