Loading...
20160352 ROW Permit 10262016City of Yelm PUBLIC WORKS 901 Rhoton Rd NW Yelm, WA 98597 Phone: 360 -458 -8406 FAX: 360- 458 -8417 Permit No. 2"1 (j Application to Perform Work on Public Right of Way and /or Connect to Utilities APPLICATION The undersigned hereby makes application to: Gas Main Extension Hoffman Short Plat Digging to begin near north property line located @ 129'S C/L of Prairie Wind Ct SE & 28' W C/L of Prairie Wind St SE. Trench south 5 onto private properly. Location of work: 9405 Cullens Rd SE I agree to perform the work in strict compliance with Yelm Municipal Code, Chapter , the special conditions enumerated herein and the attached conditions I have read and will adhere to the general provisions applicable to permits contained on this form. The Public Works Department (360- 458 -8406) must be contacted for inspection 24 hours before work commences or this permit will be void. The Underground Utilities Coordinating Council (1- 800 - 424 -5555) must be contacted two (2) working days before proceeding with any excavation associated with this permit. Name: Puget Sound Energy / InfraSource Address: 3130 South 38th St, Tacoma WA 98409 Phone: 253- 476 -6037 Proposed starting date of installation: 11/15/16 1 Duration: 1 day Date 0 11 1k.0 Signature: V rn c6p'2� 1 PERM EQUIREMENTS I For Official Use Only Fee Issued All Fee Received $ y, Application Approval Signature: Receipt Number opt, 'j q (Q To Be Completed By City Permission is hereby granted to perform the above described work subject to the general provisions contained on this form, and the followingspecial conditions: A bond in the amount of is required to insure compliance with the above conditions, refundable upon satisfactory completion of work. No work shall be done under this permit until the party or parties to whom it is granted shall have communicated with and received instructions from: Remarks: First Inspection Date: Inspector Final Project Completion A roval: Date: Revised 03/09/2011 OCT 2 5 2016 BY. .................... City of Yelm Community Development Department Building Division Phone: (360) 458 -8407 Fax: (360) 458 -3144 Permit No.: 20160352 Issue Date: 10/26/2016 (Work must be completed within 180 days) Applicant: Name: PUGET SOUND ENERGY Phone: 253 - 476 -6295 Address: 3130 S 38TH ST TACOMA WA 98409 Property Information: Site Address: 9405 CULLENS RD SE Owner: Assessor Parcel No.: 21724110700 Subdivision: HOFFMAN PLAT Contractor Information: Name: PUGET SOUND ENERGY Phone: Address: 3130 S 38TH ST TACOMA WA 98409 Contractor License No.: Expires: 0 /00 /0000 Project Information: Project: UTILITY Description of Work: GAS MAIN EXTENSION, HOFFMAN SHORT PLAT. JOB NUMBER 107051806 Sq. Ft. per floor: First Heat Type (Electric, Gas, Other): Second Third Garage Basement Fees: Item RIGHT OF WAY Contractor PUGET SOUND ENERGY TOTAL FEES: Applicant's Affidavit: I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easements striction of record. If applying as a contractor, I further certify that I am currently registered State of W shington. Signatur AA (y Date n' Firm 0V Lot: Fees $ 125.00 $ 125.00 OFFICIAL USE ONLY # Sets of Prints: Final Inspection: Date: By: Cite of Yelm (361) 458 -3244 REW 00247964 10/26/2016 9 :53 AM OPER: CO TERM: 001 REF #: 834907 PAID BY: TRAM: 33.0000 BUYING PERMI13 20160352 PUGET SOUND ENERGY 9405 CULLENS RD SE ROW 125.00CR TENDERED: 125.00 CHECK APPLIED: 125.00 - CHANGE: rn 3 v d c v E 4- 0 tD O 00 O r O LO It co O 00 0 u7 O c �I o 0 a c 0 E TO i 0 O co LO O O to it Co 0 00 0 U) 0 c 0 Z O Zi d� 2 N g E a rn N t1i I to N O U O 0 1, 2' 0 50' 100' JOINT 211 = 688 FT JOINT 2" MPE -7 JOINT 2" MPE -7 95' JOINT 2" MPE -7 SITE PLAN SCALE: 1" = 50' w- w wawa n Aft r- r%IAr T A sI C � 12+00 1 {v - NI I -- --- -- ?3&_:------ - - - - - --- L'z__ PRAIRIE WIND CT SE / t 5,506 f 2 LU .' M / / 1 t 1.1-145 ikons (L r 1�- _ �/ _ - _ _ k net, m' :r : E I I 236. 4 - - - -- - - N I0 i 21' MPE IP 28'S n� �� a� Zn T- - - - -- J / {I { I FL L /PiJMP I Yv'YSE - f - 1 I ` DESCRIPTION LOCATION PIPE DESIGN AS -BUILT OF ACTIVITIES FROM TO LOT SIZE (IN) TYPE LENGTH (F) LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS SS SINGLE 2" MAIN 1 1 1/8 MPE -7 10 ( )SCL 3 2600 1 80 SS SINGLE 2" MAIN 2 11/8 MPE -7 10 ( )SCL 60 2600 C. MCD NALD 253.395.6836 SS SINGLE 2" MAIN 3 1 1/8 MPE -7 10 ( )SCL PRESSURE 2600 GAS WK CTR CIONC TYPE TEST SS SINGLE 2" MAIN 4 1 1/8 MPE -7 10 ( )SCL OP MAP 280.38 2600 DATE OFF / / SS SINGLE 2" MAIN 5 1 1/8 MPE -7 10 ( )ECL TYPE TEST 2600 ❑ AIR ❑ NITROGEN SS SINGLE 2" MAIN 6 11/8 MPE -7 10 ( )ECL / / 2600 MARILYN DANBY - SS SINGLE 2" MAIN 7 11/8 MPE -7 10 ( )ECL DESIGN PRESSI 60 2600 2023 03/10 SS SINGLE 2" MAIN 8 11/8 MPE -7 10 ( )ECL 2600 SS SINGLE 2" MAIN 9 11/8 MPE -7 10 ( )ECL 2600 SS SINGLE 2" MAIN 10 11/8 MPE -7 10 ( JECL 2600 SS SINGLE 2" MAIN 11 11/8 MPE -7 10 ( )ECL 2600 SS SINGLE 2" MAIN 12 1 1/8 MPE -7 10 { )ECL 2600 SS SINGLE 2" MAIN 13 "M MPE -7 10 ( )ECL 2600 SS SINGLE 2" MAIN 14 11/8 MPE -7 10 ( )ECL 2600 SS SINGLE 2" MAIN 15 1 1/8 MPE -7 10 ( )ECL 2600 SS SINGLES = 15 r0r10.C1A1dft_ d'_f%L1n111T TORI P 150 FT 1 1 /8" PE PIPE X4NG # LOCATION GAS POWER XING LENGTH TYPE OF CROSSING (Feeder, Primary, SOcondary, etc.) FROM TO SIZE (IN) TYPE QTY LOCATION SIZE (IN) TYPE QTY X01 LOT 2 LOT 5 4 40 1 N 2 DB120 2 1 80 GAS MAIN, PRIMARY NIA WA 3 DB120 1 80 SECONDARY X02 LOT 10 1 "A" 3 DB120 1 60 SECONDARY 2" DB120 GREY PVG = SU F 1 Z- F'VL; VLUU QUA %'� = L 4" PVC PLUG /CAPS = 2 4" YELLOW SCH 40 PVC = 80 FT ,3" DB120 GREY PVC =140 FT 3" PVC PLUG /CAPS = 4 11;14 w a-d. - ..a+aer" * GM R!W or Property Line Excavated 4ti" Typical Dirt Pile Curb Sidewalk width may very per �4" Min Number of utilities \\ kl',,�,\ 12" Typical and Conduits 4.s ` Finial Grade ,lr /l l /j / �i \•r \ \i \�i;•` \fir \ \i \ \i; �i \ \\i \ \i \�i,��i \ \jf\ � �/ l 12" Min Final Backrill�'Z ` Separation // Min Cover Location of roof drain i 12" Min 12" Min ° /j Over Power Intercept (depth varies). i 48" ^� Max Depth 6' or 12" Min Sand Shading � % - - - - Y dPower�afte Compaction' Over Gas after Compaction �/ Over paces 4" Sand Bedding a GasJ TV & TELJ Primary J I- Seconder/ NOTES: Power Power 1. If the final backfiII contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench.* If the final backriiII contains rocks 8 inches In diameter or smaller, install 6 inches compacted sand shading across the full width Af the trench. 2. Rocks greater than 10 inches diameter are not permitted in the final badtfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from -the side of the trench nearest to where the gas main /service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications Companies. * Alternatives to full -width trench shading require PSE approval. JOINT TRENCH DETAIL NOT TO SCALE - PRIMARY AND SECONDARY - MAINLINE GAS COMMUNICATIONS EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSI= STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) FITTER'S CHECKLIST (CHECK BOX To tcONFIRM COMPLETK" ❑ Inspected Steel and PE pipe per GOS 2450.114 and 2450.1500 ❑ Reviewed and complied with all construction ncA95• ❑ Recorded all required information on the as -builk per GOS 2500.1700. ❑ Completed post installation inspection per G0.o 2525.1200 and 25252700. ❑ Left the work area in a clean and safe oonditlonn• Foreman's Signature Foreman's Name (printed) Company: Poteloo Inc Date cr IL'.._fii 56' ROW W 25.5' 30.5' 5' 1 3 19.5' 19.5' 6' 5' r SIDEWALK R - r PLA TM SIDEWALK ASPHALT ASPHALT EXIST 2" MPE IP 28' WCL 2" MPE IP - CROSS SECTION - PRAIRIE WIND ST SE SCALE: NONE LOOKING NORTH MY ROW N 25.5 30.5' 6' 18.5' 18.5' 6' 5' i PLANTER PLANTER SIDEWALK 1' rL 1'� ASPHALT I ASPHALT CROSS SECTION - ROAD A SCALE: NONE LOOKING EAST E GENERAL NOTES - GAS (JOINT TRENCH }: 1. Excavator to contact Utilities Underground Location Center (One -Calq 48 hours prior to construction, to two working days prior to construction. 1- 800 -424 -5555 2. Notify appropriate permitting agency prior to job start (see permit requirements). 3. Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. 4. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. 5. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (rest Lead) installation. 6. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. 7. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. 8. System MAOP denoted by I System MAOP = 60 PSIG 9. Install Main Valves out of traffic where possible. 10. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. 11. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. 12. If STW pipe involved, coordinate installation with CP Tech. NIA Cell # NIA 13. Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. 14. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. 15. Unless otherwise noted: All pipes installed in plat to be 2" MPE -7. All crossings to be Yellow 4" PVC. All Services to be 1 -1/8" PE. / denotes service stub location. L_i denotes footage between fittings. 16. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. 17. Note all recordable footages, locations and material changes on the as -built in red. 18. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. 19. On site pre -con required before start of job. 20. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). 21. Inclement weather conditions may cause delays in construction times and dates. GAS MAIN INSTALLATIONIRETIREMENT Notification # Type/Work Pipe Size Type Est Length Act Lglh Manufacturer WA NIA WA N/A NIA NIA JOINT 2" MPE -7 688 FT N/A NIA NIA NIA WA NIA NIA NIA ENGR - GAS C. MCDONALD 253.395.6638 9.16.16 1 DRAWN BY C. MCD NALD 253.395.6836 9.16.16 CHECKED BY GAS MAIN PRESSURE & TESTING GAS WK CTR CIONC TYPE TEST ❑ SOAP ❑ AIR ❑ NITROGEN ❑ WATER DATE ON / / START TIME OP MAP 280.38 TESTED BY DATE OFF / / STOP TIME MAPPING PRESSURE TEST RESULTS OP ❑ F TYPE TEST ❑ SOAP ❑ AIR ❑ NITROGEN ❑ WATER DATE ON / / START TIME CENTURYLINK TESTED BY DATE OFF / / STOP TIME MARILYN DANBY - PRESSURE 360.357.1230 TEST RESULTS OP ❑ F ❑ TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 DESIGN PRESSI 60 1 SYS MAOP 1 344.60 2023 03/10 PROJECT PHASE Notification # Order # GAS SAP Superior Service Stubs Service /Meter Service/Meter Service /Meter Ind. Service Ind. MSA Dis. Reg. / FT HP Svc/MSA Relocate Retirement 502846571 107051806 WA 106308784 WA NIA WA N/A NIA NIA NIA NIA WA N/A N/A NIA NIA NIA WA NIA NIA NIA IIIIIIIIIII .•.� �•. ��... C� -yl,�. �*.y ��.�, Project Manager Contact Million. Ion: Manager. Brian Hannon Cell Phone. 425.495.5528 E -Mail: Brain.HarmondMee.com Vicinity Map NOT TO SCALE EMAIL CONTACT. BOWEN CONSTRUCTIONQMSN.COM Owner / Developer Contact Info Bowen Construction PO Box 42 Buckley, WA 98321 ATTN: Brian Bowen 253.208.9412 office O w 0 00 0 00 .Is 0 v' rn For contacts below dial 1-888 -CALL PSE (225 -6773) CALL (800) 424 -55W 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES "Locates Required' Yes M No ❑ "Flagging Required" Yes ® No ❑ REAL ESTATE/EASEMENT REDT # (RW -096653) PERMIT CITY OF YELM REV# DATE BY DESCRIPTION FUNCTION CONTACT PHONE NO DATE 3 PROJECT MGR Brian Harmon 425.495.5528 6.14.16 2 ENGR - GAS C. MCDONALD 253.395.6638 9.16.16 1 DRAWN BY C. MCD NALD 253.395.6836 9.16.16 CHECKED BY COUNTY Thurston Emer Sec 49 GAS WK CTR CIONC APPROVED BY N/A CP APPROVAL N/A IN/A 114 SEC NE Sec 24 T11 7N R01 OP MAP 280.38 PLAT MAP 282.043 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# COMCAST CENTURYLINK PSE RIGHT OF WAY - TODD ZIMNY MARK TORRES MARILYN DANBY - 360. 357 .1234• 360.357.1230 253.476.6451 - PUGU HOFFMAN SHORT PLAT SOUND 2" MPE -7 GAS MAIN EXTENSION -15 S/F LOTS 1* A r F p11,V l er/ E1Y 9405 CULLENS ROAD SE, YELM, WA 98597 DESIGNED BY PUGET SOUND ENERGY SAP Sup Order Nbr 107051606 ELEC Order Number 105080845 SCALE PAGE a V = 50' 1 OF 1