Loading...
Soils and Stormwater Control 677 Woodland Square Lp SE Lacey, WA 98503 P.O. Box 3485 Lacey, WA 98509-3485 (360) 493-6002 (888) 493-6002 Toll Free (360) 493-2476 Fax December 18,1997 Ken Garmann Public Works Director 105 Yelm Avenue West Yelm, WA 98597 RE. Yelm Center; Senior Assisted Living and Children's Daycare Facility SCA #97110 Dear Ken. The following is a brief description of our initial soils and stormwater control analysis for the Yelm Center Project. We have elected to usethe Thurston County Drainage Design and Erosion Control Manual (DDECM) to size the onsite stormwater treatment and storage facilities Infiltration Rates/Soils The Soil Conservation Service (SCS) soil survey of lhurston County classifies the on-site soils as Spanaway very gravelly sandy loam SCA's analysis of three on-site soil test pits confirmed the SCS Classification. A copy of SCA's soil logs are included in Appendix "B" Spanaway soils are very deep, excessively drained soils formed in glacial outwash Spanaway soils are well suited,for stormwater infiltration systems due to their rapid permeability However, care needs to be taken to remove silt and sediment from storm water to minimize cloggihg of infiltration systems Double Ring Infiltrometer Tests were performed in test hole's #1 and #3 to determine the project site infiltration rate An average infiltration rate of 960 inches/hour was recorded by SCA staff However, the DDECM maximum allowed infiltration rate of 20 inches/hour must be used for design. A copy of SCA's infiltration test results is included in Appendix "B" Stormwater Control The proposal is to develop the 5 acre site for a Senior Assisted Living and Children's Daycare Facility Access to the facility will be from two locations off Burnett Road Water and sewer service will be provided by the City of Yelm The completed project will create approximately 0 88 acres of new on-site impervious, roadway and parking area, 2.97 acres of disturbed pervious area, and 0 95 acres of roof area. Approximately 0.20 acres of off-site impervious road,way area are tributary to the project. C I V I L TRANSPORTATION PLANNING SURVEYING Ken Garmann December 18, 1997 Page 2 On-site Development Coverage Summary Existing Proposed Off-site Impervious Roadway Area Impervious Roof Area Impervious Roadway Area Disturbed Pervious Area TOTAL. o 07 ac o 00 ac o 00 ac 4.83 ac 5 '00 ac 0.20 ac o 95 ac o 88 ac 2.97 ac 5 00 ac A. Stormwater Treatment: Stormwater runoff from Burnett Road and the new on,..site parking lot and roadway areas will require treatment. To determine the treatment requirements for the on and off-site impervious roadway surfaces, the'roqdway surfac~s were divided into three separate basins. These basins are sho\l\fn on the preliminary drainage and grading plan in Appendix "C" Stormwater runoff from the north basin sheet ijows along a raised asphalt curb and is collected by a Type 1 catch basin for discharge into the proposed wetpond of the northwest corner of the property The south basin will collect stormwater runoff from the south entrance road and the small portion of the off-site tributary area -along Burnett Road Runoff will discharged into the proposed wetpond in the southwest corner of the property The third basin consists of the main parking area in front of the proposed facility, stormwater will sheet flow east to west and thence onto a 10-foot by 200-foot biofiltration filter strip All treatment facilities discharge into the dual stormwater infiltration pond configuration as shown on the map in Appendix "D" Stormwater runoff from proposed building roofs does not require treatment prior to discharge into the groundwater Therefore, all roof stormwater will be tightlined directly to the site's infiltration facility B. Stormwater Storage: Stormwater runoff will be stored and infiltrated on-site via infiltration pond The dual pond configuration has a capacity to store 10,270 cubic feet of stormwater which \ exceeds the minimum required storage volume of 9,060 cubic feet. In addition, -we have modeled the storm pond using Waterworks modeling software The required storage , C I V I L T RAN ,S P 0 R TAT ION PLANNING SURVEYING - ~lii:; ENGINEERING Ken Garmann December 18, 1997 Page 3_ per our Waterworks modeling was 6,397 cubic feet which results in a peak water surface elevation of 298.4 feet. Our modeling utilizes a 20 inches/hour infiltration rate applied to only the bottom area (297 contour) off the ponds A copy of the Waterworks modeling output is included in Appendix "A" f If you have any questions during your review of the preliminary drainage and grading plan, call me at 493-6002, Sincerely, SeA Engineering ~d &/%' RWB/sw (f.\text\corres\deq-97\7110d17.1tr) Robert W Balmelli, P E. Project Manager C I V I L TRANSPORTATION PLANNING SURVEYING 11II ~11f!; ENGINEERING DRAINAGE CALCULATIONS The following calculations are based on requirements contained in the Drainage Design and Erosion Control Manual (DDECM) for Thurston County, 1994 Edition. DESIGN AND BASIN INFORMATION SUMMARY Site Area (Developed Condition) Total off-site impervious area. Total impervious roadway area. Total impervious roof area. Total disturbed pervious area. TOTAL SITE AREA. Soil Classification SCS soil classification. Hydrologic Group Site infiltration rate (design): Site infiltration rate (field tests)" Rainfall Design Storms: 6 month storm - 2/3 x 2 yr storm 2 yr./24 hr storm 10 yr./24 hr storm 100 yr./24 hr storm Curve Number" Lawns/Landscape Paved surface CN = 85 CN = 98 Minimum Storage Requirements: 0.20 ac o 88 ac o 95 ac 2.97 ac 5 00 ac Spanaway gravelly sandy loam B 20 inches/hour 960 inches/hour = 1.33" = 2.00" =3.00" =400" Reference Table 4 1 DDECM - 20 incheslhour Minimum storage volume (disturbed pervious): 1,000 cflac disturbed pervious Minimum storage volume (impervious) 3,000 cf/ac impervious SUB-BASIN CALCULA liONS Treatment Facility Design Calculations. North Road impervious area. South Road impervious area. Main parking impervious area. TOTAL. o 47 ac o 15 ac 0.26 ac 0.88 ac Filter Strip Design DDECM 2,000 S F./ac x 0 88 ac = 1,760 S F (required treatment area) use 200 ft. wide by 10ft. long filter strip 200 ft. x 10 ft. = 2,000 SF> 1,760 S F OK Wetpond - North Design. DDECM 0025 x 0 47 ac x 43,560 S F./ac = 511 SF (bottom area) proposed bottom area = 515 S.F > 511 SF OK Wetpond - South Design DDECM 0.25 x 0 15 ac x 43,560 S F./ac = 163 S F (bottom area) proposed bottom area = 212 SF> 163 S F OK Stormwater Storage Volume Required Two Double Ring Infiltrometer Tests were performed on-site. The average infiltration rate was 960 incheslhour Therefore, a maximum design infiltration rate of 20 inches/hour must be used to determine the storage volume requirements. From Table 4 1 and 20 incheslhour, the minimum storage volume required per acre of' Disturbed pervious surface = 1,000 cf/ac Impervious roadway surface = 3,000 cf/ac Total disturbed pervious area = 2.97 ac Total impervious area = 0.20 ac (off-site) + 0 95 ac (roof) + 0.88 ac (on-site) = 2.03 ac Required storage volume 2.97 ac (1,000 cf/ac) + 2.03 ac(3,000 cf/ac) = 9,060 cf Dual Pond Stage Storage Table Description Elevation Storage Pond Bottom 297 ft, 298 ft. 298 4 ft. 299 ft. 300 ft. o cf 3,694 cf 6,397 cf 10,270 cf *Design storm Max. W S Elevation l' Freeboard *Using "Waterworks" modeling software (100 year storm) 6,397 cf (model) < 9,060 cf (DDECM) OK 9,060 cf (DDECM) < 10,270 cf (pond storage) OK Appendix A Waterworks Output 12/18/97 11:22:4 am S Chamberlain & Assoc. Inc. YELM CENTER: SENIOR LIVING CENTER WETPOND SIZING - 6 MONTH STORM NORTH AND SOUTH AREA WETPONDS page 1 --------------------------------------------------------------------- --------------------------------------------------------------------- BASIN ID: N_wtpond SCS METHODOLOGY TOTAL AREA.......: RAINFALL TyPE....: PRECIPITATION....: TIME INTERVAL....: BASIN SUMMARY NAME: Q6 MONTH STORM ANALYSIS 0.44 Acres BASEFLOWS: 0.00 cfs TYPE1A PERV 1.28 inches AREA. . : 0.00 Acres 15.00 min eN . . . . : 0.00 TC. . . . : 0.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.11 cfs VOL: BASIN ID: S_wtpond SCS METHODOLOGY TOTAL AREA.......: RAINFALL TyPE....: PRECIPITATION....: TIME INTERVAL....: 0.04 Ac-ft TIME: 495 min NAME: Q6 MONTH STORM ANALYSIS 0.13 Acres TYPE1A 1.28 inches 15.00 min BASEFLOWS: 0.00 cfs PERV AREA..: 0.00 Acres CN....: 0.00 TC....: 0.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.03 cfs VOL: 0.01 Ac-ft TIME: 495 min IMP 0.44 Acres 98.00 5.00 min IMP 0.13 Acres 98.00 5.00 min 12/18/97 11:22:52 am YELM STORM POND ANALYSIS Q100 YR STORM EVENT S Chamberlain & Assoc. Inc. CENTER: SENIOR LIVING CENTER page 1 --------------------------------------------------------------------- --------------------------------------------------------------------- BASIN ID: N_wtpond SCS METHODOLOGY TOTAL AREA.......: RAINFALL TyPE....: PRECIPITATION....: TIME INTERVAL....: BASIN SUMMARY NAME: Q6 MONTH STORM ANALYSIS 0.44 Acres BASEFLOWS: 0.00 cfs TYPE1A PERV 1. 28 inches AREA. . : 0.00 Acres 15.00 min eN....: 0.00 TC. . . . : 0.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.11 cfs VOL: BASIN ID: S_wtpond SCS METHODOLOGY TOTAL AREA.......: RAINFALL TyPE....: PRECIPITATION....: TIME INTERVAL....: 0.04 Ac-ft TIME: 495 min NAME: Q6 MONTH STORM ANALYSIS 0.13 Acres BASEFLOWS: 0.00 cfs TYPE1A PERV 1.28 inches AREA. . : 0.00 Acres 15.00 min CN .. .. : 0.00 TC. . . . : 0.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.03 cfs VOL: 0.01 Ac-ft TIME: 495 min IMP 0.44 Acres 98.00 5.00 min IMP 0.13 Acres 98.00 5.00 min 12/18/97 11:22:52 am YELM STORM POND ANALYSIS Q100 YR STORM EVENT S Chamberlain & Assoc. Inc. CENTER: SENIOR LIVING CENTER page 2 --------------------------------------------------------------------- --------------------------------------------------------------------- STAGE STORAGE TABLE CUSTOM STORAGE 10 No. ST01 Description: STAGE STORAGE BOTH PONDS STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> (ft) ---cfn- --Ac- Ft- (ft) -ncf--- nAc- Ft- (ft) -ncf--- --Ac- Ft- (ft) -ncfn- nAc- Ft- -------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------- 297.00 0.0000 o 0000 297 60 2216 o 0509 298.20 5009 0.1150 298.80 8955 0.2056 297. 10 369 40 0.0085 297.70 2586 0.0594 298 30 5667 0.1301 298 90 9612 o 2207 297.20 738.80 0.0170 297.80 2955 0.0678 298 40 6324 0.1452 299 00 10270 o 2358 297.30 1108 0.0254 297.90 3325 o 0763 298.50 6982 0.1603 297 40 1478 o 0339 298 00 3694 0.0848 298.60 7640 0.1754 297.50 1847 0.0424 298 10 4352 o 0999 298 70 8297 0 1905 12/18/97 11:22:52 am YELM STORM POND ANALYSIS Q100 YR STORM EVENT S Chamberlain & Assoc. Inc. CENTER: SENIOR LIVING CENTER page 3 --------------------------------------------------------------------- --------------------------------------------------------------------- STAGE DISCHARGE TABLE DISCHARGE LIST ID No. DIS1 Description: POND DISCHARGE @ 20"/HR STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> eft) ---cfs-- ------- eft) ---cfs-- ------- eft) ---cfs-- ------- eft) ---cfs-- ------- -------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------- 297.00 1. 1000 297.60 1 1000 298.20 1.1000 298.80 1.1000 297.10 1.1000 297.70 1. 1000 298 30 1.1000 298.90 1. 1000 297.20 1.1000 297.80 1.1000 298.40 1.1000 299 00 1 1000 297.30 1.1000 297.90 1 1000 298.50 1. 1000 297.40 1.1000 298 00 1 1000 298.60 1.1000 297.50 1.1000 298 10 1.1000 298 70 1.1000 12/18/97 11:22:53 am YELM STORM POND ANALYSIS Q100 YR STORM EVENT S Chamberlain & Assoc. Inc. CENTER: SENIOR LIVING CENTER page 4 --------------------------------------------------------------------- --------------------------------------------------------------------- LEVEL POOL TABLE SUMMARY MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE <--------DESCRIPTION---------> (cfs) (cfs) --id- --id- <-STAGE> id VOL (cf) ----------------------------------------------------------------------------- ----------------------------------------------------------------------------- Q100 YR STORM 0.00 3.49 ST01 DIS1 298 41 1 6397 05 cf Appendix B Soil Logs & Infiltration Test Results FORM 1 GENERAL SITE INFORMATION PROJECT TITLE. Yelm Center SHEET 1 OF 1 PROJECT NO 97110 DATE December 16, 1997 PREPARED BY William W Parnell, P E. 1 SITE ADDRESS OR LEGAL DESCRIPTION Burnett Road, Tax Parcel Number 21713402000 2, PROJECT DESCRIPTION' Develop parcel for a convalescent center 3 SITE DESCRIPTION: The project site is currently undeveloped The 5 acre parcel is covered with Scott's bloom of medium density with a few 12"-18" diameter Fir trees sparesely spaced on the front one-third of the site Topography is level to gently sloping with relief varying from 0-10% slopes The site is distinguished by a plateau approximately 200' east of the west property line from which the terrain slopes to the west, north and east at approximately 6-9% slopes. The eastern one-third of the site is relatively flat. The extreme north-eastern corner of the site rises at a 10% slope for 60' to the northeast property corner 4 SUMMARY OF SOILS WORK PERFORMED' Three test pits were excavated by backhoe and ranged in depth from 108" to 120" below existing grade. Soils were inspected by entering and visually logging each test hole to a depth of 6 feet. Hole tailings were examined for soils excavated below 6 feet in depth Double ring infiltration tests were completed in test pits #1 and #3 Test results and soil log data are included in this report. 5 ADDITIONAL SOILS WORK RECOMMENDED' Additional on-site soils work will not be necessary unless drainage infiltration facilities are located at appreciable distances from those soils logged in this report, 6 FINDINGS The on-site soils for this site were mapped by the Thurston County Soil Conservation Service (SCS) as a Spanaway (110), The on-site soils logged in the three test pits confirmed this designation. Double ring infiltration tests in test pits #1 and #3 revealed infiltration rates greater than 20 inches/hour, at depths of 48"+ below the existing ground 7 RECOMMENDATIONS The Spanaway series soils are very permeable and very suitable for drainage infiltration facilities. Such facilities should be a minimum of 48" in depth and designed for an infiltration rate of 20 incheslhour During construction, care must be taken to prevent erosion of the upper horizon soils that could contaminate the facilities infiltration surface area and adversely affect the infiltration rate as designed I hereby certify that I prepared this report, and conducted or supervised the performance of related work. I certify that I am qualified to do this work. I represent my work to be complete an accurate within the bounds of uncertainty inherent to the practice of soils science, and to be suitable for its intended use. SIGNED' DATE. SOIL EVALUATION REPORT FORM 2: SOIL LOG INFORMATION PROJECT TITLE Yelm Center SHEET 1 OF 3 PROJECT NO 97110 DATE. December 11, 1997 PREPARED BY William W Parnell, P E. SOIL LOG. #1 LOCATION See Site Plan 1 TYPES OF TEST DONE. 2. SCS SOILS SERIES 3 LAND FORM: Double Ring Infiltration Spanaway - 110 Terrace 4 DEPOSITION HISTORY 5 HYDROLOGIC SOIL 6 DEPTH OF SEASONAL HW GROUp. Glacial Outwash B Greater than bottom of hole 7 CURRENT WATER DEPTH 8. DEPTH TO IMPERVIOUS 9 MISCELLANEOUS LAYER: Greater than bottom of hole Greater than bottom of hole Linear, level 10 POTENTIAL FOR. EROSION RUNOFF PONDING Slight Slow Minimal K = 015 11 SOIL STRATA DESCRIPTION See Following chart 12. SITE PERCOLATION RATE Assume 20 inches/hour at a depth of 30" or greater below existing grade 13 FINDINGS & RECOMMENDATIONS Double ring infiltration test revealed an infiltration rate equal to 960 inches/hour For design purposes, use 20 inches/hour for all infiltration facilities with bottoms greater than 30" below existing grade Soils Strata Description Soil Log #1 Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP A 0-20 10 YR 2/1 GRViFiSaLm <5 <10 <15 1SBK CF 2-6 6 Moist Bw 20-30 10 YR 3/2 SaG Rw/Cobbles <5 <5 <15 1SBK CF 2-6 6 Moist C, 30-60 2.5Y 5/4 SaG Rw/Cobbles >75 SG. >20 20 Moist Cz 60-108 2.5Y 5/3 SaGRw/Cobbles >75 SG. >20 20 Moist SOIL EVALUATION REPORT FORM 2. SOIL LOG INFORMATION PROJECT TITLE. Yelm Center SHEET 2 OF 3 PROJECT NO 97110 DATE, December 11, 1997 PREPARED BY William W Parnell, P,E SOIL LOG. #2 LOCATION See Site Plan 1 TYPES OF TEST DONE. 2 SCS SOILS SERIES 3 LAND FORM. None Spanaway - 110 Terrace 4 DEPOSITION HISTORY 5 HYDROLOGIC SOIL 6 DEPTH OF SEASONAL HW GROUP' Glacial Outwash B Greater than bottom of hole 7 CURRENT WATER DEPTH 8 DEPTH TO IMPERVIOUS 9 MISCELLANEOUS LAYER: Greater than bottom of hole Greater than bottom of hole Linear, level 10 POTENTIAL FOR: EROSION RUNOFF PONDING Slight Slow Minimal K = 015 11 SOIL STRATA DESCRIPTION See Following chart 12. SITE PERCOLATION RATE Assume 20 inches/hour at a depth of 33" or greater below existing grade 13 FINDINGS & RECOMMENDATIONS Assume 20 inches/hour for infiltration facilities in this area Soils Strata Description Soil Log #2 Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP A 0-21 10 YR 2/1 GRViFiSaLm <5 <10 <15 1SBK CF 2-6 6 Moist Bw 21-33 10 YR 3/2 GRViFiSaLm <5 <5 <15 1SBK CF 2-6 6 Moist C, 33-48 10YR 5/4 SaGRw/Cobbles >75 SG >20 20 Moist C2 48-120 2.5Y 5/3 SaGRw/Cobbles >75 SG, >20 20 Moist SOIL EVALUATION REPORT FORM 2: SOIL LOG INFORMATION PROJECT TITLE Yelm Center SHEET 3 OF 3 PROJECT NO 97110 DATE, December 11, 1997 PREPARED BY William W Parnell, P E. SOIL LOG. #3 LOCATION See Site Plan 1 TYPES OF TEST DONE 2. SCS SOILS SERIES 3 LAND FORM Double ring infiltration Spanaway - 110 Terrace 4 DEPOSITION HISTORY 5 HYDROLOGIC SOIL 6 DEPTH OF SEASONAL HW GROUP' Glacial Outwash B Greater than bottom of hole 7 CURRENT WATER DEPTH 8 DEPTH TO IMPERVIOUS 9 MISCELLANEOUS LAYER. Greater than bottom of hole Greater than bottom of hole Linear, level 10 POTENTIAL FOR. EROSION RUNOFF PONDING Slight Slow Minimal K = 015 11 SOIL STRATA DESCRIPTION See Following chart 12 SITE PERCOLATION RATE Assume 20 inches/hour at a depth of 43" or greater below existing grade 13 FINDINGS & RECOMMENDATIONS Double ring infiltration test revealed an infiltration rate equal to 960 inches/hour For design purposes, use 20 inches/hour for all infiltration facilities with bottoms greater than 43" below existing grade Soils Strata Description Soil Log #3 Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP A 0-29 10 YR 2/1 GRViFiSaLm <5 <10 <15 1SBK CF 2-6 6 Bw 29-43 10 YR 3/2 GRViFiSaLm <5 <5 <15 1SBK CF 2-6 6 C, 43-70 10YR 5/4 SaGRw/Cobbles >75 SG. >20 20 C2 70-114 2.5Y 5/3 GRw/Si, ViFiSa <5 >75 SG >20 20 Jackets YELM CENTER DOUBLE RINGINFILTROMETER TEST December 12, 1997 SCA#97110 Completed By' Brad Shea INFILTRATION RESULTS Test Hole #1 (Depth 58") Time (seconds) Depth of Water Change in Water Level Stabilized Percolation Rate (inches) (inches) (inches per hour) 0 4 15 0 4 960 0 4 15 0 4 960 INFILTRATION RESULTS Test Hole #3 (Depth 70") Time (seconds) Depth of Water Change in Water Level Stabilized PercolatlOn Rate (inches) (inches) (inches per hour) 0 4 15 0 4 960 0 5 15 0 4 960 (Abbreviations) Textural Class Structure Grades of Structure Gravelly - GR Granular - Gr Strong -3 Sandy - Sa Blocky - Blky Moderate - 2 Loamy -Lm Platy - PI Weak - 1 Silty - Si Massive - Mas Clayey - CI Single Grained - SG Coarse -C Sub-Angular Blocky - SBK Very -V Fine - F Medium - M Mottles 1 Letter Abundance 1st Number Size 2nd Letter Contrast Few -F Fine - 1 Faint -F Common -C Medium -2 Distinct -0 Many -M Coarse -3 Prominent -P Roots 1 st Letter Abundance 2nd Letter Size Few - f Fine - f Common -c Medium -m Many -m Coarse -c (f'\text\forms\soil tbl) ~ <3 r o z 4. (j) ~ :..J ~~ n::o.. og r(fl 4.~ ~rrl ~\ ~o \ S ...- 0- ';.:;" .- 1<>;- ~ Appendix C Preliminary Drainage and Grading Plan