Loading...
20150238 (01-14-15) Field Report #01 900 Valley Avenue NE A A Construction Puyallup,WA1983772 Testing Laboratories, Inc. fax 253-7780-8232 ivww.ctfwo.coni FIELD INSPECTION REPORT CLIENT Yelm Community Schools DATE OF January 14 2016 iHSPECr10H PROJECT__ Mill Pond Elementary School Playshed ___N_U_M_B_E_R____ TITLE 01 ADDR SS 10605 Mill Road SE Yelm, WA --- - --- PROJECT 60�7 CONTRACTOR Western Washin ton Construction NUMBER WORK COHTRACT PU 1101500118 I .IOB ORDER H0. ORDER NO. HO. ORDER NO. E BUILDING permit Not Available on Jobsite PERMki HO. 1 arrived on the Jobsite to perform special inspection and field testing for today's scheduled inspection of the reinforcing steel tied in place. I visually verified the reinforcing steel is grade-60, clean, property placed, and tied to conform to the approved Jobsite plans. The contractor pumped excess water from three spread footings and made minor adjustments to ensure the required clearances. All required anchor bolts will need to be verified prior to concrete placements. FIELD NIA 11VI,IARKS: y' 1 WEATHER CONDITIONS) 1 Z TEMPERATURE f TIME l INSPECTOR Y - CLEAR ___�-- '. SHOW 300 F 61 0800 1 Cam, C0'0/j//'&& _ OVERCAST <' INDOOR(S) N/A 0 N/A F.r REVIEWED BY �. PARTLY < COVERED CLOUDY AREA CLOUDY : OTHER(S)d _ 1 TIME BOX L RAIN 1 STARTT(ME S ]�FIHISHTIME 1 FOGGY �' N/A N1 A j SHOWERS 17 N/A Ja N/A /, D.Sinith REPORT SHALL NOT BE REPRODUCED EXCEPT IN FULL,WITHOUT THE WRITTEN APPROVAL OF COHSTRUCTIONTEST IRG LAB,INC. REPORT PERTAINS OHLYTO THE MATERIAL TESTED(r.,08.22.2011 DATE RECD: 01-15-18 FIELD INSPFCT"- RFPORTMal MdeFge F1Ne!C.SWART/m PAAIL nl$T-LIST f �