Loading...
20160324 ROW Permit 09132016o. "Ir \5� City of Yelm PUBLIC WORKS 901 Rhoton Rd NW Yelm, WA 98597 Phone: 360 - 458 -8406 FAX: 360- 458 -8417 Permit No. Zot(, n i 7-q Application to Perform Work on Public Right of Way and /or Connect to Utilities APPLICATION I ' The undersigned hereby makes application to: Install approx. 300' of 2" PE gas main in Coates Ave NW, 200' of the 2" PE gas main is on property. No asphalt cuts required. job # 1070.52350 Location of work: 311 Cullens St NW I agree to perform the work in strict compliance with Yehn Municipal Code, Chapter , the special conditions enumerated herein and the attached conditions I have read and will adhere to the general provisions applicable to permits contained on this form. The Public Works Department (360- 458 -8406) must be contacted for inspection 24 hours before work commences or this permit will be void. The Underground Utilities Coordinating Council (1- 800 - 424 -5555) must be contacted two (2) working days before proceeding with any excavation associated with this permit. Name: Puget Sound Emergy It InfraSource Address: 3130 South 38th St Tacoma WA 98409 Phone: 42,;-457-3397 Proposed starting date of installation: 0717116 1 Duration: 3 days Date: Signature: L A4 PERMU J&QUIREMENTS I For Official Use Only , Fee $ /as — Issued Fee Received $ Application Approval Signature: Receipt Number &tV :;t To Be Completed By city Permission is hereby granted to perform the above described work subject to the general provisions contained on this form, and the following special conditions: A bond in the amount of is required to insure compliance with the above conditions, refundable upon satisfactory completion of work. No work shall be done under this permit until the party or parties to whom it is granted shall have communicated with and received instructions from: Remarks: First Inspection Date: Inspector Final Project Com letion A roval: Date: Revised 03/09/2011 City of Yelm PUBLIC WORKS 901 Rhoton Rd NW Yelm, WA 98597 Phone: 360 - 458 -8406 FAX: 360- 458 -8417 Permit No. _%WaC3 %� `-i Application to Perform Work on Public Right of Way and /or Connect to Utilities APPLICATION The undersigned hereby makes application to: Install approx. 300' of 2" PE gas main in Coates Ave NW, 200' of the 2" PE gas main is on property. No asphalt cuts required. job # 107052350 Location of work: 311 Cullens St NW I agree to perform the work in strict compliance with Yelm Municipal Code, Chapter , the special conditions enumerated herein and the attached conditions I have read and will adhere to the general provisions applicable to permits contained on this form. The Public Works Department (360- 458 -8406) must be contacted for inspection 24 hours before work commences or this permit will be void. The Underground Utilities Coordinating Council (1- 800 - 424 -5555) must be contacted two (2) working days before proceeding with any excavation associated with this permit. Name: Puget Sound Emergy / InfraSource Address: 3130 South 38th St Tacoma WA 98409 Phone: 253 -476-603 7 425-457-3397 Proposed starting date of installation: Duration: 3 days Date: Signature: L\k� M n 1 PER QUIREMENTS For Official Use Only,. Fee $ has, — Issued T Fee Received $ i Application Approval Signature: Receipt Number 00 �� To Be Completed By City Permission is hereby granted to perform the above described work subject to the general provisions contained on this form, and the following special conditions: A bond in the amount of is required to insure compliance with the above conditions, refundable upon satisfactory completion of work. No work shall be done under this permit until the party or parties to whom it is granted shall have communicated with and received instructions from: Remarks: First Inspection Date: Inspector Final Project Completion Approval: Date: Revised 03/09/2011 City of Yelm PUBLIC WORKS 901 Rhoton Rd NW Yelm, WA 98597 Phone: 360 - 458 -8406 FAX: 360 - 458 -8417 Permit No. _=aC3 Z`'( Application to Perform Work on Public Right of Way and /or Connect to Utilities APPLICATION I The undersigned hereby makes application to: Install approx. 300' of 2" PE gas main in Coates Ave NW, 200' of the 2" PE gas main is on property. No asphalt cuts required. 0 Location of work: 311 Cullens St NW I agree to perform the work in strict compliance with Yelm Municipal Code, Chapter , the special conditions enumerated herein and the attached conditions I have read and will adhere to the general provisions applicable to permits contained on this form. The Public Works Department (360- 458 -8406) must be contacted for inspection 24 hours before work commences or this permit will be void. The Underground Utilities Coordinating Council (1- 800 - 424 -5555) must be contacted two (2) working days before proceeding with any excavation associated with this permit. Name: Puget Sound Emergy / InfraSource Address: 3130 South 38th St Tacoma WA 98409 Phone: 253-476-60_37 42_9-457-3397 Proposed starting date of installation: Duration: 3 days Date: Signature: PERMUJOEQUIREMENTS For Official Use Only Fee $ Issued Fee Received $ Application Approval Signature: Receipt Number To Be Completed By City Permission is hereby granted to perform the above described work subject to the general provisions contained on this form, and the followingspecial conditions: A bond in the amount of is required to insure compliance with the above conditions, refundable upon satisfactory completion of work. No work shall be done under this permit until the party or parties to whom it is granted shall have communicated with and received instructions from: Remarks: First Inspection Date: Inspector Final Project Completion Approval: Date: Revised 03/09/2011 City of Yelm Community Development Department Building Division Phone: (360) 458 -8407 Fax: (360) 458 -3144 Applicant: Name: PUGET SOUND ENERGY Address: 3130 S 38TH ST TACOMA WA 98409 Property Information: Site Address: Ill rl 11 I FNC Rll NW Assessor Parcel No.: 21724140502 Contractor Information: Name: PUGET SOUND ENERGY Address: 3130 S 38TH ST TACOMA WA 98409 Contractor License No.: Permit No.: 20160324 Issue Date: 9/13/2016 (Work must be completed within 180 days) Phone Owner: Subdivision: N/A Phone: Expires: 0 /00 /0000 253 - 476 -6295 Lot: N/A Project Information: Project: UTILITY Description of Work: INSTALL APROX 300 FT OF 2 INCH PE GAS MAIN IN COATES AVE NW, 200 FT OF 2 INCH PE GAS MAIN IS ON PROPERTY. NO ASPHALT CUTS REQUIRED. Sq. Ft. per floor: First Heat Type (Electric, Gas, Other): Second Third Garage Basement Fees: Item RIGHT OF WAY Contractor PUGET SOUND ENERGY TOTAL FEES: Applicant's Affidavit: I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of Yelm regulations u ing those governing zoning and land subdivision, and in addition, all covenants, easeme 'ts restri tions of record. If applying as a contractor, I further certify that I am currently register i e St a of Washin t n. p Signatur Date l " Firm Fees $ 125.00 $ 125.00 OFFICIAL USE ONLY # Sets of Prints: Final Inspection: Date: By: T I of Yell o 458 -3244 REC #: 00243397 OPER: CO TERM REF #: 1203816 PAID By: 9/13/2016 001 10:35 AM IRAN: 33.0000 BUILDING PERMITS 20160324 PUG ET SOUND ENERG.0(CR ROW 317 CULLENS RD NW 125.0(CR 1ENDERED: APPLIED: 125.00 CHECK 125.00- CHANGE: - — - - --- 0.00 Q� E o�o ('o O U W Z I E N d } ��1 O ` y `Yl 04 f/7 L �+l (qa dv m° d v m mzW"o r , /i j . U a H w U r N ' M c Ati z ZOZQ °mm °v ZA, J W 0' �'�!• U to Q M N z P ~ =W U°a°vM In fh N i. IMP `b \ 'oo �Q° EN N of /. / O M O V d J N Lu 2. C44 O > Y N M O Y N ��+ /W ��a �v a�� 0 b 0 N y Z W / r cc U .c d W U H U W r N ui Z ZGO f O °O4 `V O Z P )< ri LLI w QV a vMV QV> _O u� ) r.- M N / / r ri. li r Oe r o _ y C _ r d BOA O V O L N U X U _ E 3 0 ui E O M N� O N O N 7 U N d = N O O @ C > W (3 N V N N C N V U O 'O O U @ > m >. m aD y a d M� N, m d M a vS a� m = 2 C 4% Y d C V Q C N U O N O M y = c 0 .3 �¢L U U) co U r m N M CM V M O A \ 7 3 v U O O N r to E v 0) Y a 3 N Q) to �3 .f.r U N 0 a C i O 3 3 CL U E Q O M I (D 0 N N ..__ T __ -- ------ -- -- ..... . I L L END OF MAIN CAP 2" MPE 1O'S C/L & 560'W C/L S C/L & ___'W C/L CP WIRE #14 TEST LEAD & CP TEST LEAD BOX COMPLETE S. C/L & ___'W C/L I I I I I I I I I I I I I I 9523 I I PROPOSED 1 O'EASEMIENT I BEGIN CUSTOMER PrOVIDED rTREldCH I I �- POLYVALVE 1 -1/8" MPE (OPEN) PROPOSED PIPE 2" MPE IP MAIN WITH VALVE BOX & SUPPORT 10 "S C/L ___'S C/L 12'S C/L & 520'W C/L S C/L & ___'W C/L PROPOSED 1Y6 "MPE SVC I I I I � I Z I I ~ 1 I � - I � I Z W I I I J I U I I I I I II I I 9525 6'N I I 86 ,16'E I 80' R ES I I ,14'E K I I -J --------------- - - - - -- J _ >+ " 1412L 112 5'N-WALK N W 107005254 -1999 / r� 2 "MPE IP 17' -23'E 186550916 -2008 311 / ',4 ��� / GJ 1 1 4" MPE / \ 2062 / \ S 116 \ / 1 1 4" 2062 c / 20024" MPE \ 317 PLOT PLAN SCALE: 1 " = 50' -0" N ' ► 25' 14' I 11.5' ASPHALT PARKKING WATER - 20'N ASPHALT q_ 50' R/W 83'S,27'W \ / / 0 ol 62 1 610 i i i /608 � � 60\ S 25' -' 11.5' 1 13' ASPHALT EXIST. / PROP. 2" MPE IP - 12'N GRAVEL a r Backfill for Direct Bury - The final backfill may be soil -based select material or native soil, but free of construction debris and shall not contain rocks larger than 10' " -in. diameter to prevent impedence of gas system maintenance. VEHICLE ACCESS Excavated Dirt Pile SIDE 12" -18" Min 24" Min Final Grade \ \ , f 2° Min. of ���,,�. ,�.,�,. �• /% % . Acceptable Backfill 36" ' (See Definition Abover) Cover NOTE: Install 12" shading if the backfill contains rocks -, .,..0 `t,`•� 6" Sand Shading _ greater tthan 6" dia. 4" Sand Bedding Gas Main Line TYPICAL GAS MAINLINE TRENCH DETAIL Not to scale FITTER'S CHECKLIST (CHECK BOX TO CONFIIRM COMPLETION) ❑ Inspected Steel and PE pipe per GOS 2450.1400 anci 2450.1500 ❑ Reviewed and complied with all construction notes. ❑ Recorded all required information on the as -built per (GOS 2500.1700. ❑ Completed post installation inspection per GOS 2525.1200 and 2525.2700. ❑ Left the work area in a clean and safe condition. Foreman's Signature Foreman's Name (printed) Company: InfraSource Construction Date _ 4680 06/11 STANDARD GAS CONSTRUCTION NOTES: 1. FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE- CALL" TWO WORKING DAYS PRIOR TO TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1 -800- 424 -5555. OR CALL NATIONWIDE: 811 2. NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). 3. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 4. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION C 5. N TION A TIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 6. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE -IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 7. COMPLETE "PIPE CONDITION REPORT' ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 8. PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. 9. INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. 10. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 11. SYSTEM MAOP DENOTED BY: SYSTEM MAOP = 60 PSIG 12. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. 13. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 14. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. 15. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. -- - - - - -- , PHONE --- - - - - -- 17. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS -BUILT IN RED.( ') DENOTES FOOTAGE BETWEEN FITTINGS. 18. EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD) 12 " -18" Final Grade 6: 1� •i ~- _ 4i. �'. ;55, � HOLE HOG TABLE LOCATION DEPTH LENGTH CALLOUT .1`f .. ±4," BP1 START BP2 END BP3 START BP4 END BP5 START BP6 END BP7 START BP8 END BP9 START BP10 END BP11 START BP12 END BP13 START BP14 END BP15 START BP16 END BP17 START BP18 END BP19 START BP20 END FITTER'S CHECKLIST (CHECK BOX TO CONFIIRM COMPLETION) ❑ Inspected Steel and PE pipe per GOS 2450.1400 anci 2450.1500 ❑ Reviewed and complied with all construction notes. ❑ Recorded all required information on the as -built per (GOS 2500.1700. ❑ Completed post installation inspection per GOS 2525.1200 and 2525.2700. ❑ Left the work area in a clean and safe condition. Foreman's Signature Foreman's Name (printed) Company: InfraSource Construction Date _ 4680 06/11 STANDARD GAS CONSTRUCTION NOTES: 1. FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE- CALL" TWO WORKING DAYS PRIOR TO TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1 -800- 424 -5555. OR CALL NATIONWIDE: 811 2. NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). 3. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 4. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION C 5. N TION A TIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 6. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE -IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 7. COMPLETE "PIPE CONDITION REPORT' ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 8. PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. 9. INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. 10. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 11. SYSTEM MAOP DENOTED BY: SYSTEM MAOP = 60 PSIG 12. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. 13. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 14. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. 15. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. -- - - - - -- , PHONE --- - - - - -- 17. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS -BUILT IN RED.( ') DENOTES FOOTAGE BETWEEN FITTINGS. 18. EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD) 12 " -18" Final Grade 6: 1� •i ~- _ 4i. �'. ;55, � Type/Work : ?',; :t. 4 +. •. .1`f .. ±4," Est Length +.. Manufacturer INSTALL 2" PE 260' N/A N/A PLAT 2" PE 200' N/A N/A N/A N/A N/A N/A I N/A Final Backfill N/A DRAWN BY .WALKER-PAU 253 - 625 -0964 7/5116 CHECKED BY B.TAYLOR A Depth COUNTY THURSTON Emer Sect 49 GAS WK CTR CSPPGPM + •ti. i GAS MAIN 6" Sand Shading , .i....4. TESTING GAS PIPE DIRECT BURY CUSTOMER PROVIDED TRENCH NTS 1. IF THE TRENCH BOTTOM CONTAINS ANY SHARP OR UNUSUALLY ROUGH SURFACES, A MINIMUM OF 4" OF INITIAL BACKFILL MATERIAL IS REQUIRED TO BED THE PIPE, UNLESS THE CARRIER PIPE IS ENCASED OR WRAPPED WITH AN APPROVED ROCK SHIELD MATERIAL. 2. INITIAL BACKFILL SHALL BE SAND, NATIVE SOIL, OR SOIL -BASED SELECT MATERIAL THAT DOES NOT CONTAIN ANY SHARP ROCKS OR ROCKS LARGER THAN 1/2" DIAMETER. SEE PSE SPECIFICATION 1275.1380, "SAND BACKFILL FOR GAS PIPE, ELECTRICAL CONDUIT, AND CABLE. 3. A MINIMUM OF 6" OF INITIAL BACKFILL SHALL BE PLACED OVER THE GAS PIPE. IF THE NATIVE SOIL CONTAINS ROCKS LARGER THAN 6" DIAMETER, THEN A TOTAL OF 12" OF INITIAL BACKFILL SHALL BE PLACED OVER THE GAS PIPE. 4. IF THE CARRIER PIPE IS ENCASED, INITIAL BACKFILL IS NOT REQUIRED. THE BACKFILL MATERIAL SHALL MEET FINAL BACKFILL MATERIAL REQUIREMENTS. WHERE THE CARIER PIPE ENTERS AND EXITS THE CASING, THE INITAL BACKFILL AND BEDDING REQUIREMENTS APPLY. 5. FINAL BACKFILL MAY BE SOIL -BASED SELECT MATERIAL OR NATIVE SOIL, BUT SHALL BE FREE OF CONSTRUCTION DEBRIS AND SHALL NOT CONTAIN ROCKS LARGER THAN 10" DIAMETER TO PREVENT IMPEDANCE OF GAS SYSTEM MAINTENANCE. GAS MAIN INSTALLATION /RETIREMENT Notification # Type/Work Pipe Size Type Est Length Act Lgth Manufacturer INSTALL 2" PE 260' N/A N/A PLAT 2" PE 200' N/A N/A N/A N/A N/A N/A I N/A N/A N/A DRAWN BY .WALKER-PAU 253 - 625 -0964 7/5116 CHECKED BY B.TAYLOR 425 - 466 -8377 COUNTY THURSTON Emer Sect 49 GAS WK CTR CSPPGPM APPROVED BY GAS MAIN PRESSURE & TESTING CP APPROVAL TYPE TEST ❑ SOAP ❑ AIR ❑ NITROGEN ❑ WATER DATE ON / / START TIME TESTED BY DATE OFF / / STOP TIME PRESSURE UTILITIES CONTACT PHONE# TEST RESULTS OP ❑ F TYPE TEST ❑ SOAP ❑ AIR ❑ NITROGEN ❑ WATER DATE ON / / START TIME N/A TESTED BY DATE OFF / / STOP TIME SCALE 1 " =50' PAGE 1OF1 PRESSURE TEST RESULTS ❑ P [--IF ❑ TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 DESIGN PRESSI 60 1 SYS MAOP 1 60 2023 03/10 PROJECT PHASE Notification # Order # GAS SAP Superior Service /Meter Service /Meter Service /Meter Service /Meter Ind. Service Ind. MSA Dis. Reg. / FT HP Svc /MSA Relocate Retirement 501784365 107052350 503542358 106313557 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A I N/A N/A Project Manager Contact Information: Manager: NATE LINVILLE Cell Phone: 253- 970 -7284 E -Mail: nathaniel.linvilleO-pse.com Vicinity Map N/A Owner/ Developer Contact Info EAST HAVEN VILLA PO BOX 386 FOREST GROVE, OR 97116 ATTN: ANDY ROYCE 360 - 239 -2702 office For contacts below dial 1- 888 -CALL PSE (225 -5773) CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES "Locates Required" Yes ❑ No ❑ "Flagging Required" Yes ❑ No ❑ REAL ESTATE /EASEMENT REQUIRED PERMIT YELM REV# DATE BY DESCRIPTION FUNCTION CONTACT PHONE NO DATE PROJECT MGR N.LINVILLE 253 - 970 -7284 6/30/16 ENGR -GAS N/A N/A N/A DRAWN BY .WALKER-PAU 253 - 625 -0964 7/5116 CHECKED BY B.TAYLOR 425 - 466 -8377 COUNTY THURSTON Emer Sect 49 GAS WK CTR CSPPGPM APPROVED BY N.LINVILLE 253 - 970 -7284 CP APPROVAL 1/4 SEC NE 24 -17 -01 E OP MAP 280.038 PLAT MAP 282.043 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# N/A N/A NIA N/A N/A N/A N/A N/A N/A N/A N/A N/A , I�� P lJ EAST HAVEN VILLA MEMORY CARE SOUND 2" MPE IP COMMERCIAL MAIN ENERGY 311 CULLENS ST NW YELM 98597 DESIGNED BY PSE SAP Sup Order Nbr 107052350 Drawing Number N/A SCALE 1 " =50' PAGE 1OF1