Loading...
Soils , J ~ Jr'\ U ] J j J [J U n u~ ~ 1 ] ] 0 1] 1'~ Bradley-Noble Geotechnical Services A Division of The Bradley Group, Inc 2401 Bristol Court SW, PO Box 10267, Olympia WA 98502 Phone 360-357-7883 FAX 360-754-4240 SOILS INVESTIGATION REPORT FOR THE NEW TWIN COUNTY CREDIT UNION FACILITY, YELM, WASHINGTON presents the results of our subsurface for the new Twin County Credit Union be constructed at 1105 Yelm Avenue, State in Yelm, Washington. Our purposes in the subsurface soil conditions were to bearing capacity of the site soils, to recommendations for foundation design, and to other geotechnical considerations for this This report investigation facility to Highway 510 exploring evaluate present address project. The development of this 2.5-acre parcel is proposed in two phases. In the first phase the western one-half of the property will have a 2800-square foot building, drive-up facility, and parking. The second phase is the expansion of the building to 5825 square feet and also expansion of the drive-up facility. Additional parking and driveways will be constructed in the eastern half of the property. We expect that the new facility will be a single-story, wood- or metal-frame building. Conventional spread footings will be used for support of wall loads. A concrete slab on grade is expected to be used for the floor system. We expect that asphaltic concrete pavement will be used for driveways and parking areas at the site. Work was authorized on behalf of the Twin County Credit Union by Mr. Robert Slenes, Project Architect of the BJSS Group, the project's designers. SITE CONDITIONS Surface Conditions The project site is of low relief and nearly level with a few large Douglas firs. The eastern half of the property still has an occupied, single-family residence. It is two-story, wood-frame structure supported on a concrete block foundation system and served by one domestic well. Outbuildings are associated with this structure. The western half of the site, in the area of the phase one construction, we found surface and subsurface 96040101 Page 1 of 7 }, ",,"i;-. i~ r; , I -L i i\ -c -J -]. ~- -J ] II il \\!l I :~ ] ) ] B 1 -1 96040101 Page 2 of 7 structures associated with a mobile home that once occupied this area. A small, wood-frame, storage barn is in the area of proposed construction. There is a septic tank between Test Pits One and Two and a drainfield in the area of Test Pit Two. We expect that underground water lines served this residence. There is also an abandoned gas riser in this area. There may be an additional domestic water well in the small storage building that served this residence, or a water line may extend from the residence to the east. Concrete walks are in this area. Underground locate shows a gas line crossing the property in the northwest corner. This line serves the Moose Lodge to the project west. '.c If the existing domestic wells on this site are not to be used, then they will have to be abandoned according to the Department of Ecology Water Well Division requirements as presented in WAC 173-160-415. We are available to work with the owner to provide the abandonment of these wells. Subsurface Conditions Subsurface conditions at the site were explored by seven test pits excavated with a tractor-mounted backhoe. These test pits were excavated in the phase one area of the proposed construction. We did not extend the soil exploration to the east because of unmarked active underground utility lines that still serve the occupied residence and the outbuildings. Soils under the site are typical for this area. In the test pits, we found 1.4 to 2.0 feet of a dark brown, silty, gravelly sand, generally referred to as the Spanaway topsoil. Underlying the Spanaway topsoil and extending for the full depth of the explorations, we found the coarse sands and gravels which were fluvially deposited as the Vashon recessional outwash. These recessional outwash gravels contain cobbles and boulders to 1.5 feet in diameter. The southern area seemed to have more sand than test pits excavated in the northern area of the site. No ground water or indication of seasonal high ground water was observed in the test pits. We expect that the near surface aquifer would be encountered between 70 to 90 feet below the surface at this site. -J ] -0 -~ 96040101 Page 3 of 7 DISCUSSION AND RECOMMENDATIONS Site Work J I Based on the proposed site plan, the septic tank and drainfield that served the former mobile home will be under the building footprint. This tank will need to be located and removed. The void after removal should be filled with either a controlled structural fill section placed and compacted in conformance with the Earthwork Criteria section of this report or be filled with Controlled Density Fill (CDF). The drainfield laterals will need to be located and removed. Any effluent-contaminated earth will also have to be removed and disposed of in conformance with the Thurston County Public Health Department requirements. The septic tank and drainfield that serve the occupied residence on this site will also have to be abandoned after the structure is razed. J J I~ II .,~\ ~J The Spanaway topsoil unit is a silty, gravelly sand. The silts in this soil unit are moisture sensitive and will "mud up" rapidly if exposed to rain during site work. The underlying coarse, sandy gravels and gravelly sands are considered to be free draining and non-moisture sensitive. We expect that site work on this soil unit would not be affected by weather. ;.~ ] The recessional outwash soils on this site are considered to be suitable for use as structural fill, gravel base material under paving sections, and trench backfill. The oversized material, the large cobbles and boulders, will have to be removed in order to use this material. The Spanaway topsoil is marginal for use as structural fill or trench backfill. It is not considered to be suitable for use as gravel base material under paving sections. The percentage of fines makes this material difficult to compact as moisture control is difficult to control in order to achieve a uniform density of the material. J -] -] Foundations -] All foundations are to be founded on the Vashon outwash sands and gravels below the Spanaway topsoil unit. We recommend that the site be stripped to expose these soils. Clearing and grubbing and stripping to expose the outwash soils should extend for a minimum of 10 feet outside of building lines. l o fill l..'.:. ,a J, ~ J 96040101 Page 4 of 7 J For footings placed on the outwash soils after proof-rolling, we recommend a design bearing value of 3500 pounds per square foot. A one-third increase in this recommended bearing value is permissible for short-term wind or seismic loadings. -~~ -] Exterior footings should be founded a m1nLmum of 18 inches below planned finish grade for frost protection and confinement. We recommend that continuous and strip footings have a minimum width of 16 inches. Isolated footings supporting column loads should have a minimum dimension of 3.0 by 3.0 feet square. -J )~ --I Settlement of structures designed to the recommended bearing values and placed on soils prepared according to the recommendations of this report should not be significant. Generally, we expect that both differential and total settlements of 25 millimeters or less will occur, mostly during construction and immediately after the loads are imposed. There should be little long-term settlements. Floor Slabs r~ ~J ,l,.i ~ After the site has been stripped, additional structural fill material probably will be required to bring the site to planned subgrade elevation. The gradation of the material should be such that it can also function as a capillary break material. Use of on-site outwash soils is acceptable for structural fill under the slab. We do not recommend that the Spanaway topsoil be used for structural fill under the slabs. ] U 11 tI Placement and compaction of the structural fill section should be in strict conformance with the recommendations of the Earthwork Criteria section of this report. Placement of a thin lift of 5/B-inch minus crushed rock is acceptable to facilitate the fine grading operations for the slab placement. ~~ The native sands and gravels act as a natural capillary break. High ground water tables are not evident at this site, and we do not expect that wicking of moisture will be a major concern at this site. We do recommend that a vapor barrier be included in the design between the capillary break/structural fill section and the slab. The concrete slab should be designed to the -11, j] 1 o 1,' ! I i 11 J, b 96040101 Page 5 of 7 J recommendations of the current Reinforcing Steel Institutes Design anticipated floor loads. edition Manual of the for the J .] Paving Section The paving section may be placed on the Spanaway unit if the specified minimum paving section thicknesses are used and the Spanaway unit is uniformly compacted to the specified density of the paving section. This will minimize excavation and disposal costs. This soil will exhibit some swelling after densification because of saturation. J ] 1 Paving sections placed on the Spanaway soil unit may be designed to a CBR value of 25. This design value requires that a uniform density of 95% of ASTM 0698 be achieved on the subgrade. We recommend a minimum paving section of 2 inches of class B asphaltic concrete pavement, 2 inches of 5/8-inch minus crushed rock for the leveling course, and either six inches of ballast or eight inches of gravel base material. 1 ~ l~ All material used in the paving section is to conform to the current requirements of the WSDOT/APWA specifications for quality and compaction. The project's civil engineers should review the recommended minimum paving sections to ensure that the section meets the minimum design requirements based on the project's expected traffic loads. -I 1 Lateral Soil Pressures ] 1 It is our understanding that foundations walls over four incorporated in the design. criteria are to be built, we design information. no retaining walls or feet high are to be If walls meeting these should be consulted for 1 ~ 1 Lateral loads may be resisted either by passive soil For imported structural fill, we recommend that a clean, six-inch minus, well graded gravel or gravelly sand (classifying as GW or SW as determined by ANSI/ASTM test method 0-2487), conforming to APWA specification 9-03.14 for gravel borrow, be used. We also recommend that no more than 7% by weight pass the number 200 screen as tested by ANSI/ASTM 0-1140 test procedure. Other material may be used after the review and written approval of the soils engineer or engineering geologist. -I o n ~IJ...I ;1' ; ! J .\ J\ ~ 96040101 Page 6 of 7 J J All fill should be placed in uniform horizontal lifts of six- to eight- inch loose thickness. Each lift should be conditioned to the optimum moisture content and compacted to the specified minimum density before placing the next lift. We further recommend that all utility trench backfill be compacted as specified above. Earthwork should be performed under the continuous supervision and testing of Bradley-Noble Geotechnical Services to ensure compliance with the compaction requirements. J J Placement of fill sections on slopes greater that 4:1 (horizontal to vertical) will be benched as directed into the native soils. Height and width of the bench will be determined in the field by the soils engineer or engineering geologist. J -I I ~ llJ unrestricted slopes ~hall not exceed 2:1 (horizontal to vertical) for fill embankments and cuts that expose native soils. All fill slopes will be rolled. The project's civil engineer is responsible for the protection of the constructed fill slopes from uncollected runoff. We recommend that all cut-and-fill slopes be seeded as soon as possible after construction, so that vegetation can protect the slopes from sheet washing. ~ No fill is to be placed during periods of unfavorable weather or while the fill is frozen or thawing. When work is stopped by rain, placement of fill will not resume until the soils engineer or engineering geologist determines that the moisture content is suitable for compactive effort and that the previously placed fill has not been loosened. The contractor will take appropriate measures during unfavorable weather to protect the fill already placed. Measures that may be required include limiting wheeled traffic and grading to provide temporary drainage of the fill. At the direction of the soils engineer or engineering geologist, the contractor will be responsible for the removal and reworking of fill that has softened or has less than the required compaction. I ~ -~ -~ LIMITS OF LIABILITY 1 1 D 1~ BRADLEY-NOBLE GEOTECHNICAL SERVICES is responsible for the opinions and conclusions contained in this report. These are based on the data relating only to the specific project and locations discussed herein. 1 J JP"\ ~ 96040101 Page 7 of 7 J This report was prepared within the standard and accepted practices of our industry. In the event conclusions and recommendations based on these data are made by others, such conclusions and recommendations are not the responsibility of the soils engineer or engineering geologist unless he has been given an opportunity to review them and concurs in such conclusions or recommendations in writing. J j I The analysis and recommendations submitted in this report are based upon the data obtained in the explorations at the locations indicated on the attached plan. This report does not reflect any variations that may occur between these explorations. The nature and extent of variations between explorations may not become evident until construction is underway. J I I Bradley-Noble is to be given the opportunity to review the final plans and specifications for soils work. This is to verify that our geotechnical engineering recommendations have been correctly interpreted and implemented in the final design and specifications. r-'\ I~ I We also recommend that we be retained to provide geotechnical services during the foundation construction and trenching. These services would include review of backfill operations, excavations, and other geotechnical considerations that may arise during construction. We would observe compliance with the design concept and project specifications. If the subsurface conditions differ from those anticipated in our explorations, we would also evaluate changes in construction specifications. :1 9 BRADLEY-NOBLE GEOTECHNICAL SERVICES -II Report prepared by: -~ David C. trong Engineering Geologist 1 Please see attached soil's engineers review letter. 1 -~ u 1 11 April 1996 ~ U'~ ',. , i Jb , lJ :0 U I" IJ t] I.l] ] I: " Test Pit One: o to -1. 7 feet -1.7 to -6.1 feet Test Pit Two: o to -2.0 feet -2.0 to -6.0 feet Test Pit Three: o to -2.0 feet -2.0 to -6.0 feet ..j-\ \J I n Test Pit Four: \. TEST PIT LOGS Dark brown silty cobbly sand, Spanaway topsoil unit. Dense coarse sandy gravels and gravelly sands with cobbles to 14 inch diameter. Spanaway topsoil unit. Coarse sandy gravels with small boulders and numerous cobbles. Excavated soil had a musty smell of sewage. Drain field lateral to the west of the test pit. Spanaway topsoil unit. Coarse sandy gravels with cobbles to 8 inch diameter. Slightly sandier soils. o to -1.7 feet Spanaway topsoil unit. -1.7 to -6.2 feet Coarse gravelly medium sands with cobbles to 8 inch diameter. Test Pit Five: o to -2.0 feet -2.0 to -3.1 feet -3.1 to -6.1 feet Test Pit Six: o to -1. 7 feet -1.7 to -5.9 feet Test Pit Logs Page 1 of 2 Spanaway topsoil unit. Coarse sandy gravel layer. Gravelly medium gray sand. Spanaway topsoil unit. Yellow brown medium sandy gravel with cobbles and boulders. J o Jf\ "---.) Test Pit Logs Page 2 of 2 J Test Pit Seven: 11 o to -1. 4 feet -1.4 to -6.3 feet Spanaway topsoil unit. Yellow brown sandy gravels with cobbles and boulders. I -I No seepage or ground water was observed in any test pit. No indication of seasonal high ground water levels were observed. The outwash deposits of sands and gravels with cobbles and boulders is dense. The large boulders were occasionally difficult to remove from the test pits. ~I -I _I .1(\ .0 I I J 1 11 1_ : 1 1 '\ U fI , ~I , Uo ;I~ ~V;I :J ~ 1235 EAST 4TH AVE SUITE 101 OLYMPIA, WA 98506 (360) 754-9339 FAX (360) 352-2044 III I .,. . -. .. - - - - - - - - - , rll~ ..~~ ;1'; - - - - -- - - - Me SQUARED INCORPORATED ,. :~I fl~i April 11, 1996 if :t~~.; Mr David Strong Bradley Noble Geotechnical Services POBox 10267 Olympia, W A 98502 D MI , ~I l\'l. ~~, RE SOILS INVESTIGATION REPORT TWIN COUNTY CREDIT UNION YELM, WASHINGTON Dear David We have reviewed the attached 7 page soils report entitled "Soils Investigation Report for Twin County Credit Union, Yelm, Washington" This report was prepared by you based on field work performed by you and your firm. MC Squared, Incorporated has reviewed this report and the conclusions contained therein It is our opinion that the report and the conclusions meet the standards of good geotechnical practice for this place and time MC Squared's recommendations and opinion are based on our review of the field information and soils logs presented to us MC Squared has made recommendations to you regarding allowing bearing stresses, lateral resistance and loads, site period, and other items of an engineering nature These recommendations and conclusions have been included in the attached report. If you have any questions, or I may be of further help, please call me at (360) 754-9339. Sincerely yours, MC SQUARED, INC r~ ~n~. ~ VINCE MCCLURE, PE Principal STRUCTURAL. FOUNDATION · CrvIL ENGINEERS f., ....,...-...... .................................. _.......'\..~.....i' ~: ,~, 0 <'~__.. .1 u. _-______ . _" _ _ ,._ ~ ------. C) c -., I?' ,.,.,~.. 4'20 fi b N # 10'~" Ul'Ie '\ ~------- ~ --~-- H ~ .. ~ ~ -----1 \ I ::. ~ I _I ~ , N '\ ~ "\ ~J~. <tJ >1 -l ~ \~~ "'0 f , I t.r i '::: ... , ~ ....) 6" "<:::> I t I V\ .-J -,., c:J CJ ~1~ i \ ~ I \ I I ~ \ ~ t ~ If J' ~ I ~ c J f ) Ji s:: I' ~ ~ I , ~ ~ ~ ~ z ~ ~ . ft)1 '^ -!- :0 ~ r-- (! fl ) :::t- o ~ -I'll t C I (j- 1 1\ 'i ~ H ~ ~ o \tit ~~ i; ~~ i 2 \ "'" I ~ ~ ,{ ~ ... ... -:.. :::: -:-. The BJSS GROUP ARCHITECTS & PLANNERS, AlA no WEST BAY DRIVE sum 212 OLYMPIA WA 98\02 (J60) 94J.4MO TWrlJ CIlUm)' CR6o,-:- I,)NI~ - ";6l.J\^ DATE. ~ 1& ~G.o REVISED COMM NO .~.. .......... --~~~.~~., .....:.~.~ :~.;...:...,,;.~. - ~- ,'~.~"~'."''''~' '~"""~~:"':':;: '.7~;'~'.. STATEI\mNT OF RECORD .:~:~;~7:~'!~: i_"""~ ,'- ~' TAX PARCEL I 21724120300 LEGAL DESCRIPTION 24-17-IE NW4 NE4 SWLY OF OLY-YELM RD LESS 1.28A ~:.;~ ,(o':,~, > ' ... .~, :::.:' I" An Operation and Maintenance Permit has been issued on this parcel of property. This permit'is required by Article IV of the Thurston County Sanitary Code to insure proper operation and maintenance of the on-site sewage disposal system located on the above described property. This permit shall be obtained and kept current by the owner of such property. ' Tnis document shall run with the land and shall be binding 0,1 all parties, their successors in intefl",st and assigns, having or acquiring any right, title, or interest in the land described herein or any part thereof, and shall insure to the benefit nf each owner thereof. For information regardfng specific permit conditions, contact Thurston Coullty Environmental Health, Operation and Maintenance p:rmit section, at 786-5455, _ SPENCER C TRIPLETr L2QA1. OWNU:S PIUNT1lD HAJ.CB ~~ 5-.u-9;:/ OATS FOR AUDITOR'S US~ ONLY THURSTON COUNT'.' JLYMPIA. WA OS/20/94 09:07 A~ ~EQUEST OFJ 217241203 S.~ S. ROid, AUDITOR ;;Y: I LE~NA.'r DEPUTY S7.eO EHSRD Vol: 2276 P.age: 754 .=ile No: 94~52e1lZuZt8er STATaRCDlI2.oo.91 _._- .I:~..~ _..-~ " 1.,', t- . I J 1\ ... rr ." I .\ , \ " .'1.' ...~. "" " " ~1i .{ '1'- j ~. ~~: i. "?: ~i'Tf.'r I' .;"",". ,. .,. 1'iI, "". II , \. ',' ~ l. i . ~ "~?,. .~ ',. -" .~ ,1 f,.' .,. . . 'j.' ,,\... .. ~ .;~. l \J,,~"1t/lll <: .,.: .; ..o.r- ).1.1 > ... ~ \ , J t. ~ .h ~_.k;t, ;~~~.::". ". 1':~ ~' ,.,""~"""""-;1.u1~~""'''''''''''~ \,~~,~",. ",.~~7.~.;-"""..:"'->.~.t . lO'tir",':,.r.:..,Il.,...~.~t,Y, _...~.~...v"~.....,,_ ~" ':;0 "'y, , ". ;' . - - STATEMENT OF RECORD !" !_~f.!'~.~ ~, ?",:~'(<I,~~~1: ." . \., TAX PARCEL I 21724120300 LEGAL DESCRIPTION 24-17-1E NW4 NE4 SWLY OF OLY-YELM RD LESS 1.28A ~. An Operation and Maintenance Permit has been issued on this parcel of property, This permit' is required by Article IV of the Thurston County Sanitary Code to insure proper operation and maintenance of the on-site sewage disposal system located on the above described property. This permit shall be obtained and kept current by the owner of such property, Tnis document shall run with the land and shall be binding 011 all parties, their successors in intert.',st and assigns, having or acquiring any right, title, or interest in the land described herein or any part thereof, and shall insure to the benefil of each owner thereof. For information regarding specific permit conditions, contact Thurston COUrtty Environmental Health, Operation and Maintenance p:rmit section, at 786-5455 _ SPENCER C TRIPLEIT LOOA1. OWNI!P:S PIUN11lD ftUCB ~~~ 5-~-9Y OATH FOR AUDITOR'S USE ONLY THURSTON COUNT\' JLYMPIAJ WA OS/20/94 e9:07 A~ ^EQUEST OF: 217241203 Sd~ S. Ro~dt AUDITOR BY: ILEANA,l DEPUTY $7.e0 EHSRD Vol: 2276 Palle: 754 .=illi Uo: 94~5200080 ST A TI!. RCDll2 .c.2.91 -, - -. .I'{.- ...-,...-. " .). \ " ", , , I J , l __ r' 11/1\ , ...., "1.' -/ ,\ .'; \:'\: . .~ t 7, .; J ~~~~ ?-if)?: ~~ J7.[;f " 'I.;~." t! '-lIkl.,,a ". ..! ~ J: #.V~' ,. .' .! <11 1*. . ~. .~. \), 1-," ~. .." 'J}.,;" r l'~~":.:c. '"f' .. ~ VI I ,.,::11 < .;., . .,'-<, ,0;1',' ~ ... \ , : : . ~