Storm Drainage Report STORM DRAINAGE REPORT ~ '0 FOR RITE AID LOCATED AT SOUTHWEST CORNER OF VANCIL ROAD & YELM AVE. E (SR 507) OWNER. THE BALDRIDGE GROUP 12813 FLUSHING MEADOWS DRIVE SUITE 200 ST LOUIS, MISSOURI 63131 Phone (314) 966-2300 (\ \J PREP ARED BY BUSH, ROED & HITCHINGS, INC 2009 MINOR AVE. E. SEATTLE, W A 98102 Phone (206) 323-4144 Fax (206) 323-7135 ENGINEER. BRENT D CUMMINGS I hereby state that thIS DraInage and ErOSIOn/SedImentatIOn Control Plan for RIte AId has been prepared by me or under my supervIsIon and meets the standard of care and expertIse WhIch IS usual and customary In thIS communIty for professIOnal engIneers I understand that the CIty of Yelm does not and wIll not assume lIabIlIty for the suffiCIency, SUItabIlIty, or performance of the draInage facIlItIes prepared by me ,\ ~ January 19, 1999 T ABLE OF CONTENTS i~ \.J STORM DRAINAGE REPORT PAGE 1 PROPOSED PROJECT DESCRIPTION 1 2 EXISTING CONDITIONS 6 3 INFIL TRA TION RATES/SOILS REPORT 7 4 WELLS AND SEPTIC SYSTEMS 32 5 FUEL TANKS 42 6 SUB-BASIN DESCRIPTION 43 7 ANAL YSIS OF THE 100- YEAR FLOOD 44 8 AESTHETIC CONSIDERATIONS FOR FACILITIES 45 9 FACILITY SIZING AND DOWNSTREAM ANALYSIS 46 10 COVENANTS, DEDICATIONS, EASEMENTS 73 11 PROPERTY OWNERS ASSOCIATION ARTICLES OF INCORP 74 12. OTHER PERMITS OR CONDITIONS PLACED ON PROJECT 75 c f\ U I c Section I Proposed Project Description ThIS project seeks a bUIldIng penrut for the constructIOn of a retaIl facIlIty at the southwest corner of VancIl Road and Yelm Ave E. (SR 507) A legal descnptIOn IS Included on sheet 1 of the erosIon control plan set. The total value of the Improvements proposed at the sIte IS unknown at thIS time The proposed sIte Improvements Include InstallatIOn of a retaIl store and assocIated parkIng Improvements The total ImpervIOus area of redevelopment WIll be 61,649 sf and 17,598 sf of landscapIng UtilIties WIll be Installed to serve the bUIldIng a parkIng lot. The new storm draInage faCIlIties WIll route surface draInage to a control manhole The water qualIty storm WIll be routed to a wet vault pnor to dIscharge to the Infiltration trench. All other draInage, IncludIng the roof runoff WIll be routed dIrectly to the InfiltratIOn trench. An emergency overflow pIpe WIll be extended to VancIl Road. When the CIty relocates VancIl Road and Installs It'S assocIated storm draIn system, the overflow pIpe WIll be connected to the street system to provIde a release for storm events exceedIng the 100 yr storm. c c ~ II ~ J a 0:: (ll G;:j ~ ~.: ii &1 \~ r; 0:: ,- w (' al -.. ~ ;g VJ \~ 337TH ST ;0 Cl (j) m o IV Z Cl )> < m (J) , " o w (/) a 0:: -' -' I ~ lL. ~ f:l G .,; '" ;?:;-o 123RD AVE SE .12 RD AVE SE / i o i I I,g 1998 DeLonne. i // Street Atlas USA ./ I (\ ~ o \0 ?J STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN Table IV-I. 2 Activities Checklist CHECK ACTIVITIES THAT ARE OCCURRING OR WILL BE OCCURRING (see Chapter IV-2 for the appropriate land use, and Chapter IV-5 for relevant BMPs) Uncovered vehicle parking YES 85 N() NO yc:S Indicate number of parking spaces Washing of vehicles or equipment Vehicle or equipment fueling Loading or unloading of liquid materials Storage of raw materials, byproducts or products of manufacturing processes No - NO Nt) Above-ground bulk storage of fuel, petroleum or chemicals Use of underground tanks Use of pesticides or fertilizers Livestock husbandry No - No Temporary storage of liquid or solid wastes Indicate type of waste: Dangerous/Extremely Hazardous waste Nc - No No Food wastes Used oil Other (briefly describe) Do you have or will you be obtaining a permit from the Department of Ecology to store Dangerous or Extremely Hazardous wastes? lVeJ Do you intend to connect inside drains to the public sanitary sewer? Will you be discharging process water directly to a surface watAJdJ DESCRIBE ANY OTHER OUTSIDE ACTIVITIES NOT COVERED ABOVE IV-1-9 FEBRUARY, 1992 c o 'C 4 STORMWATER MANUAL FOR THE PUGET SOUND BASIN IV-2.3.4 RETAIL GENERAL MERCHANDISE SIC: 5300, 5600, 5700, 5900, 5990 DESCRIPTION: This group includes general merchandising stores such as department stores, shopping malls, variety stores, 24-hour convenience stores, and general retail stores that focus on a few product types such as clothing and shoes. It also includes furniture and appliance stores. MATERIALS USED AND WASTES GENERATED: Of particular concern are the parking lots of shopping malls and 24-hour convenience stores. Because of heavy vehicle usage, the concentration of oil and grease in stormwater may exceed the Ecology guideline of 10 mg/l. Although there are no local data to confirm this view, limited research in the San Francisco Bay area found the mean concentration of oil and grease in stormwater to exceed lO mg/l. Larger stores may own delivery vehicles. It is likely that servicing these vehicles occurs elsewhere and is not done by the owner. Furniture and appliance stores may provide repair services in which Dangerous Wastes may be produced. Department stores and shopping malls may have restaurants that generate waste food. Source Control BMPs: See BMPs 51.10, 51.20, 51.50, 51.80, 52.00 and 52.20 in Chapter IV-4 to determine appropriate actions. Regulatory Requirements: See R.1, R.2, R.3, R.4, and R.10 in Chapter IV-5. Stormwater Treatment BMPs: Source control BMPs such as good housekeeping should always be used to control stormwater pollution. Stormwater from parking lots and outside areas where manufacturing processes occur shall be treated using infiltration and/or detention as detailed in Volume III, Runoff Control. Those practices shall be used in combination with other appropriate pre-treatment and treatment BMPs such as biofiltration, pre-settling basins and oil/water separators or equivalent (see Volume III). stormwater runoff from rooftops may be discharged to the storm drain below the treatment system as long as the drainage requirements of the local Public Works Department are met. If there is no stormwater drainage system (storm sewer) to discharge to, runoff from rooftops should be disposed of through the use of an infiltration facility wherever possible (see BMPs RI.1S and RI.16 in Chapter 111-3 of the Runoff Control Volume). IV-2-49 FEBRUARY, 1992 g ~ .... ~ In ..:; ~ .., i lC\ ! o 0 0 0 0 a :i " r g ~ c ! .. "..- Public A~cie. (tee Chopter IV-J In Technical Manual) 0 0 0 0 0 0 0 0 9- !B Ii Il [l IS E} ~ '0 , ~i gf ""I: I: ~f '0 ! 00 0 " q ~ 5' Q, 5' S' !a: I!: 0 fg !H r! g .. n' ~ g 109 H g g ... t ~ f n' n U n n .. .. r .. .. .. l' 5' 2- 2- 2- 2- '" ~ .. '2 ;XJ ~ f g 9. !Z i !Z g ~ ~ n' /I' ii, f ~ ~ ; III I: i .. ~ i n 0 .. .:; .. 5' .. i ~ ~ i 0 i g g ,. i n .. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. o Service Bu.in..... (see Section IV-2.4 In Technical Monuol) 0 0 0 0 0 0 0 0 0 0 0 11 B B Ii ~ li ~ ~ ~ ~ fi. g I: ~ ~ I: n~ I: ~2 '" ~ ~ ~ ~' 0 f 0 l?_ 5' ~. 00 il f h s." l 2 T II. 0 nit 3 ll. "" .. g- oo II ii' " n 1 I: g' ~ ! ~ j ~ ~2 g n 0 ll. g Q ... 5' ~ ;XJ .. g f 00 ~ f ~ ~ :lll ~~ [ I- i g f- a !. :i ". -- n 0 i ! .. II 0 " n g II J c 2 : 17 0 ~ 00 g II- f ~ S' , '" ~ :1 <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. ~ <.. <.. <.. <.. <.. <.. <.. ~ <.. <.. <.. <.. <.. ~ IQ - <.. <.. <.. <.. <.. <.. <.. <: N I. <.. .- <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. <.. ~- o WholelOle ond Reton Bu.in..... (/) (.ee Section IV- 2.J In Technical Manual) 0 C ::0 0 ", 0 0 0 0 0 B 0 0 0 ~ 0 VI ,.- 0 -f 8; a [} > z > R & ~ ~ & 0 z Z ~ m 0 0 f;1 0 C r Ut a Ii 'O:lll lD:U "':u :u .., .., ~ (J) :i .... ~~ .0.. .. : ~ m ~o c_ i 00 ", -" " ~o <5' 0 2 ~ 11.", 5' '" 3 '" III ~ :u .8J ~J .oJ !J g g It ~ .. .. -0 I :11. 311. fll. -II. " .. g g' t i [i o~ 9- ':;:. ~ w (J) 3.- f: .. .. ,," I: Q ", II. ooz " - I I 9 w< J;1 c ~ !l "" ~ .. ~ i Ii: g I t 0 i\" .. ~ CD g ll. ii' I' ~ c g It S. ~ .. g g ~ 0 i ~ ~ z <.. <.. <.. <.. <.. <.. <.. Fuelinll Slollon. :t <.. <.. <.. <.. <.. <.. <.. <.. Vehicle/Equipmenl Wasllinll n and Steom Oeonlnll <.. <.. <.. <.. <.. <.. loadlnll ond Unloadln9 ~1 Liquid Molerlol. <.. <.. <.. <.. <.. liquid SIOI0ge in U Abo..-Gtound Tonk. <.. <.. <.. <.. <.. <.. <.. <.. Conlolner Slor0ge of liquids. Food U Wo.I.. 01 Oon;eroue Wo.I.. <.. Oul.ide SIOIolle 01 Row Moterlol.. ~, By-Product. or Finish" Product. <.. Oul.ide =. Monuloclurlnll Actlvitie. <.. <.. <.. <.. <.. <.. <.. <.. <.. Emer9ency SpHI U Cleonup Pion. <.. <.. Vellelollon llIon0gemenl/ ;. Int89<oted Pe'l Mon098fnenl <.. <.. <.. <.. <.. <.. <.. <.. <.. Molntenonce 01 StOlm It DroineJge Fodlll.. locotinll 11Iic;1I Connection. ~. to SIOIm Droln. <.. <.. <.. <.. <.. <.. <.. <.. <.. Str..t Sweepln9 ft1 VI o c ;0 o rrI o o Z -i ;0 o r W ~ -0 III '" b o Section II Existing Conditions The eXIstIng sIte IS a 2 956-acre parcel frontIng on the south sIde of Yelm A venue East (SR 507) and the west sIte of VancIl Road. SIngle famIly resIdences border the sIte on the south and west sIdes The sIte currently contaInS two small one-story bUIldIngs on the east sIde and a one story church wIth an asphalt parkIng lot on the west sIde The eXIstIng ground cover IS mostly grass WIth trees and some brush. The SIte IS flat WIth a slIght slope down towards the southwest corner There are no storm water conveyance systems or defined draInage channels enterIng or eXItIng the SIte The church parkIng lot contaInS a mInor storm water system wIth drywells There are no publIc storm systems In the streets frontIng thIS property It IS assumed that runoff from thIS parcel dIscharges via InfiltratIOn to the ground water c c 7 o Section III Infiltration Rates/Soils Reports InformatIOn and InfiltratIOn results follow In thIS sectIon c c 10 (0 (0 JUL-Ui-9H WED U4:44 PU KLI=.lNFI:.LDE~ rAX NO. 4~~~~~4~Ui P. UilU4 g m kLEINFELDER 2405 - 140th Avenue Northeast, Suite A 101 Bellevue, WA 98005 Transmittal Cover Sheet Original OWiIl I2IWiIl not follow DATE: July 1, 1998 FILE NO. 60-1742-02 PHONE: FAX: (206) 441..a372 PHONE: (206) 562-4200 FAX: (206) 562-4201 TO: Mr. Wayne Miller Mulvanny Partnership FROM: Gary D. Beckham KJeinfelder, Inc. RE: Rite Aid Store #5286, Infiltration Tests cc: Mr. Brent Cumminge, 8RH Enginooro, Fax (208) 323-7135 Number of pages including cover sheet:4 Message: Enclosed please find the results of our infiltration tests for the storm water system at the above property. According to our test results, it is our opinion that the southern portion of the property south-adjacent to the south driveway is suitable for the discharge of storm water. The soil types tested are the sandy gravel and gravelly sand which are present below a depth of 4 feet at the location ofPerc.l and 1.3 feet at the location of Perc-2. The infiltration area should be completed in these units and not in less permeable soils if possible. Locations of excavatIOns for Perc-l and Perc-2 are shown on the attached map. At your request we observed conditions in the shed in the southwest portion ofthe site and noted well casing and other equipment suggesting past use as a well house. Also note that capped well casing was observed in the planter at the southwest comer of the church building and that the locked shed west of the residence in the southeast portion of the site is a well house according to the resident at the east.adjacent property. fsxcvr.doc JUL-01-98 WED 04:44 PM KLEINFELDER FAX NO. 4255624201 P. 02/04 r III KI FINFFlOER (e PERCOLATION TEST DATA FOR1"I Percolation t~s: I.oc"tion f,.~l'ovJ Hry.,. -A:rI .$~~ 5,'>fr.; Sf:/~ Ale ~R 507) p.f!:'-&~/lltd. Test hole nurrber ~-I Depth to bottom of hole bD inches Diameter of hoh~~inches DeDth. inchec; Soil texture f) -- I-f S~ aJ - 'I - L~~~ If:) -t:J ..Stu , 11- 'f~ Pk. 8f"(?"""" Soa.v/ ;I ~t!ff.e.'\ - Nee!. ~~ ~'f-~O t.. f-, 8Y'01t)lI'\ ShJ7 t; ,,,,up 1 - ppl1s.e , , e Percolation test by t(/ , S ~ Lew!.$t Date of test 7 / l'> I /9td" , Time Time Measure- Drop in Per~ola- l{emarks Interval, ment, water level, tlOn rate, minutes inches inches minutes nerinch 'jato 3D - SbA A-,..,~ - 10 ^_llb:'" 'f) , 11 IS- ~rrT v - /D:,oz, I J 7.. h, ")...].;;. ..34:> 10 ~ , 3 Z- , I J..v ,~ .%. I 10: 3:- ~,.~ 0 IS I , ~D I I !\ ~ Percolation ratc= I. SO minutes per inch. UUL. VA VU nL..V V, ,"" III I\.L.L..Anl1...i-UL..1\. .I l.IIl nv. 'L..""""V'-'L..U!. .I. U"", V'" /0 Nt klEINFElOER c PERCOLATION TEST D.o\TA FOR"I Percol~~.on t~$~ Locarion r~ 1i,Y.~ AI;! Sib.-e / SR.t;"07 ~w1 tJAMdl IIj Test hote nuti'b~r p.pr~ '7- Depth to bot:oi7. of rol~ &f~ inches Diameter of nol~~inches. Depth. ir.ch~1) Soil r~xtur~ D-1 if --/(p Ih - 0/8' .$od tI!I...d' ~,D;-~~,' I -- Lorn ~~ , 13 Y"i!>WII1 SaJy L"",-. -- MrJ De....s.~ l-rf Brt'J""vt t9rt!Jvel/v .$6'",cf) / 'C . Percolation test by tI/. S. l-ew r.s Date of test 7 / () 1/9 '8'" I Time Time Measllre- Drop in Percola- Remarks Interva! , ment, water level, tion rate, minutes inches inches minutes nerinch (j') · "In '-- ("""" SN)!t- - /c:> t:q/~ ll_ ~o /"". IS - S70r"t ... I'---- ":0 ') , 9--:- b-; f).11r lI:or 7- I 7:;;" 7~ I II: I t;r' 1...1;. 0 ,-" If). {nS I c Percolation rate= O. (,..3 minutes per inch. KLEINFELDER F AX NO. ~25582~201 P OMO~ 1/ I C I I I ~S ',y !~ .~ r- ~ 0)' ~ . "-- ~ r- ~ b " ~I , !-- , --... s: , ~ . ~1 ;.Q, .. PA~<I' ~ ;-- ~~- I C - I ~TAIL SPAGE 16.""5C 9' ~ ! I e~~ I "'f!!' ~ ", C' OM~ 9'" ~ .I, I' BI ~T~ "..-;,r~ ...: :- v T . ~4 ---... D I -r;:-;-' i I ~ I~ I~. I ~7)'_ ~ c. 24' ~.Z- ~. ~ !-G' . ~ --.J "j fer. A. S ';' - --. ~Oi)i. So:' I ~ I I I l <? i . ~~7- 11tr!'Q. l3 -7.p,.. ~) OA~ - YELM ~ -0' HCflnt \J [7 o 30' ~O' :~~ 2~ '? ~,c\L~' . I I /c I I I I I I I I'C I I I I I I I ,i C I ,;A RlKLEINFELDER /2- Report of Geotechnical Investigation Proposed Rite Aid Store - MP #97-327 State Highway 507 & VaneH Road Yelm, Washington Prepared For' Baldndge Development Group, L L C Copyright 1997 Kleinfelder, Inc. All Rights Reserved Unauthorized use or copying of this document is strictly prohibited. See "Application For Authorization To Use" located at the end of this document if use or copying is desired by anyone other than Client and for the project identified above. 6O-174202J:\I~17rI2J.doc CopyrisJa 1997 KlciaCeIder. Jnc. ~'~.8~:!i' I I Ie I I I I I I Ie I I I I I I r to I KJ;~t!~.~t/.i~:'J,j. -L. III KLEINFELDER /3 TABLE OF CONTENTS PAGE ~"~<:{J1rI1V~ S~~l{ ..............................................................................1 1.0 IN'TRODUCTION A.ND SCOPE ..... ...... ..... ...... ............. ............... ................ 1 1 1 ProJect DeSCrIption 1 2 Purpose and Scope 1 2.0 FIELD EXPLORATION AND LABORATORY TESTING ................................. 2 2 I Field Exploration 2 2 Laboratory T estmg ., 3 3.0 SITE CO!'.'UITIONS ............. ................................... ............ ..... ................3 3 1 Site Geology 3 2 Surface Conditions 3 3 Subsurface Conditions 3 4 4 4.0 CONCLUSIONS.............. ............................. .................... .......................4 5.0 RE C OI\'Th lEND A TIONS .................................. .................................. ........5 5 1 Site ClearIng and Preparation 5 2 Earthwork 5 3 Temporary ExcavatIons 5 4 Foundations 5 5 Concrete Slab-on-Grade Construction 5 6 Pavement Sections 5 7 Other Dramage ConsIderatIons 5 6 6 7 8 8 9 6.0 ADDITIONAL SERVICES............. .................................................... ........9 6 1 Plan ReVIew 6 2 Project BId Documents 63 ConstructIon Observation and Testmg. 9 9 10 7.0 ~~II1r~1rI()~5; ......................................................................................10 PLATES Plate 1 Site LocatIon Map Plate 2 SIte Plan APPENDICES A Bonng Logs Al Bonng Log Legend A2 Key to Soil ClassIfication and Terms AJ-A5 Bonng Logs B ApplIcatIon for AuthOrIzation to Use 6O-174202\1:\I997\wpdraft~ 17r121.doc Copyright 1997 Kleinfelder.lnc. Page i ofi Printed: 10/09/97 'j- .~'(" ;' ... "- .' ~.' . . .. ..:t.k.f.i~.:...\f'.i:~., ~~4.f ., ~"i~i'r: -- - I I lie I I I I I I Ie I I I I I r ,0 I , .;I;{,,: III KLEINFElDER /'1- EXECU11VES~RY In response to your request, KleInfelder has completed a geotechmcal InvestigatIon related to the desIgn and construction of a proposed new RIte AId store located at the southwest comer of State Highway 507 and Vancil Road In Yelm, WashIngton as shown on the Site Location Map, Plate 1 Based on the results of our InvestIgation, the site IS sUItable for the proposed construction from a geotechnIcal perspective Key deSign Items are summanzed below, and are discussed In greater detail In the body of thiS report ThIS summary IS Intended for Introductory and reference use only A thorough reading of the entire report IS essential to develop an understandIng of the total deSign concepts and limItations Soils: The results of the subsurface explorations Indicate that the project site IS underlaIn by medIUm dense to very dense sand and gravel with vanable sIlt content and occasIOnal cobbles. BOflng locations are shown on the Site Plan, Plate 2 The bonng logs are presented In AppendiX A. With the exception of the asphalt base course and gravel fill indicated on the bonng log for B- 2, no eVIdence of fill was encountered In the bonngs Groundwater: Groundwater seepage was not encountered In any of the bonngs at the time of drIlling. Site Earthwork Recommendations: We expect that over the majorIty of the SIte, It WIll be necessary to strIp only the eXIstIng asphalt and topsoIl prIor to subgrade preparation Near surface solis encountered below the asphalt and base course generally have a hIgh proportIon of fines and WIll therefore be mOisture sensitive If possible, we recommend that grading and filhng be performed dunng perIods of relatively dry weather The exposed subgrade should be proof rolled (or probed) and compacted before any new fills are placed Site cleanng and preparation recommendatIOns are prOVided In SectIOn 5 1 If site clearIng, preparatIOn and earthwork must take place dunng wet weather, recommendations are proVIded In Section 5 2 for earthwork dUrIng wet weather constructIOn. Structural Fill: The on-SIte solis below the topsoil and/or eXisting pavement are generally SUitable for use as structural fill dUrIng dry weather and proVIdIng that mOisture contents are adequately controlled. However, the near surface soils have a high proportion of fines and may reqUire mOIsture condltIOrung to achieve speCified compactIon levels. The use of Imported crushed rock or pit run sand and gravel may be reqUired If construction proceeds dUring wet weather All Imported structural fill for placement dunng wet weather should consist of well- graded sand and gravel WIth less than 10 percent fines (portion paSSing the No 200 sieve) See SectIOn 5 2 Compaction: All natIve or Imported structural fill placed for support of the proposed buildmgs should be compacted to at least 95 percent of the MDD (maximum dry denSity), as determIned by the ASTM D-1557 test procedure. Fill placed In areas to receive new pavement should be compacted to at least 95 percent of the ~D to a depth of 2 feet below grade Beiow thiS depth, fill should be compacted to at least 90 percent of the MDD Waste fill In landscapIng areas need only be compacted to the degree reqUired for trafficabihty of construction equipment. 6O-174002I6017RI21 Copyright 1997 Kleinfelder. 1nc:. Page 1 of2 Prinled: 10109197 ... II il il'O il !I :11 'II il II il e il II 1! ill I ,I 1,1 ,'- II ilo II I~~&$," III KlEINFElDER IS- Slopes: No slgruficant permanent cut or fill slopes are anticipated for this project. Temporary Excavations: We anticipate that temporary excavations can be accomplIshed at this site uSing conventIOnal equIpment The soils encountered are consistent wIth a Type C soil when applymg the OSHA regulations on sloping and shonng excavatIOns See Section 5 3 Building Foundations' Based upon the s01ls encountered, shallow spread foundations can be used for this project provided footing excavatIOns are prepared In accordance WIth the recommendations prOVIded In Section 5 4 Individual column footings with loads up to 60 kIpS and rrurumum wIdths of 24 Inches and continuous stnp footings with loads up to 3 laps per foot and minimum widths of 18 Inches may be deSigned for beanng pressures up to 3,000 pounds per square foot. ThIs allowable s01l beanng pressure applIes to dead and long-term lIve loads, and may be Increased by up to one-third for wind or seismiC loading conditions For frost protectIOn, exterIor footings should be founded a minimum of 18 Inches below lowest adjacent grade, Intenor footIngs should have a rrummum embedment of 12 Inches Total settlements are not anticIpated to exceed 1 Inch, WIth less than Y2 Inch of dIfferential settlement between adjacent footings. See SectIon 5 4 Slabs-on-Grade: We recommend that floor slabs be underlain by a minImum 4 Inch thick layer of free drainIng sand and gravel fill An Impermeable membrane should be Installed If mOisture sensitive floor covenngs are used See Section 5 5 Seismic Hazards and Design: The project SIte IS located withIn Zone 3 on the SeismIC Zone Map of the UnIted States, Plate No 16-2 In the 1994 edition of the UBC (Umform BUilding Code) The site coeffiCIent used In calculating seismiC forces on structures IS based on SOil profile type ThiS relatIOnship IS Indicated In Table 16-1 of the UBC Based on the subsurface conditIons encountered In the bonngs and on our understanding of the geology In the VICInity of the Site, we conclude that the appropnate s01l type IS S2 With a corresponding "s factor" of 1 2 Pavements: We recommend that the prelIminary deSign pavement sectIon In automobIle parkIng areas consist of 2 Inches of Class B asphalt concrete and 4 Inches of crushed rock base course In truck traffic areas, the thIckness of Class B asphalt concrete and crushed rock base course should be Increased to 3 Inches and 6 Inches, respectIvely See SectIon 5 6 for a more thorough dISCUSSIon of Pavement recommendatIons. 60-174002160 17R 121 Copyright 1997 K1cinfeldcr.Inc. Page 2 of2 Printed: 10109197 -_. {~~::~f!~~i~~;~~ ;~~ ~ - I I .e I I I I I I lie I I I I. I ~ r e r ~~ii:~:, III KLEINFELDER I' REPORT OF GEOTECHNICAL INVESTIGA nON PROPOSED RITE AID STORE - MP #97-327 STATE HIGH\VAY 507 & VA~CIL ROAD YELM, ".-\SHINGTO:\' 1.0 INTRODUCTION AND SCOPE 1.1 Proj ect Description ThIs report presents the results of our geotechnical mvestlgatlon for the proposed RIte AId store In Yelm, Washmgton. The approxImate location of the project site IS shown on the Site Location Map, Plate 1 We understand that the project wIll Include construction of a 16,730 square foot, one-story buildIng. We further understand that the buIldmg may be of masonry construction and that the floor wIll be constructed at grade Structural loads for the buIldIng are not known at thiS tIme. For the purpose of thIS report, we have assumed that IndiVIdual column loads WIll not exceed 60 laps per column and that wall loads WIll not exceed 3 kips per hnear foot. Paved parkmg stalls, paved Intenor roadways plus landscapIng, utIlItIes and other appurtenant features WIll be located adJacent to the buIlding, The scope of geotechmcal and envIronmental services for the subject RIte AId store In Yelm IS described In our WrItten proposal for these services Verbal authonzatlon to proceed WIth thIS work was gIven by Mr Wayne Nliller of the ~lulvanny Partnership Because of the very short tIme frame avaIlable to complete work on the site, Mr Miller requested that we contmue to prOVIde servIces based on hIS verbal authonzatlon All work for thIS proJect has been performed In accordance with our proposed Master Services Agreement WIth the RIte AId CorporatIon dated June 19, 1997, In accordance WIth the verbal authonzatlon from Mr Miller 1.2 Purpose and Scope The purpose of thIs investIgation IS to evaluate the subsurface soil and groundwater condItIons at the project SIte, and to develop geotechnIcal recommendatIOns and cntena for project desIgn and constructIon. Our specIfic scope of servIces Includes the followmg tasks 1) Collect and reVIew readIly avaIlable geotechmcal and geologIC data for the project area. 2) Perform a geotechmcal sIte reconnaIssance pnor to the subsurface investIgatIon. 3) Plan and conduct a subsurface Investlgatlon consIstIng of advancmg three hollow stem auger bonngs to depths rangmg from 6 5 to 13 feet to proVIde InformatIon relatIve to SOIl, groundwater, and other geologIC condItIons m the VICInIty of the proposed development 60-174002160 17R121 Copyright 1m K1einfelder.1nc. Page I of II Printed: 10109197 ~1:~.w;' I I .0 I I I I I I Ie I o '~""""":"+~"'-.._-_..,--~,-,- III KLEINFELDER 17 4) Conduct limIted laboratory testmg m general accordance WIth appropriate Amencan Society for Testmg Matenals <ASTM) standards to check the VIsual soil claSSIfications and to provIde estImates of engIneenng parameters necessary for geotechnIcal deSIgn. 5) Based on the field exploratIOn and laboratory testIng programs, prOVIde diSCUSSIons and recommendatIons regardmg the folloWIng . RegIOnal geology and seismIcIty; . General site surface and subsurface conditions, . Shallow foundatIon deSign Includmg soIl contact pressures, embedment depths, resIstance to lateral loads, and settlements, . Earthwork constructIon includIng SIte preparatIon, fill placement and compactIon, . AntIcIpated e:-..cavatIOn conditions, . Sod slopes, . Subsurface dramage's, . Pavements, . MitigatIon of deletenous soIl condItions, If appropnate 6) Prepare a report summanzIng the results of our subsurface exploratIon program, and our analysIs and recommendatIons ThIs geotechrucal InvestIgatIOn report does not mclude an assessment of eXIstmg or potential envIronmental concerns assocIated WIth thIS site The envIronmental servIces proVIded by Klemfelder have been submItted under separate cover 2.0 FIELD EXPLORATION AND LABORATORY TESTING 2.1 Field Exploration The subsurface condItions at the proJect sIte were explored by dnllIng 3 test bonngs at the locatIons shown on Plate 2 ExploratIons were located In the field by measunng or estlmatmg distances from eXistIng sIte features. 60-174002160 I7R 121 Copyright 1997 Kleinfelder, Inc. Page 2 of II PrinIcd: 10109197 :,i.. " ---.------.~ /0 t 1 - I I I I o l i I 8 I I I 10 I The test bonngs were drilled on September 29, 1997 to depths rangmg from 6 5 to 13 feet below eXIstmg grade. The bonngs were advanced usmg a truck-mounted, hollow stem auger drill ng. RelatIvely undisturbed samples were obtamed from the bonngs usmg a 2-mch-outslde-diameter standard penetratIon split spoon sampler The sampler was dnven mto the soil WIth a 140-pound hammer free-falling 30 mches. The number of blows reqUIred to dnve the sampler the last 12 Inches, or other mdicated dIstance, IS recorded on the bonng logs It Plate AI presents a bonng log legend (AppendIx A) The test bonngs were mOnItored by an engmeer from our firm who mamtalned detalled logs of the explorations and obtamed representatIve samples of the SOIls encountered for further exammatlon m our laboratory The solis encountered were vIsually classified In accordance wIth the classIfication system described In Plate A2 The bonng logs are presented on Plates A3 through AS After the bonngs were completed, they were backfilled wIth excavated soIl usmg the equIpment at hand In areas where the eXIstmg ground surface was asphalt, the bonngs were sealed wIth concrete 2.2 Laboratory Testing RepresentatIve soli samples obtamed from the Standard Penetration Sampler were returned to the Klemfelder laboratory for further exammatlon and testmg to retine the field claSSIficatIons and to evaluate phYSIcal propertIes of the SOIls whIch may affect the geotechnical aspects of project deSign and constructIon. The laboratory testIng program mcluded the followmg . MOIsture content tests In general accordance WIth ASTM Test Method D 2216, The results of the mOisture content tests are mcluded on the bonng logs In AppendIx A. 3.0 SITE CONDITIONS 3.1 Site Geology The entIre project SIte IS underlain by glaCIal outwash SOIls, mapped as Vashon outwash gravel by the WashIngton DIVISIon of Geology and Earth Resources. These soIls are thought to have been deposited dunng the late PleIstocene Vashon Stade some 12,000 to 18,000 years before present. Several feet of sIlty sand SOIls overly the relatIvely clean glaCIal outwash sods No surface faults are mapped WIthm the ImmedIate SIte VICInIty However, several normal faults and an antIclinal ndge have been mapped approxImately 9 mIles southwest of the sIte 60-174002160 17R121 Copyright 1m K1cinfclder. Inc. Pagd of 11 Printed: 10109191 I I 10 I I I I I I Ie I I I I I e III KLEINFELDER /1 3.2 Surface Conditions The project site IS located at the southwest corner of the Intersection of State Highway 507 and VancIl Road In Yelm. WashIngton, The site currently contaInS one reSidential structure. one vacant antIque sales bUSIness. and a church The site surface topography IS relatively flat The ground surface surrounding the church IS paved The ground surface surrounding the other structures IS covered WIth tOpSOIl. gravel. and/or grass. 3.3 Subsurface Conditions The results of the subsurface explorations Indicate that the project site IS underlaIn by medIUm dense to very dense sand and gravel with vanable sIlt content and occasional cobbles Bonng B-1 encountered medium dense silty sand WIth vanable gravel content to a depth of approXImately 4 5 feet. B-1 encountered very dense sand WIth lesser amounts of sIlt and occaSIOnal gravel from 4 5 to 6 5 feet. Bonng B-2, In the proposed budding pad area. encountered dense gravel fill WIth silt and occaSIOnal cobbles to a depth of 2 feet From 2 to 7 5 feet and from 12 to 13 feet, B-2 encountered very dense sand WIth gravel. sIlt and occasional cobbles From 7 5 to 12 feet B-2 encountered dense sIlty sand With gravel and occaSIOnal cobbles B-2 was terminated at 13 feet due to refusal on a cobble The soIl profile In B-3 conSisted of very dense sdty sand With gravel and occaSIOnal cobbles to a depth of 5 feet From 5 to 6 5 feet. B-3 encountered medIUm dense sand With Silt, gravel and occaSIOnal cobbles No groundwater seepage was observed In the bonngs at the time of dnllIng. 4.0 CONCLUSIONS It IS our opinIOn that the proJect site can be satisfactorily developed as planned USIng standard construction practIces The SIte gradIng plans were not available at the time thIS report was wntten. Although not encountered In our test bonngs. loose fill or surfiCial SOils may be encountered dunng grading actIvItIes. These loose matenals, If encountered, will reqUire removal and replacement WIth compacted structural fill Other areas of the site Will reqUIre stnpplng of the upper 0 5 to 1 foot ofloose surfiCIal soils (topsoil) and/or asphalt We recommend that all foundatIOns for structures bear on the medIUm dense to very dense native soils, or on a zone of structural fill which extends down to the medium dense to very dense native SOils. BuildIng slabs. dnveway and parkIng area pavements should be supported directly on the medium dense to very dense native SOils or on structural fill Sods that WIll be excavated from cuts are generally expected to be satisfactory for use as structural fill. However, the soils that WIll lIkely be encountered In the excavations have a relatively lugh fines content and are therefore mOisture-sensitive It Will be difficult, If not 60-174002160 17R121 Copyright 1997 K1cint'elda'. Inc. Page 4 of 11 i'rinud: 10109197 \i:~~~j4\ i :'~'.~)..~...:. ~::' . . '0 . . . . . rI ~c I I I I I I I 10 I III KLEINFElDER ~ Impossible, to properly compact these soils dunng excessIvely wet conditions. Therefore, It will be preferable to schedule sIte earthwork for extended penods of dry weather m order to nurunuze earthwork costs We also recommend that all surface water runoff entenng the sIte be collected and tlghtlined, or otherwIse channeled, to a sUitable discharge pOint to avoId pondmg of water on the sIte SpeCIfic recommendatIons for project deSIgn and constructIon. includIng mitIgation of potentIal problems described above, are presented In SectIOn 5 0 5.0 RECO:\nIENDA TIO~S 5.1 Site Clearing and Preparation We recommend that all sod and topsoIl be removed from buddIng and pavement areas Any eXIstmg fill In buildIng areas that does not meet the reqUirements for structural fill should be removed and replaced We expect that the eXIstIng asphalt concrete pavement may be left m place, except wIthIn the buIldmg footpnnt. All detenorated or damaged pavement areas should be repaIred or replaced It should be antIcIpated that underground vaults or tanks may be present at the sIte If these structures are to be abandoned, they should be overexcavated and backfilled with structural fill to desIgn subgrade elevatIons We recommend that sIte c1eanng and preparation be completed dunng pen ods of dry weather to mmlnuze related costs. Areas that are stnpped or excavated to deSIgn sub grade elevatIOns, or are to receIve structural fill, should be proofrolled wIth heavy, rubber-tired constructIOn eqUIpment (such as a dump truck or large roller compactor) Soft, loose or otherwIse unsuItable areas IdentIfied dUrIng proofrolhng should be repaIred as appropnate We recommend that proofrolhng of the subgrade be observed by a representatIve from our firm to assess the adequacy of subgrade condItIOns, and to Identify areas needmg remedIal work. We recommend this procedure not be performed dunng wet weather DUrIng wet weather, systematIc probmg should be used to evaluate the subgrade Instead of proofrolhng, Temporary constructIon access roads and/or workIng pads conslstmg of clean sand and gravel, crushed rock or A TB (asphalt treated base) may be needed to support construction traffic on the sIte dunng wet weather We expect that the eXistIng asphalt concrete pavement may be left In place, except wIthm the buildmg footpnnt and at the locatIons of other structures. All detenorated or damaged pavement areas should be repaIred or replaced 60-174002160 17R 121 Copyright 1997 KJcinfcldcr.lnc. Page S of 11 Printed: 10109197 II II 10 I I I I I I .e I I I I I I I Il 0 I III KLEINFElDER '2-1 5.2 Earthwork Based on the subsurface conditions encountered m the explorations, we expect that all of the soils on the site can be excavated wIth conventional excavatmg equipment. Cobbles and boulders may be encountered at the site, and the contractor should be prepared to deal with large-sIzed matenal. New fill for the project may be Imported or may come from cuts mto the eXIsting site solis Much of the sod In these cuts (with the exception of top sod) are generally expected to be satisfactory for use as structural fill However, some of the soils that will likely be encountered In the excavations have a relatively high fines content and are therefore mOisture-sensitIve (Note that fines m thIS report are defined as that portIon of the soIl passmg the U S Standard ~o 200 sieve) It will be dIfficult, If not Impossible, to properly compact soIls with high fines contents dunng excessively wet conditIOns Therefore, It WIll be preferable to schedule site earthwork for extended penods of dry weather m order to mInImIZe earthwork costs All Imported structural fill for use dunng wet weather should consist of welI-graded sand and gravel with less than 10 percent fines (portion passing the No 200 sieve) As the amount of fines (portion passing the No 200 sieve) mcreases, the sod becomes increaSingly senSItive to small changes In mOisture content and adequate compactIOn becomes more difficult to adueve, partIcularly dunng wet \\ eather GeneralIy, soIls contammg more than about 10 percent tines by weight cannot be properly compacted when the mOisture content IS more than a few percent wetter than the optimum mOisture content All structural fill matenal should be free of orgaruc matter, debns and other deletenous matenal, with no indiVidual partIcles larger than 3-mches m maXImum dImenSIon All native or Imported filI should be placed as compacted structural filI folIoWIng proof rolling. probmg, and remedial work on the subgrade, as appropnate The filI should be placed m honzontal lifts not exceedmg 10 Inches In loose thIckness, each lift must be thoroughly and unIfonnly compacted to an unYielding condition uSing mechanIcal equipment. All native or Imported structural fill placed for support of the proposed buildmgs should be compacted to at least 9S percent of the MDD (maxImum dry denSity), as determIned by the ASTM D-1SS7 test procedure Fill placed In areas to receive new pavement should be compacted to at least 9S percent of the MDD to a depth of 2 feet below grade Below thiS depth, backfill should be compacted to at least 90 percent of the MDD ThiS Includes utility trench backfill In pavement areas Waste fill In landscaping areas need only be compacted to the degree reqUIred for trafficabdlty of construction eqUIpment 5.3 Temporary Excavations We anticipate that excavations for footings and utility trenches can be readIly made With a conventional backhoe or excavator We expect the walls of these trenches to stand near vertically for a short penod of tIme Without signIficant sloughing, If trenches extend deeper than four feet, or If loose soils or groundwater seepage are encountered, 60-174002160 17R121 Copyright 1997 KJeinfcldcr. lnc. Page 6 of II Printed: 10/09197 "'''f' L ';'l"'~:!',~:,~..-'c4 ...;\ '~7::'w~~ i, '" ,," .' ~.. ' J _~ ~,",: A~)']}';1~'" (>;' . ~;.. 'I ~'~ }):!;&"l;;' ~.. ~ ~" .".' l ~. _#. .. ... . d"l ~ ~ r " ''1 '* ~ . , ~, .,. .... ~ . - '''' J::..~ ~" .. " 4' I I 10 I I I I I I Ie I I I I I I I 10 I III KLEINFElDER ~z the excavations may become unstable and should be evaluated to venfy their stabIlity pnor to occupation by construction personnel Shonng or slopmg of deeper trenches may be necessary to protect personnel and provIde temporary stabilIty -\II excavations greater than 4 feet depth should be sloped to 1 SH.l V (honzontal to vertical) to comply with current OSHA and WISHA safety requirements for Type C sOils Dunng wet weather, runoff water should be prevented from entering excavations Water should be collected and disposed of outSide the construction lImits Heavy construction equipment, buIldmg matenals, excavated soil, and vehicular traffic should not be allowed In close proxImIty to the excavatIOns 5.4 Foundations We recommend that the new buildIng be supported on spread footIngs that are founded on the medIUm dense to dense native soils, or on a zone of structural fill which extends down to these competent native sOils. Where used, the structural fill should be compacted to at least 95 percent of the maxImum dry denSity (as determIned In accordance wIth ASTM D- I 5 S 7) ContInUOUs wall footIngs and IndiVidual column footmgs should have mmlmum Widths of 18 and 24 Inches, respectively For frost protection. extenor footmgs should be founded a mInImUm of 18 Inches below lowest adjacent grade. mterlor footmgs should have a mmImum embedment of 12 Inches Spread footIngs may be deSigned usmg an allowable beanng pressure of 3000 pounds per square foot (pst) for support on structural fill or on the medIUm dense to very dense native sods These allowable sod beanng pressures apply to dead and long-term lIve loads, and may be Increased by up to one-thIrd for wmd or seIsmiC loadmg conditions We estImate that the total settlement of spread footmgs, founded as recommended, will be less than I mch, wIth less than 0 5 Inch of differential settlement between adjacent footIngs Loose fill or dIsturbed SOli not removed from the footIng excavations pnor to pourIng concrete may result In Increased settlement. The footmg subgrades may possibly be susceptible to disturbance when wet It may be necessary to pour a lean concrete "mud mat", or place a layer of crushed rock or clean sand and gravel on the bottom of the footIng excavations, to protect the footmg subgrades from water and/or wet weather dUrIng reInforcement bar placement and preparation for plaCIng concrete We recommend that the condition of all footmg excavations be observed by a representative from our firm prIor to placement of concrete to confirm that the beanng soils are undisturbed and that the conditions and constructIon methods are consistent With our recommendations The project SIte IS located wtthIn Zone 3 on the Seismic Zone Map of the Umted States, Figure No 16-2 In the 1994 edition of the UBC (Umform Buddmg Code) The site coeffiCient used In calculatIng seismIC forces on bUIldIngs IS based on soil profile type. ThiS relationshIp IS Indicated In Table 16-J of the UBC Based on the subsurface conditIOns encountered In the bOrIngs and on our understandmg of the site geology, we conclude that the approprIate overall soil type IS S2 WIth a correspondIng "s factor" of 1 2 60-174002160 17RI21 Copyright 1997 Kleinfelder. Inc. Page 7 of 11 Printed: lOIf19I97 ~~: t;;.i.' ~, ~ ::"c . III aJ I- ,I. I. . I .. )I ~ &.,0 L. ---. III KLEINFElDER ~3 The abilIty of soil to resist lateral foundation loads IS a function of the mctlonal resistance wtuch can develop on the base and the passive resistance which can develop on the face of below-grade foundation elements as they tend to move mto the soil For spread footIngs founded on structural fill placed and compacted m accordance with our recommendations, or on undisturbed native soils, the allowable fhctlOnal resistance may be computed usmg a coefficient of mctlon of 035 applied to vertIcal dead-load forces The allowable passive reSIStance on the face of footIngs or other embedded foundation elements may be computed usmg an eqUivalent flUid denSity of 225 pounds per cubic foot (pet) (tnangular distribution) for medIUm dense on-site soils. Alternatively, passive pressures may be computed USIng an equivalent flUid density of 350 pcf for dense native soils and structural fill, proVIdIng all structural fill extendIng out from the face of the foundation element for a distance at least equal to two and one-half times the height of the element has been compacted to at least 95 percent of maximum dry denSity (ASTM 0-1557) The above coefficient of fnctlon and passive equivalent flUid denSity values mclude a factor of safety of about 1 5 5.5 Concrete Slab-on-Grade Construction We recommend that floor slabs constructed on-grade be founded on a mImmum thIckness of 4 Inches of clean sand and gravel (less than 5 percent fines) to provide umform support and a capillary break. It may be possible to support floor slabs directly on the natIve SOlIs If these soils meet the above cntena. In floor slab areas where mOIsture sensitive floor covenngs are planned, an Impermeable membrane (e g. polyethylene sheet) should be placed over the zone of free-dramIng matenal to reduce the mIgration of mOIsture vapor through the concrete slab The Impermeable membrane should be protected by two Inches of fine, mOist sand placed both above and below the membrane The sand cover will proVide protectIon for the membrane and will promote uruform cunng of the slab concrete The sand cover should be mOistened and tamped prIor to slab placement. 5.6 Pavement Sections We expect that the eXIstIng asphalt concrete pavement may be left In place, except wIthm the buildmg footprInt and at the locations of other structures. All detenorated or damaged pavement areas should be repaired or replaced. The follOWIng paragraphs proVIde recommendatIOns for new pavement areas, mcludmg patchmg of detenorated and dIstressed areas We recommend that the subgrade In new pavement areas be probed or proof rolled wIth heavy rubber-tired construction equipment pnor to pavmg. Any soft, loose or otherwise unsUitable areas should be recompacted, If practical, or removed and replaced with structural fill. We recommend that the probIng or proofrolhng of subgrade areas be observed by.a representative of our firm to Identify areas needmg remedIal work and to assess the adequacy of subgrade conditions. 6O-17400216017R12I Copyright 1997 Kleinfeldcr-. Inc. Pag,: 8 0(11 Printed: 10109197 'I II 11(0 II fl II I II . . I '0 'I I I I I I I I 10 I L ,,", . j .-....- "- III KLEINFELDER 21- We recommend that the design pavement section m automobile parlang areas consist of 2 mches of Class B asphalt concrete, and 4 mches of crushed rock base course overlymg a subgrade whIch has been compacted to at least 95 percent of the rvIDO (ASTM 0-1557) to a mInImUm depth of 12 Inches In truck traffic areas, the thIckness of Class B asphalt concrete and crushed rock base course should be mcreased to 3 mches and 6 mches, respectively An appropnate thickness of A TB (asphalt treated base) may be substItuted for a portion of the crushed rock base course, If deSIred The substItution of A TB for crushed rock base course wIll prOVIde a Similar structural section, but Improve trafficabillty over the areas to be paved pnor to placement of the Class B asphalt pavement. Our recommendations for pavement sections are based on dry \\ eather constructIOn conditions If the pa.... ement areas are constructed dunng extended penods of \\ et weather, a 6 to 12 mch layer of compacted sand and gravel may be reqUired A separation laver of geotextile fabnc may be used between the sub grade soils and the layer of clean sand and gravel to mmlfruze the thickness of select matenal reqUired In areas of soft or disturbed subgrade soils The geotextile fabnc should be a heavy duty. non-woven matenal 5.7 Other Dramage Considerations We recommend that the ground surface adjacent to buildmgs be sloped to dram surface water away from the structures Roof drams should be connected to a collection and dIsposal system whIch IS mdependent from the wall and footmg drams As a precautionary measure, we recommend that footmg drams be mstalled around the perImeter of the buildmg. The footmg drams should consist of a mmlmum 4-mch perforated ngId-wall dram pipe embedded m a zone of free-draInIng sand and gravel contammg less than 3 percent fines The zone of free-drammg materIal should be at least 24 mches thIck (measured hOrIzontally) and extend from near the base of the footmg to wIthm 1 foot of the finIshed ground surface The perforated dram pipe should be Installed near the base of the footmg, and sloped to dram mto a SUitable collectIOn and dIsposal system. 6.0 ADDITIONAL SERVICES 6.1 Plan Review We recommend that our firm be given the opportUnIty to reVIew the geotechnIcal aspects of the proJect plans and speCificatIons after the deSign has been finalIzed to confirm the applIcabilIty of our recommendatIons, or to make the appropnate modifications It IS possible that thiS reVIew might mdlcate the need for supplemental geotechmcal analYSIS, dependmg on the Issues mvolved 6.2 Project Bid Documents It has been our expenence dUrIng the blddmg process that contractors often contact us to discuss the geotechmcal aspects of the project. Informal contacts between Klemfelder and an mdivIdual contractor could result m mcorrect or mcomplete mformatlon bemg prOVIded to the contractor Therefore, we recommend a pre-bid meetmg be held to answer any questions about the report 60-174002160 17R 121 Copyright 1997 Klcinfcldcr. 1nc. Page 9 of 11 Prinl.cd: 10109197 -" JJ "'J _."'--::::;;~'::,".".:', ~ ~ I I '0 I I I I I, I I 10 I I I I I I I 10 I ~.:~.;(>~., ,',' III KLEINFElDER 2.~ pnor to subrruttal of bids. If this IS not possible, questions or c1anficatlons regardmg the report should be directed to the project owner(s) or their designated representatives. After consultation wIth Klemfelder, the proJect owner(s), (or theIr representatIves) should provide c1anficatlons or additIonal mformatIon to all contractors blddmg the Job 6.3 Construction Observation and Testing The recommendatIons presented In thIS report are based on the assumptIon that an adequate program of tests and observatIons WIll be made dunng construction to venfy complIance WIth our recommendatIons These tests and observatIons should Include, but not necessanly be lImIted to, the followmg 1 ObservatIon and testmg dunng sIte preparatIon and earthwork (includmg cuts and fills) 2 Observation of footmg subgrade preparation and SOlI conditIons 3 ObservatIon offloor slab and pavement subgrade soil condItIons. 4 Consultation as may be reqUIred dunng constructIon The reVIew of plans and speCificatIons, and field observatIon and testIng by Klemfelder, are an Integral part of the conclusIOns and recommendations presented m thIS report. If we are not retained for these servIces, the ClIent agrees to assume Klemfelder's responsibilIty for any potential claims that may anse dunng constructIOn 7.0 LIMITATIONS The recommendatIOns contaIned In thIS report are based on the field explorations and our understandmg of the proposed project The InvestIgatIon was performed USIng a mutually agreed upon scope of work. It IS our opinIOn that thiS study was a cost-effective method to explore the subject SIte, and evaluate some of the potentIal geotechmcal concerns. The soils data used In the preparatIon of thIS report were obtained from test bonngs completed at the project site It IS possible and likely that vanatlOns In soils eXIst between the pOints explored. The nature and extent of soil vanatlOns may not be eVIdent until construction occurs. If any soil conditIons are encountered at the site whIch are dIfferent from those described In tlus report, our firm should be Immediately notified so that we may make any necessary revIsions to our recommendations. In addItion, If the scope of the proposed proJect, locations of structures, or assumed bUIlding loads change from the descnptlons gIven m thIS report, our firm should be notIfied The scope of our work does not Include servIces related to construction safety precautIons and our recommendatIons are not Intended to dIrect the contractor's methods, techmques, sequences or procedures, except as speCIfically described In our report for conSIderatIon in deSign 6O-174002I60I7RI2I Copyright 1m Kleinfelder. Inc. P3go:: 10 or 11 Primed: 10109/97 ... . H .,__~._L1JJt.;~ib;..iLo.!;". . , ,0 I I I I I I I,C I I I I I I I IC I h III K L E J N FE L 0 E R 2." TIus report has been prepared for planning and desIgn purposes for specific applicatIon to the subject project in accordance WIth the generally accepted standards of practIce at the time the report was wntten No warranty. express or ImplIed, IS made This report may be used only by the CLIENT and for the purposes stated, WIthIn a reasonable tIme from Its Issuance. Land use, sIte condItIons (both on- and off-sIte), or other factors mcluding advances m man's understanding of applied sCIence may change over tIme and could matenally affect our findmgs. Therefore, thIS report should not be relIed upon after 12 months from ItS Issue Klemfelder should be notified If the project IS delayed by more than 12 months from the date of thIs report so that a reVIew of sIte condItions can be made, and recommendatIons reVIsed If appropnate. It IS the CLIENT'S responsibihty to see that all partIes to the project mcludmg the desIgner, contractor, subcontractors, etc, are made aware of thIS report m ItS entIrety The use of mformatIOn contamed In trus report for blddmg purposes should be done at the Contractor's optIon and nsk. Any party other than the CLIENT who wIshes to use thIS report shall notIfy Klemfelder of such mtended use by executmg the "ApphcatlOn for Authonzatlon to Use" whIch follows thIS document as an appendIX Based on the mtended use of the report, KleInfelder may requIre that additional work be performed and that an updated report be Issued Non-comphance wIth any of these reqUIrements by the CLIENT, or anyone else, WIll release Klemfelder from any hability resultmg from the use of thIS report by any unauthOrIzed party '~ 6O-174002I6017R121 Copyright 1997 Kleinte\der. Inc. Page 11 of 11 Printed: 10109/97 - ;":+:.~..~,.'.J' I~. , ", ~.~.\\~:~jj5. '~Ii ~ li. ~.), {I) ~ ~ IX o ~ b ~ ~ \1.1 o ..-l \1.1 \IIa '>; ~~. -z.. -- \ \1.1 \ ...a .. -:J,. ~ 1\ i "" \ :\'.~,:., ~.l. :~1f,~ ff:. ,t\. '1 " ,\. ;~. ,.,. .\~ (J' ~f,'" ~\.. \ , , \ ~ \ \ \ \~ ~ ~ ... .. ~..&. p) ~\ p..,\ Sf' ~6C. ~., " -- -- \ \ \ ~' ~~c;:. \. <& -- \ )4' ~')...(J' .J ~ - , 0 ~~ ~, \? ~ \ ~ -41 ~ \ , 1. ----------- n.- - - . (\ - t- "'0 \II -- \ " - II Q II " \... ~ II 1- son.. CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME - COARSE GRAVEL CLEAN GW WElLGlADBD altAVIL. F'lNB to COAISB GRAINED GRAWL GRAVEL SOILS ~(ore ib.atI 50% GP POOIU.Y~ GItAVBL oC COlIne Fl'Klioa RcwDed ClQ GRAVEL GM SlUY CiJtAVEL No.4 Sieve wrrn FINES I Mere 1'baa 50% CiC CUYEY GRAVEL RetaiDcd ClQ I I No. 200 Sieve SA.'"O CLEA. 'I SW WEJ.L.GIWJED SAND. F1NB to COAltSB SAND SAND SP POORlY ~ED SAND ~(ore ib.atI ~O'!.. ofCouK F~oo I SM I SIUY SA."'O Puscs SA. \fD I I '10. 4 SIC'''C wrrn ~c:s I I ; SC CLAITl SA.....'O I I I SILT .-\.'..-0 CUY ~lL SIII FINE INORGANIC GRAlNED I SOILS liquid !...Imst CL CLAY I Less ib.atI SO ORGANIC I OL I ORGA.'ilC SlU. ORGANIC CL\Y Mere ib.atI 50% Sll.T A.'"O CUY I MH SIII OF HIGH PLASnc:rT'! EL\S1IC SlU I Puscs ~ORGA.'llC I '10. 200 Sieve eH CLAY Cf HIGH PUSTIc:rT'! F AI a.AY Liquid Limit 50 or More ! ORGA.'llC I OH ORGA'OC CLAy, ORGA.'<IC SIII HIGffi.Y ORGA.'lC SOn.s t PT I i PEA! , I I () PARTICLE SIZE LIMITS () SAND GRAVEL CLAY SILT BOUIDERS COBBLES FiB: Coarse Coarse Fine 1l" 3" 3/4" #4 #200 0.002 mm #10 #oW Strongest DESCRIPTIVE lERMS USED wrrn SOILS CONSISTENCY &: APPARENT DENSITY SILTS AND CLAYS SANDS &. GRAVELS Hard Vel)' Dense Very Stiff Dense Stiff Medium Dense Medium Stiff Loose Soft Vel)' Loose Very Soft Driest MOISTURE CONTENT Wettest 1 Wet Very Moist Moist SlighLly Moist Dry 1 Weakest NOTES. 1 Field cJassifcation is based on VISual examination of soil In gcncrallCCOrdance with ASTM 02488-90. 2. Soil classification USing laboratory tests is based on ASTM 02487-90. SOIL MOISlURE MODIFIERS. Dry. Absence of moIStUre, dusty, dry to touch Moist - Damp, but no visible water 3 Description of 90iJ denSity or consistency arc based on Wet. Visible free water or saturated, usually soil is U1tcrpretation of blow count data, visualappcarance of obtained from below water table !CO andIcr test data. Cm KLEINFELDER KEY TO SOIL CLASSIFICATION AND TERMS ~ 1W7~ . '" ., r.e. L.EOEND1PIUl PLATEA2 28 ~ . ~~~;~'i:~';':l:~'tl..,".,",""~.~"'.{. ""~ ,'~, ," '. .'.' ",.,~' ~.. ~ ,~~:. .,..~ ::",^\{<j,~~.:~\>".,{\~ ~< I c 7..q , Surface Conditions: GnIu Date 0riIIed: 9129197 logged By SGH '\ Groundwater No groundwllter observed Approx. Surface EIeY Cft): .J Total Depth: 6.5 feet Laboratory Field DESCRIPTION - ! ~ C" >- :s ! ~ g, c ~ E 1i - ~ Q. >- ~ 411_ ~ ftI en cD 'iii - c:; 0 8' s; "9 .8~ ~cD Q. ~ Q. 111- 1Il ~ ~ Co E 03 ~ii ~ 0 QI ftI ftlQI "" c3 :II 0 en -I.... ::Eo 00 in -I 0 Sod and topsoil SM Dark Brown silty fine sand with occasional gravel (medium dense, moist) X SM 5.1 23 '-- SM Light Brown silty fine sand with gravel (medium dense, moist) 5 - SP-SM Light brown sand with silt and occasional gravel (very dense, moist) - 5 - \< 5014 '-- I 10- -10 \ 15 - 15 20- -20 25 25 " LOG OF BORING B-1 ---10 SR 507 & Vancil Rd KLEINFELDER Yelm. Washington I c..p,.;p 1tt71C1oioNdor.-. LOO ~ IIOIlINO 174202.~1 Project 1# 6O-1742~ I PLATEA3 - - 1M/97 NOTE. See plates Al aud A2 for ~t).~ of symbols I lie I I I I I I Ie I I "';',p."," .". .. --- - - ~ --- - ,n~:,~;';n!J~-vI"'~.f'4 r'~\I"Q.l"H..'n>J':/II1r.sr.:'Z';:"'';''.l''{ir;t .l~..,,,,:,..'t;',,:,';"~~~"~iiZ';:fri;1~6];:.~~;:;;;,t;~~\~;i:j7"-..'ii;}i::~ c Surface Conditions: Asphalt Date OriDed: 9129197 Logged By: SGH '\ Groundwater' No groundwater observed Approx. Surface EIeY (ft): ) Total Depth: 13 feet Laboratory F"teId DESCRIPTION - I~ ~ C" >- :g li ~ ~ C .c. [ ! ~ j Q. 0 GI_ >: 0 IV VJ ! iii ~c 0 ~ .c. ~ III ~GI = I Q. .c. Ci. .8Ui .- ... ~ j Ci. E '0 l5 ~i 0 GI IV III GI (; GI 0 VJ ........ :::Eo 00 ii5 :.:; 0 2" of asphalt and 5" of crushed rock base course oC GP-GM Dark brown gravel with fine to medium sand and silt (dense, moist) FILL X SP-SM Dark brown fine to medium sand with gravel, silt. and occasional cobbles (very dense, .:;.;: SM 6.4 5014 moist) 5 - I- 5 ~ I Brown silty medium to coarse sand with gravel and occasional cobbles (dense, moist) 6 48 I SM 10- -10 '\ I 2 r SP-SM Brown fine to medium sand with silt, gravel and occasional cobbles (very dense, moist) SO/6 15 - I- 15 20- -20 25 25 LOG OF BORING B-2 ~~IU SR 507 & Vancil Rd KLEINFELDER Ye/m, Washington r CcIp)'Wa.'" ~..... LOO_ OF _1lOIUNO 114J02.OPJ Project 1# 60-1742-02 I PLATEA4 ,- 30 ,I I ,Ie I I 'I I I I Ie I I I I r NOTE. See plates Al aDd A2 for ~lUItioD of symbols ~ _ ....... _ ...."' _~. _'.__'___"__u ___. ". .._,,___ I -,",",-='~~'-'----" ,'"'-''--''' .~- "'"'''-''-''-'''''''-~;;~'''c-.'''~ _..'....,.... ," .=""~~,.c,,,,,~,,,,',~,-~o., '"~","',=",._-'-'--'.........., """.~-,-,.'"'., .'.:........J c Surface Conditions: Beauty bar1c Date 0rIIIed: 9129197 Logged By: SGH ) Groundwater No groundwater obserVed Approx. Surface EIev (ft): T ota1 Depth: 6.5 feet Labor'atexy F'1eIcI DESCRIPTION ! ~ '# '[ { ~ - f 'i! ~ ! 41-- ~ <<I "c f ell en .c 9 j~ .3.. 0 t Q. .c Q. E "'- j ;, Q. oa ~~ 0 Q) ca ~.! :r:: (; GI 0 en :Eo 00 al ...J 0 Toosoil SM Brown silty fine to medium sand with gravel and occasional cobbles (very dense, moist) ~ SM 5.5 64 " 5 - . " 5 t8 f J SP-SM Brown fine sand with silt, gravel and occasional cobbles (medium dense, moist) 22 10- ~10 ""'" 15 - 15 20- ~20 25 25 LOG OF BORING B-3 ~ KLEINFELDER SR 507 & Vanell Rd Ye/m. Washington f ~11t71C11Wddor."" LOO 01 IIOIlINO 17410ZJJPJ projcc:t #I 60-1742-02 I PLATEA5 - - I"'" 31 c L NOTE: See plates Al and A2 for explanatioa of symbols 32 c Section IV Wells and Septic System There are two known dry wells onsIte that are used for storm draInage purposes AccordIng to the report prepared by KleInfelder, dated November 9, 1998, there are no other known wells wIthIn 100' of the sIte There IS a prInt contamed m KleInfelder's report that IdentIfies a septIc dram field behInd the AntIque Dealer's buIldIng. ThIS wIll be abandoned and removed as a part of thIS development. c c NOV-09-98 MON 10:27 AM KLEINFELDER FAX NO. 4255624201 P. 01/05 33 10 c iG ~~ KlEINFELDER TRANSMITTAL Geotechnical Engineering Materials Testing & Inspection Environmental Science & Engineering Water Resources Earthquake Engineering Air Quality Date.November 9, 1998 Mr. Brent D. Cummings Bush, Roed & Hitchings, Ine 2009 Manor Ave. E Seattle, WA 98102-35l3 Subject. Identification of EXIsting Water Wells at Ye1m, Washington Rite Aid Site L...- -, As requested, Kleinfeldcr reviewed our data to determine if there were any drinlang water wells within 100 feet of the proposed Rite Aid site in Yelm Washington. Per our discussions, there are two wells located within the property boundaries, but we were unaware of any other wells within 100 feet of the property We also conducted an electronic search of the State and Federal data bases to determine if there were any additional wells listed This search did not Identify any addItional welJs 111 the area. I have attached a copy of the search results for your fi] es Please contact us if you need any addItional information regarding tlus sIte. Respectfully, Wilham A. Zbitnoff, PE Northwest Regional Manager Attachment 2405 140lh AVe. NE Suite A101 8ellevue. WA 98005 Tel. (425) 562-4200 Fa.". (425) 562-4201 NOV-09-9g MON 10:27 AM KLEINFELDER FAX NO. 4255624201 P. 02/05 3+ C IC !C @: Environmental : 0 ata / : Resources, Inc. . : an.df(edrcompany The EDR-Radius Map with GeoCheck@ Rite Aid Hwy 507 (Bald Hill Rd. SE) Yelm, W A 98597 Inquiry Number: 309632.1s The Source For Environmental Risk Management Data November OS, 1998 3530 Post Road Southport, Connecticut 06490 Nationwide Customer Service Telephone: 1-800-352..0050 Fax: 1-800-231-6802 Internet: www.edrnet.com NOV~rr9-g8-MON 10:27 AM KLEINFELDER FAX NO. 4255624201 TOPOGRAPHIC MAp.. 309632.15. KJelnfelder, Inc. P. 03/05 '3'3 _....-- / ..-'.- Ie ,_-__ milD AvE ~ --------------,.. . \~~~~---------- _~>!!.Hl'.~k<,)J;~,- L,J/ "", / N Majo, R04d& N Contour Une& N Wa~Nia~ @ Earthquake eplcantsr, Ricnler 5 or greatsr en Clo&&&t Fedoral Well In quadranl rm C106ll&l Slate Well In quadrant ~ Clo&e&! Public WaJ.r.r Supply Well o ~, .' ~ CB]) Clocc&1 Hydrogeological DlIla c TARGET PAOPERTY' ADDRESS: CITY/STATElZIP' LAT/LONG: Rite Aid Hwy 507 (Bald Hill Rd. Sf) Valm WA 98597 46.9359/122.5949 CUSTOMER: CONTACT' INQUIRV 1/' DATE: Klelnfeldar, Inc, Wallace Reid 309632.1 s NnVAmh..., n." 1 QQA 7'?A...m o Ie o NOV-09-98 MaN 10:27 AM KLEINFELDER FAX NO, 4255624201 P. 04/05 3b TARGtIT PROPERTY COORDINATES Lall\udc (North) Longitude (West): Universal Transverse Mercator UTM X (MeIers); UTM Y (Meters): 46.935902 - 46' 56' 9.2" 122.594S02-122' 35' "'.6" Zone '0 -4199193,0 15101017.0 USGS TOPOGRAPHIC MAP ASSOCIATED WITH THIS sITe Targel Property: 244612.2-HS MCKENNA, WA GEOLOGIC AGE IDENTlFICATIONt Geologic Code: Era; Syslem. Series: Q Cen~oic Qua1emary Qualernary ROCK STRATIGRAPHIC UNiTt Calegory Strati fed Sequence GROUNDWATER FLOW INFORMATION Groundw~ler Row dlrecl/M fot' a pan/ell/ar s/trJ 'll best determined by a qualified envlronmtlnral prolrJulons/ titling s"specllk well d6fa. U such datil I. not f1!8I1DMbIy atJcerlalnabltl, h may be nectJstJary to mIy on other tlDUrcM 01 Information, InclUding wtlll dsfll coJltJcl<<l DII nearby prr1pertlu, nglanlll groundwater flow Inf"''''IIflon (from deep aquifers), or BurltJt:e 'opog,.phy~ AQUIFLOW"''' Search Radius. 2,000 Miles MAP ID No! Reported DISTANCE FROM TP DIRECTION FROM TP GENERAL DIRECTION GROUNDWATER FLOW General Topographic Gradienl al Target Property' General NE General Hydrogeologic Gradient 81 Targel Properly' No hydrogeologic da1a available SIle-Specific Hydrogeological Da1ao. Search Radius: 2.0 miles Sla1us; Not found FEDERAL DATABASE WELL INFORMATION WELL QUADRANT DISTANCE FROM TP LITHOLOGY No! Reponed Not Reported DEPTH TO WATER TABLE No\Rcpot1ed Not Reported EaSlem Wes1em , - 2 Miles 1/2 -, Mile STATE DATABASE WELL INFORMATION WELL DISTANCE QUADRANT FROM TP NO WELLS FOUND T ~ P.G.~, RE. AInaI oIOd W-J.lln4<ro. ~ogy 011110 Cclobomoi,.,.. U,S. III 1:2.foOO.llOO SaoIo.A, ,jo~l_...,;... <i.... \9~ p,a, ~...a ~!.M. __ &t"fl U&iS DlvloI c... _ DDS '1 (1l$4~ % U,S, EPA. Gr<xm w..., ~. 'I<ll; Q.wnG W_1/IIj Canl_. 011(>. ~ Fla..""", oIOd ~.... El'Ml2:>i&-1lCW16o>.C""","" 4. _ 711. EopI_ lllllO. . .. EOR AQI~flO\Y'...~ ~ "1lyd~"IIIy-"""'~, IIcJoI alrodl_ot opadllo -. P_iN dIlIP_..... _ aI """ _" "". -... d~. TC309632.1a Page 3 e e e NOV-09-98 MON 10:28 AM KLEINFELDER FAX NO, 4255624201 P. 05/05 ,1 PUBLIC WATER SUPPLY SYSTEM INFORMATION Searchod by Nearest PWS. NOTE: PWS Syslem Ioealiol'lla not a/ways the same as wolllocalion. PWS Name: SCENIC PROPERTIES WATER CO. YELM. WA 98597 Loc.allorl Rela1ive 10 TP' 112.' Mile Weat PWS currontly has or has had major v101allon(s): Yes AREA RADON INFORMA110N EF'A Radon Zone for THURSTON County. :'I Note: Zone 1 indoor average /evel > 4 pCi/!., Zone 2 Indoor average level >= 2 pCilL. and <'" 4 pCilL Zone 311'1door average level < 2 pCVl. Zip Code: 98597 Number or s"e6 tested: 5 Area Average Actillily % <:4 pCiIL "Ia 4-20 pCVL % >20 pClJL Uving Arca. 1st Floor Uvlng Area - 2nd Floor Basemenl 0.360 pCiA.. Not Repol'1ed Nol Reponed 100% Not Reported Nol Reported 0% Not Aaported Not Aeported 0% Not Reported Not Reported TC309632.1s Page 4 - BUSH, ROED & HITCHINGS, INC. CIVIL ENGINEERS & LAND SURVEYORS ~ 2009 Minor Avenue East ~ Seattle, WA 98102 ---- (206) 3234144 BRH (206) 323-7135. Fax JOB ~~1~ \1.. ~O\ YLI-- ~; ~ A, do 3? SHEET NO, OF CALCULATED BY ':fA.'- DATE LJ-"Z.4 -'l~ CHECKED BY DATE o SCALE '?~1"~~T~~~II~i~ ~...... , . ",,~"'" QA:\~~~~ t= ~ 0 ~.~ ,ISC,,,..v\,.:.:: \1. ~-l'\Q'::l~es. ...~. '" >< ~ ---- '-'~r. .. .. ..... .. .frQ~Lt\\o \~, 1- -es"tt~ ~t.e~ .do.'\':)T \0'""'"' .t<:, ;;; ~ ~~~t:~a.~A:\2~:t;~"'~' v. ~'. Ly\1.-ST.~lS~ .... ,:: 'L~ tf 1,0 <.0 ~o.l'Q\J\s, ..... ..... .-.--..--..--......-................... use ... L;;PQ~~\\ 0_ <::':'~0TI~~ \'- l)" . ~Em~~--s. 0+)1>1.... t..-A~ .?IQf2.. ~ 6MPLCt:::(~ CQv~r \ 4 .lliQe~ Ht f2..eD,> 2eg", s TO '2. e 1.... ,SJ~ \ E:::TS(P,8Q0t2. 5 -1 .... p~e,-e:- fe~~J~""""\ G"2.)?eOP~ CP::/2,.e--Qy~rL- L9 ~~ 0 .sri \ 'PI o bY:-..I\,) t-/\ ..4- ob~ytA-.q~~E s 1're,f2.- ... \ l..H Q..... D..A'{.':= \1... I--"S..... \J PIlOOUCT104,IISingIeSheels) 2ll5-1(Padded) 1-1..lnc.. GroIon,Mass. OU7L To Order PHONE TOll FREE 1_225-6300 3f SANITARY SEWER ( C TABLE 2 - ESTIMATED DAILY UiWI!at J"LOWS Type of Establishment Ga1loDa Per Penon Per Day (Unlea Othenriae DOted) 5 6S 10 c Airports (per passenger) ApartmentS - multiple family (per resident) Bathhouses and swimming pools Camps. Campground wIth central comfon stations With tlush toiletS, no showers Construction camps (semi-permanent) Day Camps (no meals served) Resort camps lnight and day) with limited plumbing Luxury camps Coltages & small dwellings with seasonal occupancy Counuy clubs (per residem member) Countrv clubs (per non-resident member present) Dwellings Boarding houses additional for non-residem boarders Luxurv residences and estates Multiple famil: dwellings (apartments) Rooming houses Single family dwellings Factors (gallons per person, per shift. exclusive of industrial wastes) Hospitals (per bed space) Hotels with private baths (2 persons per room) Hotels without private baths Institutions other than hospitals (per bed space) Laundries, self-service (gallons per wash. Le.. per customer Mobile home parks (per space) ~otels with bath, toilet, and kitchen wastes (per bed space) ~otels (per bed space) Picnic Parks (toilet wastes only) (per picnicker) Picnic parks with bathhouses, showers. and flush toiletS RestaurantS (toilet and kitchen wastes per patron) RestaurantS (kitchen wastes per meal serviced) RestaurantS additional for bars and cocIaaillounges Schools. Boarding Day, without gyms. cafeterias, or showers Day, with gyms, cafeterias, and showers Day, with cafeteria, but without gyms. or showers Service stations (per vehicle served) Swimming pools and bathhouses Theaters. Movie (per auditorium seat) Drive-Ill (per car space) Travel trailer parks without individual water and sewer hook-ups (per space) Travel trader parks WIth mdividual water and sewer hoole-ups lper space) Workers. Construction (at semi-permanem camps) Day at schools and offices (per shift) 35 25 50 15 - 50 100 50 100 50 50 10 150 65 40 75 ~ 60 50 125 50 250 SO 40 5 10 10 8 2 100 15 25 20 10 10 5 5 50 100 50 15 ,0 7/95 7 - 25 c o o FINISHED GRADE 21-. MIN.PVC RISER WITH WATER l1GHT UD 14 GAUGE TONING WIRE TO 55 CO ~ . ~ V-1 . o N I o N I V-2 c Q) N I. l 6- MIN BEDDING J VARIES 1500 GAL 3000 GAL 4500 GAl 0-1 4 60" 72- 72- 0-2 4 43- 55- 55- 0-3 4 50 62- 62- V-1 400 GAL 6 GAL V-2 1100 GAL 2400 GAL NOTES: 1. DELETE BAFFLE FOR A 3000 GALlON TANK Ul1UZED AS A TRIPlEX PUMP VAULT. 2. INSTALL POWER TRANSFER SWITCH. 3. ENGINEER WILL REVIEW TOLERANCES IN EXCESS OF DIMENSIONS SHO'MII. 4. THE TRIPLEX PUMP VAULT REQUIRES TWO VAULTS AND TWO COMPLETE RISERS. ONE VAULT CONTAINS FLOATS AND ONE PUMP. THE SECOND VAULT CONTAINS TWO PUMPS. * / WATER l1GHT UD PUMP VAULT RISER '14 GAUGE TONING WIRE TO SERVICE BOX I 4-_IORflCE I : () () (J I I I BAFFLE (NOTE 1) I L__-l 2 PART EPOXY IN 1/2- GROOVE FORMED IN THE TOP OF THE TANK PUMP ASSEt.4BL Y, SEE SPEClFlCA l10NS CI TY OF YELM DEPT. OF PUBLIC WORKS 007-11.DWO TANK/PUMP TANK APPROvm DWG. NO. PUBUC WORKS DIRECTOR 7-11 DATE CKD. S-C TE 2/17/95 PMX PMX/S-C If/ c ", .. USE ,. UNION TO CONNECT TESl1NG NJARA 1\JS F~ PRESSURE TESlING SEfM 2fr ... RISER HElQiT T'tPtCAL. WIlli AlL NON-1RAfFIC 8EARIHG TANKS ( C . .... - FlBERQ.ASS UD 'M'Di STEEL sa. 1'5 AND NECPRENE GASKET , - DIA.PVC HOSE AND VAI.'t€ .A~Y ORIENT BAI.L VAI.'t€ AS SHO.. (2.. CIA. RI88ED PYC RISER M'Di NECI'RENE ~ TOP RISER TO t EFF1.IJENT DISCHARGE (TONING WIRE - WRAP ONCE AROUND RISER EFFlUENT DISotARCE 2-P ART EPOXY IN 1/2'" GROO'IE FCRftD IN 'DiE TOP OF 'THE TANK LEA't€ SUf'F1CIENT WIRE TO AlLOW FOR PUMP REWOVAI. aECTRICAL SPUCE BOX .-rH <:am GRIPS ALL CCHtEClIOtS SHAll BE IRAPPED YlI1H HEAT SIRtK TAPE 21- OR 248 PVC RISER W/lIO 1. GAUGE INSULATED TONING MRE STANDARD INLET TEE 3/.- EY CONDUIT SEAL aEClRICAI. CONDUIT TO POWER SOURCE . ~ - REDUNDANT OFF ,. PVC FLOAT ASSaml. Y . o co 1-1/.- 011.. INlET HOlES AROUND PERIMETER OF VAULT z :i .- 011.. PVC FLOW INOUCER . CD N DRAIN PORT 'M'Di NEOPRENE FlAP CHECK 'DiE alA TERIAL F~ DUPLEX. TRJPlEX. AND a.ASS , DIVISION 1 1NSTAl.l.A~ 'MlL VARY. 'mE CONTRACTOR SHALL MEET niE IN1ENT OF THE INSTAl.l.A11OH REQUIREWENTS SHOWN IN niE T1PlCAL STEP INST Al.l.A nON. POI. YElH'I1..ENE SCREEN L SUBNERSISLE EFFlUENT ORENCO TURBINE 8 GPU 20 OS! 05 HHF PUWP YfTH S. O. POYIER CA8l..E AND l/B. BY-PASS ORIFICE IN lliE OISCHARGE HEAD CI TY OF YELM DEPT OF PUBLIC WORKS c TYPICAL SIMPLEX STEP TANK INSTALLATION APPROVED DWC. NO. CITY ENGINEER DES. OWN. DATE CKD. 7-9 OC7-9.DWC DA 2/20/95 t.f2. c Section V Fuel Tanks AccordIng to the envIronmental report prepared by Klemfelder, dated November 9, 1998, there are no known underground fuel tanks All other above ground tanks wIll be removed from the sIte c e "3 e Section VI Sub-basin Description AccordIng to the topographIc survey, there IS no off-sIte upstream area that slopes toward thIS sIte c e c c c Section VII Analysis of the 100-year flood ThIS sIte does not abut any stream and, therefore, IS not subJect to flood hazard. The FIRM map prepared for thIS area, dated January 18, 1998, CommunIty Panel #530310000 lA, shows the subJect property outSIde the 500-year flood plaIn boundary Therefore, the desIgn meets or exceeds the reqUIrements of the permIttIng agency See attached map #' -.---- -~- ._----------...._--_._~.-----~-- ... _ _"', . _.....~ ',....'..d..<~"" ~ ._....-.,.,_.. ._~_'''''_~"'".''''''''~_''''''''''''~''!~'''''''''~'_'_.''~'''' \ \ \ r'~ ~'_~--,\ \ ,,- ' '\";- \~ ~~ \ , \~.. \ ", '\ \ "" " \ I ~,\ 1__ ~~ I I I I I .=-g~TT l! 1'-' ,fL."D,1 J i f i 0' ~H jl~ l !., 0 g o i 'D ... '~"ool"-" I~ I \ I I I I / I- / / / / I I I .__--1.____ ;. i ","_! JJ c:: ;0 en ::r:: :z :JJ C) i11 .~-- .--"-. C1 c:::: rn 0 CJ c::> Q<:o J'T1 ji:;d~~:)'-"- " ::r:: ..c- ~ ...... - CJ ~ c.c < :z: c.c G') CO rn en z 0 -:.-, ~J~~~.,. e i~l \~:i f "II" ~ J .') . 'Ii " }J j'tj , 111 II ~ It fl. ,I III l. ;JjfJ ! J f I f.( J J I" j! :'1 'I' i ! ~ lU 1 d I ~ Jnr~; I "'1 .! II) j'! 1 i ; j dl } III I . I ~ JI:f~' I ! I~~ !f' d~ ~II . ; ~ 1Hl J ! JI ~ j 1 9 Hidi !~ I 'IIJ I Jilt in I ' 1,0 I Ii.lli J: fit II I! { I I I '11Ii ~ ~~. ifP'IPJd, ~IIJ J'i "III,lt II - ;:~i, lit., ~I J Ihf I I, I _I. ! l~dh, i; H J d ~ Jhl h: ..._...,..,........-.iN' ..............._-t.....,~-_,J...<_~_..._~.___ ...._._ J ; , 'A ~r I L~ .. !: Illt.11 s=' ~ s ~ l l .11 I,'l ~ ~ ed, ~ 3 ~. 1 to rw~ ., I{.' ~ ~ 9 ~ ~ i" IJ l~i21 h i S a III !jl lit " / ~ ,/ : g I ! I ;:I """'.'~~" "-:~":1.!i' , !II '.' '. iI ,,' 1-:: ~ ,,' ., ,I I! --.:t.. I~ g:. ., I ~ [1~ : I f!\J7C~~/ : ~ \/ i ! ~ <J: 5 c.~ r 9 I I (I ~ I L___L~ C> ~ ", . C) l \ t.l a ... \..... --.J . r'\ i~ U \" :1 }t ~ ~ : ~~.\0 r-~'tVllOd2'.~---. I I I I ~ I I ~. I I . I I ; i y ~ I I L_ I " , I ~ ::r ,..- . '6 "?;i :\'1)"'" ..t. \~. ''? ~ D ~ ,; "1 . -l~: :~"'_.: ~l~ \ ,! '~.,' :. ~. J... ~ .;-'--.----.-- Ir., !~'4.:,t. ........; -~ ~ ~ o z ~ ~ [--I I -;--:;1 l .. '~ 21to<} "~ " / ~ I; 2--~':"--1 } I I . ,~, I " ""'" ~ N U " R' ,;' ~ I I I I ..",.. i-=- / I _ ----,....--o.;........,-l .. , ~ I ~ Ii J It ,:':., f" .",~~,~>.,\ ". .,e',f "i: :~;~""i<:..,'~;....'1it , "i' .~: l,~.. ...tl;l~!'(,,~'l801. , ," ~,'9. .;/,... ~,.;;.' ., ..' ,j': .;1-1 ~ ~ , I,~ ..~. I I ~ .OL --Lf n"~';'~,\, '..' ,f..' '. ~.~ .-.' -"--~..: ..........J' . "t'IY..~ ~ I L______--. I ti':'l ~rt. :t;'\{ .~ / N ....... (', , ..-1 ..... !If ! " ~.~~' : 1"1 e Section VIII Aesthetic Considerations for Facilities SInce no surface quantIty or qualIty features are proposed onsIte, no measures have been taken for aesthetIc purposes. However, by locatIng the water qualIty vaults and InfiltratIOn system underground, more area IS aVaIlable for aesthetIc landscapIng e c Ifs tk c' Section IX Facility Sizing and Downstream Analysis The downstream system was InvestIgated by a sIte VISIt and reVIew of avaIlable InfOrmatIOn from the CIty of Yelm (none) Topography In thIS area IS very flat, but generally slopes to the southwest. The field VISIt for the purpose of thIS analYSIS was performed by InspectIng the eXIstIng sIte condItIons and walkIng southwesterly from the sIte ThIS area has no formal draInage system. There are two eXIstIng drywells onsIte Based on the soIl types for thIS area, It appears all storm draInage dIscharges VIa InfiltratIOn at the surface The two eXIstIng drywells located onsIte appear to be operatIng properly, wIth no eVIdence of standIng water or erOSIOn The topography slopes to the southwest, but there IS no eVIdence of standIng water or erosIon. There IS a playfield adJacent to our SIte, but once agaIn, no eVIdence of standIng water or erOSIOn e An InfiltratIOn system WIll be Installed on the SIte per DOE standards ThIS system WIll be sIzed to Infiltrate the 10 yr storm In 24 hours and checked to make sure It can Infiltrate the 100 yr storm In less than 48 hours The measured InfiltratIOn rate for thIS property IS approxImately 1 50 mInutes per Inch USIng a factor of safety of 2, the desIgn InfiltratIOn rate IS 0 33 Inches per mInute A correctIon factor of 40% for 78 ImpervIOUS area was added to the reqUIred InfiltratIOn surface area. A wet vault IS Included to treat the 6-month storm volume prIor to dIscharge to the InfiltratIOn system. The wet vault contaInS two chambers The first chamber of the wetvault (at Inflow) contaInS an presettlIng basIn to address pre-treatment concerns The storm draInage conveyance system on-sIte has been sIzed for the 25 year ratIOnal flow rate An emergency overflow pIpe WIll be extended to VancIl Road as a part of thIS development. WhIle there IS no storm drainage system In VancIl Road at thIS tIme, It IS antICIpated the CIty WIll Install a draInage system as a part of the realIgnment of VancIl Road. The overflow pIpe from our SIte could be connected to thIS future storm system to deal WIth storms that exceed the 100 year event or at such tIme as the InfiltratIOn system faIls In the event the InfiltratIOn system faIls, the Owner wIll observe standIng water onsIte near CB #2 before the emergency overflow pIpe IS utIlItIzed. Overflow, If It does occur, wIll be dIrected to VancIl Road. o e '\ U o if7 FACILITY SUMMARY FORM Complete one (1) form for each project and sections 6-8 for'each drainage control facility on the project site Attach an 81/2 X 11 inch sketch showing location of each facility NOTE. This does not apply to each catch basin or dry well. Proponent's Facility Name or Identifier (i.e., Pond A) / NFl L.71l4 77 ON 7l2E.N 6/1- Name of Road or Street to Access Facility. <-(1% LM AVt:: t ~ (S R 5a 7) i YWG/'- R O. Hearings Examiner Case Number () Nit-, Development Review Project No./Bldg Permit No. t...UJ ~ Parcel Number - ul'/f- Part 1 - Proiect Name and Proponent Project Name. ~I Ie A-1 tL #: 528" Project Owner -rn e /?;a. / clrldj e Gro LA-,P Project Contact: A LLF-1J /(4/-1N Address. / 2~/3 FLUSI+IN6 Mc./t{)()WS f)f(. I Sf.) IT&. ?oo, , . Phone. ( 31 tI) q ~ fA - 2:~oo StLOUIS j\4ISSoURJ Project Proponent: (if different) Address. Phone. Project Engineer Firm. BJSI-I i Rae.,;) 7 M /-rCH JN6 oS Phone. 2a{#..3 2.3 .. 'fl '-I- ~ 0-3 o e o Part 2 - Proiect Location Section Township Range NE'/4 f~'f 30 17 N "2. IE 'A/t1 Names and Addresses of Adjacent Property Owners: ~ee :f&PA 'I-S ( Part 3 - Type of Permit Application Type of pennit (i.e, Commercial Bldg) Co;nm~'-'Cd b/~ Other Pennits (circle) DOFIW HPA COE Wetlands FEMA Shoreline Mgmt Encroachment NPDES P C Wetlands COE 404 DOE Dam Safety Floodplain Rockery/Retaining Wall Grading P C Roads Other c Other Agencies (Federal, State, Local, etc.) that have reviewed or will review the Sediment and Erosion Control Plan. NONe Part 4 - Proposed Proiect Description What stream basin is this project in (i.e., Clover) Project Size, acres Zoning: On-site. Residential Subdivision. Number of Lots: 0-4 UNit- /,8Z. ~, c:. -I ~ rn I'Y" e,.. c( at... NIA l o c e '11 Lot size (average), acres: Building Permit/Commercial Plat: .d- /'\J... Building(s) Footprint, acres. rT ":Jf'" ~(tt.t~R9FeOC Paving, acres: Gravel Surface, acres: Public Roads (including gravel shoulder), acres. Private Roads (including gravel shoulder), acres. On-site ImpefVious Surface Total, acres. /, 82.1k., 0, 32.1h..1 I./o/k,. o () o I, '1Zk . Part 5 - Pre-Oevelooed Project Site Characteristics No Stream through site, y/n Name DNR Type Type offeature this facility discharges to (i.e., lake, stream, intermittent stream, pothole, roadside ditch, sheet flow to adjacent private property, etc.) Swales, Ravines, y/n. Steep slopes, (steeper than 15%) y/n. Erosion hazard, y/n. 100 yr Floodplain, y/n. Lakes or Wetlands, y/n. Streams or Creeks, y/n. Seeps/Springs, y/n High Groundwater Table, y/n. Wellhead Protection or Aquifer Sensitive Area, y/n. Other Inliltrtd10n -If) 1r7JUt1clwde-r Ale No Nc No NI) N~ 1'10 No Part 6 - Facility Oescriotion Total Area Tributary to Facility Including Off-site (acres) Total On-site Area Tributary to Facility (acres) Design ImpefViou5 Area Tributary to Facility (acres). Design Landscaped Area Tributary to Facility (acres) Design Total Tributary Area to Facility (acres) /,821tt:". / · 8 2Az, · 1,4-2k..~ () ,1f(!J~. , ,62-1rt-. 0-5 e o e Enter a check mark and number, i.e., one (1), for the type offacility. Wet p~1fJclm.r;,tion Wet pond water surface area, acres Dry pond detention Underground detention Infiltration ~nd -fr ~ Y) "J, Dry well infiltration Other Outlet type (Enter a check mark and number, i.e., one (1), (or each type present) Filter Oil water separator Single orifice Multiple orifice Weir Spillway Pump(s) Other Part 7 - Release to Groundwater Design Percolation Rate To Groundwater (if applicable) Part 8 - Release to Surface Water (if applicable) Nl A- Facility Elevation, MSL (ft) Discharge to Surface Water (cfs) Percent Design Full Volume (cu ft) Empty. o _00_ _00_ _25_ _50_ _100_ 0-6 I / ~ ( c (), 33 "/rn;n. ( c N Q) I f MO t>NI , ~/ ~ s:. .~'" ff' , tif :;;: ,/:,: "'/. ~~. ,(1)~ ~.,w___,o>,o>.,.,. !l( Rite AId with 1/4 mIle radius shown i: ) ,..t.. ~ ,0 ,~ 'Z< "Hammer "" ith Hi~ 0 0; ~~ ~,I e/It/ ,----P..!'E!r._ f ' '. -... '-... E C I@,:) e nne. Street Atlas USA r~ ,. "t 5199 ( :0 5197 "q, 5196 ::~ I I . . , I \ . . \ . \ . \ . . \ \ . \ , , \, ~ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ 1 ~ ) J ,--~ i \, i ~" / " c . J t ------:;--- ,k,i, Itmh~------------, / \.. ~ -tre nciJ I I I I I J:~~ ' . '\ ",~". . . ,). ~:t. , ., ;. .~. ~ ~ : .. ....". . ....; , . ~ '.. ~\ ',,', ....~ 'v . ~ " ,:0:,,' ... ...'!o\ ,.....: " e .~, ,. ....' :~.: , . ~ .. x ~~... ". ~~ PROJECT AREA: BUILDING AREA: IMPERVIOUS AREA PERVIOUS AREA: PAVEMENT AREA: ,0 ~?; I , 1--- I I , I-- I I , I I I I I I I ~ e 0.315 ac o 0.252 ac -'" o o o (") 0.315 ac 0.148 ac e 0.182 ac 0.110 ac e BASIN AREAS SCALE' 1"=50' ReAr 1/13/'" BRH #97312.01 7/01/98 _11-,-\ Q7.31_?~01.~ XGRn_nWG \ J 49f \ \ i \ \ Ie o -- /'l SToRMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN -= - ( 124 123 122 121 48 ,-t-~~_25." . .-.-- __IU.IIol. _Ill " ,c.. r \.:::?,) ,'\- ~\ \X n~~ ~~ '" I ,1 ..;::: ~~ ~ 9E.':"'" .-i ~. 2~Tt'I";a t I ~ ----- - v""". i\1' ~ ~~ 7 jI , ~~ ,~~~' i ~ . OLGA " \" ~l!. 'W\\~' .., ~~. \ \ ~ t'v' , "~ '\~"~ ,L~ -"-,,,jfi~ ~ FRIDAY HAR80! ,POR~ ST.A~L.EY. \. . JO '\. ~ I ~:~. ~. ~.._,- > ,'~I;,:,-,-'i,.','''~~Jr' .~'0 ~~a~(~ Rr NE!( ~ ... ~:. I -1'1~. T '. '\,~' ~ "\>> ::;t~16'~ ... ,~~~;w,~ :{ \\'-1ft ~ 40 I _ _______ I ,--J, r. I; ))1/,.,//'0 , \ ~ ...~\"-c\Li -- ... ! I ~ ~ ' I -...:::l~_, I'\,)\\~ ,( ~Ii\. ~/ 't, ~ 302520 lS/~ i 1~ (,.\ \ )j3tl ,..:) ~~ :-:J~ ':ll~Sj;-.~~'~~~'~:}"". \~\ \,r~ ~. K\j.~ r,U' ~ ) I rlc. 'l.;::- , v,. --= J:\\\ iJi\'\ ~i, ~ ,\ S~ ~ ' >;;;::- \ 1111" ,> ~ =" 'l~r, ~~J (f);",. "'1C.i ~ ,,",11_ ,'-. L 40''''5 \oS~., L,-~ ~M~~ >......."'IJ"V "'~~sw ~\:' ) 1~5 21----' ~~ '~( : 25~ ~(. 45\. ~ ,J, ~~ ~\ VV r...;';":\ 1\ r' \ - f: 50\ ' ..' , _ ' ~,. :Is ,- '"l!'r i'o~ 'C '> "?,~"",,iJ!. )~5 ( 501 ~~"?V - l~, p." s:. .J~~') \ \ ]~_~C. ~r~r-~.nl\~'liti s ~ ~'~lr~_~-' ~~V ~'~~r~)~;~ d I(r? ~~. \\...\ 45\~1 @"II",,-:/;fI/T\' AT, ~~~(. ' · ,,'..~ , ' ~ ",\ 11e.,....i1l'i " ,IPI ~ l? \ I(~~ v'l'(; ~ \ ~~~~~A 1<(~~ I~,.~,..F~;,~~ ~~VL ~\\~..,~~r1~ ~A/ ~ct::- , . ~ t-~{- '~"',. I:"" '- '''------'>''1.1" I \ I r!1{~~ i~ "''' ~""\~ 'rVr?'''~O'n(~ n 0'1 \ ( !:_'~ ' ~"~0\ l,,^ ~ '----. ~ 3ll ,( ~~.~:.U{~ Is7fl:':;~ ,1, S) , 4;Ai: \- -CENT ',.r-.. ;:,.~m~4 ~~~~! I- , ~~ ~ ~r>1O "',L.~fj ~....t'~~ f. . ;, · \ Ju ~~.~~ ~~J~ ~"~~~~~~(,' l g,,'r7L;~ 10~.YAKI ~ ',; ;"'''?;", ,I ,<"~ -, ~:'IF' "", c... '~ ~.[~~I~'\0~~i~::f);:~I~~~ ":~j"1O " , E::; ,___ _ V~ 0.M ) .~~tt") HSJU, .."" \,i~ ' 35-' ~ -'\':;";::::,~(~&7~ ~AOA~ 2K:'fl}~~~~~A='S5) V, / ~ \~ ,-' "rL_ , ,?S,.t:~" ", ". ,[7 ~ \ .,.-...... - "-=l--' = 10 ~A\~H~~~oT~~. ~,.\~~~~Ut~); ~.~:;~~- ~~ ')' ... ~""''''1'~ jl~~il5 ~E:r!.E. , ;:...- _ ----:l MILES 2Ok, \ I \.., f'\ T "'<-'J r:'-I' ~L"'O i "/ .... \.: (~~_-(V.,..l~""'{n'" ,t--."L.--- ~ -- Figure 25 t 15--- "I~~: NOAA ATLAS 2, Volume IX ISOPlUVlALS 2.YR 24-HR PRECIPITATI )N IN "'j ~retpared by U,s, DepartmeO. t of. '~~,:.' TENTHS OF A ..I 1CHl41 OCnnIC Ind AtmospherIC "pmmiattation INCH I \ ' Nltionl' Welt~ ServICI. ()fticlI=of HYdroloCY. ~ 11 \ Prepared fOf U,s' Department of . ulture. _ t-, i- ,Soli ConservatiOn ServIce, Et1 , I DiviSIOn ( 47 46 124 123 122 121 FEBRUARY, 1992 III-1-44 po -- " 124 123 122 121 4q~ i 1 ; \ ,- ----- -... -..... '--... ~j"'- " _ "'~ C~, \ >t~ ~<L~~: - '~l~~;' . ~ ~~~&;~ ~~ ~ - ';;,,"'0 .~1 / \ "'-......,,' \ fRIOA1 H"RBO~(ij?RT ST~~L :'f -~31 - iI-' ' 1! II..- ~~ \;, ,':i{1j I'JM VE1~'\/~r'~ "j - ,), NI' ~\,:- - --I- ./ -[i ~ ~~. I\~'<'G:':~' - />' ~ ." ~ I ~ 8~ ---------\15 Illlr;J.~ - "~--.. ~J '-:., ( ~)) \:: .. ......_ "li<' " , ,,:!1' \( r~~~ ;>. i\: ,i?i1 " ,_,~ ~'"'' k';:-i\~~ \,,-::,~ ~ Vi . ~ g~ 4BIl\ ~C'?- "'''~ ~h\:l\, \ \;4:: ' "r8 ~ \1 Il~~;" t\~"~"'<"'o-.- \ ~ ~~~1l~'~- ,,\...~. .,.. ,'2\ ",,\, __ _ _ "''' ~ ,\~\ ~1E iVE ,T ) ::-~~ ~ ~ ~..... '" ') \ \~ '-" _~' ,_.,' W _~ · i?;. ":'i ~ ~' ~~.. Z,..,"-~~~ 1m<. ,,- II ,TI'"Z? -~ -~\\ . C= I'r .,t)':'" l'1~~ i\.\'k \ 2S \ 7~ , ~,~, ""' 'I" 1:i1)\\?'tt 111 ., --~ y'" ~ ' . '\ ~7 ~ _ --- )j ~f .' 1\ SEAT ~ ;~'~~.iS -- -- ~~ ~~~~._ _ #- f flu J ~_ =-<:;: ~"'ll""0.;r~ 11 iS~~"'~" V) 'I ,I X:,'--~ / '~-:.-v_ 0 .,,'''''''' ~ "'- .. ~1"I;;'f"'f.- ""'--.=-- "",.,"" '-:J. ' - w~ ~...:'V" '/ "Co.. "', ~,., ~,~;,~~~- - __7~ 0 ~"- -, ~~ ~p~l~, )>)(".~~~ '" ~" -"" _ ~ ~ T '" "'- J" 5 -':~ MNl~~~ :',j. ~~ If, 'li . ., 4. Fl(' pm'!;' ~ '!, - ~Q -, . .,... ,"'- " .~~~.~~b"\~~~~"S_( ~~/ l'\~'- ~T../1i<",')_.,~r(Y~~ "I..s ,,~ l5K.. 'f<<"'1 ,'l( 10 ,u' (/ , \...- 1 ,~ r 111' v" ~ .;'. >--.- ~ .::.215-- WASH\NGTON Yi~= ~ (~!(<io '(U.YII~~Pl · ~~~~ 10 0 10 20 30 '0 \ 'c """,)l" ' '>--' __ - II-.\. ~ "'., "" " .."''''' / / ~ ~ _ <-- .::: MIllS '" v'" n \~~ 'I"""" - -<:-1..... ,,/fI ,-c::::: figure 27 b ..:.. _iA~51,"OAA ATLAS 2. Volume IX ~ PreQll~ by U.s. Depertment of (;(~. lsoPUJV1ALS F lCl-YR 24-HR PRECll'lll nON ......"'g,....."....-..........- IN ,-allIlS OF /IN INCH' .".... ....... "".'. Off" of~y''-' /2 . 0 l, \ PrtQIltd f~ u,s. Department of" icultur.. :> . So,' c.'d""~ So"".-....- 4 0"'- STORWWATER MANAGEMENT MANUAL FOR THE ?"GET soUND BASIN ~ J '\ ,l) 47 46 o \ 124 , 123 ~ IlI-1-45 122 121 FEBRUARY, 1992 STO~ATER ~AGEMENT ~UAL FOR THE PUGET SOUND BASIN ( \'2\ 122 \23 \0 V4 ~S\\\NG10N \0 'QQ~ ~. WA\lES fi.... 30 i \ \ ~ I \ ,S(lI'\.U'MlS f lllO-YR Z4."R PRtCIPfl4110N , \K 'TEf{fl\S Of K \NCH \ \ 1 4.t2.- ~\24 \23 12 122 fEBRUAl\"I. 1992 111-1-46 rig- STORllWATBR MANACBMBNT MANuAL FOR THE POGET SOUND BASIN c T.w. Dl-l.6 Rydroqic Soil Group. eo. SoiIa iD .... .... SaualI BuiD () ~ Hyclroloaie Soil H~SaiI Soil TJpo ... 0nIap Soil Type"'- . a..-; Apew C Colla' C AhI - B Culler NO AiII C Dabob NO AIderwood C DeIpbi 0 AreaIa, AIderwood a Dick NO AreaIa, Bvena B Dimal 0 A.Iboe B Dupoa& 0 BaIdbiIl B BarImaIII C ........ C Bdpwick C Baumprd B EId B BeIuIite B ElweU B Belful C EIqumeI B RI!II"'afuo1ll 0 Evereu A QooI1i+m vuiaa& c EvCl'lOQ 0 Boiltfort B GaIviD 0 Bow 0 GctcheU . A BriICOt 0 Gilca B Buckley C Godfrey 0 8wIker B Greeawater A Caaey C Grove C CarIIbcq NO HantiDe C Cuey NO HalUlit -- ~ Cauolary C Hob No Cathcart B Hoko ,- NO CmnIia B Hoocbport NO CbchaIia B Hoogdal C ChClllW A Hoypua NO Cinebar B Huel NO C1aUam C IDdiaDola NO Claytoa B Jonu B Coutal beacbea variable JIlIIIpO NO lCapoWIia cm KalaloCb C ICaIuIa C ReImD 0 Kilchia C Republic B IGlIap C Rivenvub variable Klaua NO Rober C K10ae NO SalaJ .: " C Lalea C Salbun . B Lebam B SammamUib l' . 0 Lummi NO San Juan - - NO L)'lIIlWOOCI NO S<:amman 0 Lyuir NO S<:lmeidcr ~ B Mal C Seattle 0 Manley B Sekiu NO Mubel B Semiahmoo 0 MaytowD C SbaJcar 0 MclCta. 0 Shano B McMUftay NO Shehoa C MeJboumo B Si C MeazoI NO SiDc:1air C Mixod ADuvial variable Skipopa 0 Moa- B Sltykomiab B Mukillco cm SnabopiIb NO Natr B SnobomiIb -, 0 NatpI' A Solduc B NalioaaJ NO Solleb ~ Neiltoa A Spana !e III-1-9 FEBRUARY, 1992 e (C c ~f S'l'ORMWATBR MANAGEMENT MANt1AL FOR THE Pt1GET SOUND BASIN ( Table III-1.3 (Published by SCS in 1982) SCS Western Washington Runoff CUrve Humbers Runoff curve numbers for selected agricultural, suburban and urban land use for Type 1A rainfall distribution, 24-hour storm duration. LAND OSE DESCRIPTION CURVE NUMBERS BY HYDROLOGIC SOIL GROUP A B C 0 CUltivated land(1): winter condition 86 91 94 95 Mountain open areas: low growing brush & grasslands 74 82 89 92 Meadow or pasture: 65 78 85 89 Wood or forest land: undisturbed 42 64 76 81 Wood or forest land: young second growth or brush 55 72 81 86 Orchard: with cover crop 81 88 92 94 Open spaces, lawns, parks, golf courses, cemeteries, landscaping. B Good condition: grass cover on ~75\ of the 68 80 86 area Fair condition: grass cover on 50-75\ of 77 85 90 92 the area Gravel roads & parking lots: 76 85 89 91 Dirt roads & parking lots: - 72 82 87 89 Impervious surfaces, pavement, roofs etc. 98 98 98 98 Open water bodies: lakes, wetlands, pOnds etc. 100 100 100 100 Single family residential(2): Dwelling Onit/Gross Acre Umpervious(3) Separate curve number 1.0 DO/GA 15 shall be selected for 1. 5 DU/GA 20 pervious & impervious 2.0 DU/GA 25 portions of the site 2.5 DO/GA 30 or basin 3.0 DO/GA 34 3.5 DO/GA 38 4.0 DO/GA 42 4.5 DU/GA 46 5.0 DU/GA 48 5.5 DU/GA 50 6.0 DU/GA 52 6.5 DU/GA 54 7.0 DU/GA 56 Poo's, condos, apartments, 'impervious commercial businesses & must be industrial areas computed ( ( 1) (2 ) (3) For a more detailed description of agricultural land use curve numbers refer to National Engineering Handbook, Sec. 4, Hydrology, Chapter 9, August 1972. Assumes roof and driveway runoff is directed into street/storm system. The remaining pervious areas (lawn) are considered to be in good condition for these curve numbers. ( 1II-1-12 FEBRUARY, 1992 o BUSH, ROED & HITCHINGS, INe. CIVIT... ENGINEERS & LAND SURVEYORS ~ 2009 Minor Avenue East ~ Seattle, WA98102 - (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 bf..j~(c> c."1C.. JO'l{" I coyr I j,YQe Z,~' ~ " :::".0 Y " . c.... ...... --, . "::.. 4,,'1L ~ :::. .. ...])EC\,J\QUS ~ JI~~~E' r \) \9qS -:. j") ~9~muB SF.. ~ loLkLl<:l,Ll'?.. SEt: Q,ljC>>L 1=1( ~ .......'m J '-lIS .ac. , !j,JeTE( Q,Yft\\i"l c o ... ~Om Dc=C\J\60<l..... . C> 1\>.~&xJE txl'~u06CS...... ~ LfT299<;;" .2.'"1ms"F ~:- Q,Slc..F <1 Or \F\~Em 't>f?;'G..0 G)?S,YoLu ~~JrllJf :1. ? .' ,\"l.. 'Il Q."S l~IlO1.. (Q,LS} tt,. L,s'] ~ Hi~~ JOB (j()- SHEET NO, CALCULATED BY CHECKED BY SCALE r:J/d,f/J; i'JOG OF DATE 11/:3 /q1 '1/1;:'1*1 DATE ~\\2\nj --LsbSY .16SE ~ O,~IS J,J~ .J:te.. },.. :-.. $......'..'......-..-.... \' 1..)9. cS Hm":;L;') 2'. o PRODUer 104'l1Sing~ Sheets)1ffi.l (Polded) o BUSH, ROED & HITCHINGS, INe. CIVIL ENGINEERS & LAND SURVEYORS ~ 2009 Minor Avenue East ~ Seattle, WA 98102 ........-- (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 JOB fd SHEET NO, OF CALCULATED BY DATE CHECKED BY DATE SCALE ... .... .......Ve:u\\- ~1G.W ..1?--E~\~~ 10 ~d blf"!o~&.. .b8JB10~&~ ?':yL . .'S,:TC)( I'D I , .... ..bH(;)!Q DF~-}.orJt:L ....2"j( H)2..3.. . c.E o 3'\, ...........CES.. WCT.Vf1<JYt. ::: ZdWJ~EX S:2,',LQDj , XG,(. ~0 'tlQ)WsD5. ,~'fD\J\C~ ~ YaB~ CF 4BftB)lf)2s. ...........wwa~w c PRODUCT 104,115111910 S_1105'llPadd<d1 o G o BUSH, ROED & HITCHINGS, INe. CIVIL ENGINEERS & LAND SURVEYORS ~ 2009 Minor Avenue East ~ Seattle, WA 98102 ---- (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 1\1'1 i...[ . \o^I () \!,L PRODUCT 204,1 (Sirt;Il Slleolsl ~1 (PUlod) V'/.. ::J rJ ..r. JOB 62 SHEET NO, CALCUU\TED BY CHECKED BY SCALE I.....~ ... , ... ....J --I ~N"" k)m'm g. l' ("'\0 3GJ" =P_ 'X .../0-., -n It) V'j.~ .. .. ... -f? ...0 (".l...D v'J _. if\ f\l ..... ~ ~. ..J .J \1'1. o C .., C'> G C ......m ..ft, """ OF DATE \ \N Vi f'J V') DATE <:: t ~ ., V) N;" .('0-... X ('J 0.... x 6' iV o BUSH, ROED & HITCHINGS, INe. CIVIL ENGINEERS & LAND SURVEYORS ~ 2009 Minor Avenue East ~ Seattle, WA 98102 .....-- (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 12. _. 'clX,).' 1;::x;.Aj c: ......... I (frll0 \ J+DQb) So V\?rJ\t- -:.. \ 1 <;'2.. LcXOZP\A..L Vy,.u \r El.J \l ::: ( ~~{ (2= t..J~~\ QX2.c y. b -z.,=Io~yy ...........CF C 1J..h"YEC~ hZ.,'-L#1c.f .. ......1Fo~c.€'~b2. Ll (b~YH\ :: JOB ~3- SHEET NO. CALCULATED BY CHECKED BY SCALE OF DATE DATE ~ So $0 3.~.. h~ ~'S'~b~ L~#, tofCE ~N. r T '...j COCL{S1E ~......~ 2. X2.Q)(Q.b n XlS,C1!/CP .LOVer =- Sz.',X"CD'X2.,bX Ii?ctJl<F Fofc.Edo',)J'<\ jEO(ct?" ~.... o PRODUCT 2Il4,llSin91e Sheels)20S-1 (l'DIedl : IO'-j~ZO s:Z.<-JLf8Q 4,-9~# &........ "::: ,0 Ie e 1/13/99 9.56'4 am Bush, Roed & Hitchings, Inc page ~If- --------------------------------------------------------------------- --------------------------------------------------------------------- 1 BASIN RESULT SUMMARY BASIN -----VOLUME---- -RATE- ----TIME----- Bydrograph Area ID ---cf-- Ac-ft --cfs- -min- hours Methodology Acres ------------------------------------------------------------------------- ------------------------------------------------------------------------- 100YR 10YR 2YR I/Q 24924 0 57 17129 0 39 11990 0 28 4723 0 11 1 57 1 09 o 76 o 31 470 7 83 SBUB Method 470 7 83 SBUB Method 470 7 83 SaUB Method 470 7 83 gBUB Method 1 82 1 82 1 82 1 10 ~,,- 1/13/99 8:56:8 am Bush, Roed & Hitchings, Inc page 1 ================================~==================================== BASIN SUMMARY {\ ."-./ BASIN ID: 100YR SBUH METHODOLOGY TOTAL AREA.......: RAINFALL TyPE....: PRECIPITATION....: TIME INTERVAL....: NAME: DEV 100 YEAR 24 HR 1.82 Acres TYPE1A 4.20 inches 10.00 min BASEFLOWS: 0.00 cfs PERV 0.40 Acres 90.00 5.00 min IMP 1.42 Acres 98.00 3.20 min AREA. . : CN....: TC. . . . : ABSTRACTION COEFF: 0.20 impTcReach - Sheet L: 54.00 ns:0.0110 p2yr: 2.20 s:0.0185 impTcReach - Channel L: 406.00 kc:42.00 s:0.0050 PEAK RATE: 1.57 cfs VOL: 0.57 Ac-ft TIME: 470 min BASIN ID: 10YR NAME: DEV 10 YEAR 24 HR SBUH METHODOLOGY TOTAL AREA.......: 1.82 Acres BASEFLOWS: 0.00 cfs RAINFALL TyPE....: TYPE1A PERV IMP PRECIPITATION....: 3.00 inches AREA. . : 0.40 Acres 1.42 Acres TIME INTERVAL. . . . : 10.00 min eN. . . . : 90.00 98.00 TC. . . . : 5.00 min 3.20 min ABSTRACTION COEFF: 0.20 impTcReach - Sheet L: 54.00 ns:0.0110 p2yr: 2.20 s:0.0185 impTcReach - Channel L: 406.00 kc:42.00 s:0.0050 PEAK RATE: 1.09 cfs VOL: 0.39 Ac-ft TIME: 470 min ,e BASIN ID: 2YR NAME: DEV 2 YEAR 24 HR SBUH METHODOLOGY TOTAL AREA.......: 1.82 Acres BASEFLOWS: 0.00 cfs RAINFALL TyPE....: TYPE1A PERV IMP PRECIPITATION....: 2.20 inches AREA. . : 0.40 Acres 1.42 Acres TIME INTERVAL. . . . : 10.00 min eN . . . . : 90.00 98.00 TC. . . . : 5.00 min 3.20 min ABSTRACTION COEFF: 0.20 impTcReach - Sheet L: 54.00 ns:0.0110 p2yr: 2.20 s:0.0185 impTcReach - Channel L: 406.00 kc:42.00 s:0.0050 PEAK RATE: 0.76 cfs VOL: 0.28 Ac-ft TIME: 470 min BASIN ID: WQ NAME: DEV 6MO/24HR-WATER QUALITY SBUH METHODOLOGY TOTAL AREA.......: 1.10 Acres BASEFLOWS: 0.00 cfs RAINFALL TyPE....: TYPE1A PERV IMP PRECIPITATION....: 1.40 inches AREA. . : 0.00 Acres 1.10 Acres TIME INTERVAL....: 10.00 min eN . . . . : 0.00 98.00 TC. . . . : 0.00 min 3.20 min ABSTRACTION COEFF: 0.20 impTcReach - Sheet L: 54.00 ns:0.0110 p2yr: 2.20 s:0.0185 impTcReach - Channel L: 406.00 kc:42.00 s:0.0050 PEAK RATE: 0.31 cfs VOL: 0.11 Ac-ft TIME: 470 min ,0 \ ~ STORMWATBR MAHAGBHER'r MARUAL FOR THE PUGET SOUND BASIN (' o FIGURB 111-1.1 VolU1D8 Correction Factor to be Applied to Streambank Bro.ion Control BMPs Based on Site ImperVious Cover '0 50 4S 'fcPbo ~ u IE 35 0 b ~ 30 z ~ l:; w 25 IE g u 20 15 10 0 20 40 80 80 100 SITE I ~RV tOUS COVER (to c III-1-3 FEBRUARY, 1992 o BUSH, ROED & HITClllNGS, INe. CIVIL ENGINEERS & LAND SURVEYORS e 2009 Minor Avenue East ~ Seattle, WA 98102 -- (206) 323-4144 BRH (206) 323.7135. Fax JOB =tfq'l --; \ "- . 0 \ (;j Ye.\'^-" ~I+~ A~~ SHEET NO, OF CALCULATED BY ;J"Al. DATE \a - '2'; - q b CHECKED BY SCALE I ,^f, \ -t(~-t'~'?~ -r" ~0(..\"""5 \ -z. ; _ j M.~tJo-:?~C~J"p w '-'0 t~:t'Q~Co..-k (se~~ tfp..~~J +,(S"tc::k-tdo-.")m . M I '^' .../. ( "'\ \~, / ..................... : 1,5m .~ill\ I .....J" rc, t. ?t:\c:,~ )'?t?I~ '1/ '^'" ; _ , .r1...... ..,. .-.,.... .....1......"".....~......~~.7...,__.1'.~ _ ~eS\J~p~("~o lo...1-\o...... (~-te(500/o VV\-€4S~("e.J) ~ L/. '?:> /'-~. d.~jt\O~lJ. ..... .l 0 J~5to {~"'QJv~...........~....... )(01988' c::.f' . ............J,ey'~JQf~.J LWJ~s+;J~VJlu~f <,~,eL9 ~f . ~ Jl:z.,~ -t[~~~-to {~.f':lm+r; ~lQ~-r <S-to(~;",24k~~~: 0,:'01 i .,l~;~.7s f " 41$,-[ J"./.i~J/ -.f.", 7, q , t,.. 9..B. !\.l~;(Z'" f'. '110. 9B~ .;:...t.;- )"'1 (,1~fi );"j;1<=:.1:< Yl9 sf ce~fJ, Om. ... ................... .' .. .chmm " ~...w.. (.. ~+(~" l..'('"JP Q ~(",<;:to (" ~... .. L~ +e> ~ Q--J{s.,~ ...?'- ,., ~,~ I~ ; ~ J~t~.1-1{,!'Z. i - ,4~31 ",.-(i=1 "l ''lPft;:Z J'<>'j,/",,-f Z'i . Uq .,;. {'; '-1 q ,1-9 -:; ~ I? s tt"-i~'0,'d. !3fLr · {d~ ~Q({ e. Co -t~ 0", .(;,4 ~ch-c 'I 0 0 ~ ~,^",P~"\O-,J~ U)J (W' ; .G.~................. .f;~~ferrr..l, I ~ c.Q([~c:,.d-ig- ~+o(" : ~cp 04 YL9 x I, yo bOO ~t ... re'6,' cl, (; -L -9m h · I~ .~lk4. t,o,"" ';y ( Ul.?{!>~ 'm~,e d ;. tL' w:~ :>"S'O · t 6~.j -= .... bOO sf'. ....... ~......., P110DUCT~IISingIeS/leds) 205-1IPoiIedI/_I",Ir<.. Groton. Mass. OWl. To OrderPllONE TOll fREE 1$225-03IIl q,s!c -01 Ye=/ry\ p. \11==" fD::~ rd. BUSH, ROED & HITCHINGS, INC. JOB CIVIL ENGINEERS & LAND SURVEYORS SHEET NO, OF B- 2009 Minor Avenue East \\F~ II , ~lqB Seattle, WA 98102 CALCULATED BY DATE ~ -- (206) 323-4144 FAX (206) 323-7135 CHECKED BY DATE 0 BRH 1-800-935-0508 SCALE , , ....I'(l~\ \hetl~ 'S,.xFftC.E - I2'....XSc/ ~bOOSF. 'nPnClOiQES'ft F~11 ~ z.,O >s. fE ~~\ (E~ .....).EC hQ8 .....F \1111':\ BCQ\)\dEd ...... .J'"E\\"tferr\u'O= 1-z,ICV\(\ E)()Oq'l..QlJj I..... .. . JZQ<.::l SF ~.... . ..... --'y U I......... I I ......... . . . \ l) PRODUCT 204,1151"9" Sheets) 2ll5-1(Padded) c/.,' File Input Hydrograph Storage ~Discharge LPool ..... ...'...Bush, Roed & Hitchings, Inc:::::!,:::, :WaterWorks- Release 4 .12g'~':':':':':" [.] Riser Input Dialog Orifice Id. OVERFLOW Descrip: OVERFLOW Riser Diameter. ..... Weir Coefficient '" Orifice Coefficient 12.000 in 9.739 3.782 349 290 ft 351 750 ft 0 100 ft Next . Ok I I Riser Elevation. " . Maximum Elevation. . Stage Disch Increm . Get. Prey I Delete . Insert. Cancel Help Enter 8 char Storage ID c He File InJ?ut Hydrograph ~Storage Discharge LPool .. ....'..Bush, Roed & Hitchings, Inc: WaterWorks - Release 4.12g':':':':'::::::::':': Trapezoidal Vault Input Dialog Trapeziodal Vault Id' C,i Proj. 97312 :::-....:0.. Proj, 97312 [.] Description: TRENCH Length. 100.000 1 Width.: 12.000 1 Infiltration Rate: Starting Elev ...: Max Elev of Vault: Stage-Sto increment H:1V H'lV 1 500 346.000 349.290 0.100 1 H:IV 1 H'lV mini in - ~f+.'G ft ft ft (f'tiG Structure Vol' 5207.8 cf o 120 acft Get Ok Pre v Next. Insert I . I . . Delete I Cancel Get the next record in the list 70 .;( .............. ...................... N.;.;.;::...:::::.:,,' ..... .. ........... ..:-:......:.:.:.:.:.::::::::::;::::::::::::.::K:::::...... ................... ............... :'>:::::::.::::::..:::.:.:::::::::.:.:.:,::::::::.::::::: ::::.::::::::::::::.... "::.................'........... ... ................. ...... .... Menu. Perform Level pool computations using input table instructions File Input Hydrograph Storage Discharge ~LPool Routing Comparison Table MATCH INFLOW STO DIS PEAK PEAK PEAK PEAK No. No STG OUT proj: 97312 DESCRIPTION OUT HYD -------------------------------------------------------------------------- -------------------------------------------------------------------------- 10 YEAR 100 YEAR o 00 o 00 1 09 TRENCH OVERFLOW 349.23 1.57 TRENCH OVERFLOW 349.27 1.09 1 55 21 21 ==================>Done<==================== Press any key to exit (e'.... ..J'........ :.~~:.:... Menu Perform Level pool computations using input table instructions e 01/15/99 RA.INFALL FILE CHART7 RND r; LiNe lU -------- LINl#1 UlSCKIPIION I DOWNLINE# I I 1 ~ CB#1-CB#T1 I DNLN = 0 I 2 ! CB#I-CB#7 I DNLN = 1 -I :3 I CB#1- eB#2 I DNLN = I 4 I CR#?-CR#3 1 DNLN = 3 I 5 I CB#3 - CB#4 I DNLN = 4 1 6 I CB#4-CB#7 I DNLN = 5 -I C7,1, CB#4-CB#5 ! DNLN = 5 I R I CR#5-CR#6 I DNLN = 7 STORM seweR SUMMARY RePORT PIPE CONVEYANCE CALCULATIONS FILE 97312 STM ~LOW KAll IN~O 25 YEAR DESIGN STORM PIPe IN~O PAG[ 1 or 1 7/ I = 11 0.20./ ( Te + 3 250.)' 0. 660. HYUKAULl C INf-O [lNC AKlKUNO~~CIINLlIMlIINLI IJlNC CIAt INPUIU IUNHOKMISlLUlINVeKI JPIPe l NVAL IHtiLSLOPIc[HYU tiKI) [ VIcL ITOT ARIWEIGHTD[ Te LTOTL IlTOT CIAl TOTALQ IFLOWCAPlTYPE lUP/DOWN ILEN IINVSLOPI JLC [UP/DOWN [UP/DOWN I (ae) I C I (min) I (in/h) I (cfs) I (efs) I (cfs) I (in) I (ft) I (ft) I (ft/ft) I (ft/ft) I (ft) I (ft/s) I o.,D~ 1 21 1 0. 31 (} 31 ! {} 31 0. 91 I a 11 0. 71 I 0. 21 0. 51 I o 11 on I 0. 11 0. 21 1 a 11 0. 11 I o 901 0. 90.1 I a 90.1 0. 901 I () 90.1 0.901 I o 90.j 0. 90.1 I a WI a 90.1 I 0. 90.1 0. 901 I a 90.1 o 90.1 I D 901 a 90.1 I 0. 0.0.1 17 291 I o OO! o 001 I a 0.0.1 16 53l t 6 o.o~ 15 181 I o 00-1 1259j 1 O_OOj o DOl I 6 001 10. 101 I fi OOj 6 DO.l I 5 06~ 1 50.1 r 5 061 5- 061 ! 5 061 1 541 t ?Mj 1 611 I 5- 0.61 1 78! I 5_061 5061 I 2541 1 991 I ? M1 2 541 I 0. 00.1 1 661 I 1441 1 441 ! 1 151 1 27! t 0. 341 O%t j 0. 831 0. 83j I o 501 0. SOl I a 291 0. 4Di t (} ?31 o 231 l 0. 001 1 661 I o 001 1 44-1 I o D~I 1 27j 1 0. 001 0. 9&1 I 0. DO.l :0 83j I o 001 O'SOI 1 0. 0.01 o 401 I 0. 001 0. 231 I ~ 9 31 t j 2 81 ! I 2 71 t j 2 71 I ! 3 51 I I 271 I I 3 51 I ! 3 51 L I 12DI 349 261 l2D1 346 001 1 I 12DI 348 0.81 12DI 347 541 ! ! 12D1 347 931 l2D! 347 54! 1 I l?DI 348 451 12DI 347 931 I I , , 12Hl 349 10 I 121011 348 45j I I 1201 349 571 121}! 349- 1 {) t I I 12ftl 349 401 12W-! 349 10. I t I l?Hl 349 fi9j 121011 349 401 I 55\ I ! 1011 1 I 771 I I I 0. 0121 o 059j 1 o 0121 o 005l ! o 0121 ODDS! t 0. 01?1 a 0051 1 o 0.121 o 005! I o 0121 o 0051 I 0- 0121 0005j 1 OD1?1 o 0.0.51 I 0. 0591 1 00 I I 0. D02j 1 00 1 I o 0011 1 00 j I o 0011 1 00 ! I (} 000.1 1 ,00 j 1 o OOO! 1: 00 t I o 00.01 1 001 ! o OODI 1 DO I I 349 561 346 30.1 I 350 881 3SO 6') I 1 350'781 350 691 I 3S0 RBI 350 821 I 350 941 35090j ! 350981 3S0951 I 350. 961 35Q %1 I 35fl%! 350. 961 856 8 56 1 83 1 83 1 62 1 62 1 ?3 1 23 o 83 0. 83 o 64 0. 64 o 40. 0. 40 073 o 23 e 1 1D3j I I 1301 I 1 951 I I 601 I I S6! j ,0 ~\ l'1 ~ I ~ o 79 e Section X Covenants, Dedications, Easements The Owner wIll be responsible for maIntamIng the facIlIty Only onsIte stormwater WIll be controlled or conveyed by the system, therefore easements are not reqUIred. e e e c c 14-- Section XI Property Owners Association Articles of Incorporation N/A 7? e Section XII Other Permits or Conditions Placed on the Project The stormwater wetvault wIll be structurally desIgned by others The bUIldIng permIt process WIll cover thIS process. c o e c c EROSION AND SEDIMENTATION CONTROL REPORT FOR RITE AID LOCATED AT SOUTHWEST CORNER OF VANCIL ROAD & YELM A VEUNUE E. (S.R. 507) OWNER. THE BALDRIDGE GROUP 12813 FLUSlllNG MEADOWS DRIVE ST LOUIS, MISSOURI 63131 Ph.(314) 966-2300 I hereby state that tlus Mamtenance Plan for Rite Aid Puyallup Canyon has been prepared by me or under my supervIsIon and meets the standard of care and expertIse wluch IS usual and customary m tlus commumty for professIonal engmeers. I understand that PIerce County does not and will not assume liability for the sufficIency, sUItabilIty, or performance of the dramage facilItIes prepared by me. PREPARED BY BUSH, ROED & HITClllNGS, INC 2009 MINOR AVENUE EAST SEATTLE, WA. 98102 Ph. (206) 323-4144 Fax. 323-7135 ENGINEER. BRENT D CUMMINGS January 19, 1999 c c e EROSION CONTROL/SEDIMENT REPORT 1 CONSTRUCTION SEQUENCE AND PROCEDURE--------------------____ 1 2 SOIL STABILIZATION AND SEDIMENT TRAPPING-------------------- 3 3 PERMANENT EROSION CONTROL AND SITE RESTORATION------ 4 4 GEOTECHNICAL ANALYSIS AND REPORT------------------------------- 5 5 INSPECTION SEQUENCE-------------------------------________________-______ 6 6 CONTROL OF POLLUTANTS OTHER THAN SEDIMENTS------------- 7 7 UTILITIES-------------------------------------___________----------------__________ 8 8 APPE]\[[)l)(---------------------------------________________---------------------_____ 9 o e o 1 CONSTRUCTION SEQUENCE AND PROCEDURE 1 Contact the CIty ofYelm Department ofPubhc Works and schedule a preconstructIon meetmg. 2 Install filter fabnc fence, CB protectIOn, mterceptor swales, Sediment traps and other ESC measures as mdIcated on the erosIOn control plans. 3 All temporary and permanent eroSIon control measures shall be mamtamed and reparred as needed to assure contmued performance These measures shall be repaIred to theIr ongmal desIgn condItIon. 4 StrIp the SIte m the presence of the on-SIte geotechmcal engIneer so that proper evaluatIon of the subgrade can be made Tills may Include prootfolhng With rubber tIred eqUipment or other means to detect soft areas willch need to be replaced pnor to fill placement. 5 Install temporary constructIon entrance 6 PrIor to ant constructIon the contractor shall revIew the recommendatIons of the SIte geotechrucal engmeer report prepared by Gales EngIneenng AsSOCIates, Inc RelatIvely large settlements are expected on tills SIte due to the underlymg orgamc silt matenals and the proposed depth of fill. 7 Fill SIte m 8-mch lifts and allow for expected settlements as recommended by the soils report. Fill matenal shall meet the charectenstIcts of "common borrow" per sectIon 9 03 14(3) of the 1996 WSDOT/ APW A standard specIficatIons or "gravel backfill for walls" per sectIon 9 03-12(2) as per the on-SIte soils engmeers recommendatIons and condItIOnS of the SIte dunng constructIon. NatIve matenal may be acceptable With the approval of the SIte soils engIneer 8 Install new utilitIes and storm draInage structures as reqUired. Install block and gravel filter Inlet protectIon on new storm dramage structures. No more than 500 feet of trench shall be left exposed at any tIme If dewatenng deVices are reqUired for constructIOn, water shall be routed to the sediment trap Cavmg of trench walls should be expected 1f constructed m natIve matenals. See current geotechrucal engmeenng report for expected subsurface condItIons. 9 Construct new buildmg. Dunng the constructIon penod, any and all pollutants other than sedIment willch are used on-SIte shall be handled and dIsposed of m a manner willch does not cause contarmnatIon of stormwater 10 Final grade and pave SIte 11 Landscape or hydro seed all exposed areas. 12 Remove catch basm grate protectIon and clean storm dramage system (do not flush) after vegetatIon has been stabilized. c e o L 13 Remove all erosIOn control measures when entIre site IS stabilized. All temporary erOSIon control measures shall be removed 30 days after final SIte stabilizatIon or after they are no longer needed. Trapped sediment shall be removed or stabilized on-sIte DIsturbed areas resultIng from sedlffient removal shall be permanently stabilized. 14 Contact the City of Yelm Pubhc Works Department for final mspectIon. e c c s 2 SOIL STABILIZATION AND SEDIMENT TRAPPING Filter fabnc fence will be mstalled to prevent silt laden storm water from leaVIng the sIte. The filter fabnc fence will also serve as the Iirrnt of cleanng on the north and west property lines. A sediment trap will be mstalled near the southwest comer Interceptor ditches will be mstalled around the penmeter of the sIte to direct silt-laden runoff to the sediment trap Rock check dams will be mstalled m the mterceptor ditches to reduce sedIment transport. To protect off-SIte facilities from sedimentatIon catch basm protectIon will be mstalled on all of the off-SIte catch basms surrounding the sIte Also, a stabilIzed rock constructIon entrance will help reduce the amount of debns transported off-site and mto the nght-of-way DIrt whIch IS tracked mto public nght-of-way will be reqUired to be removed unmedIately The frequency of mamtenance will depend on the amount of rarnfall. Soils on the sIte currently support vehIcular traffic dunng wet weather and should contmue to hold up dunng constructIon If normal precautIOns are taken. Smce fill IS requITed, the type matenal will be deterrnmed by the amount ofrcunfall. If the finIsh grades are reached dunng wet weather, than matenal With less fines will be requITed. c c e 3 PERMANENT EROSION CONTROL AND SITE RESTORATION Grades between the mfiltratIon trench and property line will match the existmg. Slopes between the future nght-of-way line and onsIte parkmg will be no more than 2 1 (RoY) All slopes will be landscaped as per the landscape arcmtectural plans. Since the sIte IS relatIVely flat, eXlstmg soils on the sIte are stable and do not present a senous eroSIOn control problem. Lf c o o s 4 GEOTECHNICAL ANALYSIS AND REPORT An underground vault will be used for water quality treetment and an mfiltratIon trench IS proposed for detentIon. Therefore, there IS no danger of dramage onto adjacent property For geotechmcal Information pertmmng to tlns SIte see Report of Geotechmcal InvestIgatIon by KleInfelder, Inc Project No 60-1742021 Date October 10, 1997 Relevant portIOns of the Geotechmcal Engmeenng ExploratIOn are located m the Storm DraInage Report as part of tlns subffilttal. c c e f..o 5 INSPECTION SEQUENCE The followmg measures are necessary for proper erosIOn/sedunentatIon control. Phase I The contractor will mstall the filter fabnc fence shown on the plans. Catch basm protectIon will also be mstalled where shown on the plans. Phase II Install the stabilized rock constructIOn entrance where shown on the plans. Construct the sedImentatIOn trap and cut m the mterceptor ditches assunng posItIve draInage to the sedIment trap The contractor shall have the erosIOn/sedIment control facilities mspected after completIon of tills work. Phase ill Rough grade the sIte. Regrade the mterceptor ditches dunng rough grading to assure posItive dramage to the sediment trap Contractor shall Inspect the erosIon/sedIment control measures each day or after heavy raInfall. Remove sediment from rock check dams when accumulation reach a depth of 6 mches. Remove sediment from the sedIment trap when accumulatIons reach a depth of one foot. e c c 7 6 CONTROL OF POLLUTANTS OTHER THAN SEDIMENTS The contractor will be requrred to perform all constructIon stagmg on-site. In additIon, concrete truck washmg will be reqUired to be performed m a centralized deSIgnated area. Stock piled matenals will also be requrred to be stored on-SIte No matenals will be allowed m public nght-of-way After constructIon the only pollutants expected on-SIte are those generated by cars and by fertilizatIon of landscapIng. All of these pollutants are addressed by the BMPs proposed to be Installed on the sIte. c e c 8 7 UTILITIES A samtary sewer STEP mam IS available on the Yelm Avenue East frontage. A stub has been proVided and all trenchIng will occur wrthm the boundanes of the sIte work. No addinonal measures are requIred. Water maInS are located m Y elm Avenue East and Vancil Road. Fire and domestic water semce will looped and tIe Into both eXistIng mams. The maJonty of the work will occur WIthIn the lImits of the SIte and have easements dedicated. No addItIonal measures are requIred. ~ APVE-rroU' G e 1/13/99 8:56:8 am Bush, Roed & Hitchings, Inc page 10 BASIN SUMMARY (0 BASIN 10: 100YR SBUR METHODOLOGY TOTAL AREA.......: RAINFALL TyPE....: PRECIPITATION....: TIME INTERVAL....: NAME: DEV 100 YEAR 24 HR 1.82 Acres BASEFLOWS: 0.00 cfs TYPE1A PERV IMP 4.20 inches AREA. . : 0.40 Acres 1.42 Acres 10.00 min eN. . . . : 90.00 98.00 TC. . . . : 5.00 min 3.20 min ABSTRACTION COEFF: 0.20 impTcReach - Sheet L: 54.00 ns:0.0110 p2yr: 2.20 s:0.0185 impTcReach - Channel L: 406.00 kc:42.00 s:0.0050 PEAK RATE: 1.57 cfs VOL: 0.57 Ac-ft TIME: 470 min BASIN 10: 10YR NAME: DEV 10 YEAR 24 HR SBUH METHODOLOGY TOTAL AREA.......: 1.82 Acres BASEFLOWS: 0.00 cfs RAINFALL TyPE....: TYPE1A PERV IMP PRECIPITATION....: 3.00 inches AREA. . : 0.40 Acres 1.42 Acres TIME INTERVAL. . . . : 10.00 min eN . . . . : 90.00 98.00 TC. . . . : 5.00 min 3.20 min ABSTRACTION COEFF: 0.20 impTcReach - Sheet L: 54.00 ns:0.0110 p2yr: 2.20 s:0.0185 impTcReach - Channel L: 406.00 kc:42.00 s:0.0050 PEAK RATE: 1.09 cfs VOL: 0.39 Ac-ft TIME: 470 min C BASIN 10: 2YR NAME: DEV 2 YEAR 24 HR SBUH METHODOLOGY TOTAL AREA.......: 1.82 Acres BASEFLOWS: 0.00 cfs RAINFALL TyPE....: TYPE1A PERV IMP PRECIPITATION....: 2.20 inches AREA. . : 0.40 Acres 1.42 Acres TIME INTERVAL....: 10.00 min eN . . . . : 90.00 98.00 TC. . . . : 5.00 min 3.20 min ABSTRACTION COEFF: 0.20 impTcReach - Sheet L: 54.00 ns:0.0110 p2yr: 2.20 s:0.0185 impTcReach - Channel L: 406.00 kc:42.00 s:0.0050 PEAK RATE: 0.76 cfs VOL: 0.28 Ac-ft TIME: 470 min BASIN 10: WQ NAME: DEV 6MO/24HR-WATER QUALITY SBUR METHODOLOGY TOTAL AREA.......: 1.10 Acres BASEFLOWS: 0.00 cfs RAINFALL TyPE....: TYPE1A PERV IMP PRECIPITATION....: 1.40 inches AREA. . : 0.00 Acres 1.10 Acres TIME INTERVAL....: 10.00 min eN....: 0.00 98.00 TC. . . . : 0.00 min 3.20 min ABSTRACTION COEFF: 0.20 impTcReach - Sheet L: 54.00 ns:O.Ol10 p2yr: 2.20 5:0.0185 impTcReach - Channel L: 406.00 kc:42.00 5:0.0050 PEAK RATE: 0.31 cfs VOL: 0.11 Ac-ft TIME: 470 min e c \0 .Ow JOB ~ ~ '\ '""\ \ c... . 0 \ BUSH, ROED & HITCHINGS, INe. CIVil.. ENGINEERS & LAND SURVEYORS ~ 2009 Minor Avenue East ~ Seattle, WA 98102 .......-. (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 SHEET NO, CALCULATED BY CHECKED BY SCALE s ~..~. ~ <::;.~~\~ -t \<Q...f>....... \)0/q, \Q?e~ ,..19 ~t~C / '1.4 T{'~p .\,-J a.. ~ ...S yr+ y\.c...(. l,..., 0"'" ('" o...A' eo-.. '{~~'- ~~-k ~l J II OF (fA. ~ DATE l.4.. 10 - ~ e pg~wl<- ~l'O~: (SA') c...~. - -'2..9 60 ~~\Ja.(~ ~j-~~ : (i.~.e;Q)(I.Q~0 =- ~1.le~ " 20 sf W~ -:. 7<;wY8 'b~+-+p~ = . I . I . "2, j ,,><-2.]. PROOUCT204'll~11\jIl SbooIsj2llS-1 (PllIloI) Df 1.09 4fs ;..~.....r{.'.'~..';;;.""'.' c c \ 12. ENGINEER'S INSPECTION REPORT FORM PrOject Name, Plat Name: County Development Engineering Number Project BuIldmg Permit Number Location (address, Section, Township and Range). '.\ 41 Pierce Pond Information: 1 Type: 2(a). After pond construction, have mfiItratlOn tests and/or soIl logs been completed? 2(b) Indicate test results and compare with deSign critena (pre-construction soils mformation). do the post-constructIOn values indicate a need to modify the system design? Explain. 3 Outlet Type Filter, Oil Water Separator, Smgle orifice, all Water Separator, Multiple onfice, Slot, V-notch, Other ( 4 Outlet works at correct elevatlon(s), (hst the structures and elevatIons) filter fabnc mstalled properly (If needed), etc. 5 Spillway at correct elevation, slope, adequately armored, etc. Conveyances: Channels properly graded, sloped, planted, etc. e ~ N -2 I t (0 03 o \ IS. 2. Storm drains at proper grade, inlets as designed, trenches as designed, pipe bedding properly prepared, backfilling procedures correct, matenals as specified, etc. . Roof Leaders: Do roof leaders d.ram to infUtratlOn trenches or as shown on the approved plans. Erosion Control: (This section to be filled out by ESe Lead) 1 ErOSIOn facilItIes m place at the speCIfied tIme relative to other constructIon. 2. Construction entrance pad as speCIfied. DId facIlitIes keep sedIment, mud etc, out of water bodies, wetlands, and from crossing the property boundary 4 Are permanent erosIOn control measures 10 place and as deSigned. As-Built (Record) Plans: An "as-built" (record) set of plans for the storm dramage system must be submitted to the MunICipality with the form. The plans must be Identified as "as-built" (record) and stamped, signed and dated by the Project Engineer Any alterations to the system which vary from the accepted deSIgn must be noted on the "as-built" (record) drawings. N -3 c c c Notification of Completion: I, or someone under my direct supervision, inspected the constructed storm drainage control facility located on the project known as and)>ased on the current standard of care and expertise whIch IS usual and customary m this communIty for professional engineers, I fmd that It conforms to the terms and conditions of the approved plans and specifications for the project. Signature: Dated. Seal. N-4 14 ( c I I to I I I I I I I Ie I I I I I I I Ie l .iJM: .. KLEINFElDER JS; Report of Geotechnical Investigation Proposed Rite Aid Store - MP #97-327 State Highway 507 & Vancil Road Yelm, Washington Prepared For" Baldndge Development Group, L.L. C Copyright 1997 Kleinfelder, Inc. All Rights Reserved Unauthorized use or copying of tlus document is strictly prohibited. See .. Application For Authorization To Use" located at the end of this document if use or copyiog is desired by anyone other than Client and for the project identified above. 6O-17"2021:\l~17rI21.doc Copyript 1m 1C~.1Dc:. :.~~,.,.. I I to I I I I I Ie r ,e \.,;....."'. ~'s.,.... III KLEINFELDER TABLE OF CONTENTS PAGE ~"~C:lJ~I1{~ S~~ ..............................................................................1 1.0 IN'TRODUCTION AND SCOPE ..................................................................1 1 1 ProJect Descnptlon 1 2 Purpose and Scope 1 2.0 FIELD EXPLORATION Ai.'ID LABORATORY TESTING ................................. 2 2 1 Field Exploration 2 2 Laboratory T estmg 2 ] 3.0 SITE CO~nITIONS . ... ~... ... .......... ........................ ............ ... .......... ... .... ....3 3 I Site Geology 3 2 Surface Conditions. 3 3 Subsurface Conditions 3 4 4 4.0 <:()~<:~{]S;I()~S ......................................................................................4 5.0 lt~<:()~1J\.~~~1rI()~5; ............................................................................5 5 1 Site Cleanng and Preparation 5 2 Earthwork 5 3 Temporary ExcavatIons 5 4 FoundatIons S S Concrete Slab-on-Grade Construction 5 6 Pavement Sections S 7 Other Dramage ConSIderatIons 5 6 6 7 8 8 9 6.0 ~1)I>I1rI()~~~ ~~Il~I<:~ .........................................................................9 6 1 Plan ReVIew 62 Project Bid Documents 6.3 ConstructIon Observation and Testmg. 9 9 10 7.0 ~~II1r~1rI()~S; ......................................................................................10 PLATES Plate 1 Site LocatIon Map Plate 2 Site Plan APPENDICES A Bonng Logs Al Bonng Log Legend A2 Key to Soil Classification and Terms AJ-AS Bonng Logs B ApplIcation for Authonzatlon to Use 60-174202\1:\ 1997\wpclraft'6O 17r 1:Z l.doc Cop)righc 1997 lOcinteldcr. Inc. PaFiofi Prinled: 10/09/97 ~i'r'.t~ _ ,~.;."" ,,,,(~ ;~11'!'~"""'- J.,~ ,~ . I I ro I o o :f;-' III KLEINFELDER EXECU1TVES~RY In response to your request, Klemfelder has completed a geotechmcal investigatIOn related tp the design and construction of a proposed new RIte .~d store located at the southwest corner of State Highway 507 and Vancil Road In Yelm, Washmgton as shown on the Site Location Map, Plate I Based on the results of our mvestlgatIon, the site IS sUItable for the proposed construction from a geotechrucal perspective Key design Items are summanzed below, and are discussed m greater detail In the body of thiS report. ThIS summary IS Intended for Introductory and reference use only A thorough readmg of the entire report IS essential to develop an understandmg of the total deSign concepts and hmItatIOnS SOlIs: The results of the subsurface explorations indicate that the project site IS underlam by medium dense to very dense sand and gravel with vanable slit content and occasIOnal cobbles. Bonng locations are shown on the Site Plan, Plate 2 The bonng logs are presented m Appendix A. With the exception of the asphalt base course and gravel fill indicated on the bonng log for B- 2, no eVIdence of fill was encountered m the bonngs Groundwater: Groundwater seepage was not encountered In any of the bOrIngs at the time of dnllmg. Site Earthwork Recommendations: We expect that over the majorIty of the Site, It will be necessary to stnp only the eXIstmg asphalt and topSOIl pnor to subgrade preparation Near surface soils encountered below the asphalt and base course generally have a hIgh proportion of fines and WIll therefore be mOIsture senSItive. If possible, we recommend that gradmg and filltng be performed dunng perIods of relatively dry weather The exposed subgrade should be proof rolled (or probed) and compacted before any new fills are placed Site cleanng and preparation recommendatIons are prOVIded m Section 5 1 If site cleanng, preparation and earthwork must take place dunng wet weather, recommendations are proVlded In SectIon 5 2 for earthwork dUrIng wet weather construction. Structural Fill: The on-site soils below the topsoil and/or eXisting pavement are generally SUItable for use as structural fill dunng dry weather and provIdmg that mOisture contents are adequately controlled. However, the near surface soils have a high proportion of fines and may reqUire mOIsture condltlOrung to achIeve speCIfied compaction levels. The use of Imported crushed rock or pit run sand and gravel may be required If construction proceeds dUrIng wet weather All Imported structural fill for placement dunng wet weather should consist of well- graded sand and gravel With less than 10 percent fines (portion passmg the No 200 sieve) See SectIon 5 2 Compaction: All natIve or Imported structural fill placed for support of the proposed buildmgs should be compacted to at least 95 percent of the MOD (maximum dry denSIty), as deternuned by the ASTM D-1557 test procedure. Fill placed m areas to receive new pavement should be compacted to at least 95 percent of the MOD to a depth of 2 feet below grade. Beiow tlus depth, fill should be compacted to at least 90 percent of the MOD Waste fill In landscapmg areas need only be compacted to the degree reqUired for trafficabihty of construction equipment 60-1 74002I6017R12 I Copyright 1997 Klcinfcldcr lnc. Pa~ I of2 Print.ed: 10109197 j.~..:r,iJ~:.~; t~ I I Ie I I I I I I II i II II C II I I I I I I IC I ... ~eln III KLE/NFELDER Slopes: No slgruficant permanent cut or fill slopes are anticipated for tillS proJect. Temporary Excavations: We anticipate that temporary excavations can be accomplished at trus site uSlOg conventIonal equipment The soils encountered are conSistent With a Type C soil when applymg the OSHA regulations on sloplOg and shonng excavations, See Section 5 3 Building Foundations: Based upon the solis encountered. shallow spread foundations can be used for this project provIded footlOg excavatIons are prepared In accordance WIth the recommendations provIded 10 Section 5 4 IndivIdual column footmgs with loads up to 60 laps and mIrumum Widths of 24 IOches and contmuous stnp footmgs With loads up to 3 laps per foot and mmImum wIdths of 18 mches maj be deSigned for beanng pressures up to 3,000 pounds per square foot. This allowable soil beanng pressure apphes to dead and long-tenn hve loads, and may be mcreased by up to one-thIrd for wmd or seismIC loadmg conditions For frost protection, exterIor footmgs should be founded a minImum of 18 mches below lowest adjacent grade; IOtenor footIngs should have a mInimum embedment of 12 Inches. Total settlements are not antIcipated to exceed I lOch, With less than Y2 lOch of dIfferential settlement between adjacent footmgs. See Section 5 4 Slabs-on-Grade: We recommend that floor slabs be underlam by a mInImUm 4 Inch thick layer of free drammg sand and gravel fill An Impermeable membrane should be Installed If mOIsture senSItive floor covenngs are used See Section 5 5 Seismic Hazards and Design: The proJect site IS located withIn Zone 3 on the Selsrruc Zone Map of the UnIted States, Plate No 16-2 10 the 1994 edition of the UBC (Umform Buildmg Code) The SIte coeffiCIent used m calculatIng seismiC forces on structures IS based on soil profile type ThiS relationship IS Indicated 10 Table 16-J of the UBC Based on the subsurface conditions encountered 10 the bOrIngs and on our understand 109 of the geology In the vIcmlty of the SIte, we conclude that the approprIate soil type IS S2 WIth a correspondmg "S factor" of 1 2 Pavements: We recommend that the prehmmary deSign pavement section In automobile parkIng areas conSIst of 2 Inches of Class B asphalt concrete and 4 Inches of crushed rock base course. In truck traffic areas, the tluckness of Class B asphalt concrete and crushed rock base course should be Increased to 3 Inches and 6 Inches. respectively See Section 5 6 for a more thorough diSCUSSion of Pavement recommendations. 60-174002160 17R 121 Copyrighll991 K1ciafc/dcr. Inc. Page 2 0(2 Prinsed; 10109197 .~.~', , ... ......'"'~" - I I 10 I t I I I I [e l o ~;'I:I' RI KLEINFELDER REPORT OF GEOTECHNICAL INVESTIGATION PROPOSED R.lTEAID STORE - MP #97-327 STATE HIGH\VAY 507 & VA~CIL ROAD YELM, "ASH~GTO~ 1.0 L'lTRODUCTION AND SCOPE 1.1 Proj eet Description ThIS report presents the results of our geotechnical mvestlgatlon for the proposed Rtte AId store tn Yelm, WashIngton, The approxImate location of the project site IS shown on the Site Location Map, Plate 1 We understand that the project wdl Include construction of a 16,730 square foot, one-story bUilding. We further understand that the building may be of masonry construction and that the floor will be constructed at grade Structural loads for the bUIlding are not known at thIS time For the purpose of this report, we have assumed that mdlvIdual column loads WIll not exceed 60 kIps per column and that wall loads wIll not exceed 3 kips per hnear foot. Paved parkIng stalls, paved Intenor roadways plus landscapmg, utihues and other appurtenant features will be located adJacent to the budding. The scope of geotechmcal and envIronmental services for the subject Rtte AId store III Yelm IS described In our wntten proposal for these services. Verbal authonzatlon to proceed WIth tlus work was gIven by Mr Wayne Miller of the Mulvanny PartnershIp Because of the very short time frame available to complete work on the Site, Mr Miller requested that we continue to prOVIde servIces based on hIS verbal authonzauon. All work for thIS project has been performed In accordance WIth our proposed Master Services Agreement with the RIte AId CorporatIon dated June 19, 1997, In accordance WIth the verbal authonzatlon from Mr Miller 1.2 Purpose and Scope The purpose of tlus investigatIOn IS to evaluate the subsurface soil and groundwater conditions at the project SIte, and to develop geotechnIcal recommendatIons and cntena for project desIgn and construction. Our specific scope of servIces Includes the follOWing tasks 1) Collect and review readily avadable geotechmcal and geologiC data for the project area. 2) Perform a geotechmcal site reconnaissance pnor to the subsurface investIgation. 3) Plan and conduct a subsurface investigation consIsting of advanCing three hollow stem auger bonngs to depths ranging from 6 5 to 13 feet to provIde information relative to soil, groundwater. and other geologiC condlt1ons In the VIClruty of the proposed development. 60-174002160 17R12I Copyright 1997 Klcinf'clder. lnc. Pagc I of 11 PrUud: 10109/97 - ;-:~,~~ I [0 ,0 o III KLEINFELDER 4) Conduct limited laboratory testing in general accordance with appropriate American Society for Testing Matenals (ASTM) standards to check the visual soil classifications and to provide estimates of engineering parameters necessary for geotechnIcal design. 5) Based on the field exploration and laboratory testmg programs. provide diSCUSSIOns and recommendations regarding the followmg: . Regional geology and seismicity; . General site surface and subsurface conditions, . Shallow foundation deSign Includmg soil contact pressures, embedment depths, resistance to lateral loads, and settlements; . Earthwork construction Includmg site preparation. fill placement and compaction, . Anticipated excavation conditions, . SOIl slopes, . Subsurface drainage's, . Pavements, . Mitigation of deletenous soil conditions, If appropnate. 6) Prepare a report summanzmg the results of our subsurface exploration program. and our analYSIS and recommendatIOns. This geotechrucal InvestigatIOn report does not mclude an assessment of eXlstmg or potential enVIronmental concerns associated With this site The environmental services proVIded by Klemfelder have been subrrutted under separate cover 2.0 FIELD EXPLORATION AND LABORATORY TESTING 2.1 Field Exploration The subsurface conditions at the project site were explored by drilling 3 test bonngs at the locations shown on Plate 2 Explorations were located In the field by measunng or estimatIng distances from eXIstmg site features. 60-174002160 17R 121 CopyriPi 1997 KJciDfcldcr.lnc. Page 2 of 11 Priated: 10109/97 .'. '. c' _t"':~.{ lit .t- l C I , I I l ~ r c' c The test borings were drilled on September 29, 1997 to depths rangmg from 6 5 to 13 feet below eXJstmg grade. The bonngs were advanced usmg a truck-mounted, hollow stem auger drill rig. Relatively undisturbed samples were obtamed from the bonngs usmg a 2-mch-outside-diameter standard penetration split spoon sampler The sampler was dnven mto the soil with a 140-pound hammer free-falling 30 mches. The number of blows reqUired to dnve the sampler the last 12 mches, or other Indicated distance, IS recorded on the bonng logs. Plate Al presents a bonng log legend (Appendix A) The test bonngs were morutored by an engmeer from our firm who mamtamed detailed logs of the explorations and obtamed representative samples of the soils encountered for further exammatlon In our laboratory The soils encountered were Visually claSSified m accordance WIth the claSSification system described m Plate A2 The bonng logs are presented on Plates A3 through A5 After the bonngs were completed, they were backfilled WIth excavated soil us10g the eqUipment at hand In areas where the eXIstmg ground surface was asphalt, the bonngs were sealed with concrete 2.2 Laboratory Testing Representative soil samples obtamed from the Standard Penetration Sampler were returned to the Klemfelder laboratory for further examInation and testIng to retine the field claSSifications and to evaluate phYSical properties of the SOlis whIch may affect the geotechnical aspects of project deSign and construction The laboratory testIng program mcluded the followmg . MOIsture content tests m general accordance with ASTM Test Method D 2216, The results of the mOisture content tests are mcluded on the bonng logs 10 Appendix A. 3.0 SITE CONDITIONS 3.1 Site Geology The entIre project site IS underlam by glaCial outwash SOils, mapped as Vashon outwash gravel by the Washington DIVISion of Geology and Earth Resources. These soils are thought to have been depOSited dunng the late Pleistocene Vashon Stade some 12,000 to 18,000 years before present. Several feet of silty sand soIls overly the relatively clean glaCial outwash s01ls No surface faults are mapped WIthin the Immediate site VICinIty However, several nonnal faults and an anticlinal ndge have been mapped approXimately 9 mIles southwest of the site 60-174002160 17R121 CGpyrigtlll997 KJein&1dcr. Ioc. P.3ofll PriIud: 10109/97 .. KLEINFELDER o 3.2 Surface Conditions The proJect site IS located at the southwest corner of the mtersectlon of State Highway 507 and Vancil Road m Yelm, Wastungton. The site currently contaInS one reSidential structure, one vacant antique sales bus1Oess, and a church The site surface topography IS relatively flat. The ground surface surrounding the church IS paved. The ground surface surrounding the other structures IS covered WIth topsoil, gravel, and/or grass. 3.3 Subsurface Conditions The results of the subsurface explorations indicate that the proJect site IS underlain by medIUm dense to very dense sand and gravel With vanable silt content and occasional cobbles Bonng B-1 encountered medIUm dense silty sand with vanable gravel content to a depth of approXImately 4 5 feet. B-1 encountered very dense sand WIth lesser amounts of silt and occasional gravel from 4 5 to 6 5 feet. Bonng B-2, m the proposed building pad area, encountered dense gravel fill WIth silt and occasional cobbles to a depth of 2 feet. From 2 to 7 5 feet and from 12 to 13 feet, B-2 encountered very dense sand WIth gravel, Silt and occasional cobbles From 7 5 to 12 feet B-2 encountered dense silty sand With gravel and occasional cobbles B-2 was terminated at 13 feet due to refusal on a cobble The soil profile m B-3 consisted of very dense silty sand With gravel and occasional cobbles to a depth of 5 feet. From 5 to 6 5 feet, B-3 encountered medium dense sand With silt, gravel and occasIOnal cobbles c No groundwater seepage was observed m the bonngs at the time of drilhng. 4.0 CONCLUSIONS It IS our opinIon that the proJect site can be satisfactorily developed as planned usmg standard construction practices The site grading plans were not available at the time thiS report was wntten. Although not encountered m our test bonngs, loose fill or surfiCial soils may be encountered dunng grading actiVIties. These loose matenals, If encountered, will require removal and replacement WIth compacted structural fill Other areas of the site Will require stnpp10g of the upper 0 5 to 1 foot ofloose surfiCial soils (topsoil) and/or asphalt. We recommend that all foundations for structures bear on the medium dense to very dense native soils, or on a zone of structural fill which extends down to the medIUm dense to very dense native soils. Bulldmg slabs, dnveway and parkIng area pavements should be supported directly on the medium dense to very dense native soils or on structural filL Soils that will be excavated from cuts are generally expected to be satisfactory for use as structural fill However, the soils that will likely be encountered m the excavations have a relatively high fines content and are therefore mOIsture-sensitive. It Will be difficult, If not c 60-174002160 17R121 Copyrigbll997 KJeinfeJder, lnc. Page 4 or 11 PrinI.cd: 10109197 - . . '~1~ }"~~,.f..:t;~~~i\i,~;:'t,,,.,;: ~ '~- . o~. ," .~>> P -./ ~ " ~ ~, ,.....~~.,~. ,..,,~t""" ~ '.f?l ;r~,. '. ,.~~;i.~." I II '0 I I I I I I IC I I I I I I I IC I .. KLEINFELDER Impossible, to properly compact these soils dunng excessively wet conditions. Therefore, It will be preferable to schedule site earthwork for extended penods of dry weather in order to minimize earthwork costs We also recommend that all surface water runoff entenng the site be collected and tlghtlined, or otherwIse channeled, to a sUitable discharge pOint to avoid ponding of water on the site SpecIfic recommendations for proJect deSIgn and construction, including mitigation of potential problems described above, are presented 10 SectIon 5 0 5.0 RECO\nIENDA TIO"S 5.1 Site Clearing and Preparation We recommend that all sod and topSOIl be removed from bUildIng and pavement areas Any eXIsting fill 10 bUilding areas that does not meet the reqUirements for structural fill should be removed and replaced. We expect that the eXlstmg asphalt concrete pavement may be left m place, except wIthin the building footpnnt. All detenorated or damaged pavement areas should be repaired or replaced It should be anticIpated that underground vaults or tanks may be present at the site If these structures are to be abandoned, they should be overexcavated and backfilled with structural fill to deSign sub grade elevations. We recommend that site cleanng and preparation be completed dunng pen ods of dry weather to mlnIrruze related costs. Areas that are stnpped or excavated to deSign subgrade elevatIOns, or are to receive structural fill, should be proof rolled with heavy, rubber-tired construction eqUipment (such as a dump truck or large roller compactor) Soft, loose or otherwIse unSUitable areas Identified dunng proofrolling should be repaired as appropnate We recommend that proofrolling of the sub grade be observed by a representative from our firm to assess the adequacy of subgrade conditions, and to Identify areas needmg remedial work. We recommend this procedure not be performed dunng wet weather Dunng wet weather, systematic prob1Og should be used to evaluate the subgrade mstead of proofrolhng. Temporary construction access roads and/or workmg pads consistIng of clean sand and gravel, crushed rock or ATB (asphalt treated base) may be needed to support construction traffic on the site dunng wet weather We expect that the eXIstIng asphalt concrete pavement may be left In place, except wtthIn the building footpnnt and at the locations of other structures. All detenorated or damaged pavement areas should be repaIred or replaced 60-174002160 17R 121 Copyright 1997 Klcinf'ddcr. lnc. P;agd of II PrinIcd: 10109/97 ___';":o':?'-", ,., ,'.. .... ..\:..... :.JIi _ III I,~ Ire 1:1 1'1 1:1 !I ~I I I (', .u ,I 'I ~I I I I II 0 'I ",-Iccn-N-t-t-CUTK S.2 Earthwork Based on the subsurface conditions encountered in the explorations. we expect that all of the soils on the site can be excavated with conventional excavat10g equipment. Cobbles and boulders may be encountered at the site, and the contractor should be prepared to deal with large-sized matenal. New fill for the proJect may be Imported or may come from cuts Into the eXIstIng site soils. Much of the sod In these cuts (With the exception of topsod) are generally expected to be satisfactory for use as structural fill However, some of the sods that Will hkely be encountered In the excavations have a relatively high fines content and are therefore mOlsture-sensltl':e (Note that fines 10 this report are defined as that portIon of the sod pass10g the U S Standard '\;0 200 sieve) It will be difficult, If not Impossible, to properly compact soils \vlth high fines contents dunng excessively wet conditions Therefore. It will be preferable to schedule site earthwork for extended penods of dry weather In order to mInimIZe earthwork costs All Imported structural fill for use dUrIng wet weather should consist of well-graded sand and gravel with less than 10 percent fines (portion pass10g the No 200 sieve) As the amount of fines (portion passing the No 200 sieve) Increases, the sod becomes increaSingly senSItive to small changes In mOisture content and adequate compaction becomes more difficult to achieve, particularly dUrIng wet \veather Generally, sods conta101Og more than about 10 percent tines by weIght cannot be properly compacted when the mOisture content IS more than a few percent wetter than the optimum mOisture content All structural fill materIal should be free of orgaruc matter, debrIS and other deleterIOUs materIal, With no 10dlvldual particles larger than 3-1Oches 10 maximum dimenSion. All native or Imported fill should be placed as compacted structural fill follow1Og proofrolhng. prob1Og, and remedial work on the subgrade, as approprIate The fill should be placed In honzontal hfts not exceeding 10 Inches 10 loose thickness; each lift must be thoroughly and uruformly compacted to an unYielding condition uSing mechanical equipment. All native or Imported structural fill placed for support of the proposed buildings should be compacted to at least 95 percent of the MDD (maxImum dry denSIty), as deternuned by the ASTM D-1557 test procedure Fill placed 10 areas to receive new pavement should be compacted to at least 95 percent of the MDD to a depth of 2 feet below grade Below thiS depth, backfill should be compacted to at least 90 percent of the MDD ThiS 10cludes utihty trench backfill In pavement areas Waste fill 10 landscapIng areas need only be compacted to the degree reqUired for trafficablhty of construction eqUipment 5.3 Temporary Excavations We antiCipate that excavations for footIngs and utihty trenches can be readily made WIth a conventional backhoe or excavator We expect the walls of these trenches to stand near vertically for a short penod of time Without Significant sloughing. If trenches extend deeper than four feet, or If loose soils or groundwater seepage are encountered. 6O-174002I6017R121 Copyright 1997 KJcin{cldcr. lnc. P:agc 6 of II Printed: 10109/97 1& .."H:"~'''. .... '~"~'J,j":Z~'oii}';..~~..,~.~~;~'i~i:~"t'5. ...~. 5"!';~~ t. '\".... ',' ,,: '. f,. ..' ,T ~ " '" r~," ~ ,s.,"',," ..~ I I Ic' I I I I I I Ie I I I I I I I 10 I !M.. ....-K-n:-n"4-,.-t-CUTK the excavations may become unstable and should be evaluated to venfy theIr stability pnor to occupation by construction personnel Shonng or slopmg of deeper trenches may be necessary to protect personnel and provide temporary stability ~I excavations greater than 4 feet depth should be sloped to 1 5H.l V (honzontal to vemcal) to comply with current OSHA and WISHA safety requirements for Type C soils. Dunng wet weather, runoff water should be prevented from enterIng excavations Water should be collected and disposed of outside the construction limits Heavj construction equipment, building matenals, excavated soil, and vehIcular traffic should not be allowed In close proXlrruty to the excavatIons 5.4 Foundations We recommend that the new building be supported on spread footings that are founded on the medIUm dense to dense nattve soils, or on a zone of structural fill whIch extends down to these competent native sOils. Where used, the structural fill should be compacted to at least 95 percent of the maxImum dry density (as determIned In accordance wIth ASTM D-1557) Contmuous wall footings and IndiVidual column footmgs should have mInimum Widths of 18 and 24 Inches, respectively For frost protectIOn. exterIor footings should be founded a minImum of 18 Inches below lowest adJacent grade, interior footings should have a mlmmum embedment of 12 mches Spread footIngs may be deSigned usmg an allowable bearmg pressure of 3000 pounds per square foot (pst) for support on structural fill or on the medIUm dense to very dense native soils. These allowable soil beanng pressures apply to dead and long-term live loads, and may be Increased by up to one-third for WInd or seismic loadIng conditions. We estimate that the total settlement of spread footmgs, founded as recommended, will be less than 1 Inch, wtth less than 0 5 lOch of differential settlement between adjacent footIngs. Loose fill or disturbed soil not removed from the footIng excavations pnor to pounng concrete may result In Increased settlement. The footIng subgfades may possibly be susceptible to disturbance when wet. It may be necessary to pour a lean concrete "mud mat", or place a layer of crushed rock or clean sand and gravel on the bottom of the footIng excavatIOns, to protect the foot1Og subgrades from water and/or wet weather dunng reInforcement bar placement and preparatIOn for plac10g concrete. We recommend that the conditIon of all footing excavations be observed by a representative from our firm pnor to placement of concrete to confirm that the bearIng SOils are undisturbed and that the conditions and construction methods are consistent With our recommendations The proJect site IS located wtdun Zone 3 on the SeismiC Zone Map of the UnIted States, Figure No 16-2 In the 1994 edition of the UBC (UnIform Bulldmg Code) The site coeffiCient used In ca1culat1Og seismiC forces on bUlldmgs IS based on soil profile type. ThIS relattonstup IS Indicated 10 Table 16-1 of the UBC Based on the subsurface conditions encountered In the bonngs and on our understandmg of the site geology, we conclude that the appropnate overall soil type IS S2 wtth a corresponding "S factor" of 1 2 60-174002160 17R 121 Copyrisflt 1997 KJcin(elder. Inc. Page 7 of II Printed: IMl9/97 .--'- ...;- ':",;;' " \ '. . . " ~ .:.: I ". ...,. " 0 ~_ fl... ~.~.;:", 7'!("'~:"','}J;i ~~~f ~ ~...' .' " ~'. _ ~ . I() . :. I. '. III . .. iO ~ .. I i I '. ,II :- :. '. I 'l.O I , t .... ...,. . -. - .- ;t~;)o.\ f ~ :: III KLEINFELDER The ability of soil to resist lateral foundation loads IS a function of the frictional resistance which can develop on the base and the passive resistance which can develop on the face of below-grade foundation elements as they tend to move Into the soli For spread footIngs founded on structural fill placed and compacted In accordance With our recommendations, or on undisturbed native solis, the allowable thctlonal resistance may be computed uSing a coeffiCient of thction of 0 3S applied to vertical dead-load forces The allowable passive resistance on the face of footmgs or other embedded foundation elements may be computed us10g an eqUivalent flUid denSity of 225 pounds per cubiC foot (pcf) (tnangular dlstnbutIOn) for medIUm dense on-site soils. Alternatively, passive pressures may be computed uSing an eqUivalent flUid denSity of 350 pcf for dense native solis and structural fill, prOVIding all structural fill extend10g out from the face of the foundation element for a distance at least equal to two and one-half times the height of the element has been compacted to at least 95 percent of maxImum dry density (ASTM 0-1557) The above coeffiCient of fnctlon and passive eqUivalent flUid denSity values Include a factor of safety of about I 5 5.5 Concrete Slab-on-Grade Construction We recommend that floor slabs constructed on-grade be founded on a mInImum thickness of 4 Inches of clean sand and gravel (less than 5 percent fines) to proVide uruform support and a capillary break. It may be possible to support floor slabs directly on the native SOils If these soils meet the above cntena. In floor slab areas where mOIsture sensitive floor covenngs are planned, an Impermeable membrane (e.g. polyethylene sheet) should be placed over the zone of free-draInIng matenal to reduce the migration of mOisture vapor through the concrete slab The Impermeable membrane should be protected by two 10ches of fine, mOist sand placed both above and below the membrane The sand cover will proVide protection for the membrane and will promote uruform cunng of the slab concrete. The sand cover should be mOistened and tamped pnor to slab placement. 5.6 Pavement Sections We expect that the eXIstIng asphalt concrete pavement may be left m place, except WIthin the buildmg footpnnt and at the locations of other structures. All detenorated or damaged pavement areas should be repaired or replaced. The follOWIng paragraphs proVIde recommendations for new pavement areas, mcludIng patching of detenorated and distressed areas We recommend that the sub grade m new pavement areas be probed or proof rolled With heavy rubber-tired construction equipment pnor to paVIng. Any soft, loose or otherwIse unsuitable areas should be recompacted, If practical. or removed and replaced With structural till. We recommend that the probIng or proofrolhng of subgrade areas be observed by a representative of our firm to Identify areas needing remedial work and to assess the adequacy of subgrade conditions. 60-174002160 17R 121 C4pyright 1997 Kleinfelder. lnc:. Page80fll Printed: lOIfY9/97 .__-c,.-' I I IC I I I I I I I IC I I I I I I I IC I .:.:.0_> KI-KTfTNTt-CU-C-1( We recommend that the design pavement section In automobile parkmg areas COnsist of 2 Inches of Class B asphalt concrete, and 4 IOches of crushed rock base course overlying a subgrade which has been compacted to at least 95 percent of the rvmD <ASTM 0-1557) to a mmlmum depth of 12 IOches In truck traffic areas, the thickness of Class 8 asphalt concrete and crushed rock base course should be Increased to 3 Inches and 6 Inches, respectively An appropnate thIckness of A TB (asphalt treated base) may be substituted for a portion of the crushed rock base course, If deSired The substItution of A T8 for crushed rock base course WIll prOVIde a Similar structural section. but Improve trafficablllty over the areas to be paved pnor to placement of the Class 8 asphalt pavement Our recommendations for pavement sectIons are based on dry \"earher construction conditions. If the pa....ement areas are constructed dunng extended penods of wet weather, a 6 to 12 Inch layer of compacted sand and gravel may be reqUired A separation laver of geotextile fabnc may be used between the subgrade SOlis and the layer of clean sand and gravel to mmuruze the thIckness of select matenal reqUired In areas of soft or disturbed subgrade solis The geotextlle fabnc should be a heavy duty, non-woven matenal 5.7 Other Drainage Considerations We recommend that the ground surface adjacent to bUlldmgs be sloped to dram surface water away from the structures. Roof drams should be connected to a collection and disposal system which IS mdependent from the wall and footing drams As a precautionary measure, we recommend that footIng draInS be mstalled around the penmeter of the buildmg. The footIng drams should consist of a minimum 4-mch perforated ngld-wall dram pipe embedded In a zone of free-draInIng sand and gravel contalnmg less than 3 percent fines. The zone of free-dramIng matenal should be at least 24 mches duck (measured honzontaIly) and extend from near the base of the footIng to wtthm 1 foot of the fimshed ground surface. The perforated dram pipe should be 10stalled near the base of the footmg, and sloped to draIn Into a sUitable collectIOn and disposal system. 6.0 ADDITIONAL SERVICES 6.1 Plan Review We recommend that our firm be gIven the opportunity to revIew the geotechnical aspects of the proJect plans and specIfications after the deSign has been finalized to confirm the applIcability of our recommendatIOns, or to make the appropnate modifications It IS possible that thiS reVlew might Indicate the need for supplemental geotechnical analYSIS, dependIng on the Issues Involved. 6.2 Project Bid Documents It has been our expenence dunng the blddmg process that contractors often contact us to discuss the geotechnical aspects of the project. Informal contacts between KleInfelder and an mdivldual contractor could result In Incorrect or Incomplete mformatlon being provided to the contractor Therefore, we recommend a pre-bid meetmg be held to answer any questions about the report 60-174002160 17R12I Page 9 of 11 Prin&ed: 10109191 Copyright 1997 K1einfelder. lnc. -~Ii--'V"- I I I .0 I !I II 'I I, I I IC I 'I I I I I I o I I ;....L III KLEINFELDER prior to subrruttal of bids. If thIs IS not possible, questions or clanfications regarding the report should be directed to the project owner(s) or their designated representatives. After consultation wIth Klemfelder, the proJect owner(s), (or their representatives) should proVide c1anficauons or additional mformatIon to all contractors biddIng the Job 6.3 Construction Observation and Testing The recommendations presented In thiS report are based on the assumption that an adequate program of tests and observations WIll be made dUring construction to venfy compliance WIth our recommendations These tests and observatIons should Include, but not necessanly be hmlted to, the followmg I Observation and testIng dUring site preparation and earthwork (including cuts and fills) 2 Observation of footIng subgrade preparation and soil conditions. 3 Observation of floor slab and pavement subgrade SOIl conditIOns. 4 Consultation as may be reqUired dUrIng construction. The reVIew of plans and speCifications, and field observation and testing by Klemfelder, are an mtegral part of the conclUSions and recommendations presented 10 thiS report. If we are not retamed for these services, the ClIent agrees to assume Klemfelder's responsibility for any potential claims that may anse dunng construction. 7.0 LThHTATIONS The recommendations contamed In thJS report are based on the field explorations and our understanding of the proposed proJect. The mvestIgatIon was performed usmg a mutually agreed upon scope of work. It IS our oplnlOn that thiS study was a cost-effective method to explore the subJect Site, and evaluate some of the potentIal geotechmcal concerns. The soils data used 10 the preparation of thiS report were obtamed from test bonngs completed at the proJect site. It IS possible and likely that vanatlons m soils eXIst between the pomts explored. The nature and extent of soil vanatlons may not be eVident until constructIOn occurs. If any soil conditions are encountered at the SIte which are different from those described 10 tlus report, our firm should be Immediately notified so that we may make any necessary reVISions to our recommendatIOns. In addition, If the scope of the proposed proJect, locations of structures, or assumed buildmg loads change from the descnptlons given In thiS report, our firm should be notified The scope of our work does not mclude services related to construction safety precautions and our recommendatIOns are not mtended to direct the contractors methods, techniques, sequences or procedures, except as speCifically described m our report for conSideration 10 deSign. 60-174002160 17R121 Copyrip. 1997 Klcinfcklcr. lnc:. Pag.: 10 of II PrinIed: 10J09/97 ~. -....t,;;-;A;.~ ~. I I (0 l t l ~ [ ~ Ie I c .. KLEINFELDER This report has been prepared for planning and design purposes for specific application to the subject project in accordance Wlth the generally accepted standards of practice at the time the report was written. No warranty, express or Implied, is made. This report may be used only by the CLIENT and for the purposes stated, WlthIn a reasonable time from Its issuance. Land use, site conditions (both on- and off-Site), or other factors including advances 10 man's understanding of applied sCience may change over time and could materially affect our findings. Therefore, this report should not be relied upon after 12 months from Its Issue. Klemfelder should be notified If the proJect IS delayed by more than 12 months from the date of this report so that a revIew of site conditions can be made. and recommendations reVlsed If appropnate. It IS the CLIENT'S responsibility to see that all parties to the proJect mcluding the deSigner, contractor, subcontractors. etc, are made aware of thiS report 10 ItS entirety The use of mformatlon contamed 10 this report for bidding purposes should be done at the Contractor's option and nsk. Any party other than the CLIENT who WIshes to use this report shall notify Klemfelder of such mtended use by executmg the ,i Application for Authonzatlon to Use" which follows this document as an appendix. Based on the lOt ended use of the report, Klemfelder may require that additional work be performed and that an updated report be Issued. Non-compliance WIth any of these reqUirements by the CLIENT, or anyone else, will release Klemfelder from any liability resultmg from the use of this report by any unauthonzed party 60-174002160 17R121 Cop)'riPi 1997 KleinreIder. lnc. Page 11 or 11 Prided: 10109/97 ...Jfs..,."IJ'...,... _ --- \ , , ~ ,cf ----- - - --- - - --- ----------- ---...-- ~D~ e ":. a- -c- C7 ~ .." B"''l -- ~ -- ~~ , \D' ,.' ,cf oX " ~O ~ ~. CI)' CI). ,..' ~~ \ , .. "; ! o 1 ---~ .. C) SOIL CLASSIFICATION SYSTEM MAJOR DMSlONS GROUP CiR.OUP NAME ---. COARSE GRAVEL CLEAN ow ~GaIMIL."'1'OCCWtS8 GRAINED ORAVEL GltAWL son.s ~fcn ThaA ~ OP PClClI1r.QWJED Ga.IMlI. of Coane Fnctioa R.A&iDed CID ORAVEL OM SUY GRAVU No. " Sieve wmt FINES I Mare ThaD ~ c;c cum GJtAWI. RctaiDed CID I I No. 200 Sieve SA." 1> CUA.'1 SW WElJ...GJWJED SAM). F1HB 1'0 COAJUB SAND SA.'ID ! I ~{cn TbaD ~~. SP I POOlU..Y ~!AND o(~ Fraaioa I I SM ! SIUY SA.'iO Puscs ! SA. 'ID I I '10. " Sie'ic wmt f'D;t:S I I ! : SC I cur::: $A"n : : i , sn. T A. ',1) etA y I I SIlI FINE j ~n. rNORGA.'iIC GRAlNED I ) soas liquid LimIt I I CL cur Less TbaD 50 ORGANIC I OL I OR.CiA'UC SIl.!. ORGANIC C1.AY Ma"e ThaD 5~ SILT .-\.'\,1> cu.y I MH SIU or B1GH~ EUS'1lC SllJ' PasIe:s DoiORGA.'l1C I >';0. 200 Sieve CH cur Cf HIGH PUSnCrI'Y. F,tJ CLAY Uqu id Limit SO or Men ! ORGA.'l1C I OH OR.G....'UC C1J.y. OR.GA'<IC SIU HIGHLY ORGA.'>lC SOn.S I I i PT PEAt I , PARTICLE SIZE LIMITS () BOUlDERS COBBLES GRAVEL SAND SILT CLAY Coarse Fine Coalse Fme 12" 3" 3/4" #4 #10 #.W #200 0.002 rom Strongest j DESCRIPTIVE TERMS USED WITH SOILS CONSISTENCY clAPPARENT DENSITY SILTS AND CLAYS SANDS cl GRAVELS Han:1 Very Dense Very Stilf Dense Stiff Mcd.iwn Dense Medium S tiff Loose Soft Very Loosc Very Soft MOISTURE CONTENT Wettest ) Wet Very Moist Moist Slightly Moist Dry Weala:st Driest NOTES. 1. FICId c:lassifcation is based on visual examination of soil in gcncrallCCOrdancc wirh ASTM 02488-90. 2. Soil classi1ieation using laboratory tcsls is based on ASTM 02487-90. son. MOISWRE MODIFIERS. Dry. Absence of moisture, dusty, dry to touc:h Moist - Damp. but no visible walcr 3 Dcs:ription of 30iJ dc:n5lty or conmt.ency arc based on Wet. VlJible free water or saturated. usually soil IS IIltcrpretalion of blow count dall.. visualappcarancc of oblAmcd from below water table 30' and! or test dara. C k~ KLEINFELDER KEY TO SOIL CLASSIFICATION AND TERMS eo"ripIlW7~ . - u ... l.EOI!ND1JIU PIA TE A2 r , , ,. , -- ._-. '-- ,-,. J I I 10 I r Surface CondItiona: Graa o.ce 0riIed: llnIr'97 Logged By. SOH Gnlundwater No gr'ClUI1CtftIer obMfwd Apprax. SurfIIc:e a.v (ft): Total 0epCtl: 8.5 feet / ../ FteId L..abaraDy oeSCRIPTlON I ! ~ c c: >0- J i 8- ~ ii ! .i' f ~ III en ~ ~ lj", 0 8' Co ~. .- j ~ ~ E 'i5 ~~ ~i s; a '" .. alii :0:= (; >> e en ....1- ee CD .... e Sod and topsoil SM Carl< Brown silty fine sand with occasional gravel (medium dense. moist) ,.- ~ SM 5.1 23 SM Light Brown silty fme sand with gravel (medium dense, moist) 5 - . SP-SM Light brown sand with silt and occasional gravel (very dense, moist) - 5 I- IX 5014 ~ 10- -10 J 15 - - 15 20- -20 25 25 .... LOG OF BORING B-1 to KLEINFELDER SR 507 & Vancil Rd Yelm. Washington ) I PLATEA3 .I-.....m 1llilMllr,a. LOG 01 IC*NO 11GI2.0I1 Project " 60-1742-02 - - IMM NOTE: See plata A1111C1 A2 lilt ~tiftn of symbols I I I I I I 1(; J ..,.....- .~ ._-- - - ~~;"'~..,.,;...K.'=;r;,~_r.r_.~" _.__n ~~1;1,~;.:r,i;;n- wj ( Surface CondIIIona: AIpNlt 08le 0riIIed: 9I2M7 Logged By: SGH Groundwater No ;roundwate' obMfved Apprax. Surface EJey (ft): Total Depth: 13 feet ) L..aborItIIlc 'f Field DESCRIPTlON - ! i C" { :g ! ~ &. c: ~ I 1 ~i '>: ~ .. II) ~ ii '= <.J t Q, J~ ~ Q. .~ . j :J "6- ~i 0 w ... Ill- !u ::: (; IJ 0 II) -'~ 00 III -' 0 2"' ot asphalt and 6" ot CNShecI rocIc base course p'-..I GP-GM Carl< brown gravel with fine to medium sand and silt (dense. moist) FILL he x - SP-5M Carl< brown fine to medium sand with gravel. silt. and occasional cobbJes (very dense, SM 6.4 5014 moist) '-' 5 - f- 5 r- I SM Brown silty medium to coarse sand with gravel and occasional cobbles (dense, moist) ~ 48 I 10- -10 ~ :2 r SP-5M Brown fine to medium sand with silt. gravel and occasional cobbJes (very dense, moist) 5016 "-' 15 - - 15 20- -20 25 2S -? LOG OF BORING B-2 WI KLEINFELDER SR 507 & Vancil Rd Ye/m. Washington )'-4..1'" ICkiIlIIWor. & LOG 01 8OUIO 11GI2.ClPJ Project /I 60-1742.02 I PLATEA4 - - IMm NOTE: See.... AI ud A2 filr "",,"ft.~ of symbols fO (j .. ..-- :c::.:..~__~~~~~ ~""""'-'''::--''::';'':'~_'''':''':'''''::-=';''''''''~==''""''=--''~__'''''~_'__ 4___-"'-"~-'--_.. - .. .__ ._,.....___.....__ _---=--_-_ ,_~~_.-,- C" '- I I to I (' SurflIce CondItiona: BeUy bartc DIlII CrIIed: 8I2M7 Lagged By. SGH Groundwater No graundw8ter obMMld Apprax. SurfKe EIev. (ft): .J TataI Oepch: 6.5 feet L*lratoI y Field DESCRIPTION I ! ~ C' i ~ i 8- C! ~ ! - ~ 1 v- i In j~ "c: (.) .s: 3v 1 Q. "15. .- j g .s: ~~ ~i "15. tI 1lI ~~ ..: <'5 v 0 U) 00 CD ...J 0 TODIOiI SM Brown silty line to mecflUm unci with gravel and oc:casionaf cobbles (very dense, moist) tx SM 5.5 64 I'-' .. 5 - SP-SM Brown line sand with siI, gravel and oceasional cobbles (medium dense, moist) 5 ~ 22 .. . 10- -10 ~ 15 - ~ 15 20- 1-20 25 25 LOG OF BORING B-3 WI KLEINFELDER SR 507 & Vancil Rd relm. Washington )..J CWWIIt97IC1oi1M11r.a. LOO C1I 8llIINO 17CI2.ClPI Project f# 60-1742-02 I PLATEA5 - - IIIIIm NOTE. See plates AI_ A2 fix' ~a.1ioa of symbols I I t (j Oi o o MAINTENANCE PLAN FOR RITE AID LOCATED AT SOUTHWEST CORNER OF VANCIL ROAD & YELM A VEUNUE E (S.R. 507) OWNER. THE BALDRIDGE GROUP 12813 FLUSIDNG MEADOWS DRIVE ST LOUIS, MISSOURI 63131 Ph.(314) 966-2300 PREPARED BY BUSH, ROED & illTCIDNGS, INC 2009 MINOR AVENUE EAST SEATTLE, W A. 98102 Ph. (206) 323-4144 Fax: 323-7135 ENGINEER. BRENT D CUMMINGS I hereby state that trus Mamtenance Plan for RIte Aid Puyallup Canyon has been prepared by me or under my supefVlSIon and meets the standard of care and expertIse which IS usual and customary m trus comrnumty for professIOnal engIneers. I understand that Pierce County does not and will not assume liability for the suffiCIency, SUItabilIty, or performance of the dramage facilitIes prepared by me January 19, 1999 CJ o c\ MAINTENANCE PLAN 1 0 20 30 40 50 60 70 St()rnnl)r~e l'aclUtIes------------------------------------------_______---------- 1 VegetatIon Management Plan----------------------------------------------------- 2 What are PollutIon Source Controls, and Why are they Needed?------------- 3 Purpose of tills PollutIon Source Control Manual-------------------------------- 3 Background 3 Wastes Generated at a Retail Site 5 RequIred PollutIon PreventatIve Source Control ActIons 5 AJ>J>endIx---------------------------------------------------------------------------------------- 7 o c c 1.0 Storm Drainage Facilities The owner will be requIred to maIntaIn storm the draInage facilities on-site m accordance Wlth the City of Yelm standards This mcludes entenng mto an agreement for maIntenance of the grounds and stormwater facihtIes see "Commercial Industnal Agreement to MamtaIn Stormwater Facilities and to Implement a PollutlOn Source Control Plan" m the appendix. The facihtles which requIre maIntenance mclude catch basms which collect dramage, conveyance pipes which convey draInage, a wet vault which treats stormwater for quahty, and a detentlOn system which mfiltrates water at a controlled rate to ground water The result of msufficlent mamtenance mcludes poor performance of the dramage facihtles, possible flooding of the parkmg lot, and 10 cases of neglect, fines as outhned 10 the attached "Commercial Industnal Agreement to MamtaIn Stormwater Facihtles and to Implement a PollutIOn Source Control Plan." The goal of this MaIntenance Plan IS to msure a properly functlOnmg storm draInage system and to aVOld costly repaIrS m the future like replacement of the entire mfiltratlOn system. The Items hsted m "Attachement A" are standard preventive maIntenance Items. Most of these maIntenance Items could be performed by the on-site manager, property manager, or a landscapmg contractor The estunated yearly cost of maIntenance of these facihtIes IS $2,000 This figure mcludes cleanmg of catch basms (Gelco SefVlces), cleanmg of pipes (Gelco SefVlces), clearung of the wet vault (Gelco SefVlces), checkmg the mfiltratlOn trench, and landscapmg services. 1.1 Storm System Maintenance Activities BMPs for the storm draInage facihtIes fall mto two categones, maIntenance BMPs and preventIOn BMPs MaIntenance BMPs are those actIVIties which restore the treatment capacity and effiCiency of the treatment facilities while prevention BMPs are those actIVltIes which prevent pollutants from reaching the facihtles m the first place MaIntenance BMPs are the subJect of this sectlOn. Each of these actIVIties IS discussed below Prevention BMPs are discussed m sectIOn 70 1.1.1 Catch Basin Cleaning One of the purposes of catch basms IS to collect sedIments transported m stormwater Therefore, accumulation of sediment and debns In the sumps of catch basm structures IS expected. Neghgent or delmquent clearnng can result 10 parkmg lot floodmg and pollutant release to downstream systems. A typiCal problem IS sediment build-up mSlde the catch basm structure which blocks or restncts water flow It IS unportant that a good maIntenance program be estabhshed to remove the sediments and debns 10 the catch basm sumps. Also, debns which collects m grates of catch basms can restnct water entry mto the structure and cause floodmg on parkmg lot surfaces. To prevent these problems, debns and vegetatlOn should be removed when 20% or more of the grate IS covered. Also, cleanmg of the catch basm sumps o c c L should be performed With a vactor truck when 10% or more of the capaCIty of the basm IS occupied by silt and debns. VegetatIOn removal from catch basm grates can easily be performed by regular mamtenance personnel or a landscapmg contractor Removal of silt and debns from catch basm sumps should be contracted out to comparues willch own vactor trucks and speCialize m these actIVIties. 1.1.2 Pipe Cleaning The storm dramage conveyance pipe at the SIte needs to be cleaned occasIOnally to protect pIpe capacIty This can be achieved With the use of a vactor truck. When pIpe cleanmg IS required, It can be performed by a company that operates vactor eqUIpment like that recommended for catch basm clearung. Clearung can be achieved by flushing sedunents caught m the bottom of the mfiltratIon pIpe to an adJOlnmg catch basm where the mIXture can be sucked up by the vactor truck. The vactor truck should be eqUIpped to remove water from the catch basm as fast as the flushIng water IS apphed. 1.1.3 Wet Vault and Inrdtration Trench Maintenance SedIments should be removed from the wet vault and mfiltratIon trench at the same tIme that the catch basms and conveyance pIpes on SIte are cleaned. Negligent or delInquent cleamng can result m parkmg lot flooding and/or decreased mfiltratIon rates. All of the elements of the storm dramage system that reqUIre mamtenance are described m the mamtenance checklist found m "Attachement A" m the appendIX. The recommended frequency of clearung IS speCIfied m these checklists. 2.0 Vegetation Management Plan In terms of vegetatIon on-Site, the landscape arcilltecture plans should suffice for the vegetatIon that IS proposed on-SIte It IS customary that landscapmg contrators proVIde a VIabilIty guarantee for the plants that are planted on a SIte. It IS recommended that tills standard proceedure be adhered to m tills case Therefore, the landscape contractor's contract with the owner will msure that plants are establIshed well 10 the first place It IS also typiCal for a commercIal development to have profeSSIOnal landscape mamtenance personnel that perform regular SIte mamtenance Tills should be the case for this development at well. :s c 3.0 What are Pollution Source Controls, and Why are they Needed? PollutIon source controls are actIons taken by a busmess to reduce the amount of pollutIon reaching surface water or groundwater PollutIOn source controls, also called "best mangement practices" mclude · Altenng the pollution generatmg actiVIty (use alternate means) · Enclose the pollutIon generatmg actIVIty · Covenng the pollutIOn generatmg actiVIty (WIth a roof or shed) · Segregatmg the pollutIon generatmg actIVIty (routmg stormwater around actIVIty) · Treatmg certaIn types of runoff at a sewage treatment plant or deSIgnated stormwater treatment facilIty PollutIon source controls are needed because of the contam.matIon found m runoff from commercIal areas and the effect of tills contarrunatIon on aquatIC lIfe and human health. reasearch on urban runoff 10 the Puget Sound area and elsewhere has found oil and grease (roads and parkIng lots), nutnents (fertilIZer), orgarucs (pet waste), toXIC metals (lead, zmc, and cadrruum from parkIng lots), bactena, VIruses, and sedIments (contaInIng all of these pollutants) at levels higher than those of typICal sarutary wastewater Effects of contarrunated runoff mclude closures of shellfish beds, and sWImrrung areas, fish kills, fish tumors, and cessatIon of fish reproduction. 4.0 Purpose of this Pollution Source Control Manual C The purpose of tills manual IS to outline recommended best management practIces (BMPs) for the operatIon and maIntenance of the storm draInage facilIties at the proposed development. These storm dramage facilitIes mclude dramage culverts, catch basms, a wet vault, and a mfiltratlOn trench. BMPs recommended 10 this manual will be taken from the Stormwater Management Manual for the Puget Sound Basm, 1992, as prepared by the Washmgton State Department of Ecology, and from best known management practIces SatIsfactory maIntenance of the stormwater conveyance and water quality facilitIes on SIte will msure theIr best possible functIon. MaIntenance of the conveyance facilitIes, like catch basms and storm culverts, will msure that the potentIal for on-sIte flooding is kept to a lll1l1llllum. In addItIon to reduced floodmg potential, maIntenance of stormwater conveyance, detentIOn, and water qUalIty facilIties will help prevent pollutIon of downstream recelvmg waters. Runoff from parkIng areas has been shown to contaIn many dIfferent types of pollutants mcludmg oil, grease, lead, cadrruurn, tOXIC heavy metals, and tOXIC orgarucs from vehicular traffic. These types of pollutants are harmful to orgamsms downstream mcludmg mvertebrates at the bottom of the food cham which proVIde sustenance for larger anunals mcluding fish. PreventIon of the off sIte rrugratlOn of these tOXICS has obVIOUS POSItIve effects on downstream ecosystems 5.0 Background c To appreCIate the need for water quality facilitIes on commerCIal development SItes, It IS mformatlve to reVIew the pollutants commonly found 10 stormwater runoff L- { . Oil & Grease ConcentratIOns In stormwater from commercIal and mdustnal areas often exceed the Waslungton State Department of Ecology guideline of 10 mg/l. c', . Nutnents Runoff from landscape areas of commercial developments has been shown to contribute large quantItIes of nutnents to downstream waters as a result of over- fertilizatlOn. Fertilizers, wluch contam phosphorus and mtrogen, find therr way mto downstream receIvmg streams and lakes and can cause large growths of vegetatIon or "blooms" These types of blooms can lead to the deoxygenatIon of the water and to stress or kill of mvertebrates and vertebrate lITe . Oxygen demandIng orgamcs natural orgaruc matenals washed from paved surfaces are consumed by bactena present m receiVIng waters. Oxygen may be depleted 10 the process, threatemng lugher orgamsms such as fish. . TOXIC Orgamcs. A recent study found 19 ofthe US EnVlfonmental ProtectIon Agency's 121 pnonty pollutants present m runoff from Seattle streets. These mcluded pestiCIdes, phenols, and polynuclear aromatIc hydrocarbons (P AHs) . Metals Stormwater runoff from parkIng areas and roads contams metals such as lead, ZInC, cadrruum and copper at concentratIOns that exceed State water quahty cntena. . Bactena and Viruses Research has shown that stormwater contams dlsease-causmg bactena and VIrUses, although not at levels found In sarutary sewage As a result, often shellfish m the Puget Sound area located near urban areas are unsafe for consumptIon. o . Eroded Soil. EroslOn of soil dunng constructlOn carnes soil partIculates mto streams. These sediments destroy the requrred spamng gravel beds m local streams and nvers. TYPical stormwater pollutant concentratIons for several of these pollutants IS gIven In the Stormwater Management Manual for the Puget Sound BaSIn, by the Department of Ecology and the table IS reproduced here for reference. Table 5.1 Companson of TypICal Stormwater Pollutant ConcentratIOns vs Water QJ1a1ity Cntena ConcentratlOn(ppb) EcologylEP A Std. (Ppb) Pollutant ReSIdential CommercIa11 Highway Acute2 Chromc Cadmmm <3 5 <10 06 032 Copper 20 245 100 39 30 Lead 210 380 1,780 105 041 Zinc 120 275 400 300 270 Oil/Grease 15 10 03 Fecal Coliform 980/100 rnl 50/100 rnI.4 c 1 geometnc mean values for commercIal areas; concentrations of mdIVIdual samples often exceed the mean by a factor of 5 to 10 2 for freshwater at a hardness of 20 ppm. c c c s 3 Ecology effluent gUideline, 10,000 4 Ecology cntena for class AA waters. 6.0 Wastes Generated at a Retail Site Retail SItes generate high volumes of car tnps every day Two potentIal sources of stormwater pollutIOn are from the parkIng lots and from the garbage dumpster If It IS exposed to preCIpitatIon. Stormwater runoff from parktng lots has been shown to contaIn concentratIons of oil and grease 10 excess of the Department of Ecology's gUIdeline of 10 mg/l (see table In sectIon 5 0 ) The blOfiltratIOn swale deSIgned for tills SIte IS an accepted BMP that uses the filtenng mecharusm of the grass (medIa) to clean stormwater runoff It IS a recommended BMP by the Washmgton State Department of Ecology and PIerce County 7.0 Required Pollution Preventative Source Control Actions The follOWIng pollutIon preventIon actIons are taken from volume IV, "Urban Land Use BMPs", of the Stormwater Management Manual for the Puget Sound BaSIn as prepared by the WashIngton State Department of Ecology, 1992. The recommended BMPs below Included those listed In sectIOn IV -2.3 4 "Retail General MerchandIse" willch IS appropnate for the proposed Rite AId development. 1 InformatIOnal SIgnS, (i.e "Dump No Waste Drams to Stream") shall be pamted or embossed on or adJacent to all storm dram m1ets. The constructIon sequence IdentIfies thts requrrement. 2 ParkIng lot shall be swept on a regular contracted schedule to remove debns. 3 Sedunent shall be removed from the conveyance system 10 accordance WIth the gmdelmes of" Attachement A" Contact a sefVIce proVIder to proVIded such sefVIces 4 No employee vehtcle washtng or vehicle maIntenance shall be allowed on SIte RinsIng of Intenor cleamng supplies shall not be allowed m the parkIng lot. (EMP S 1 20) 5 Employees shall be Instructed on the reqUirements of this pollution preventIon plan. 6 F ertihzatlon of landscapmg should not exceed the recommended values by manufacturers or the formula gIven below (BMP S 1 90) e c e (p Soil Amendments. Apply lime at a rate of 100 pounds per 1000 square feet. Apply actual mtrogen at a rate of 1-2 pounds per 1000 square feet, phosphonc aCId at a rate of 1 5 pounds per 1000 square feet, and potasSIUm at a rate of 1 5 pounds per 1000 square feet. (per sectIon Il-S 4 3, BMP E1 35) Work m hme and other nutnents to a depth of 4-mches WIth SUItable eqUIpment. Scatter amendments umformly amd work mto the soil dunng seedbed preparatlOn. 7 LIds of garbage dumpsters shall be mtact and m good workmg order m order to prevent the entry or ram. Dumpsters shall be replaced If they have corroded or leakmg onto the pavement below the dumpster (BMP S 1 50) 8 Storm dramage facihtIes shall be mamtamed as per Attachement "A" m order to prevent pollutIon from flOWIng to downstream systems. (BMP S2.00) e e e 1 APPENDIX CommercIa1/Industnal Agreement to Mamtam Stormwater FacilitIes and to Implement a Pollution Source Control Plan mcludes. Attachment "A" - Stormwater Facility MaIntenance Program e e c Inspection Period: Number of Sheets Attached: Date Inspected: Name of Inspedor: Inspector's Signature: AnAar~ wAw IIAJNTENANCE PROGRAM - ---------- J -17 - 8 "~ 9 " e INSTRUCTIONS FOR USE OF MAINTENANCE CHECKLISTS The foIowing pages contain mainterl8llC18 needs for most 01 the aM~"'" that .. pM of your drUtage system. as well as for some components that you may not have. let the County know if there are any components that are missing from these pages. Ignore the requirements that do not apply to your system. You should plan to complete a cheddist for at system components on the following schedule: (1) MonthJy from November ttvough April. (2) Once in late summer (preferabte September) (3) After any major storm (use 1-inch in 24 hours as a guideline), items marfa!d "S" onJy Using photocopes of these pages, check off the problems you Jooked for each time you did an inspection. Add commentl on problems found aI'ld actions taken. Keep these -chec:ked'" sheets in your files, as they wiD be used to write your annual report (due in May, for Pierce County Only). Some items do not need to be Jook8d at every time an illSpection is done. Use the suggested frequency at the left of each item as a guideftne for your inspedioo. e ( 1 - 18 ; \. c " c ~~10<"""'" ~ 5 ~"To ~"..--~ ~ ../ Pfddi'P' Cl-"For ~ ~ ~ ~___..,.s ~ ~ ...,.,.l..-a ~~-_....~..,.... ~ ~ Ill"" piIC.... --- " ~.... ~r;;:$ ~ ~.,...r:IJIl""" (piP'8"'" ~...tll~ ~..,.s~ ~~..~ ~~.::-- 1S'ftal~' ~ 12-~ ~':,c::=:--- " ---..~--~ """"~-.",,- ~ ~ ~~~ t:SfIJIo rJP1i'4 ___tll"-'- -----~ ~. ~". ,. ~ I-Zffll"'-~~ia~~ 'T~~OI~ 'T~~~~ tll~tor ,., ".,. rP~~ ~.&IDft. cdlfllia~= ~ia~ ~_llIt1fP' tLS ~ ~ ~...'fI/II"" ~~1ltA ~~~;:. ... ,. ~ ~----....~~ ~__~_.ptftll .-'). CI1IfII all "" ~.- ~__tll~ "",~.:;::::.::;.-~ ~....--- ,. ~-:::...__Wl'-" ,..-. olI~tll-~ d/IIIfII1IP"""'- 1.JIlllW~'-- ~_.......- -::-..;;:::-~ -.;:::::::,'::_ ,..-__- I ,. __"",-Ol~-- ...... a~~ ,,11 "e",,,EN1 ..,.... ~EPfloG~" ~ (P~af\~) _.. ____. f<dd""'''-' ~ ~ \i .,ou are ua- - '#IIf1D"'- ccmmentS: '(&! .... ....... ~ or .... ~ . lA' ~~... ~ ,-" 2' t>O"" as ......-i s~f4t1JC~~ l' \9 c "TT~.'" Ic;oMt'MUED\ .....-.If'CN ~ ~ ~... f:AdId ~e..s (OciIil'Il t~_~rate.. ~-rO~For ~"..~~ ~ ~ ./ V'fddtII'" ~ ~~___----'(1fIII1fl'd. ",-"-------- ~ -r-" .--- t;tiItDt r;IfIII' II ... o-n ,_,n Wll- la ~ ~;::~~.,.,. ~~~. :::: .... _ cPfI1IA t/fJIl'- " rr;;:..- ,._~al..orfillllll' ~ ......iII~~ ~lIrllllill~~"".,.... " '\~ fIOI"~). ~.--!;':<< ~ IlIcPf111A \llPlI- rllll.... " _ __<#p al fUll. ~~~- ~ ",.,,~\l'lIl'~~- ~-1IO....-- --~..... IA ~ 0.--"""""- --- ~ ~<< ~".lInal~<<lI~ ~ ...s ~ o.-__Ilf - tJ11I14-* ~ c:;.-~.--..-fiIIIIII'tlf- --~ ,. ~~ ~-.tJIIII'--- Q\8il' -"Ill ".1I........<<~ ~ ...5 GlIlll is nJ1III4 r:t* .."". al'll .... ...... 0.-11 ~<<fIIIIIIII"llI --~~ " ",."~---,,,.,.,..tJt~ p.-lI_tJ~~ ~ _.--- ...5 ~..~ f'4llt lI_tJ ~ ttd/II!" ",.",....<<~~{<<--... l ~ ......"",..... ...5 oIfIIItI" ~tJ~"'~~ ~ aPt~~ . .""....",se.",...... ~..-. ~ ~ ~ c \II! ,..--llA""" '" """ ~ ~ lS'" ~l ,_ ;n 2' hO'" as · 'l""'""'"l ~ef ma\OC' ~ \use \ ...... 1 - '2,0 G 12- -"", e ATTACHMENT "An (CONTINUED) MainI8nance CheddiltforCab::h Basins and Inlets o ~ ~ ./ ProIlIIm C4ndiIlons To Check For C4rdIialw ". ..... &ill ~ ...... ...S ~ TI8IIl. .... .., T..-, ~ oellnI in flQnt at1lle ~ __ No lI'8SII 01 cIIIIlla ..... . - ~. ...... in Of on ~ illlIDcbIg ~ lly_ in Inn at ~.... ~ GI.- tIain "*' 1 0% ... c:IMn..s.....-rID_. II SednwJl ~ ... (in !he 1leIin) _ No ..... 01 dItlria iII"'__ lIXCIIeds 113 ... clelllIll'tam .. Ill*In tII tIIIAL CaIIIlain." OIl'" Ilain ID '-t at tile kM.r _ _ 01 cIMn. out at... tIIIAL ...S Trash 01'" in "'" inIIl 01_ InIIt ..s OUlIII" ... at DIll 01 bIocbIg _lMn 1/3 atllllligllt. .... iii SN:UaI CQmer at'-..... INn'" 3U F_ is _ will CUItl. dImIgIlD '- ft:Il_ QIIb ,.. .., .... (f .." lap"" 1IlClbI*)' iii Top.." ,.. IlaIIIlIlgIrlllM 2.... Top sIIb it ... atllalll... CIlICb. incIIa 01 crIICQ wIdIr... 1J4 IldI (tlIInt is 10 n-......"'" it I\lllNlg .. ... tIain). iii F_ llllt II&lg a.tI an. -. i.e.. F_ is sIIIng tulI an. IIIIl. I8pIrIIIlan at_1hm 3U IldI at.. '- frail .... IIIIl. A CIxb iI bain CIacb wIdIr Ihm 1n 1ldI_1oagIt BelIn ..... 01......10..... ~ Ihm 3 fIIIC. .., IftidIncI at_..... ....... CGlIMI:t. r . ...... Il'Dring '*' bain lInI9I__ 01 .-far....... m.a....IQ"..... ~.. IlnIdIn it___ A CIacb wIdIr lIwn 1n 1ldI_1oagIt No c:rKb ...... U4I11d1W1a. lIwn 1 foclt.... iC*Il atlllJ ___ ...;omr at.......... c..ct. plpe 0181'1'/ ewidIncI at____ llIa~ 111e ... ...._......... enlIIring CIIIctI ....lInI9I CRCb. A SIIlIIIMalt s.- ha MlIlId _... 11ld1 01 BelIn ..... 01"'-" 10..... II'J "...~. '* ~ _lIl8n 2 inl:Ms _ tII .... COllIiICl. ~ I' .~ 8IgnnwIt. .- far....... u.s Fh,.... 01 ~ at dlemic8IIlUl:Il. ..... No calor. 0dlIr. 01'" ..... it.. ae.r poMan gal. ai, ... pIllb. 0IlnaIilIUI ClllIar. cU ..s dIM. ocIar. 01 aIudge IlOeId. "'5 01*_ it V.-n Of IaaII gnMIg i1........ No-~ Ofl'llllt~"'" dllpd will pipe jclfts !Nt . _... . indlIII ~ tal and lea lMn . indlIIIlIPM. If you are unsure whether a problem exists. please contact a Professional Engineer Comments: Ku- A=Annu8I (March << April preferred) M=MonttIIy (see schedule) S=Aft8r major storms (use 1-inc:h in 24 hours as a guideline) J - 21 c o ATTACHMENT "A" (CONTINUEDt MairltelIa'IC:8 Chedlist for ~ ScreenIOlher ~~lg e ~ o..iMga ./ PI-.m c.c.dIarw. CNdI For eor.ea.. TllIr SIloulIf "... e:..r ...... .. ~ ..... or Ant dIfIIc:t ..ow __ Qf _ 0lIl1*IIID "-....... or ...... .., erey . I -..y. ~ ...... _Iaan I ~ IOId __ _.ey. IIIMIbefy "'5 EIllSiDn E/llMln ,.. I-*d in .. opening .... I R8plIce IGi ____ __ _.. erey by peapII at" 10 _ no ClC*Iilg ~~~in heigIlt. .. lJftMJ SIwbbery . ~ out at CllIeaI or. .... SIIMbery ....... ......., wiIIl ...... ... ..... -....... ~....... OD lllIlI_ dIMIicIIII_ ClllIeal....... A ...... F..- DInIIglId ... POIb out at plumb men ... e...... POIlI plumb _.... t. 112 .... fII...... A Tap rail .. men'" 8.... Tap ,.. he flllIIndI ....,... t lid\. A Ant pM fII.... {kadlg....... -. IIIll "-..... ... fItlrfcJ men'" t blC out fII.......... ,....... ........ A ~ 0I1Do1l1....... will. T......iII... hldIg fIIIIIc. A ..... or__ ........ lilt..... 811bed..III.... men... 2-tJ2 .... ~ pIlIII. .... .... 3oIt-Indl1ll ..... pclIIL A &IInIIon _ ..... ...... 01'" GIll at ElIIInIiaa IIIIl ill..... ....men... t-1121nc:ML wilt /10 bInlII...... 3/4 ind\. A 0IeIIIalIMd P8It 01 peItI_ '- llUIIng.--" SlIudInIy --- pIinl. CIIIIIdIIlln _... dIdId....~. podI OIpMa we. ...... uribm plaIIdIwe CIllI6Ig ~ .. 0IleI*lllI ill 0peniIgI in flIIIrlc _IUCII... _ NIcII No openings it fIIIIIc. fIIlrtc cIInIIeIr IlIlI ClIlIId allnllglL If you are LI'lSUr8 wheIher a problem exists, please contact a Prvr.s.icc18l Engineer Coo1ments: ~ A=AnnuaI (March or April preferred) M=MonthIy (see schedule) S=After major stonns (use 1-inch in 24 hours as a guideline) 1- 26 c ( \.. IS. =-..-". ''\.'\.. ( I~ " '- e Mail.... ATTACHMENT "A" (CONTlNUED) Chedlist for ConYeyanc:e SY*mS (Pi Oft c . ICe pes. . ctles. and Swas) ( ~ Dr-. ./ PraoIMI CondGans III o.cx Fer I ~ ThaI SIloolIiI ex. s,.m I ,.... w.s ~ SedimInt & dera ~___lIlII_ ~_at"___1ftlI 20% at lIle ...., at lIle IlCle. dD1I. M VegIIIIiDn VegetIIion II..- rwduces Iiw Aj~ --.r 10.... ~ at_~llIl*- !lows fnIefy lIlnlu!IIl ~ A o.m.g.d (1\IIIIId. bent. Of PrllIIIdMl ~ is ~". is ~ ~ Of /eClIK8l1 CNINd) causing rnoralllln 5ll" <liIIIl1i)o*" 10 .., PIrt at pipe. .. Any dIInllMt ~..... ~ repaAd Of rwpIKed. flaw (I.... ~.. c:rwa.aion _ at pipe by _lIIIn 2O'lro}. .. ~ Ila IIIIiar aacD at.... P'C>>~ OI~ ~~..... w.s 0pIn dIcMI Trash & deIlriI ~ at.....IUCII. RemcMt trasIIlftlI dDiI and gr-. ~ IIId laaI::Ns_ diIpoIe as ~ by" bain. UnIigIllIy IClCIIlIIlIIIIc 01 Counly .MlI~~sudI. gIaa. pIMtic. IIIIIC:II, am. IIld aoG8d "... W Sedinent ~ AaulUIIIId......1lIIt ___ Oildl dNned at.. ~... 20% at lhe deI9l deplIL deIlriI SO lIlIIl ~ dIsigIL A VegItIIIIon ~ (~-..,1INlI 01 WaIIr 1IlMs frMlJ..... -C apIngI) lMt..... We dIdleL Gr.-y~ _._. at...,lRugI\~ be 11ft ... W EnlIIcln ......10 IIDpea See Panda CIledIIIl. See Panda CtledlIIt. A RacIlIRng oat at ~ 01 WW........ 1*IllIIl2l _ ".. RepIK:e racb 10 cMign ItandIId. milling (f 1IIlPbI*) soi benaIIlllle Illdt rnng. V... c.tl..... See ca:n s.m ClIecdIt. See c.n BaIinI CMdlIIl w.s Sw8IIa TI8III & dIbIlI See awe for 0Ictw.. See abCIw llr OII:ML W Sdnwlt~ See aIIoft for OldIes. V... ",., ne.llo be ........ cM*Ig. W VegiIlIIIon Illlt gnMWIg 01 Graa __ is spne IIId .-ly << AenD .... .., ...... ... -.- _.. ~ ftllWllCld1 nUcft c.. _ ......... ........ IleigN . . "**- atl.... far belt A."...___ ~ RemcMt waody gIlMlII. -*U. and,....., as~. w.s EroIion dIrMge III Iiopes See Poncls ClledciIl See Puna a.cdIt M Cclnwnian by ~ SwaIe r.s _ !lid .. at ~ IIy lf~. roaIl"-~JIIj 1lI~~_ INd. ~. sIW\lIlllery. III:. and ~ lMt..._1Ie ~ ConaIc:t IJIe c-.r III l'IIOOrt ~ , nat redIIId ....uuriy A- s... does lICIt drain Wl/f1Ir sQnl1S .. _ at /Igw ..eloaly A surwy ....,. lie ,...., III d** " --, SlOW. Sl:a9naon ocan. ~ Gt.-,.., III De " 1- 5% ran;e I PGIIIIIIIL '''' ill .... 1!WI1% undeldr-. rIW!' /-.:lID lie ~ .J J - 28 e Jbi-01-98 WED 04:41 PM KLEINFELDER FAX NO. 4255624201 p, 01 k~ KLEINFElOER 2405 - 140th Avenue Northeast, Suite A 101 Bellevue, WA 98005 Transmittal Cover Sheet Original ClWiII ~Will not follow DATE: July 1, 1998 FilE NO. 60-1742-02 PHONE: FAX: (206) 441-8372 PHONE: (206) 562-4200 FAX: (206) 562-4201 Mr Wayne Miller Mulvanny Partnership FROM: Gary D. Beckham Klelnfelder, Inc. TO: RE: Rite Aid Store #5286, Infiltration Tests cc: Mr Brent Cummings, BRH Engineers, Fax (206) 323-7135 Number of pages including cover sheet:4 Message: Enclosed please find the results of our infiltration tests for the storm water system at the above property Accordmg to our test results, it is our opinion that the southern portIon of the property south-adjacent to the south driveway IS suitable for the discharge of storm water, The soil types tested are the sandy gravel and gravelly sand which are present below a depth of 4 feet at the location ofPerc-l and 1 3 feet at the location ofPerc-2 The mfiltratlon area should be completed In these urnts and not in less permeable soils if possible. Locattons of excavatIOns for Perc-l and Perc-2 are shown on the attached map At your request we observed condItIOns In the shed In the southwest portion of the site and noted well casmg and other eqUIpment suggesting past use as a well house Also note that capped well casing was observed In the planter at the southwest comer of the church buildmg and that the locked shed west of the residence in the southeast portion of the site is a well house accordIng to the resident at the east-adjacent property fucvr.doo J~l-OI-98 WED 04:42 PM KLEINFELDER FAX NO. 4255624201 P. 02 ~lIfJ KlEINFElDER PERCOLATION TEST DATA FOlliy! Percolation test Depth to bottom of hole bO Inches DIameter of hol';~lI1ches Depth , Inches Sol! texture () -'7 S~ t!ll1d - '/ - LtX'se 1t:J1J Sol , '1- '1~ Pk. Bv-owlA.. So ~y ~ t1 /;-\ '-" M-ed. Jb..,sc '1rp~hO 1..-.;-, BY"OwV'l SQ~7 (; Y'tt VP } })e"1s.e , PercolatlOn test by t(/, Sf) LewiS Date of test 7/61/Cj~ r Tun e Time Me<lsure- Drop In Pcrcola- Remarks Interval, ment, water level, tlOn rate, mInutes Inches inches mw II tes oer Inch 1~o 3D -- SN.dn..,~ - 100'1,,110..), 10' II -- I ,rJ ~V'-t ~ v .Lf2 · I 2- I l?- ~ ?.-% ,,3tD 10: (3 2- 1 I J-O" 3~ I IO~'3"!' ':l-1-~ 0 - IS , I r SO I Percolation rate=. I. So minutes per Inch JWL-Ol-98 WED 04:42 PM KLEINFELDER FAX NQ 4255624201 p, 03 k~ KLEINFELDER PERCOLATION TEST D.:\.TA FORi"! Perco!::...on [;;St Location fnF~J fI;rc A-,;f S~.-e)' S R G"07 nw/ tJ/f""d/ II~ Test hok nurber Pe"'," rz- Depth w bot:or:-. 0: r.ok 'f'?' \nch~s Diameter of hole & lnches Denth, lr.cnes SOIl textllre 0-1 'i -ICo Ib - e.;~ .$cJd a....eI ~".s~,' I - I..-("~o \.~ , /3 Y"()WlIf Sb~/ L.&Jw. ~ M~ Dt?~s.(-l. l-f. BNJWvt ~Y'~tlel/'L .s6l"f(:Q / t Percolatlon test by t(/, S. L.et.P's Date of test 7/ C) I /q~ /. I Tlme T uti e ~ kasu re- Drop In Percola- Remarks Inter/a!, ment, water level, tJon rate, mmutes Inches Inches minutes Der mch ;,,' Lfn 1.. _or- $t!>().!l ~ /0 f;;Q/IoV1!.. [/ ~ 0 f" IS- Sfo" f v ........... -- J/ .'0) , '1~ S--!; o .or I/:or 7- I 7~ 7~ I 11:/<4'" q{ 0 I .t;""' I D. {,-..'3 I \ PercolatIOn rate== O~ "'6 minutes per inch KLEINFELDER Jl~I_-O [-98 WED 04' 43 PM I '" '" I , I , ~ , , ,~ "- ./ I I I ~ ~ F= n I I ~I , 1 1- ~ ~ 'I ~ I I ' I ......-/ I <"Ii c --x-- ~.. L- I r- r-- ! I 1- 1 ^ 'I r ~ ti AII_ SPAC::' , 16T" ~\ ~ <>- L__~H ^\j V-I V :: _ ,......." 'I - : eLl ~ ~ ~~~~ [) FAX NO. 4255624201 p, 04 I ~ Ss ,y So / .... .... I '-" --s- P i\ ~<, NE~ ~ 16.-,;c Si' S .y~-::(" - I L' r- 7 f~ - .."...:::: v ::f ' OiY1C6 s--- ;xsr"-LS C ~4 D Ci ~ ~I,.'.- ~ ,0-'...... ~ -- ~r:;T""", ~ ~' --:=-- l.e' , ~ .J -1 /' ? ~ ~--2- -1,..-f','/~o"1 f?~ (3-7(Jf-,Arr) o 30 &0 -r LJ -