Loading...
Report of Geotechnical Investigation kq KLEINFElDER Report of Geotechnical InvestigatIOn Proposed Rite Aid Store - MP #97-327 State Highway 507 & Vancil Road Yelm, Washington Prepared For. Baldndge Development Group, L L C Copyright 1997 Kleinfelder, Inc. All Rights Reserved Unauthorized use or copyIng of thIs document IS stnctly prohibIted. See "Application For Authorization To Use" located at the end of this document if use or copYIng IS desIred by anyone other than Client and for the project identified above. 60-1742021:\1997\wpdraft\60 17rl21.doc copyright 1997 K1einfelder, Inc. kq KlEINFElDER All t'rnplcwce owned comp.1ll}' October 8, 1997 KleInfelder File No 60-1742-02 Baldndge Development Group, L L C c/o Mr Wayne Miller Mulvanny PartnershIp 112 Fifth Avenue North Seattle, W A 98109 SUBJECT: Report of Geotechnical Investigation Proposed Rite Aid Store - MP #97-327 State Highway 507 & Vancil Road Yelm, Washington Dear Mr Miller. The attached report presents the results of our geotechI1lcal InvestIgatIOn for the proposed RIte AId Store located at the southwest corner of State Highway 507 and VancIl Road In Yelm, Washmgton. Tills InvestIgatIOn was performed In accordance wIth our proposal dated September 12, 1997 It IS our oplI1l0n that the project SIte IS well-SUIted for the proposed RIte AId store The new buildIng may be supported on conventIOnal spread footmgs as planned We apprecIate the opportUnIty to proVIde geotechnIcal servIces to you on thIS project Please contact us If you have any questIons regardIng thIS report or If we can provIde assIstance WIth other aspects of the proJect. Smcerely, KLEINFELDER, INe. ~~)j ~~ Susan G Hamson, EIT Project EngIneer j~E~ James B Thompson, PE Pnnclpal GeotechnIcal EngIneer J EXPIRES 4:C:J119SB 1 J .:? Enclosures Final Report (6 copIes) k-LEINHLIXI\ J3BO 146111 I'I:HC Sf: ':Julie 110 I)elllevuc WII. QBl107 (,472 IlObl Sh2 4200 (206) 5h2 42111 t<lX 60-174202\J:\1997\wpdraft\6017r12I.doc Page I of 1 Printed. 10/09/97 Copyright 1997 Kleinfelder, Inc. kq KLEINFElDER TABLE OF CONTENTS PAGE ~"~<:lJ1rl1{~ ~~fl~l{ .........................$....................................................1 1.0 INTRODUCTION AND SCOPE ..................................................................1 1 1 ProJect DescnptlOn 1 2 Purpose and Scope I 2.0 FIELD EXPLORATION AND LABORATORY TESTING ................................. 2 2 1 Field ExploratIon 2 2 2 Laboratory T estmg 3 3.0 SITE CONDITIONS.... ....... .......... ............. .......... ......... .......... ..................3 3 1 SIte Geology 3 3 2 Surface CondItIOns 4 3 3 Subsurface CondItIons 4 4.0 CONCLUSIONS ............................................................ .................. ........4 5.0 RECOJ\iThIENDA TIONS ......... .......... .......... ...................... ........ ................5 5 1 SIte cleanng and PreparatIon S 5 2 Earthwork 6 5 3 Temporary ExcavatIOns 6 S 4 FoundatIons 7 5 5 Concrete Slab-on-Grade ConstructIon 8 5 6 Pavement SectIOns 8 5 7 Other DraInage ConsIderatIons 9 6.0 ADDITIONAL SERVICES .... ............................ ........ ................ ....00...........9 6 1 Plan ReVIew 6 2 ProJect BId Documents 6 3 ConstructIOn ObservatIOn and T estmg. 9 9 10 7.0 ~I1YII1rIl1[I()~~ ......................................................................................10 PLATES Plate 1 SIte LocatIon Map Plate 2 SIte Plan APPENDICES A Bonng Logs Al Bonng Log Legend A2 Key to SoIl ClassIficatIOn and Terms AJ-AS Bonng Logs B ApplIcatIon for Authonzatlon to Use -' 60-1742021J:\1997\wpdraft\60 17r\ 2 I. doc Copyright 1997 Kleinfelder Inc. Page i ofi Printed. 10/09/97 k.q KLEINFELDER EXECUTIVES~ARY In response to your request, Klemfelder has completed a geotechnIcal InvestIgatIon related to the desIgn and constructIon of a proposed new RIte AId store located at the southwest corner of State Highway 507 and VanCIl Road In Yelm, WashIngton as shown on the SIte LocatIon Map, Plate 1 Based on the results of our InvestIgatIOn, the sIte IS SUItable for the proposed constructIon from a geotechnIcal perspectIve Key design Items are summanzed below, and are dIscussed In greater detaIl In the body of thIs report ThIs summary IS Intended for Introductory and reference use only A thorough readIng of the entIre report IS essential to develop an understandIng of the total desIgn concepts and lImItatIOns Soils: The results of the subsurface explorations IndIcate that the project sIte IS underlaIn by medIUm dense to very dense sand and gravel with varIable sIlt content and occasIOnal cobbles Bonng locatIOns are shown on the Site Plan, Plate 2 The bonng logs are presented m AppendIX A. With the exceptIon of the asphalt base course and gravel fill IndIcated on the bonng log for B- 2, no eVIdence of fill was encountered In the bonngs Groundwater. Groundwater seepage was not encountered In any of the bonngs at the tIme of dnllIng. Site Earthwork RecommendatIOns We expect that over the maJonty of the SIte, It wIll be necessary to stnp only the eXIstIng asphalt and topsoIl prIor to sub grade preparatIon Near surface sOIls encountered below the asphalt and base course generally have a hIgh proportIOn of fines and WIll therefore be mOIsture sensItIve If possible, we recommend that gradIng and fillmg be performed dunng pen ods of relatIvely dry weather The exposed subgrade should be proof rolled (or probed) and compacted before any new fills are placed SIte cleanng and preparatIon recommendatIOns are proVIded In SectIOn 5 I If sIte cleanng, preparatIon and earthwork must take place dunng wet weather, recommendations are prOVIded In SectIon 5 2 for earthwork dunng wet weather constructIon Structural Fill: The on-sIte soIls below the topsoIl and/or eXistIng pavement are generally SUItable for use as structural fill dunng dry weather and provldmg that mOIsture contents are adequately controlled However, the near surface soIls have a hIgh proportIon of fines and may requIre mOIsture condItIOnIng to achIeve speCIfied compactIon levels The use of Imported crushed rock or pIt run sand and gravel may be requIred If constructIon proceeds dunng wet weather All Imported structural fill for placement dUrIng wet weather should consIst of well- graded sand and gravel wIth less than 10 percent fines (portIon passmg the No 200 sIeve) See SectIOn 5 2 Compaction: All natIve or Imported structural fill placed for support of the proposed bUlldmgs should be compacted to at least 95 percent of the MDD (maxImum dry denSIty), as determIned by the ASTM D-1557 test procedure Fill placed In areas to receIve new pavement should be compacted to at least 95 percent of the MDD to a depth of2 feet below grade Below thiS depth, fill should be compacted to at least 90 percent of the MDD Waste fill In landscapIng areas need only be compacted to the degree reqUIred for trafficabIllty of construction eqUIpment 60-174002/6017RI21 Copyright 1997 Kleinfelder Inc. Page t of2 Pnnted: 10/09/97 kq KLEINFELDER Slopes: No slgruficant permanent cut or fill slopes are antIcIpated for thIs proJect. Temporary Excavations. We anticipate that temporary excavatIons can be accomplIshed at thIs sIte USIng conventIOnal eqUIpment The soils encountered are consIstent wIth a Type C soil when applYIng the OSHA regulatIons on slopmg and shonng excavatIons See SectIon 5 3 Building Foundations Based upon the soils encountered, shallow spread foundatIons can be used for thIs proJect provIded footIng excavations are prepared 10 accordance wIth the recommendatIons provIded In Section 5 4 IndIVidual column footIngs wIth loads up to 60 kIpS and mIrumum WIdths of 24 mches and contmuous strIp footIngs wIth loads up to 3 kIps per foot and mInImum WIdths of 18 Inches may be designed for beanng pressures up to 3,000 pounds per square foot ThIS allowable soIl beanng pressure appltes to dead and long-term lIve loads, and may be mcreased by up to one-thIrd for WInd or seismIC load 109 condItIons For frost protectIon, extenor footmgs should be founded a mInImum of 18 Inches below lowest adjacent grade, Intenor footIngs should have a mInImum embedment of 12 Inches Total settlements are not antIcIpated to exceed 1 lOch, wIth less than V2 Inch of dIfferential settlement between adjacent footIngs See SectIOn 5 4 Slabs-on-Grade We recommend that floor slabs be underlaIn by a mInImum 4 Inch thIck layer of free draInmg sand and gravel fill An Impermeable membrane should be Installed If mOIsture sensItIve floor covenngs are used See SectIon 5 5 Seismic Hazards and DeSign. The project sIte IS located wlthm Zone 3 on the SeIsmIc Zone Map of the Umted States, Plate No 16-2 In the 1994 edItIOn of the UBc (Umform BUIldIng Code) The sIte coefficIent used In calculatmg seismIC forces on structures IS based on soIl profile type ThIs relatIonshIp IS IndIcated In Table 16-1 of the UBc Based on the subsurface condItIOns encountered In the bonngs and on our understandIng of the geology 10 the VICInIty of the SIte, we conclude that the appropnate soIl type IS S2 wIth a correspondIng" S factor" of 1 2 Pavements: We recommend that the prelImInary deSIgn pavement sectIon 10 automobIle parkIng areas consIst of 2 mches of Class B asphalt concrete and 4 Inches of crushed rock base course In truck traffic areas, the thlckness of Class B asphalt concrete and crushed rock base course should be Increased to 3 Inches and 6 mches, respectively See SectIon 5 6 for a more thorough diSCUSSIOn of Pavement recommendatIons 60-174002/60 17R 121 Copyright 1997 Klemfelder, Inc. Page 2 of2 Printed: 10/09/97 k.q KLEINFELDER REPORT OF GEOTECHNICAL INVESTIGATION PROPOSED RITE AID STORE - MP #97-327 STATE HIGHWAY 507 & VANCIL ROAD YELM, WASHINGTON 1.0 INTRODUCTION AND SCOPE 1 1 Project DescriptIOn ThIs report presents the results of our geotechnIcal InvestIgatIOn for the proposed RIte AId store In Yelm, Wasillngton. The approxImate locatIOn of the project sIte IS shown on the SIte LocatIOn Map, Plate 1 We understand that the proJect wIll Include constructIOn of a 16,730 square foot, one-story buildmg. We further understand that the butldIng may be of masonry constructIon and that the floor wIll be constructed at grade Structural loads for the bUIldIng are not known at thIS tIme F or the purpose of thIS report, we have assumed that mdlvldual column loads wIll not exceed 60 \ups per column and that wall loads wtll not exceed 3 kIps per lmear foot. Paved parkIng stalls, paved Intenor roadways plus landscapIng, utllttles, and other appurtenant features WIll be located adJacent to the buIldmg The scope of geotechnIcal and envIronmental servIces for the subject RIte AId store In Yelm IS described In our wntten proposal for these services Verbal authonzatlon to proceed wIth thIS work was gIven by Mr Wayne ~-1iller of the l'vIulvanny PartnershIp Because of the very short tIme frame avatlable to complete work on the SIte, Mr Miller requested that we contmue to proVIde servIces based on hIS verbal authonzatlon All work for thIS proJect has been performed In accordance wIth our proposed Master ServIces Agreement wIth the RIte AId CorporatIon dated June 19, 1997, 10 accordance wIth the verbal authonzatlon from Mr Miller 1.2 Purpose and Scope The purpose of thIS mvestlgatlOn IS to evaluate the subsurface soIl and groundwater condItIOns at the proJect Site, and to develop geotechnIcal recommendatIons and cntena for proJect deSIgn and constructIOn. Our specIfic scope of servIces mcludes the follOWIng tasks 1) Collect and revIew readIly avatlable geotechnIcal and geologIc data for the proJect area. 2) Perform a geotechnIcal site reconnaIssance pnor to the subsurface InvestIgatIon. 3) Plan and conduct a subsurface mvestIgatlon consIstIng of advanCIng three hollow stem auger bOrIngs to depths rangmg from 6 5 to 13 feet to proVIde InformatIon relatIve to sOIl, groundwater, and other geologIc condItIOns 10 the VICInIty of the proposed development 60-174002/6017R121 Copynght 1997 K1emfelder, Inc. Page I of II Printed: 10/09/97 kq KLEINFELDER 4) Conduct hmlted laboratory testIng 10 general accordance WIth appropnate Amencan SocIety for Testmg Matenals (ASTM) standards to check the vIsual sOli classIficatIons and to provIde estImates of engmeenng parameters necessary for geotechnIcal deSIgn. 5) Based on the field exploratIOn and laboratory testIng programs, provIde dISCUSSIons and recommendatIOns regardIng the follOWIng . RegIOnal geology and seismIcIty; . General sIte surface and subsurface condItIons, . Shallow foundatIon deSign IncludIng soIl contact pressures, embedment depths, resIstance to lateral loads, and settlements, . Earthwork constructIOn Includmg sIte preparatton, fill placement and compactIon, . AntIcIpated excavatIon conditIOns, . SoIl slopes, . Subsurface dramage's, . Pavements, . Mittgatlon of deletenous soIl condItIOns, If appropnate 6) Prepare a report summanzmg the results of our subsurface exploratIon program, and our analYSIS and recommendatIons ThIS geotechnIcal InvestIgatIon report does not Include an assessment of eXlstmg or potentIal envIronmental concerns assocIated WIth thIS sIte The envIronmental servIces prOVIded by KleInfelder have been submItted under separate cover 2.0 FIELD EXPLORATION AND LABORATORY TESTING 2.1 Field Exploration The subsurface condItIons at the proJect sIte were explored by dnllIng 3 test bonngs at the locatIons shown on Plate 2 ExploratIons were located 10 the field by measunng or estlmatmg dIstances from eXlstmg sIte features ..)' 60-174002/60 17R 121 Copyright 1997 Kleinfelder, Inc. Page 2 of II Printed: 10/09/97 kq KLEINFELDER The test bonngs were drilled on September 29, 1997 to depths rangIng from 6 S to 13 feet below eXIstIng grade The bonngs were advanced usmg a truck-mounted, hollow stem auger dnll ng. RelatIvely undIsturbed samples were obtamed from the bonngs usmg a 2-mch-outslde-dlameter standard penetratIon splIt spoon sampler The sampler was dnven mto the sOIl wIth a 140-pound hammer free-fallIng 30 Inches. The number of blows requIred to dnve the sampler the last 12 Inches, or other mdlcated dIstance, IS recorded on the bonng logs Plate Al presents a bonng log legend (AppendIx A) The test bonngs were momtored by an engmeer from our firm who mamtamed detaIled logs of the exploratIOns and obtamed representatIve samples of the sOIls encountered for further exammatlon m our laboratory The soIls encountered were vIsually classIfied m accordance wIth the classIficatIon system described m Plate A2 The bonng logs are presented on Plates A3 through AS After the bonngs were completed, they were backfilled wIth excavated sod usmg the equIpment at hand In areas where the eXIstIng ground surface was asphalt, the bonngs were sealed wIth concrete 2.2 Laboratory Testing RepresentatIve soIl samples obtamed from the Standard Penetration Sampler were returned to the Klemfeldef laboratory for further exammatlOn and testmg to refine the field claSsIficatIons and to evaluate physIcal propertIes of the soIls whIch may affect the geotechmcal aspects of project desIgn and constructIon The laboratory testmg program Included the follOWIng . MOIsture content tests In general accordance with ASTM Test Method D 2216, The results of the mOIsture content tests are mcluded on the bonng logs m AppendIx A. 3.0 SITE CONDITIONS 3.1 Site Geology The entIre proJect sIte IS underlam by glacIal outwash SOlis, mapped as Vashon outwash gravel by the WashIngton DIVISIon of Geology and Earth Resources. These soIls are thought to have been depoSited dunng the late PleIstocene Vashon Stade some 12,000 to 18,000 years before present. Several feet of sIlty sand soIls overly the relatively clean glacIal outwash soIls No surface faults are mapped WIthIn the ImmedIate sIte VICInIty However, several normal faults and an anticlInal ndge have been mapped approxImately 9 mIles southwest of the sIte 60-174002/6017RI21 Copyright 1997 Kleinfelder Inc. Pagd of II Printed: 10/09/97 "'l kq KLEINFELDER 3.2 Surface Conditions The proJect sIte IS located at the southwest corner of the IntersectIon of State Highway 507 and VancIl Road In Yelm, WashIngton The sIte currently contaInS one residentIal structure, one vacant antIque sales busIness, and a church The site surface topography IS relatIvely flat The ground surface surrounding the church IS paved The ground surface surroundIng the other structures IS covered wIth topsoIl, gravel, and/or grass 3,3 Subsurface Conditions The results of the subsurface explorations IndIcate that the proJect site IS underlaIn by medIUm dense to very dense sand and gravel wIth varIable stlt content and occasIOnal cobbles Bonng B-1 encountered medIUm dense sIlty sand wIth van able gravel content to a depth of approxImately 4 5 feet. B-1 encountered very dense sand wIth lesser amounts of sIlt and occasIOnal gravel from 4 5 to 6 5 feet Bonng B-2, In the proposed buIldIng pad area, encountered dense gravel fill wIth sIlt and occasIOnal cobbles to a depth of 2 feet From 2 to 7 5 feet and from 12 to 13 feet, B-2 encountered very dense sand wIth gravel, sIlt and occasIOnal cobbles From 7 5 to 12 feet B-2 encountered dense sIlty sand wIth gravel and occasIOnal cobbles B-2 was termmated at 13 feet due to refusal on a cobble , ,. / The soIl profile In B-3 consIsted of very dense sIlty sand with gravel and occasIOnal cobbles to a depth of 5 feet From 5 to 6 5 feet, B-3 encountered medIUm dense sand wIth sIlt, gravel and occasIOnal cobbles No groundwater seepage was observed 10 the bonngs at the tIme of dnllmg. 40 CONCLUSIONS It IS our opInIOn that the proJect sIte can be satIsfactonly developed as planned usmg standard constructIOn practIces The sIte gradIng plans were not available at the tIme thIS report was wntten. Although not encountered 10 our test bonngs, loose fill or surficial soils may be encountered dunng grading actIvItIes These loose matenals, If encountered, WIll reqUIre removal and replacement WIth compacted structural fill Other areas of the sIte Will reqUIre stnppIng of the upper 0 5 to 1 foot ofloose surficIal soIls (topsoIl) and/or asphalt We recommend that all foundatIOns for structures bear on the medIUm dense to very dense natIve soils, or on a zone of structural fill whIch extends down to the medIUm dense to very dense natIve soIls BuIldIng slabs, dnveway and parkmg area pavements should be supported dIrectly on the medIUm dense to very dense natIve SOils or on structural fill SoIls that will be excavated from cuts are generally expected to be satIsfactory for use as structural fill. However, the soIls that wIll lIkely be encountered In the excavatIons have a ) relatIvely hIgh fines content and are therefore mOisture-sensItIve It Will be difficult, If not 60-174002/6017RI21 Copyright 1997 Kleinfelder. Inc. Page 4 of II Printed: 10/09/97 ...q KLEINFELDER Impossible, to properly compact these sOlis dunng excessIvely wet condItIons Therefore, It WIll be preferable to schedule sIte earthwork for extended penods of dry weather In order to rrurumlze earthwork costs We also recommend that all surface water runoff entenng the sIte be collected and tIghtlmed, or otherwIse channeled, to a sUItable dIscharge pOint to avoId pondmg of water on the sIte SpecIfic recommendatIons for proJect desIgn and construction, mcludmg mItIgatIOn of potentIal problems described above, are presented In Section 5 0 5.0 RECOI\fl\lENDA TIO'\'S 5.1 Site Clearing and Preparation We recommend that all sod and topsOIl be removed from bUlldmg and pavement areas Any eXIstIng fill In bUIldIng areas that does not meet the reqUIrements for structural fill should be removed and replaced We expect that the eXlstmg asphalt concrete pavement may be left m place, except wIthIn the buIldmg footpnnt All deterIorated or damaged pavement areas should be repaIred or replaced It should be antIcIpated that underground vaults or tanks may be present at the sIte If these structures are to be abandoned, they should be overexcavated and backfilled wIth structural fill to desIgn subgrade elevatIOns We recommend that sIte cleanng and preparation be completed dunng penods of dry weather to mlmrruze related costs. Areas that are stnpped or excavated to design subgrade elevatIons, or are to receIve structural fill, should be proofrolled wIth heavy, rubber-tIred constructIon eqUIpment (such as a dump truck or large roller compactor) Soft, loose or otherwIse unsUItable areas IdentIfied dunng proofrolhng should be repaIred as appropnate We recommend that proofrolhng of the subgrade be observed by a representatIve from our firm to assess the adequacy of subgrade condItIOns, and to IdentIfy areas needmg remedIal work. We recommend thIS procedure not be performed dunng wet weather Dunng wet weather, systematIc probmg should be used to evaluate the sub grade Instead of proofrollmg Temporary constructIon access roads and/or workmg pads consIstIng of clean sand and gravel, crushed rock or ATB (asphalt treated base) may be needed to support constructIon traffic on the sIte dunng wet weather We expect that the eXlstmg asphalt concrete pavement may be left 10 place, except WIthIn the bUlldmg footpnnt and at the locatIons of other structures All detenorated or damaged pavement areas should be repaIred or replaced 60-174002/6017R 121 Copyright 1997 Kleinfelder Inc. Page 5 of II Printed: 10/09/97 k.q KLEINFELDER 5.2 Earthwork Based on the subsurface condItions encountered In the exploratIons, we expect that all of the soIls on the site can be excavated wIth conventional excavatIng equipment Cobbles and boulders may be encountered at the SIte, and the contractor should be prepared to deal wIth large-sIzed matenal New fill for the proJect may be Imported or may come from cuts mto the eXIstIng sIte sOIls Much of the soIl 10 these cuts (wIth the exceptIon of topsoIl) are generally expected to be satIsfactory for use as structural fill However, some of the soIls that wIll lIkely be encountered In the excavatIons have a relatIvely hIgh fines content and are therefore mOIsture-sensitIve (Note that fines In thIS report are defined as that portIon of the soIl passIng the U S Standard No 200 sIeve) It WIll be dIfficult, If not ImpossIble, to properly compact soIls wIth hIgh fines contents dunng excessIvely wet condItIOns Therefore, It wIll be preferable to schedule sIte earthwork for extended penods of dry weather In order to mInImIze earthwork costs All Imported structural fill for use dunng wet weather should consIst of well-graded sand and gravel wIth less than 10 percent fines (portIon passIng the No 200 sIeve) As the amount of fines (portIon paSSIng the No 200 sIeve) Increases, the soIl becomes mcreasIngly senSItive to small changes In mOIsture content and adequate compactIon becomes more dIfficult to achIeve, partIcularly dunng wet \veather Generally, soIls contaInIng more than about 10 percent tInes by weIght cannot be properly compacted when the mOIsture content IS more than a fev. percent wetter than the optImum mOIsture content All structural fill matenal should be free of orgamc matter, debns and other deletenous matenal, WIth no IndIVIdual partIcles larger than 3-Inches In maxImum dImenSIOn All natIve or Imported fill should be placed as compacted structural fill follOWIng proofrollmg, probmg, and remedIal work on the subgrade, as appropnate The fill should be placed In honzontal lIfts not exceedIng 10 Inches In loose thIckness, each 11ft must be thoroughly and umformly compacted to an unYIeldIng condItIOn USIng mechamcal equIpment All natIve or Imported structural fill placed for support of the proposed bUIldIngs should be compacted to at least 95 percent of the MDD (maxImum dry denSIty), as determIned by the ASTM D-1557 test procedure Fill placed In areas to receIve new pavement should be compacted to at least 95 percent of the MDD to a depth of 2 feet below grade Below thIS depth, backfill should be compacted to at least 90 percent of the MDD ThIS Includes utIlIty trench backfill In pavement areas Waste fill In landscapIng areas need only be compacted to the degree reqUIred for trafficabllIty of constructIon eqUIpment 5.3 Temporary Excavations We antICIpate that excavatIons for footmgs and utIlIty trenches can be readIly made WIth a conventional backhoe or excavator We expect the walls of these trenches to stand near vertIcally for a short penod of tIme WIthout SIgnIficant sloughIng If trenches extend deeper than four feet, or If loose SOlis or groundwater seepage are encountered, -' 60-174002/60 17R 121 Copyright 1997 K1einfelder, Inc. Page 6 of II Printed: 10/09/97 ..q KLEINFELDER the excavatIOns may become unstable and should be evaluated to venfy their stabIlIty pnor to occupatIon by constructIOn personnel ShorIng or sloping of deeper trenches may be necessary to protect personnel and prOVide temporary stabIlIty AJI excavatIons greater than 4 feet depth should be sloped to 1 SR.I V (honzontal to vertIcal) to comply WIth current OSHA and WISHA safety reqUIrements for Type C SOIls Dunng wet weather, runoff water should be prevented from entenng excavatIons Water should be collected and dIsposed of outSIde the constructIon hmlts Heavy construction eqUIpment, bUIlding matenals, excavated soIl, and vehIcular traftic should not be allowed In close proxlmlty to the excavatIons 5.4 Foundations We recommend that the new bUlldmg be supported on spread footIngs that are founded on the medIUm dense to dense natIve soIls, or on a zone of structural fill whIch extends down to these competent natIve soIls Where used, the structural fill should be compacted to at least 95 percent of the maXImum dry denSIty (as determIned In accordance WIth ASTM D-IS57) ContInuous wall footIngs and mdlvldual column footIngs should have mInImum WIdths of 18 and 24 mches, respectIvely For frost protection, extenor footIngs should be founded a mInImum of 18 Inches below lowest adjacent grade, InterIor footIngs should have a mInImum embedment of 12 mches Spread footIngs may be deSIgned USIng an allowable bearIng pressure of 3000 pounds per square foot (psf) for support on structural fill or on the medIum dense to very dense natIve soIls These allowable soIl beanng pressures apply to dead and long-term lIve loads, and may be Increased by up to one-thIrd for WInd or seIsmIC loadIng condItIOns We estImate that the total settlement of spread footmgs, founded as recommended, will be less than 1 lOch, WIth less than 0 5 lOch of dIfferentIal settlement between adJacent footIngs Loose fill or dIsturbed soil not removed from the footIng excavatIons pnor to pounng concrete may result In Increased settlement. The footmg subgrades may possibly be susceptible to disturbance when wet It may be necessary to pour a lean concrete "mud mat", or place a layer of crushed rock or clean sand and gravel on the bottom of the footIng excavatIons, to protect the footmg subgrades from water and/or wet weather dunng reInforcement bar placement and preparatIon for plaCIng concrete We recommend that the condItIOn of all footmg excavations be observed by a representatIve from our firm pnor to placement of concrete to confirm that the beanng soIls are undIsturbed and that the conditIOns and constructIon methods are consIstent WIth our recommendatIOns The project SIte IS located wlthm Zone 3 on the SeIsmiC Zone Map of the UnIted States, Figure No 16-2 10 the 1994 edItIOn of the UBc (UnIform BUlldmg Code) The sIte coeffiCient used In calculatmg seIsmIC forces on bUlldmgs IS based on soIl profile type ThIS relatIOnshIp IS mdlcated In Table 16-J of the UBc Based on the subsurface conditIons encountered m the bonngs and on our understandmg of the sIte geology, we conclude that the appropnate overall ..;; soIl type IS S2 WIth a correspondmg "S factor" of I 2 60-174002/6017RI21 Copyright 1997 Kleinfelder, Inc. Page 7 of II Printed: 10/09/97 kq KLEINFELDER The ablhty of soIl to resIst lateral foundatIon loads IS a functIOn of the frIctIonal resIstance whIch can develop on the base and the passIve resIstance whIch can develop on the face of below-grade foundatIon elements as they tend to move Into the sOIl For spread footIngs founded on structural fill placed and compacted In accordance wIth our recommendatIons, or on undIsturbed natIve soIls, the allowable fnctlOnal resIstance may be computed USIng a coefficIent of fnctlon of 0 35 applIed to vertIcal dead-load forces The allowable passIve resistance on the face of footIngs or other embedded foundatIon elements may be computed USIng an equIvalent flUId denSIty of 225 pounds per cubIC foot (pcf) (tnangular dlstnbutlOn) for medIUm dense on-site SOIls AlternatIvely, passIve pressures may be computed USIng an equIvalent flUId denSIty of 350 pcf for dense natIve soils and structural fill, provldmg all structural fill extendIng out from the face of the foundatIon element for a dIstance at least equal to two and one-half tImes the heIght of the element has been compacted to at least 95 percent of maxImum dry denSIty (ASTM D-1557) The above coeffiCIent of fnctlon and paSSIve eqUIvalent flUId denSIty values Include a factor of safety of about 1 5 5.5 Concrete Slab-on-Grade Construction We recommend that floor slabs constructed on-grade be founded on a mInImum thIckness of 4 mches of clean sand and gravel (less than 5 percent fines) to proVIde UnIform support and a capIllary break It may be possible to support floor slabs dIrectly on the natIve soIls If these soIls meet the above cntena. In floor slab areas where mOIsture senSitIve floor covenngs are planned, an Impermeable membrane (e.g. polyethylene sheet) should be placed over the zone of free-draInIng matenal to reduce the mIgratIon of mOIsture vapor through the concrete slab The Impermeable membrane should be protected by two mches of fine, mOIst sand placed both above and below the membrane The sand cover WIll proVIde protectIon for the membrane and WIll promote UnIform cunng of the slab concrete The sand cover should be mOIstened and tamped pnor to slab placement. 5.6 Pavement Sections We expect that the eXlstIng asphalt concrete pavement may be left In place, except WIthIn the buildIng footpnnt and at the locations of other structures All detenorated or damaged pavement areas should be repaired or replaced The follOWIng paragraphs proVIde recommendatIons for new pavement areas, IncludIng patchIng of detenorated and dIstressed areas We recommend that the subgrade In new pavement areas be probed or proofrolled WIth heavy rubber-tIred constructIon eqUIpment pnor to pavmg. Any soft, loose or otherwIse unSUItable areas should be recompacted, If practIcal, or removed and replaced WIth structural fill We recommend that the probmg or proofrolhng of subgrade areas be observed by a representatIve of our firm to IdentIfy areas need 109 remedIal work and to assess the adequacy of subgrade condItIOns 60-174002/6017RI21 Copyright 1997 Kleinfelder, Inc. Page 8 of 11 Printed: 10/09/97 kq KLEINFELDER We recommend that the desIgn pavement sectIon In automobile parkIng areas consIst of 2 mches of Class B asphalt concrete, and 4 Inches of crushed rock base course overlYIng a subgrade willch has been compacted to at least 95 percent of the MDD (ASTM D-1557) to a mInImum depth of 12 mches In truck traffic areas, the thIckness of Class B asphalt concrete and crushed rock base course should be Increased to 3 Inches and 6 Inches, respectIvely An appropnate thIckness of ATB (asphalt treated base) may be substituted for a portIon of the crushed rock base course, If deSIred The SubstItutIon of A TB for crushed rock base course wIll prOVIde a sImIlar structural sectIOn, but Improve trafficabllIty over the areas to be paved pnor to placement of the Class B asphalt pavement Our recommendations for pavement sectIons are based on dry \\ eat her constructIon condItIons If the pavement areas are constructed dunng extended penods of \\et weather, a 6 to 12 lOch layer of compacted sand and gravel may be reqUIred A separatIon laver of geotextIle fabnc may be used between the sub grade soIls and the layer of clean sand and gravel to mInImIZe the thIckness of select matenal required In areas of soft or disturbed subgrade soIls The geotextIle fabnc should be a heavy duty, non-woven matenal 5.7 Other Dramage Considerations We recommend that the ground surface adjacent to buIldIngs be sloped to draIn surface water away from the structures Roof drams should be connected to a collectIon and dIsposal system whIch IS Independent from the wall and footIng draInS As a precautIOnary measure, we recommend that footmg draInS be Installed around the penmeter of the buIldIng The footmg draInS should consIst of a mInInlUm 4-Inch perforated ngld-wall draIn pipe embedded In a zone of free-draInmg sand and gravel contaInIng less than 3 percent fines The zone of free-draInIng matenal should be at least 24 Inches thIck (measured honzontally) and extend from near the base of the footmg to wlthm 1 foot of the finIshed ground surface The perforated dram pIpe should be Installed near the base of the footIng, and sloped to dram Into a SUItable collectIon and dIsposal system 6.0 ADDITIONAL SERVICES 6.1 Plan Review We recommend that our firm be gIven the opportUnIty to revIew the geotechnical aspects of the proJect plans and speCIficatIOns after the deSign has been finalIzed to confirm the applIcabIlIty of our recommendatIons, or to make the appropnate modIficatIons It IS possible that thIS revIew mIght mdlcate the need for supplemental geotechnical analYSIS, dependIng on the Issues Involved. 6.2 Project Bid Documents It has been our expenence dunng the blddmg process that contractors often contact us to dISCUSS the geotechnIcal aspects of the proJect. Informal contacts between Klemfelder and an IndIVIdual contractor could result In mcorrect or mcomplete InformatIon beIng proVIded to the contractor Therefore, we recommend a pre-bId meetmg be held to answer any questions about the report 60-174002/6017RI21 Copyright 1997 Kleinfelder Inc. Page 9 of II Printed: 10/09/97 kq KLEINFELDER pnor to subrruttal of bIds If thIs IS not possible, questIons or clanficatlOns regardIng the report should be dIrected to the proJect owner(s) or theIr desIgnated representatIves. After consultatIon wIth KleInfelder, the project owner(s), (or theIr representatIves) should proVIde clanficatlons or addItIonal InfOrmatIOn to all contractors biddIng the job 6.3 Construction Observation and Testing The recommendatIons presented In thIS report are based on the assumptIon that an adequate program of tests and observatIons wIll be made dunng constructIon to venfy complIance WIth our recommendatIOns These tests and observatIons should Include, but not necessanly be lImIted to, the folloWIng 1 ObservatIon and testIng dunng sIte preparation and earthwork (IncludIng cuts and fills) 2 ObservatIon of footIng sub grade preparatIon and soIl condItIons 3 ObservatIon of floor slab and pavement sub grade SOli condItIons 4 ConsultatIon as may be reqUIred dunng constructIon The revIew of plans and speCIficatIons, and field observatIon and testIng by KleInfelder, are an Integral part of the conclUSIOns and recommendatIons presented In thiS report If we are not retamed for these servIces, the ClIent agrees to assume Klemfelder's responsibIlIty for any potentIal claIms that may anse dunng constructIon 7.0 LThfITATIONS The recommendatIons contaIned In thIS report are based on the field exploratIons and our understandIng of the proposed proJect The InvestIgation was performed usmg a mutually agreed upon scope of work It IS our opInIOn that thIS study was a cost-effectIve method to explore the subJect SIte, and evaluate some of the potentIal geotechnIcal concerns The soils data used In the preparation of thIS report were obtamed from test bonngs completed at the project sIte It IS possible and lIkely that vanatJons 10 soIls eXIst between the pOInts explored The nature and extent of soIl vanatIOns may not be eVIdent until constructIon occurs If any soil condItions are encountered at the sIte whIch are dIfferent from those described 10 thIS report, our firm should be ImmedIately notIfied so that we may make any necessary revIsIons to our recommendatIons In addItIOn, If the scope of the proposed project, locatIOns of structures, or assumed buIldIng loads change from the descnptlOns gIven In thIS report, our firm should be notIfied. The scope of our work does not mclude servIces related to constructIon safety precautIons and our recommendatIons are not Intended to dIrect the contractor's methods, technIques, sequences or procedures, except as speCIfically described 10 our report for conSIderation 10 deSIgn ') i1 -" 60-174002/6017RI21 Copyright 1997 Klemfelder Inc. Page 10 of II Printed: 10/09/97 ....q KLEINFELDER ThIS report has been prepared for plannIng and desIgn purposes for specIfic applIcation to the subject proJect In accordance WIth the generally accepted standards of practice at the tIme the report was wntten No warranty, express or ImplIed, IS made Tills report may be used only by the CLIENT and for the purposes stated, WIthIn a reasonable tIme from ItS Issuance Land use, sIte condItIons (both on- and off-sIte), or other factors mcludIng advances In man's understandIng of applIed sCIence may change over tIme and could matenally affect our findmgs Therefore, thIs report should not be relIed upon after 12 months from ItS Issue KleInfelder should be notIfied If the project IS delayed by more than 12 months from the date of tills report so that a reVIew of sIte conditions can be made, and recommendatIOns revIsed If appropnate It IS the CLIENT'S responsibIlIty to see that all partIes to the proJect IncludIng the desIgner, contractor, subcontractors, etc, are made aware of thIs report In ItS entIrety The use of InformatIOn contaIned In thIS report for biddIng purposes should be done at the Contractor's optIOn and nsk. Any party other than the CLIENT who WIshes to use thIs report shall notIfy KleInfelder of such Intended use by executIng the "ApplIcatIon for Authonzatlon to Use" whIch follows thIS document as an appendIx Based on the Intended use of the report, KleInfelder may requIre that addItIonal work be performed and that an updated report be Issued Non-complIance WIth any of these reqUIrements by the CLIENT, or anyone else, wIll release KleInfelder from any lIabilIty resultmg from the use of thIs report by any unauthonzed party 60-174002/6017RI21 Copyright 1997 Kleinfelder Inc. Page II of II Pnnted: 10/09/97 Reference: USGS 15 mmute topographIc quadrangle, Yelm, WA, 1959 APPROXlMA1E SCALE HI-----l O' I-----l 4000' ~ -.- PROIECf NO 60-1742-01/02 October, 1997 SITE LOCATION MAP State Highway 507 & Vancil Road Yelm, Washington PLATE " ,~ k,. KLEINFELDER 1 ----------;; ;\ ,I I /; ',\1 J ----------- ------------ r----- 4- 7 .. ~\ C .. .....c>' \ --- - ---- { _t- \ , ........- ' \{ \ T'-A ---0.' \ -... ---. h ' , , I]]' . .-- B-2 .. \b- )4' )(/ ~ ~ ~~ ~ \\1 ~ (\\ ~. t ~ ~ \ , I ---~ \ '" I.r; 0 ~~ Cf)' Cf). APPROXIMATE scALE ~O' LEGB@: ~ llOlUNG L<JC^"t10" ",Ie"'."" p",\\~ Site PI" by!ofU!V".Y p""",,,,,,p, ""dated. .. KlHNfElOER PROJECf ~O 60-114'2.-02. October, \991 p\.P- 1(. 2 --- ~ state Highway S01 & vancil Road yelm, Washington. SYMBOLS SAMPLE TYPE LABORATORY TESTS ~ 8 ~ AL CP cs DS GS o/oF HA SK SM MD SP PP TV TX UC CA Atterberg limits Compaction Consolidation Direct shear Grain-size analysis Percent fines Hydrometer analysis Permeability Moisture content Moisture and density Swelling pressure Pocket penetrometer T orvane Tnaxial compression Unconfined compression Chenucal analysis Note: Blow count IS the number of blows reqwred to dnve the sampler 12 Inches, or other Indicated distance, using a 140 pound hammer fallIng 30 inches. "Po Indicates sample pushed WIth weight of hammer or agaInSt weight of drill rig. 1 The reader must refer to the discussion presented In the report text, the Key to Soil Classification and Terms, and the exploration logs for a proper understanding of subsurface conditions. BULK/BAG SA1vfPLE MODIFIED CALIFORNIA SAMPLER (2-112 inch outside diameter) STANDARD PENETRATION SPLIT SPOON SAMPLER (2 inch outside dtameter) I ~ SHELBY TUBE (3 Inch outside dtameter) SAMPLE NOT RECOVERED GENERAL NOTES 2. Lines separating strata on the logs represent approximate boundaries only Actual transitions may be gradual. 3 No warranty IS proVIded as to the contInwty of SOlI condttIOns between indtVldual sample locatIons. 4 Bonng logs represent general soil condttions observed at the point of exploratIon on the date indtcated. ~'q KLEINFELDER BORING LOG LEGEND Cop}Tight 1997 K1cmfclder, iDe. ICA_LOG_LEGEND PLATE Al SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME :"oTMMlJl COARSE GRAVEL CLEAN GW WEU,.Gl,AI)ED GRAVEL. FINB 10 COARSB GRAVEL GRAINED GRAVEL SOILS ~{ore 1ban ~O% GP POORLY -GRADED GRAVEL of Coarse F!"Idioo SIIIY GRAVEL Reu.incd 00 GRAVEL GM No.4 Sieve wrrn FINES More 1ban SO% GC CL\YEY GRAVEL Reu.incd 00 No. 200 Sieve SA."'D CLEAN SW \'IEl.LGRADED SAND, FINE 10 COARSE SAND SAND SP POORLY ~ED SAND More 1ban ~~'" of Coacs.c F n.ctioo SM SIUY SA.""D P ilSS4:S SA.'ID No.4 Sieve WITH FINES SC CI..AYEY SAND SILT A."'D CLAY I ~lL SnI FINE lNORGA.'<IC GRAINED , SOILS Liquid Limit CL CLAY Less 1ban ~o ORGANIC OL ORGA"lC SnI. ORGANIC OAY More 1ban ~O% SILT A.'o'D CLW I MH SnI OF HIGH PlAS1lCITY, J:L\S11C SIlI Passes il'iORGA.'lIC '<0. 200 Sieve CH CLAY Of HIGH PLASTICITY. FAT a.AY Liquid Limit SO or More ORGA.'lIC ! OH ORGA.'lC CLAY, ORGA.'lIC SnI I PT HIGHLY ORGA."lC SOILS I PEAT PARTICLE SIZE LTh-illS GRAVEL SAND BOULDERS COBBLES SILT CiA y Coarse Fine ~ Fine 12" 3" 3/4" #4 #10 t4() #200 o 002 rom Strongest j DESCRIPTIVE TERMS USED wrrn SOILS CONSISTENCY & APPARENT DENSITY SILTS AND CLAYS SANDS & GRAVELS Hard Vel)' Dense Very Stiff Dense StJif Mediwn Dense Medium S tiff Loose Soft Vel)' Loose Very Soft MOISTURE CONTENT Wettest 1 Wet Vel)' Moist Moist Slightly Moist Dry Weakest Driest NOTES 1 Field c1asSlfcatloo is ba3ed on VISual exanunatlon of soil In general accordance WIth ASTM D2488-9O 2. Soil classification USing laboratory tests is based on ASTM D2487-90 SOIL MOISTIJRE MODIFIERS Dry - Absence of moisture, dusty, dry to touch Moist - Damp, but no Visible water 3 Do::riptlOn of soil denSIty or consistency are based on IIlterpretation of blow count data, VISUal appearance of soils and/or test data. Wet - Visible free water or saturated, usually soil IS obtained from below water table ~~ KLEINFELDER KEY TO SOIL CLASSIFICATION AND TERMS PLATE A2 Copyris/lt 1991 KJeinCeldc:r. Inc. UOGEND2.PRE Surface Conditions: Grass Date Drilled: 9/29/97 Logged By. SGH Groundwater. No groundwater observed Approx. Surface Elev (ft): Total Depth: 6.5 feet Laboratory Field DESCRIPTION ~ ~ c ,.., :8 I ~ <) 'E .c E ;; Q. ::J Q. ,.., ~ 0 CD_ ~ 0 IV en CD j;j ~c U g, .c "9 ~ III .2 CD .Cij Q. .c 0.. ..8Ui 1Il- ~ ::J a. E -c ~ai ~ 0 CD III IV CD o 0 0 OJ 0 en ..Jf- ::Eu 00 iii :.:J 0 Sod and topsoil SM Dark Brown silty fine sand with occasional gravel (medium dense, moist) ~ SM 5.1 23 SM Light Brown silty fine sand with gravel (medium dense, moist) 5 - SP-SM Light brown sand with silt and occasional gravel (very dense, moist) f- 5 l-- 1)< 50/4 f-- 10- f--10 15 - 15 20- -20 25 25 LOG OF BORING B-1 k~ SR 507 & Vanctl Rd KLEINFELDER Yelm, Washington ~ 1997 K1.inf.ldcr. ac. LOG_Of_BORING 174202.GPl Project # 60-1742-02 I PLATEA3 1016/97 .. ,t " .. ! ! i ~ NOTE. See plates Al and A2 for explanation of symbols Surface Conditions: Asphalt Date Drilled: 9/29/97 Logged By. SGH Groundwater. No groundwater observed Approx. Surface Elev (ft): Total Depth: 13 feet - Laboratory Field DESCRIPTION .~ ?i c >- :8 Qj ~ (.J C .r: E Qj ~ I- ~ Co ::J Co >- ~ 0 ClI_ ~ 0 lU en ~ iii ~c (J ~ .r: ~ III BClI .iii Co .r: Ci. ..8iii 1Il- ~ ::J Ci. E .05 ~~ :5 0 ClI lU lU ClI {5 ClI 0 en ...JI- ::!:(J 00 co ~ 0 2" of asphalt and 6" of crushed rock base course ~'C GP-GM Dark brown gravel with fine to medium sand and silt (dense, moist) FILL X SP-SM Dark brown fine to medium sand with gravel, silt, and occasional cobbles (very dense, "-" SM 6.4 50/4 moist) 5 - f- 5 ~ I SM Brown silty medium to coarse sand with gravel and occasional cobbles (dense, moist) 48 I 10- ~10 X I SP-SM Brown fine to medium sand with silt, gravel and occasional cobbles (very dense, moist) "-" 50/6 15 - f- 15 20- 1-20 25 25 LOG OF BORING B-2 IH SR 507 & VancIl Rd KLEINFELDER Yelm. Washington C~&ft 1991 K1einfclder. ". LOG_Of_BORING 114202.GPJ Project # 60-1742-02 I PLATE A4 I 019/91 NOTE. See plates Al and A2 for explanation of symbols , . Surface Conditions: Beauty bark Date Drilled: 9/29/97 Logged By' SGH Groundwater. No groundwater observed Approx. Surface Elev (ft): Total Depth: 6.5 feet Laboratory Field DESCRIPTION I ! ~ c- >- :8 2:- 8- c .r::. E ! ::;, a. >- 0 !c ~ 0 '" en CD ~'" u g, .r::. Q .2 CD a. .J::. Q. E .8-;; "'- '" ~ ::;, a. -c: 2:-5i .r::. 0 CD '" ",CD 00 "" (5 CD 0 en -II- :::!:u 00 iD -I 0 Topsoil SM Brown silty fine to medium sand with gravel and occasional cobbles (very dense, moist) X SM 5.5 64 "-' 5 - 1 J SP-SM Brown fine sand with silt, gravel and occasional cobbles (medium dense, moist) 5 X 22 "-' 10- -10 15 - - 15 20- -20 25 25 LOG OF BORING B-3 1ft SR 507 & Vaned Rd KLEINFELDER Ye/m. Washington c~ 1997 K1ca.rcldcr. bo. LOG_Of_BORINO 174202.0PJ Project # 60-1742-02 T PLATE A5 1CW6I97 NOTE. See plates AI and A2 for explanatIon of symbols