Level of Service Analysis
heffron
TECHNICAL APPENDIX
LEVEL OF SERVICE ANALYSIS
PRAIRIE PARK
YELM, WA
Prepared for"
Prairie Park Limited Partnership
FEBRUARY 11, 2000
transportation. Inc.
4133 Interlake Avenue N
Seattle WA 98103
Ph: (206) 547-7170
Fx: (206) 547-7744
Prairie Park, Yelm
Yelm Ave and 1st St
Existing PM PH
01/31/98
11.13: 51
SIGNAL97/TEAPAC[Ver 1.00] - Capacity Analysis Summary
Intersection Averages for Int # 1-
Degree of Saturation (v/c) 0.74 Vehicle Delay 40.4 Level of Service D+
Sq 84 Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
**/** -------------------------------------------------------------
I + + * I + + I 1 I ^ I
I + + * I + + I I 1 ++++1
/1\ 1<+ + *> 1<+ + 1 I 1 <++++1
I I v I v I 1 ^ ****1 I
I 1 I ^ I ^ 1++++ V 1 I
North I I * *>1 <* + +>1 1****> I
I I I * * I * + + I 1**** I
I I * * I * + + I 1 v 1
G/C=0.058
G= 5.2"
Y+R= 4.0"
OFF= 0.0%
G/C=0.072
G= 6.5"
Y+R= 4.0"
OFF=10.3%
C= 90 sec
G/C=0.086
G= 7.7"
Y+R= 4.0"
OFF=21.9%
G/C=0.136
G= 12.2"
Y+R= 4.0"
OFF=35.0%
G/C=0.425
G= 38.3"
Y+R= 4.0"
OFF=53.0%
G= 70.0 sec = 77.8% Y=20.0 sec = 22.2% Ped= 0.0 sec = 0.0%
-------------------------------------------------------------------------------
I Lane 1 Width/I g/C I Service Rate 1 Adj I
Group I Lanes I Reqd Used I @C (vph) @E 1 Volume I
I HCM 1 L 190% Maxi
v/c I Delay I S I Queue I
-------------------------------------------------------------------------------
N Approach
36.4
D+
-------------------------------------------------------------------------------
TH+RTI 12/1 10.169 10.175 I
LT 1 12/1 10.132 10.058 1
149 I
1 1
286 I
85 1
133 10.451 1
39 10.379 1
34.4 I C I 139 ftl
43.1 I*D+I 47 ftl
-------------------------------------------------------------------------------
S Approach
TH+RTI 12/1 10.248 10.202 1
LT 1 12/1 10.155 10.086 1
50 2
D
195 1
1 1
330 1
133 I
277 10.827 1
101 10.669 1
50.0 I*D I 281 ftl
50.7 I*D I 117 ftl
-------------------------------------------------------------------------------
E Approach
TH+RTI 12/1 10.279 10 425 1
LT I 12/1 10.188 10.136 1
29.2
C
692 1
51 1
786 1
227 I
380 10.483 I
182 10.755 I
19.2 I B 1 276 ftl
50.2 I*D 1 199 ftl
-------------------------------------------------------------------------------
W Approach
43.9
D+
TH+RTI 12/1 10.446 10.425 1
LT 1 12/1 10.183 10.136 I
778 I
228 I
684 I
51 I
728 10.936 I
174 10.719 I
43.2 I*D+I 528 ftl
47.1 I D I 190 ftl
-------------------------------------------------------------------------------
Prairie Park, Yelm
Yelm Ave and 1st st
Existing PM PH
01/31/98
11:14:07
SIGNAL97/TEAPAC[Ver 1.00] - Summary of Parameter Values
Intersection Parameters for Int #
METROAREA
SIMULATION PERIOD
LEVELOFSERVICE
NODELOCATION
Approach Parameters
APPLABELS
GRADES
PEDLEVELS
PARKINGSIDES
PARKVOLUMES
BUSVOLUMES
RIGHTTURNONREDS
Movement Parameters
1 - .
NONCBD
15
C S
o 0
N
0.0
o
NONE
20
o
o
E
0.0
o
NONE
20
o
o
S
0.0
o
NONE
20
o
o
W
0.0
o
NONE
20
o
o
MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT
VOLUMES 74 49 36 19 330 167 176 79 93 102 568 160
WIDTHS 0.0 12.0 12.0 0.0 12.0 12.0 0.0 12.0 12.0 0.0 12.0 12.0
LANES 0 1 1 0 1 1 0 1 1 0 1 1
UTILIZATIONS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRUCKPERCENTS 2.5 2.5 2.5 2.0 2.0 2.0 3.0 3.0 3.0 1 5 1.5 1.5
PEAKHOURFACTORS 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
ARRIVALTYPES 3 3 3 3 3 3 3 3 3 3 3 3
ACTUATIONS YES YES YES YES YES YES YES YES YES YES YES YES
REQCLEARANCES 4 0 4.0 4.0 4.0 4.0 4 0 4.0 4.0 4.0 4.0 4 0 4.0
MINIMUMS 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
IDEALSATFLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
FACTORS 1.00 1.00 1 00 1.00 1.00 1.00 1.00 1.00 1.00 1 00 1.00 1.00
DELAYFACTORS 1.00 1 00 1 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
NSTOPFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
GROUPTYPES NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM
SATURATI ONFLOWS o 1686 1761 o 1847 1770 o 1654 1752 o 1829 1778
Phasing Parameters
SEQUENCES 84
PERMISSIVES NO NO NO NO LEADLAGS NONE NONE
OVERLAPS NO NO NO NO OFFSET 0.00 1
CYCLES 90 90 10 PEDTIME o 0 0
GREENTIMES 5.25 6.48 7.73 12.25 38.29
YELLOWTIMES 4.00 4.00 4.00 4.00 4.00
CRITICALS 3 8 9 6 11
EXCESS 0
Prairie Park, Yelm
Yelm Ave and 1st st
Future 2005 PM PH w/o project
01/31/98
11:16 02
SIGNAL97/TEAPAC[Ver 1.00] - Capacity Analysis Summary
Intersection Averages for Int # 1-
Degree of Saturation (v/c) 0.85 Vehicle Delay 57.0 Level of Service E+
Sq 84 Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
**/** -------------------------------------------------------------
I + + * I + + I 1 I ^ 1
I + + * 1 + + I I I ++++1
/1\ 1<+ + *> 1<+ + I I I <++++1
I I v I v 1 1 ^ ****1 I
I I I ^ 1 ^ 1++++ V 1 I
North I I * *>1 <* + +>1 1****> I
1 I 1 * * I * + + I 1**** 1
I I * * 1 * + + I I v I
G/C=0.057
G= 5.2"
Y+R= 4.0"
OFF= 0.0%
G/C=0.077
G= 6.9"
Y+R= 4.0"
OFF=10.2%
G/C=O 079
G= 7.1"
Y+R= 4.0"
OFF=22.3%
G/C=0.130
G= 11 7"
Y+R= 4.0"
OFF=34.6%
G/C=0.435
G= 39.1"
Y+R= 4.0"
OFF=52.1%
C= 90 sec
G= 70.0 sec = 77.8% Y=20.0 sec = 22.2% Ped= 0.0 sec = 0.0%
I Lane IWidth/1 g/C I Service Rate I Adj I
Group I Lanes I Reqd Used I @C (vph) @E I Volume I
1 HCM 1 L 190% Maxi
v/c I Delay I S I Queue I
N Approach
36.8
D+
TH+RTI 12/1 10.177 10.179 1
LT I 12/1 10.134 10.057 I
156 I
1 I
292 I
83 1
152 10.505 I
43 10.426 I
34.7 I C 1 158 ftl
43.9 I*D+I 51 ftl
S Approach
72.5
E
TH+RTI 12/1 10.268 10.200 1 191 I
LT I 12/1 10.159 10.079 I 1 I
325 I
119 1
315 10 952 I
114 10.826 1
72.4 I*E 1 321 ftl
72.9 I*E I 134 ftl
E Approach
36.7
D+
TH+RTI 12/1 10.302 10.~35 I
LT 1 12/1 10.201 10.130 I
713 I
34 I
804 I
215 I
430 10.535 I
207 10.900 1
19.4 I B 1 307 ftl
72.5 I*E 1 228 ftl
W Approach
66 9
E+
TH+RTI 12/1 10.493 10.435 1
LT I 12/1 10.194 10.130 1
704 I
34 I
795 I
216 I
826 11.039 I
196 10.848 I
67.9 I*E I 589 ftl
62.8 I E+I 215 ftl
Prairie Park, Yelm
Yelm Ave and 1st St
Future 2005 PM PH w/o project
01/31/98
11:16:11
SIGNAL97/TEAPAC[Ver 1.00] - Summary of Parameter Values
Intersection Parameters for Int #
METROAREA
SIMULATION PERIOD
LEVELOFSERVICE
NODELOCATION
Approach Parameters
APPLABELS
GRADES
PEDLEVELS
PARKINGSIDES
PARKVOLUMES
BUSVOLUMES
RIGHTTURNONREDS
Movement Parameters
1 - .
NONCBD
15
C S
o 0
N
0.0
o
NONE
20
o
o
E
0.0
o
NONE
20
o
o
S
0.0
o
NONE
20
o
o
W
0.0
o
NONE
20
o
o
MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT
VOLUMES 85 55 40 20 375 190 200 90 105 115 645 180
WIDTHS 0.0 12.0 12.0 o 0 12 0 12.0 0.0 12.0 12 0 0.0 12.0 12.0
LANES 0 1 1 0 1 1 0 1 1 0 1 1
UTILIZATIONS 0.00 0.00 0.00 0.00 0.00 0.00 o 00 0.00 0.00 0.00 0.00 0.00
TRUCKPERCENTS 2.5 2.5 2.5 2.0 2 0 2.0 3.0 3.0 3.0 1.5 1.5 1.5
PEAKHOURFACTORS o 92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
ARRIVAL TYPES 3 3 3 3 3 3 3 3 3 3 3 3
ACTUATIONS YES YES YES YES YES YES YES YES YES YES YES YES
REQCLEARANCES 4.0 4.0 4.0 4.0 4.0 4 0 4.0 4.0 4 0 4.0 4.0 4.0
MINIMUMS 5.0 5.0 5.0 5.0 5.0 5 0 5.0 5.0 5.0 5.0 5.0 5.0
IDEALSATFLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
FACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
DELAYFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 00 1.00 1.00 1.00 1.00
NSTOPFACTORS 1. 00 1. 00 1. 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
GROUP TYPES NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM
SATURATIONFLOWS o 1685 1761 o 1848 1770 o 1654 1752 o 1829 1778
Phasing Parameters
SEQUENCES 84
PERMISSIVES NO NO NO NO LEADLAGS NONE NONE
OVERLAPS NO NO NO NO OFFSET o 00 1
CYCLES 90 90 10 PEDTIME 0.0 0
GREENTIMES 5 17 6.92 7.09 11.70 39.13
YELLOWTIMES 4.00 4.00 4.00 4.00 4.00
CRITICALS 3 8 9 6 11
EXCESS 0
prairie Park, Yelm
Yelm Ave and 1st St
Future 2005 PM PH with project
01/31/98
13'47:57
SIGNAL97/TEAPAC[Ver 1.00] - Capacity Analysis Summary
Intersection Averages for Int # 1 - .
Degree of Saturation (v/c) 0.89 Vehicle Delay 65.8 Level of Service E+
Sq 84 Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
**/** -------------------------------------------------------------
I + + * I + + I I 1 ^ I
I + + * 1 + + I 1 I ++++1
/1\ 1<+ + *> 1<+ + I 1 1 <++++1
I I v I v 1 I ^ ****1 I
I 1 I ^ I ^ 1++++ V 1 I
North I I * *>1 <* + +>1 1****> I
1 I 1 * * I * + + I 1**** 1
I 1 * * 1 * + + 1 I v I
-------------------------------------------------------------
G/C=0.054
G= 4.8"
Y+R= 4.0"
OFF= 0.0%
G/C=0.083
G= 7.5"
Y+R= 4.0"
OFF= 9.8%
G/C=0.063
G= 5.7"
Y+R= 4.0"
OFF=22 6%
G/C=0.120
G= 10.8"
Y+R= 4.0"
OFF=33.3%
G/C=0.458
G= 41.2"
Y+R= 4.0"
OFF=49.8%
C= 90 sec
G= 70.0 sec = 77.8% Y=20.0 sec = 22.2% Ped= 0.0 sec = 0.0%
I Lane I Width/ 1 g/C 1 Service Rate I Adj I
Group 1 Lanes 1 Reqd Used I @C (vph) @E I Volume I
I HCM 1 L 190% Maxi
v/c I Delay 1 S I Queue I
N Approach
37.5
D+
TH+RTI 12/1 10.177 10.181 1
LT 1 12/1 10.136 10.054 I
160 1
1 1
297 I
77 1
152 10.498 I
50 10.526 1
34.4 I C 1 158 ftl
46.8 I*D 1 60 ftl
S Approach
105.4
F
TH+RTI 12/1 10.273 10.190 1 174 1 308 I 323 11.025 1 93.8 I*F I 333 ftl
LT I 12/1 10.159 10.063 1 1 1 91 I 114 11.036 1 138.1 I*F 1 136 ftl
E Approach
47.3
D
TH+RTI 12/1 10.331 10.458 1
LT I 12/1 10.207 10.120 1
758 1
6 I
843 1
197 1
488 10.579 1 19.0 1 B 1 335 ftl
220 11.033 1 110.1 I*F 1 245 ftl
W Approach
67 2
E+
TH+RTI 12/1 10.512 10.458 1
LT 1 12/1 10.194 10.120 I
754 I
6 I
839 I
198 I
868 11.035 I
196 10.916 I
64.7 I*E+I 593 ftl
78.3 I E I 218 ftl
Prairie Park, Yelm 01/31/98
Yelm Ave and 1st St 13:48'09
Future 2005 PM PH with project
SIGNAL97/TEAPAC[Ver 1.00] - Summary of Parameter Values
Intersection Parameters for Int # 1 - .
METROAREA NONCBD
SIMULATION PERIOD 15
LEVELOFSERVICE C S
NODELOCATION 0 0
Approach Parameters
APPLABELS N E S W
GRADES 0.0 0.0 0.0 0.0
PEDLEVELS 0 0 0 0
PARKINGSIDES NONE NONE NONE NONE
PARKVOLUMES 20 20 20 20
BUSVOLUMES 0 0 0 0
RIGHTTURNONREDS 0 0 0 0
Movement Parameters
MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT
VOLUMES 85 55 46 34 415 202 207 90 105 115 684 180
WIDTHS 0.0 12.0 12.0 0.0 12.0 12.0 0.0 12.0 12.0 0.0 12.0 12.0
LANES 0 1 1 0 1 1 0 1 1 0 1 1
UTILIZATIONS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRUCKPERCENTS 2.5 2.5 2.5 2.0 2.0 2.0 3.0 3.0 3.0 1.5 1.5 1.5
PEAKHOURFACTORS 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 o 92 0.92
ARRIVAL TYPES 3 3 3 3 3 3 3 3 3 3 3 3
I
ACTUATIONS YES YES YES YES YES YES YES YES YES YES YES YES
REQCLEARANCES 4.0 4 0 4.0 4 0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
MINIMUMS 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
IDEALSATFLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
FACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
DELAYFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1 00 1 00 1.00 1.00 1.00 1.00
NSTOPFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1. 00 1. 00
GROUPTYPES NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM
SATURATI ONFLOWS o 1685 1761 o 1842 1770 o 1652 1752 o 1831 1778
Phasing Parameters
SEQUENCES 84
PERMISSIVES NO NO NO NO LEADLAGS NONE NONE
OVERLAPS NO NO NO NO OFFSET 0.00 1
CYCLES 90 90 10 PEDTIME 0.0 0
GREENTIMES 4.83 7.48 5.66 10.81 41.22
YELLOWTIMES 4.00 4.00 4.00 4.00 4.00
CRITICALS 3 8 9 6 11
EXCESS 0
Prairie Park, Yelm
Yelm Avenue/Vancil Road
Existing PM Peak
02/02/00
12:37:38
SIGNAL97/TEAPAC[Ver 1 00] - Capacity Analysis Summary
Intersection Averages for Int # 1 - Yelm Avenue/Vancil Road
Degree of Saturation (v/c) 0 62 Vehicle Delay 24 4 Level of Service C+
Sq 74
**/**
Phase 2
Phase 1
Phase 3
Phase 4
/1\
I
I
North
1
1 + * * I I ^ I
1 + * * 1 1 ++++1
1<+ * *> 1 I <++++1
I v I ^ ++++1 I
1 ^ 1**** v 1 1
I <* * *>1 1****> 1
I * * * I 1**** 1
I * * * 1 1 v 1
G/C=0.127
G= 11 4"
Y+R= 4 0"
OFF= 0 0%
G/C=O 120
G= 10.8"
Y+R= 4 0"
OFF=17.1%
G/C=O 088
G= 7 9"
Y+R= 4 0"
OFF=33 6%
G/C=O 488
G= 43.9"
Y+R= 4.0"
OFF=46 8%
C= 90 sec
G= 74 0 sec = 82 2% Y=16 0 sec = 17 8% Ped= 0 0 sec = 0 0%
1 Lane IWidth/1 g/C I Service Rate 1 Adj I
Group I Lanes 1 Reqd Used 1 @C (vph) @E I Volume I
N Approach
1 HCM 1 L 190% Maxi
v/c 1 Delay 1 S I Queue 1
38 9
D+
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
1 RT
ILT+TH
I 12/1 10 140 10 127 I
I 12/1 10 163 10 127 1
S Approach
22 I
26 I
53 10.261 1
128 10.559 1
36 2 I D+I 58 ftl
40 0 I*D+I 141 ftl
187 1
214 1
40 3
D+
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
4 1 174 I 103 10.539 I 40.3 I*D+I 115 ftl
I LT+TH+RT 1 12/1 10 160 10.120 I
E Approach
18 1
B
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
RT
TH
LT
1 12/1 10 138 10 488 I
I 12/1 10.360 10 488 I
I 12/1 10.123 10 088 1
W Approach
676 I
806 I
1 I
47 10.063 1
540 10.612 I
13 10.086 1
12.2 I B+I 31 ftl
18.1 1 B 1 356 ftl
38.0 I D+I 25 ftl
750 1
882 1
133 I
23.8
C+
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
TH+RTI 12/1 10 412 10 488 I
LT I 12/1 10 146 10 088 1
811 1
1 I
651 10 734 I
78 10 506 1
21 6 I*C+I 424 ftl
41 9 I*D+I 91 ftl
887 I
136 I
Prairie Park, Yelm
Yelm Avenue/Vancil Road
Existing PM Peak
02/02/00
12 39.14
SIGNAL97/TEAPAC[Ver 1.00] - Summary of Parameter Values
1 - Yelm Avenue/Vancil Road
Intersection Parameters for Int #
METROAREA
SIMULATION PERIOD
LEVELOFSERVICE
NODELOCATION
Approach Parameters
APPLABELS
GRADES
PEDLEVELS
PARKINGSIDES
PARKVOLUMES
BUSVOLUMES
RIGHTTURNONREDS
Movement Parameters
NONCBD
15
C S
o 0
N
o 0
o
NONE
20
o
o
E
o 0
o
NONE
20
o
o
W
o 0
o
NONE
20
o
o
S
0.0
o
NONE
20
o
o
MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT
VOLUMES 51 17 107 46 524 13 12 21 67 60 571 76
WIDTHS 12.0 12.0 o 0 12.0 12 0 12 0 o 0 12 0 o 0 o 0 12 0 12 0
LANES 1 1 0 1 1 1 0 1 0 0 1 1
UTILIZATIONS o 00 o 00 0.00 o 00 0.00 0.00 o 00 o 00 o 00 o 00 o 00 0.00
TRUCKPERCENTS 1.0 1 0 1.0 5.0 5 0 5 0 2.0 2 0 2.0 3.0 3 0 3 0
PEAKHOURFACTORS o 97 o 97 0.97 o 97 0.97 o 97 o 97 o 97 o 97 o 97 0.97 0.97
ARRIVAL TYPES 3 3 3 3 3 3 3 3 3 3 3 3
ACTUATIONS YES YES YES YES YES YES YES YES YES YES YES YES
REQCLEARANCES 4 0 4 0 4.0 4.0 4 0 4.0 4.0 4.0 4 0 4 0 4 0 4.0
MINIMUMS 5 0 5 0 5.0 5.0 5 0 5.0 5.0 5 0 5 0 5 0 5 0 5 0
I DEAL SAT FLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
FACTORS 1 00 1 00 1 00 1 00 1.00 1 00 1 00 1 00 1 00 1 00 1 00 1 00
DELAY FAC TORS 1 00 1 00 1 00 1.00 1.00 1 00 1 00 1 00 1 00 1 00 1 00 1.00
NSTOPFACTORS 1 00 1. 00 1 00 1. 00 1. 00 1. 00 1 00 1 00 1 00 1 00 1 00 1 00
GROUPTYPES NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM
SATURATIONFLOWS 1599 1804 0 1538 1810 1719 o 1594 0 o 1818 1752
Phasing Parameters
SEQUENCES 74
PERMISSIVES NO NO NO NO LEAD LAGS NONE NONE
OVERLAPS NO NO NO NO OFFSET 0.00 1
CYCLES 90 90 30 PEDTIME 0.0 0
GREENTIMES 11 43 10 78 7 90 43 89
YELLOWTlMES 4 00 4 00 4 00 4 00
CRITICALS 2 8 12 11
EXCESS 0
Prairie Park, Yelm
Yelm Avenue/Vancil Road
Future 2005 PM Peak Without Project
02/02/00
12'43 03
SIGNAL97/TEAPAC[Ver 1.00] - Capacity Analysis Summary
Intersection Averages for Int # 1 - Yelm Avenue/Vancil Road
Degree of Saturation (v/c) 0 65 Vehicle Delay 24.5 Level of Service C+
-------------------------------------------------------------
Sq 54
**/**
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
-------------------------------------------------------------
/1\
1
I
North
1
* 1 + + + 1 * * 1 1 ^ I
* I + + + I * * I I ++++1
*> 1<+ + +> 1<* * I I <++++1
I v I v I ^ ++++1 1
I I ^ 1**** v 1 I
<+ I I + +>1 1****> I
+ I 1 + + I 1**** 1
+ 1 1 + + I 1 v I
-------------------------------------------------------------
G/C=O 119
G= 10 7"
Y+R= 4 0"
OFF= 0 0%
G/C=O 000
G= 0 0"
Y+R= 0 0"
OFF=16.3%
G/C=O 092
G= 8 3"
Y+R= 4 0"
OFF=16 3%
G/C=0.092
G= 8 3"
Y+R= 4.0"
OFF=30.0%
G/C=0.519
G= 46 7"
Y+R= 4.0"
OFF=43 7%
-------------------------------------------------------------
C= 90 sec
G= 74 0 sec = 82.2% Y=16 0 sec = 17.8% Ped= 0 0 sec = 0 0%
-------------------------------------------------------------------------------
1 Lane 1 Width/I g/C
Group I Lanes 1 Reqd
1 Service Rate 1 Adj 1
Used 1 @C (vph) @E 1 Volume I
1 HCM 1 L 190% Maxi
v/c 1 Delay 1 S 1 Queue 1
-------------------------------------------------------------------------------
N Approach
42 1
D+
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
42 8 I*D+I 95 ftl
41 7 I*D+I 137 ftl
TH+RTI 12/1 10 150 10 092 1
LT 1 12/1 10.162 10 119 1
1 1 136 1
3 1 196 1
83 10 539 1
124 10 585 1
-------------------------------------------------------------------------------
S Approach
38 0
D+
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
47 ftl
86 ftl
TH+RTI 12/1 10.133 10 092 I
LT 1 12/1 10.146 10.119 I
1 1 144 1
2 I 194 I
41 10 253 1
77 10.367 1
38 8 I D+I
37 6 1 D+I
-------------------------------------------------------------------------------
E Approach
17 3
B
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
RT
TH
LT
1 12/1 10 140 10 519 1
I 12/1 10 395 10 519 1
I 12/1 10 124 10.092 I
731 1
871 I
1 I
798 I
939 1
141 I
52 10.065 1
613 10 653 I
15 10 094 I
10 8 1 B+I 32 ftl
17 4 I B 1 380 ftl
37 7 1 D+I 25 ftl
-------------------------------------------------------------------------------
W Approach
24.1
C+
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
TH+RTI 12/1 10.453 10 519 1
LT 1 12/1 10 150 10.092 I
875 1
1 1
943 1
144 1
737 10.782 I
88 10.543 1
21.8 I*C+I 451 ftl
42.8 I*D+I 102 ftl
-------------------------------------------------------------------------------
Prairie Park, Yelm
Yelm Avenue/Vancil Road
Future 2005 PM Peak Without Project
SIGNAL97/TEAPAC[Ver 1.00] - Summary of Parameter Values
02/02/00
12 43 43
Intersection Parameters for Int #
1 - Yelm Avenue/Vancil Road
METROAREA
SIMULATION PERIOD
LEVELOFSERVICE
NODELOCATION
NONCBD
15
C S
o 0
Approach Parameters
APPLABELS
GRADES
PEDLEVELS
PARKINGSIDES
PARKVOLUMES
BUSVOLUMES
RIGHTTURNONREDS
N
0.0
o
NONE
20
o
o
Movement Parameters
MOVLABELS
VOLUMES
WIDTHS
~S
UTILIZATIONS
TRUCKPERCENTS
PEAKHOURFACTORS
ARRIVAL TYPES
ACTUATIONS
REQCLEARANCES
MINIMUMS
IDEALSATFLOWS
FACTORS
DELAYFACTORS
NSTOPFACTORS
GROUPTYPES
SATURATI ONFLOWS
RT TH LT
60 20 120
o 0 12 0 12.0
011
o 00 0 00 0 00
1 0 1.0 1 0
o 97 0 97 0.97
333
YES YES YES
4.0 4 0 4 0
5.0 5 0 5 0
1900 1900 1900
1 00 1 00 1 00
1 00 1 00 1. 00
1. 00 1. 00 1 00
NORM NORM NORM
o 1670 1787
E
o 0
o
NONE
20
o
o
RT TH LT
50 595 15
12 0 12 0 12 0
111
0.00 0 00 0.00
5 0 5 0 5 0
o 97 0 97 0.97
333
YES YES YES
4 0 4.0 4 0
5 0 5.0 5 0
1900 1900 1900
1 00 1 00 1. 00
1 00 1 00 1. 00
1. 00 1 00 1 00
NORM NORM NORM
1538 1810 1719
S
o 0
o
NONE
20
o
o
RT TH LT
15 25 75
o 0 12.0 12 0
011
o 00 0 00 0 00
2 0 2 0 2.0
o 97 0.97 0 97
3 3 3
YES YES YES
4 0 4 0 4.0
5 0 5 0 5 0
1900 1900 1900
1. 00 1 00 1 00
1. 00 1 00 1 00
1 00 1 00 1 00
NORM NORM NORM
o 1761 1770
W
o 0
o
NONE
20
o
o
RT TH LT
70 645 85
o 0 12.0 12 0
011
o 00 0 00 0 00
3.0 3.0 3.0
o 97 0.97 0.97
333
YES YES YES
4 0 4.0 4 0
5 0 5 0 5 0
1900 1900 1900
1 00 1. 00 1 00
1 00 1 00 1 00
1. 00 1. 00 1 00
NORM NORM NORM
o 1818 1752
Phasing Parameters
SEQUENCES 54
PERMISSIVES NO NO NO NO LEADLAGS NONE NONE
OVERLAPS NO NO NO NO OFFSET 0.00 1
CYCLES 90 90 30 PEDTIME 0.0 0
GREENTIMES 10.69 o 00 8 29 8 32 46 70
YELLOWTIMES 4 00 0.00 4 00 4 00 4 00
CRITICALS 3 0 2 12 11
EXCESS 0
Prairie Park, Yelm
Yelm Avenue/Vancil Road
Future 2005 PM Peak With Project
02/02/00
12 45 13
SIGNAL97/TEAPAC[Ver 1 00] - Capacity Analysis Summary
Intersection Averages for Int # 1 - Yelm Avenue/Vancil Road
Degree of Saturation (v/c) 0.68 Vehicle Delay 26.0 Level of Service C+
Sq 54
**/**
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
/1\
I
I
North
I
* I + + + I * * I 1 ^ I
* I + + + I * * I I ++++1
*> 1<+ + +> 1<* * I I <++++1
1 v I v I ^ ++++1 I
1 I ^ 1**** v I I
<+ I I + +>1 1****> 1
+ I I + + I 1**** 1
+ I I + + I I v 1
-------------------------------------------------------------
G/C=O 119
G= 10.7"
Y+R= 4.0"
OFF= 0.0%
G/C=O.OOO
G= 0 0"
Y+R= 0 0"
OFF=16.3%
G/C=0.092
G= 8 3"
Y+R= 4 0"
OFF=16 3%
G/C=0.092
G= 8.3"
Y+R= 4 0"
OFF=30.0%
G/C=O 519
G= 46 7"
Y+R= 4 0"
OFF=43.7%
C= 90 sec
G= 74 0 sec = 82 2% Y=16.0 sec = 17 8% Ped= 0.0 sec = 0 0%
I Lane IWidth/1 g/C I Service Rate I Adj 1
Group I Lanes I Reqd Used I @C (vph) @E I Volume 1
N Approach
I HCM I L 190% Maxi
v/c I Delay I S I Queue I
42.6
D+
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
S Approach
TH+RTI 12/1 10 151 10 092 I
LT 1 12/1 10 162 10 119 I
1 I 136 I 87 10.565 1 43.9 I*D+I 99 ftl
3 I 196 I 124 10.585 I 41 7 I*D+I 137 ftl
38.1
D+
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
E Approach
TH+RTI 12/1 10.133 10.092 I
LT I 12/1 10.147 10.119 I
1 I 144 I
2 I 194 I
41 10.253 I 38 8 I D+I 47 ftl
81 10.386 I 37 8 I D+I 90 ftl
18.2
B
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
W Approach
RT
TH
LT
I 12/1 10.140 10.519 I
I 12/1 10 411 10.519 I
I 12/1 10 124 10.092 I
731 I
871 I
1 I
52 10 065 I
646 10 688 I
15 10 094 I
10 8 I B+I 32 ftl
18 3 I B 1 400 ftl
37 7 I D+I 25 ftl
798 I
939 I
141 I
26 6
C+
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
TH+RTI 12/1 10.474 10 519 I
LT I 12/1 10.152 10 092 I
875 1
1 I
943 I
144 I
781 10 828 1 24.5 I*C+I 478 ftl
93 10 574 1 44.0 I*D+I 107 ftl
Prairie Park, Yelm
Yelm Avenue/Vancil Road
Future 2005 PM Peak With Project
02/02/00
12.45'46
SIGNAL97/TEAPAC[Ver 1 00] - Summary of Parameter Values
1 - Yelm Avenue/Vancil Road
Intersection Parameters for Int #
METROAREA
SIMULATION PERIOD
LEVELOFSERVICE
NODELOCATION
Approach Parameters
APPLABELS
GRADES
PEDLEVELS
PARKINGSIDES
PARKVOLUMES
BUSVOLUMES
RIGHTTURNONREDS
Movement Parameters
NONCBD
15
C S
o 0
N
0.0
o
NONE
20
o
o
E
0.0
o
NONE
20
o
o
S
o 0
o
NONE
20
o
o
W
o 0
o
NONE
20
o
o
MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT
VOLUMES 64 20 120 50 627 15 15 25 79 74 684 90
WIDTHS o 0 12 0 12 0 12.0 12 0 12 0 0.0 12 0 12 0 0.0 12 0 12 0
LANES 0 1 1 1 1 1 0 1 1 0 1 1
UTILIZATIONS 0.00 o 00 0.00 0.00 o 00 0.00 0.00 0.00 0.00 o 00 o 00 o 00
TRUCKPERCENTS 1.0 1.0 1 0 5 0 5.0 5 0 2.0 2 0 2.0 3.0 3.0 3.0
PEAKHOURFACTORS o 97 o 97 0.97 o 97 o 97 0.97 o 97 0.97 o 97 o 97 0.97 0.97
ARRIVAL TYPES 3 3 3 3 3 3 3 3 3 3 3 3
ACTUATIONS YES YES YES YES YES YES YES YES YES YES YES YES
REQCLEARANCES 4.0 4 0 4.0 4.0 4 0 4.0 4.0 4 0 4.0 4.0 4.0 4.0
MINIMUMS 5.0 5 0 5.0 5.0 5 0 5.0 5.0 5 0 5.0 5.0 5 0 5.0
IDEALSATFLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
FACTORS 1 00 1.00 1 00 1 00 1.00 1 00 1 00 1 00 1.00 1.00 1.00 1 00
DELAYFACTORS 1 00 1.00 1. 00 1 00 1.00 1 00 1 00 1 00 1 00 1.00 1 00 1.00
NSTOPFACTORS 1 00 1. 00 1 00 1. 00 1. 00 1 00 1 00 1 00 1 00 1 00 1 00 1. 00
GROUPTYPES NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM
SATURATIONFLOWS o 1667 1787 1538 1810 1719 o 1761 1770 o 1818 1752
Phasing Parameters
SEQUENCES 54
PERMISSIVES NO NO NO NO LEAD LAGS NONE NONE
OVERLAPS NO NO NO NO OFFSET o 00 1
CYCLES 90 90 30 PEDTIME 0.0 0
GREENTIMES 10 69 0 00 8 29 8 32 46 70
YELLOWTIMES 4 00 0 00 4 00 4 00 4 00
CRITICALS 3 0 2 12 11
EXCESS 0
Prairie Park, Yelm
Yelm Ave and Bald Hills Rd
Existing PM PH
01/31/98
11. 08 : 33
SIGNAL97/TEAPAC[Ver 1.00] - Capacity Analysis Summary
Intersection Averages for Int # 1-
Degree of Saturation (v/c) 0 48 Vehicle Delay 23 8 Level of Service C+
Sq 34 Phase 1 Phase 2 Phase 3 Phase 4
**/** -------------------------------------------------
I I * * + I 1 ^ I
I 1 * * + I I ++++1
/1\ I 1<* * +> 1 1 <****1
1 I 1 v 1 ^ ++++1 I
1 I ^ I ^ 1**** v 1 1
North 1 <* + +>1 <+ + +>1 1++++> I
1 1++++ * + + I + + + 1 1++++ I
I v * + + I + + + 1 1 v I
-------------------------------------------------
G/C=0.068
G= 6.2"
Y+R= 4.0"
OFF= 0.0%
G/C=0.207
G= 18.6"
Y+R= 4.0"
OFF=11.3%
G/C=0.167
G= 15.1"
Y+R= 4.0"
OFF=36.4%
G/C=0.380
G= 34.2"
Y+R= 4.0"
OFF=57.6%
C= 90 sec G= 74.0 sec = 82.2% Y=16.0 sec = 17.8% Ped= 0.0 sec = 0.0%
-------------------------------------------------------------------------------
I Lane I Width/ 1 g/C I Service Rate I Adj 1
Group I Lanes I Reqd Used 1 @C (vph) @E 1 Volume I
I HCM 1 L 190% Maxi
v/c I Delay 1 S I Queue I
-------------------------------------------------------------------------------
N Approach
30.9
C
----------------------------------------------------------
TH+RTI 12/1 10.168 10.207 I 212 1 351 I 134 10.377 1 31.4 I*C 1 134 ftl
LT I 12/1 10.138 10.207 1 159 1 268 1 39 10.141 I 29.4 1 C 1 39 ftl
-------------------------------------------------------------------------------
S Approach
25.9
C+
TH+RTI 12/1 10.140 10.319 1 429 I 548 1 59 10.108 I 21.7 1 C+I 52 ftl
LT I 12/1 10.039 10.068 1 251 1 342 I 195 10.570 1 27.1 I*C+I 172 ftl
E Approach 24.8 C+
-------------------------------------------- ------
RT 1 12/1 10.134 10.380 I 483 1 582 1 36 10.062 17.8 1 B 1 29 ftl
TH 1 12/1 10.308 10.380 1 578 I 684 I 430 10.629 24 6 I*C+I 344 ftl
LT 1 12/1 10.136 10.167 I 133 I 276 I 47 10.164 32.4 I C 1 51 ftl
W Approach
20.8
C+
RT
TH
LT
I 12/1 10.256 10.493 1
I 12/1 10.296 10.380 1
I 12/1 10.136 10.167 1
704 I
597 1
138 I
777 1
704 I
285 I
276 10.355 1
417 10.592 I
49 10.166 I
14.3 I B+I 178 ftl
23.7 I C+I 328 ftl
32.4 I*C I 52 ftl
Prairie Park, Yelm 01/31/98
Yelm Ave and Bald Hills Rd 11:09:00
Existing PM PH
SIGNAL97/TEAPAC[Ver 1. 00] - Summary of Parameter Values
Intersection Parameters for Int # 1 - .
METROAREA NONCBD
SIMULATION PERIOD 15
LEVELOFSERVICE C S
NODELOCATION 0 0
Approach Parameters
APPLABELS N E S W
GRADES o 0 0.0 0.0 o 0
PEDLEVELS 0 0 0 0
PARKINGSIDES NONE NONE NONE NONE
PARKVOLUMES 20 20 20 20
BUSVOLUMES 0 0 0 0
RIGHTTURNONREDS 0 0 0 0
Movement Parameters
MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT
VOLUMES 66 62 37 35 413 45 16 40 187 265 400 47
WIDTHS 0.0 12.0 12.0 12.0 12 0 12.0 0.0 12.0 12.0 12.0 12.0 12.0
LANES 0 1 1 1 1 1 0 1 1 1 1 1
UTILIZATIONS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRUCKPERCENTS 2.0 2.0 2 0 5.5 5.5 5.5 6.0 6.0 6.0 2.5 2.5 2 5
PEAKHOURFACTORS 0.96 0.96 0.96 0.96 o 96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
ARRIVAL TYPES 3 3 3 3 3 3 3 3 3 3 3 3
ACTUATIONS YES YES YES YES YES YES YES YES YES YES YES YES
REQCLEARANCES 4.0 4.0 4.0 4 0 4.0 4.0 4.0 4.0 4 0 4.0 4.0 4.0
MINIMUMS 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
IDEALSATFLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
FACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
DELAYFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 00 1.00 1.00 1.00
NSTOPFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
GROUP TYPES NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM
SATURAT I ON FLOWS o 1719 1338 1531 1801 1711 o 1715 1703 1576 1854 1761
Phasing Parameters
SEQUENCES 34
PERMISSIVES NO NO YES NO LEADLAGS NONE NONE
OVERLAPS NO :YES NO YES OFFSET 0.00 1
CYCLES 90 90 10 PEDTIME o 0 0
GREENTIMES 6.16 18.59 15.05 34.20
YELLOWTIMES 4.00 4.00 4.00 4.00
CRITICALS 9 2 12 5
EXCESS 0
Prairie Park, Yelm
Yelm Ave and Bald Hills Rd
Future 2005 PM PH w/o project
01/31/98
11'09'42
SIGNAL97/TEAPAC[Ver 1.00] - Capacity Analysis Summary
Intersection Averages for Int # 1-
Degree of Saturation (v/c) 0.54 Vehicle Delay 25.0 Level of Service C+
Sq 34 Phase 1 Phase 2 Phase 3 Phase 4
**/** -------------------------------------------------
1 I * * + I I ^ I
I I * * + 1 I ++++1
/1\ 1 1<* * +> 1 I <****1
I I 1 v I ^ ++++1 I
1 1 ^ 1 ^ 1**** v 1 1
North 1 <* + +>1 <+ + +>1 1++++> I
I 1++++ * + + I + + + I 1++++ 1
I v * + + I + + + 1 1 v I
-------------------------------------------------
G/C=0.069
G= 6.2"
Y+R= 4.0"
OFF= 0 0%
G/C=0.203
G= 18.2"
Y+R= 4.0"
OFF=11.4%
G/C=0.161
G= 14.5"
Y+R= 4.0"
OFF=36.1%
G/C=0.389
G= 35.0"
Y+R= 4.0"
OFF=56.6%
C= 90 see
G= 74.0 sec = 82.2% Y=16.0 see = 17.8% Ped= 0.0 sec = 0.0%
I Lane I Width/ 1 g/C 1 Service Rate I Adj 1
Group 1 Lanes 1 Reqd Used I @C (vph) @E 1 Volume 1
1 HCM 1 L 190% Maxi
v/c 1 Delay I S I Queue 1
N Approach
31. 7
C
TH+RTI 12/1 10.174 10.203 I 204 I 344 1 151 10.434 I 32.2 I*C I 152 ftl
LT 1 12/1 10.140 10.203 1 152 1 259 1 42 10.156 1 29.8 1 C 1 42 ftl
S Approach
29.5
C
TH+RTI 12/1 10.144 10.316 I 421 I 541 I 68 10 126 1 22 0 1 C+I 60 ftl
LT 1 12/1 10.060 10.069 I 236 1 324 1 219 10.676 1 31.9 I*C I 194 ftl
E Approach
25.9
C+
RT
TH
LT
1 12/1 10.136 10.389
I 12/1 10.335 10.389
I 12/1 10.138 10.161
499
598
117
596
701
265
42 10.070
484 10.690
52 10.188
17.3 1 B 1 33 ftl
25.9 I*C+I 382 ftl
33.0 I C I 56 ftl
W Approach 21.4 C+
RT 1 12/1 10.277 10.503 721 792 313 10.395 14.2 B+I 197 ftl
TH I 12/1 10.322 10.389 617 721 474 10 657 24.8 1 C+I 367 ftl
LT I 12/1 10.139 10.161 121 273 57 10.201 33.1 I*C 1 61 ftl
-------------------------------------------------------------------------------
Prairie Park, Yelm 01/31/98
Yelm Ave and Bald Hills Rd 11:09:59
Future 2005 PM PH w/o project
SIGNAL97/TEAPAC[Ver 1 00] - Summary of Parameter Values
Intersection Parameters for Int # 1 - .
METROAREA NONCBD
SIMULATION PERIOD 15
LEVELOFSERVICE C S
NODELOCATION 0 0
Approach Parameters
APPLABELS N E S W
GRADES 0.0 0.0 0.0 0.0
PEDLEVELS 0 0 0 0
PARKINGSIDES NONE NONE NONE NONE
PARKVOLUMES 20 20 20 20
BUSVOLUMES 0 0 0 0
RIGHTTURNONREDS 0 0 0 0
Movement Parameters
MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT
VOLUMES 75 70 40 40 465 50 20 45 210 300 455 55
WIDTHS 0.0 12.0 12.0 12.0 12.0 12.0 0.0 12.0 12.0 12.0 12.0 12.0
LANES 0 1 1 1 1 1 0 1 1 1 1 1
UTILIZATIONS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRUCKPERCENTS 2.0 2.0 2.0 5.5 5 5 5.5 6 0 6.0 6.0 2.5 2.5 2.5
PEAKHOURFACTORS 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
ARRIVALTYPES 3 3 3 3 3 3 3 3 3 3 3 3
ACTUATIONS YES YES YES YES YES YES YES YES YES YES YES YES
REQCLEARANCES 4.0 4.0 4 0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
MINIMUMS 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
IDEALSATFLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
FACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
DELAYFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
NSTOPFACTORS 1.00 1.00 1.00 1 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
GROUPTYPES NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM
SATURATI ONFLOWS o 1718 1328 1531 1801 1711 o 1709 1703 1576 1854 1761
Phasing Parameters
SEQUENCES 34
PERMISSIVES NO NO YES NO LEADLAGS NONE NONE
OVERLAPS NO YES NO YES OFFSET 0.00 1
CYCLES 90 90 10 PEDTIME 0.0 0
GREENTIMES 6.22 18.25 14.51 35.02
YELLOWTIMES 4.00 4.00 4 00 4.00
CRITICALS 9 2 12 5
EXCESS 0
Prairie Park, Yelm
Yelm Ave and Bald Hills Rd
Future 2005 PM PH with project
01/31/98
13:45.15
SIGNAL97/TEAPAC[Ver 1.00] - Capacity Analysis Summary
Intersection Averages for Int # 1-
Degree of Saturation (v/c) 0.57 Vehicle Delay 26.1 Level of Service C+
Sq 34 Phase 1 Phase 2 Phase 3 Phase 4
**/** -------------------------------------------------
I I * * + 1 I ^ 1
I 1 * * + 1 1 ++++1
/1\ I 1<* * +> I I <****1
I 1 I v I ^ ++++1 1
I 1 ^ I ^ 1**** v 1 I
North I <* + +>1 <+ + +>1 1++++> 1
1 1++++ * + + I + + + I 1++++ I
I v * + + I + + + 1 1 v I
-------------------------------------------------
G/C=0.088
G= 7.9"
Y+R= 4.0"
OFF= 0.0%
G/C=0.198
G= 17.8"
Y+R= 4.0"
OFF=13.2%
G/C=0.153
G= 13.8"
Y+R= 4.0"
OFF=37.5%
G/C=0.383
G= 34.5"
Y+R= 4.0"
OFF=57.3%
C= 90 sec G= 74.0 sec = 82.2% Y=16.0 sec = 17.8% Ped= 0.0 sec = 0.0%
I Lane 1 Width/ I g/C I Service Rate I Adj 1
Group 1 Lanes 1 Reqd Used 1 @C (vph) @E I Volume I
I HCM 1 L 190% Maxi
v/c I Delay 1 S 1 Queue I
N Approach
32.4
C
TH+RTI 12/1 10.179 10.198 I 197 I 337 1 161 10.471 1 32.9 I*C I 163 ftl
LT I 12/1 10.140 10.198 1 146 I 253 I 42 10.160 I 30.2 1 C I 43 ftl
S Approach
29.7
C
TH+RTI 12/1 10.144 10.331 I 449 I 565 I 68 10.120 I 21.1 I C+I 59 ftl
LT 1 12/1 10.081 10.088 I 258 I 342 I 244 10.713 I 32.1 I*C 1 212 ftl
E Approach
27.8
C
RT
TH
LT
1 12/1 10.136 10.383
I 12/1 10.346 10.383
I 12/1 10.138 10.153
488
584
95
586
689
250
42 10.072
508 10.737
52 10.198
17.7 I B
28.1 I*C
33.6 1 C
33 ftl
405 ftl
57 ftl
W Approach 22.3 C+
RT I 12/1 10.285 10.515 744 812 328 10.404 13.7 I B+I 202 ftl
TH I 12/1 10.334 10.383 604 710 499 10.703 26.6 I C+I 391 ftl
LT I 12/1 10.139 10.153 99 258 57 10.211 33.7 I*C I 61 ftl
-------------------------------------------------------------------------------
Prairie Park, Yelm 01/31/98
Yelm Ave and Bald Hills Rd 13 46:04
Future 2005 PM PH with project
SIGNAL97/TEAPAC[Ver 1.00] - Summary of Parameter Values
Intersection Parameters for Int # 1 - .
METROAREA NONCBD
SIMULATION PERIOD 15
LEVELOFSERVICE C S
NODELOCATION 0 0
Approach Parameters
APPLABELS N E S W
GRADES 0.0 0.0 0.0 0.0
PEDLEVELS 0 0 0 0
PARKINGSIDES NONE NONE NONE NONE
PARKVOLUMES 20 20 20 20
BUSVOLUMES 0 0 0 0
RIGHTTURNONREDS 0 0 0 0
Movement Parameters
MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT
VOLUMES 75 80 40 40 488 50 20 45 234 315 479 55
WIDTHS 0.0 12.0 12.0 12.0 12.0 12.0 0.0 12.0 12 0 12.0 12.0 12.0
LANES 0 1 1 1 1 1 0 1 1 1 1 1
UTILIZATIONS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRUCKPERCENTS 2.0 2.0 2.0 5.5 5.5 5.5 6 0 6.0 6 0 2.5 2.5 2.5
PEAKHOURFACTORS 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
ARRIVALTYPES 3 3 3 3 3 3 3 3 3 3 3 3
ACTUATIONS YES YES YES YES YES YES YES YES YES YES YES YES
REQCLEARANCES 4.0 4.0 4.0 4.0 4.0 4.0 4 0 4 0 4.0 4.0 4.0 4.0
MINIMUMS 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
IDEALSATFLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
FACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
DELAYFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
NSTOPFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
GROUPTYPES NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM
SATURATI ONFLOWS o 1727 1328 1531 1801 1711 o 1709 1703 1576 1854 1761
Phasing Parameters
SEQUENCES
PERMISSIVES
OVERLAPS
CYCLES
GREENTIMES
YELLOWTIMES
CRITICALS
EXCESS
34
NO
NO
90
7.92
4.00
9
o
NO
YES
90
17.83
4.00
2
YES
NO
10
13.80
4.00
12
NO
YES
LEAD LAGS
OFFSET
PEDTIME
NONE
0.00
0.0
NONE
1
o
34.45
4.00
5
HCS' Unsignalized Intersections Release 3.1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: West Rd and 1 03rd Avenue
Count Date. Existing
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements: 2 3 4 5 6 7 8 9 10 11 12
------ -------- ----------
Volume 13 103 3 59 27 2 0 4 20 6 14
HFR: 14 113 1 3 65 30 2 0 4 22 7 15
PHF 0.91 091 091 091 091 091 091 091 091 091 091 091
PHV' 001 001 001 001 001 001 017 017 017 000 000 000
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
Y
Y
N
N
N
N
N
N
Channelized: N
Grade. 000
Lane usage for movements 4,5&6 approach.
Lane 1 Lane 2 Lane 3
L T R L T R L T R
------------------------ ----------
Y Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 7,8&9 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
------ ---------------
Y Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
y
y
y
N
N
N
N
N
N
Channelized: N
Grade' 0 00
Data for Computing Effect of Delay to Major Street Vehicles.
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
103
1
1700
1700
Westbound
59
27
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,It
t c,T
1 stage
tc
1 stage
41 41 71 65 6.2 71 6.5 6.2
1010101010101010
001 001 0 17 017 017 000 000 000
0.2 0.2 01 0.2 0.2 01
000 000 000 000 000 000 000 000
00 00 00 00 00 00 00 00
o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
41 41 73 67 64 71 6.5 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 35 40 33 35 40 3.3
09 09 09 09 09 09 09 09
001001017017017000000000
2.2 2.2 3 7 4.2 3 5 3.5 4 0 3.3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St.
9
12
Conflicting Flows 113 79
Potential Capacity 900 987
Pedestrian Impedance Factor 100 1 00
Movement Capacity 900 987
Probability of Queue free St. 100 098
--------
Step 2: L T from Major St. 4
---------- --------
Conflicting Flows 114 94
Potential Capacity 1482 1506
Pedestrian Impedance Factor 1 00 100
Movement Capacity 1482 1506
Probability of Queue free St. 1 00 0 99
Maj. L Shared In. Prob Queue Free St. 1 00 0 99
Step 3 TH from Minor St.
8
11
Conflicting Flows 243 228
Potential Capacity 634 675
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 0 99 0 99
Movement Capacity 626 666
Probability of Queue free St. 1 00 0 99
Step 4 L T from Minor St.
7
10
Conflicting Flows 239
Potential Capacity 685
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 98
Maj. L, Min T Adj. Imp Factor 0 98
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 663
230
729
1 00
099
099
099
097
719
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
v(vph)
Movement Capacity
Shared Lane Capacity
1----11---
1 II
I II
2 0 4 22 7 15
663 626 900 719
804 784
666 987
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
I II
1 II
1 II
v(vph) 14 3 7 44
C m(vph) 1506 1482 804 784
vlc 001 000 001 006
95% queue length
Control Delay 7 4 7 4 9 5 9 9
LOS A A A A
Approach Delay 9 5 9 9
Approach LOS A A
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
V i1
Vi2
S i1
Si2
P* OJ
D maj left
o 99 1 00
103 59
1 27
1700 1700
1700 1700
o 99 1 00
74 74
N number major st lanes
Delay. rank 1 mvmts
1 1
01 00
HCS" Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: West Rd and 1 03rd Avenue
Count Date Existing with project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume
HFR:
PHF
PHV'
13 103
14 113 1
o 91 0 91 0 91
o 01 0 01 0 01
3 59 41 2 0 4 23 6 14
3 65 45 2 0 4 25 7 15
091 091 091 091 091 091 091 091 091
001 0.01 001 0 17 017 017 000 000 000
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage
Median Type" None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 4,5&6 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 7,8&9 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
y
y
N
Channelized: N
Grade. 0 00
L
Lane 3
T R
N
N
N
N
N
Data for Computing Effect of Delay to Major Street Vehicles.
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
103
1
1700
1700
Length of study period, hrs: 0.25
Westbound
59
41
1700
1700
1
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
tc
1 stage
41 41 71 65 6.2 71 65 6.2
10 10 10 10 10 10 10 10
001 001 017 017 0 17 000 000 000
0.2 0.2 01 0.2 0.2 01
000 000 000 000 000 000 000 000
00 00 00 00 00 00 00 00
000 000 000 000 000 000 000 000
41 41 73 67 64 71 6.5 6.2
Follow Up Time Calculations.
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3.5 4 0 3 3 3.5 4 0 3 3
09 09 09 09 09 09 09 09
001 001 0 17 017 017 000 000 000
2.2 2.2 3 7 4.2 3.5 3 5 4 0 3 3
Worksheet 6 Impedance and capacity equations
9
Step 1 RT from Minor St.
113
900
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St.
100
900
100
4
Step 2: L T from Major St.
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
114
1482
100
1482
12
87
977
1 00
977
098
110
1487
100
1487
Probability of Queue free St. 1 00 0 99
Maj. L Shared In. Prob Queue Free St. 1 00 0 99
Step 3' TH from Minor St. 8 11
Conflicting Flows 258 236
Potential Capacity 621 668
Pedestrian Impedance Factor 1 00 1 00
Cap. Adj. factor due to Impeding mvmnt 0 99 0 99
Movement Capacity 614 660
Probability of Queue free St. 1 00 0 99
Step 4 L T from Minor St.
7
10
Conflicting Flows 246
Potential Capacity 677
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 98
Maj. L, Min T Adj. Imp Factor 0 98
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 655
238
721
100
099
099
099
097
711
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement 7 8 9 10 11 12
II
II I
II I
v(vph) 2 0 4 25 7 15
Movement Capacity 655 614 900 711 660 977
Shared Lane Capacity 800 771
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
I II
I II
I II
v(vph) 14 3 7 47
C m(vph) 1487 1482 800 771
vlc 0 01 000 001 006
95% queue length
Control Delay 74 74 95 100
LOS A A A A
Approach Delay 9 5 1 0 0
Approach LOS A A
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
V i1
Vi2
S i1
Si2
p. OJ
D maj left
o 99 1 00
103 59
1 41
1700 1700
1700 1700
o 99 1 00
74 74
N number major st lanes
Delay, rank 1 mvmts
1 1
01 00
HCS. Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: West Rd and 1 03rd Avenue
Count Date Future 2005 w/o project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
------------------- ------------------
Volume 15 115 5 65 30 2 0 5 25 6 15
HFR: 16 126 1 5 71 33 2 0 5 27 7 16
PHF 091 091 091 091 091 091 091 091 091 091 091
PHV' 0.01 001 001 001 001 001 017 017 017 000 000
091
000
Pedestrian Volume Data:
Movements.
Flow'
Lane width:
Walk speed:
% Blockage
Median Type. None
# of vehicles. 0
Flared approach Movements.
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
Y
Y
N
N
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach.
Lane 1 Lane 2 Lane 3
L T R L T R L T R
-------------- ------------
Y Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 7,8&9 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
-------
Y Y Y N N N N N N
Channelized: N
Grade: 000
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
y
y
N
Channelized: N
Grade. 0 00
L
Lane 3
T R
N
N
N
N
N
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
115
1
1700
1700
Length of study period, hrs: 0.25
Westbound
65
30
1700
1700
1
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,lt
t c,T
1 stage
tc
1 stage
4 1 4 1 7 1 6 5 6.2 7 1 6 5 6.2
10 10 10 10 10 10 10 10
001 001 0 17 017 017 000 000 000
0.2 0.2 01 0.2 0.2 01
o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
00 00 00 00 00 00 00 00
0.00 000 000 000 000 000 000 0.00
4 1 4 1 73 6.7 6.4 7 1 6.5 6.2
Follow Up Time Calculations.
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 35 40 33 35 40 33
09 09 09 09 09 09 09 09
001 001 017 017 0 17 000 000 000
2.2 2.2 3 7 4.2 3 5 3 5 4 0 3 3
Worksheet 6 Impedance and capacity equations
9
Step 1 RT from Minor St.
127
885
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St.
1 00
885
099
4
Step 2: L T from Major St.
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
127
1465
100
1465
12
88
976
100
976
098
104
1494
1 00
1494
Probability of Queue free St. 1 00 0 99
Maj. L Shared In. Prob Queue Free St. 1 00 0 99
Step 3 TH from Minor St. 8 11
Conflicting Flows 274 258
Potential Capacity 608 649
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 0 98 0 98
Movement Capacity 599 639
Probability of Queue free St. 1 00 0 99
Step 4 L T from Minor St.
7
10
Conflicting Flows 269
Potential Capacity 654
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 097
Maj. L, Min T Adj. Imp Factor 0 98
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 630
261
696
1 00
098
099
098
096
684
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
II
v(vph)
Movement Capacity
Shared Lane Capacity
II
II
2 0 5 27 7 16
630 599 885 684 639 976
793 750
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
I II
I II
I II
v(vph) 16 5 8 50
C m(vph) 1494 1465 793 750
vlc 0 01 0 00 0 01 0 07
95% queue length
Control Delay 74 75 96 101
LOS A A A B
Approach Delay 9 6 1 0 1
Approach LOS A B
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
Vi1
Vi2
S i1
Si2
P* OJ
o maj left
o 99 1 00
115 65
1 30
1700 1700
1700 1700
o 99 1 00
74 75
N number major st lanes
Delay, rank 1 mvmts
1 1
01 00
HCS' Unsignalized Intersections Release 3.1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: West Rd and 103rd Avenue
Count Date Future 2005 with project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume
HFR:
PHF
PHV'
15 125
16 137 1
o 91 0 91 0 91
001 001 001
5 80 38 2 0 5 33 6 15
5 88 42 2 0 5 36 7 16
091 091 091 091 091 091 091 091 091
001 001 001 017 017 017 000 000 000
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage'
Median Type. None
# of vehicles: 0
Flared approach Movements.
# of vehicles. Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
Y
Y
N
N
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
Y
Y
N
N
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 7,8&9 approach.
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
Y
Y
N
N
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
y
y
N
N
N
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
Westbound
80
38
1700
1700
1
125
1
1700
1700
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
41 41 71 65 6.2 71 65 6.2
10 10 10 10 10 10 10 10
001 0.01 017 017 017 000 000 000
0.2 0.2 0 1 0.2 0.2 0 1
o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
00 00 QO 00 00 00 00 00
000 000 000 000 000 000 000 000
tc
1 stage
41 41 73 67 64 71 65 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 35 40 33 35 40 3.3
09 09 09 09 09 09 09 09
001 001 017 017 017 000 000 000
2.2 2.2 3 7 4.2 3 5 3 5 4 0 3 3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St.
12
9
Conflicting Flows 137 108
Potential Capacity 873 951
Pedestrian Impedance Factor 100 100
Movement Capacity 873 951
Probability of Queue free St. 099 098
Step 2: L T from Major St. 4
Conflicting Flows 138 129
Potential Capacity 1452 1463
Pedestrian Impedance Factor 100 1 00
Movement Capacity 1452 1463
L
Lane 3
T R
N
N
N
Probability of Queue free St. 1 00 0 99
Maj. L Shared In. Prob Queue Free St. 1 00 0 99
Step 3: TH from Minor St. 8 11
Conflicting Flows 311 290
Potential Capacity 580 623
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 0 98 0.98
Movement Capacity 571 613
Probability of Queue free St. 1 00 0 99
Step 4 L T from Minor St.
7
10
Conflicting Flows 301
Potential Capacity 623
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 97
Maj. L, Min T Adj. Imp Factor 0.98
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 599
292
664
100
098
099
098
096
651
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement 7 8 9 10 11 12
"
" I
" I
v(vph) 2 0 5 36 7 16
Movement Capacity 599 571 873 651 613 951
Shared Lane Capacity 772 709
Worksheet 10 delay,queue length, and LOS
Movement 4 7 8 9 10 11 12
I "
I "
I "
v(vph) 16 5 8 59
C m(vph) 1463 1452 772 709
vlc 001 o 00 0 01 008
95% queue length
Control Delay 75 75 97 105
LOS A A A B
Approach Delay 97 105
Approach LOS A B
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
V i1
Vi2
S i1
Si2
p. OJ
D maj left
0.99 1 00
125 80
1 38
1700 1700
1700 1700
o 99 1 00
75 75
N number major st lanes
Delay. rank 1 mvmts
1 1
01 00
HCS Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst Heffron Transportation Inc
Intersection Yelm Avenue/Clark Road
Count Date Existing
Time Period PM Peak
Intersection Orientation East-West Major St
Vehicle Volume Data
Movements
1
2
3
4
5
6
7
8
9
10
11
12
-----------------------------------------------------------------------------------------------
Volume 12 780 12 46 719 0 5 0 51 0 0 0
HFR 13 830 13 49 765 0 5 0 54 0 0 0
PHF 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94
PHV 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
-----------------------------------------------------------------------------------------------
Pedestrian Volume Data
Movements
-----------------------------------------------------------------------------------------------
Flow
Lane width
Walk speed
% Blockage
Median Type
# of vehicles
None
o
Flared approach Movements
# of vehicles Northbound 0
# of vehicles Southbound 0
Lane usage for movements 1 2&3 approach
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
-----------------------------------------------------------------------------------------------
Y Y Y N N N N N N
Channelized N
Grade 0 00
Lane usage for movements 4 5&6 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
-----------------------------------------------------------------------------------------------
Y Y Y N N N N N N
Channelized N
Grade 0 00
Lane usage for movements 7 8&9 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y Y Y N N N N N N
Channelized N
Grade o 00
Lane usage for movements 10 11&12 approach
Lane 1 Lan~ 2 Lane 3
L T R L T R L T R
-----------------------------------------------------------------------------------------------
Y
Y
Y
N
N
N
N
N
N
Channe 13. z ed
Grade
N
o 00
Data for Computing Effect of Delay to Major Street Vehicles
-----------------------------------------------------------------------------------------------
Shared In volume major th vehicles
Shared In volume major rt vehicles
Sat flow rate major th vehicles
Sat flow rate major rt vehicles
Number of major street through lanes
Eastbound
780
12
1700
1700
1
Westbound
719
o
1700
1700
1
Length of study period hrs
o 25
-----------------------------------------------------------------------------------------------
Worksheet 4 Critical Gap and Follow-up time calculation
Critical Gap Calculations
Movement 1 4 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
t c base 4 1 4 1 7 1 6 5 6 2 7 1 6 5 6 2
t c hv 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0
P hv 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
t c g 0 2 0 2 0 1 0 2 0 2 0 1
G 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
t 3 It 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
t c T
1 stage 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
t c
1 stage 4 1 4 1 7 1 6 5 6 2 7 1 6 5 6 2
Follow Up Time Calculations
Movement 1 4 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
t f base 2 2 2 2 3 5 4 0 3 3 3 5 4 0 3 3
t f HV 0 9 0 9 0 9 0 9 0 9 0 9 0 9 0 9
P hv 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
t f 2 2 2 2 3 5 4 0 3 3 3 5 4 0 3 3
-----------------------------------------------------------------------------------------------
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St
9
12
-----------------------------------------------------------------------------------------------
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St
836
365
1 00
365
o 85
765
407
1 00
407
1 00
Step 2 LT from Major St
4
1
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St
Maj L Shared In Prob Queue Free St
843
789
1 00
789
o 94
o 89
765
844
1 00
844
o 98
o 97
Step 3 TH from Minor St
8
11
Conflicting Flows 1724 1731
Potential Capacity 88 89
Pedestrian Impedance Factor 1 00 1 00
Cap Adj factor due to Impeding mvmnt 0 87 0 87
Movement Capacity 77 77
Probability of Queue free St 1 00 1 00
Step 4 LT from Minor St
7
10
-----------------------------------------------------------------------------------------------
Conflicting Flows
Potent1al Capacity
Pedestrian Impedance Factor
Maj L Min T Impedance factor
Maj L Min T Adj Imp Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
1724
70
1 00
o 87
o 90
o 90
62
1752
68
1 00
o 87
o 90
o 76
52
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7
8
9
10
11
12
1-------------------11-------------------1
I II I
I II I
v(vph)
Movement Capacity
Shared Lane Capacity
5
62
255
o
77
54
365
o
52
o
77
o
407
Worksheet 10 delay queue length and LOS
Movement
1
4
7
8
9
10
11
12
1-------------------11-------------------1
I II I
I II 1
v(vph) 13 49 60
C m(vph) 844 789 255
v/c o 02 o 06 o 23
95% queue length
Control Delay 9 3 9 9 23 4
LOS A A C
Approach Delay 23 4
Approach LOS C
Worksheet 11 Shared Major LT Impedance and Delay
Rank 1 Delay Calculations
Movement
2
5
p oj o 98 o 94
V i1 780 719
V i2 12 0
S i1 1700 1700
S i2 1700 1700
P* OJ o 97 o 89
D maj left 9 3 9 9
N number major st lanes 1 1
Delay rank 1 mvmts o 3 1 1
HCS Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst Heffron Transportation Inc
Intersection Yelm Avenue/Clark Road
Count Date Existing With Project
Time Period PM Peak
Intersection Orientation East-West Major St
Vehicle Volume Data
Movements 1 2 3 4 5 6 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
Volume 25 778 12 46 717 9 5 1 51 6 1 8
HFR 27 828 13 49 763 10 5 1 54 6 1 9
PHF 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94
PHV 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
Pedestrian Volume Data
Movements
Flow
Lane width
Walk speed
% Blockage
Median Type
# of vehicles
None
o
Flared approach Movements
# of vehicles Northbound 0
# of vehicles Southbound 0
Lane usage for movements 1 2&3 approach
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
Y N N N Y Y N N N
Channelized N
Grade o 00
Lane usage for movements 4 5&6 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y N N N Y Y N N N
Channelized N
Grade 0 00
Lane usage for movements 7 8&9 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y N N N Y N N N Y
Channelized N
Grade 0 00
Lane usage for movements 10 11&12 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y
Y
Y
N
N
N
N
N
N
Channelized N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles
Shared In volume major th vehicles
Shared In volume maJor rt vehicles
Sat flow rate major th vehicles
Sat flow rate major rt vehicles
Number of major street through lanes
Eastbound
o
o
1700
1700
1
Westbound
o
o
1700
1700
1
Length of study period hrs
o 25
-----------------------------------------------------------------------------------------------
Worksheet 4 Critical Gap and Follow-up time calculation
Critical Gap Calculations
Movement 1 4 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
t c base 4 1 4 1 7 1 6 5 6 2 7 1 6 5 6 2
t c hv 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0
P hv 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
t c g 0 2 0 2 0 1 0 2 0 2 0 1
G 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
t 3 It 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
t c T
1 stage 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
t c
1 stage 4 1 4 1 7 1 6 5 6 2 7 1 6 5 6 2
Follow Up Time Calculations
Movement 1 4 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
t f base 2 2 2 2 3 5 4 0 3 3 3 5 4 0 3 3
t f HV 0 9 0 9 0 9 0 9 0 9 0 9 0 9 0 9
P hv 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
t f 2 2 2 2 3 5 4 0 3 3 3 5 4 0 3 3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St
9
12
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St
834
367
1 00
367
o 85
768
405
1 00
405
o 98
Step 2 LT from Major St
4
1
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St
840
790
1 00
790
o 94
772
838
1 00
838
o 97
Step 3 TH from Minor St
8
11
Conflicting Flows 1757 1759
Potential Capacity 84 86
Pedestrian Impedance Factor 1 00 1 00
Cap Adj factor due to Impeding mvmnt 0 91 0 91
Movement Capacity 77 78
Probability of Queue free St 0 99 0 99
Step 4 LT from Minor St
7
10
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Maj L Min T Impedance factor
Maj L Min T Adj Imp Factor
Cap Adj factor due to Imped~ng mvmnt
Movement Capacity
1757
66
1 00
o 90
o 92
o 90
59
1780
65
1 00
o 90
o 92
o 78
51
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7
8
9
10
11
12
v(vph)
Movement Capacity
Shared Lane Capacity
5 1
59 77
11-------------------1
II I
------11 I
54 6 1 9
367 51 78 405
99
1------
I -------
I
Worksheet 10 delay queue length and LOS
Movement
1
4
7
8
9
10
11
12
v(vph)
27
49
5 1
11-------------------1
II I
------11 I
54 16
1------
I -------
I
C m(vph) 838 790 59 77 367 99
v/c o 03 o 06 0 09 0 01 o 15 0 16
95% queue length
Control Delay 9 4 9 9 71 5 52 7 16 5 48 1
LOS A A F F C E
Approach Delay 22 0 48 1
Approach LOS C E
-----------------------------------------------------------------------------------------------
HCS Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst Heffron Transportation Inc
Intersection Yelm Avenue/Clark Road
Count Date Future 2005 w/oProject
Time Period PM Peak
Intersection Orientation East-West Major St
Vehicle Volume Data
Movements 1 2 3 4 5 6 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
Volume 15 880 15 50 815 0 5 0 60 0 0 0
HFR 16 936 16 53 867 0 5 0 64 0 0 0
PHF 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94
PHV 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
Pedestrian Volume Data
Movements
Flow
Lane width
Walk speed
% Blockage
Median Type
# of vehicles
TWLTL
5
Flared approach Movements
# of vehicles Northbound 0
# of vehicles Southbound 0
Lane usage for movements 1 2&3 approach
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
Y N N N Y Y N N N
Channelized N
Grade 0 00
Lane usage for movements 4 5&6 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y N N N Y Y N N N
Channelized N
Grade 0 00
Lane usage for movements 7 8&9 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y N N N Y N N N Y
Channelized N
Grade 0 00
Lane usage for movements 10 11&12 approach
Lane 1 Lan~ 2 Lane 3
L T R L T R L T R
Y
Y
Y
N
N
N
N
N
N
Channelized
Grade
N
o 00
Data for Computing Effect of Delay to Major Street Vehicles
Shared In volume major th vehicles
Shared In volume major rt vehicles
Sat flow rate major th vehicles
Sat flow rate major rt vehicles
Number of major street through lanes
Eastbound
o
o
1700
1700
1
Westbound
o
o
1700
1700
1
Length of study period hrs
o 25
Worksheet 4 Critical Gap and Follow-up time calculation
Critical Gap Calculations
Movement 1 4 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
t c base 4 1 4 1 7 1 6 5 6 2 7 1 6 5 6 2
t c hv 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0
P hv 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
t c g 0 2 0 2 0 1 0 2 0 2 0 1
G 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
t 3 It 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
t c T
1 stage 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
2 stage 0 00 0 00 1 00 1 00 0 00 1 00 1 00 0 00
t c
1 stage 4 1 4 1 7 1 6 5 6 2 7 1 6 5 6 2
2 stage 4 1 4 1 6 1 5 5 6 2 6 1 5 5 6 2
Follow Up Time Calculations
Movement 1 4 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
t f base 2 2 2 2 3 5 4 0 3 3 3 5 4 0 3 3
t f HV 0 9 0 9 0 9 0 9 0 9 0 9 0 9 0 9
P hv 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
t f 2 2 2 2 3 5 4 0 3 3 3 5 4 0 3 3
-----------------------------------------------------------------------------------------------
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St
9
12
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St
944
317
1 00
317
o 80
867
355
1 00
355
1 00
Step 2 LT from Major St
4
1
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St
952
718
1 00
718
o 93
867
772
1 00
772
o 98
Worksheet 7a - Computation of the effect of Two-stage gap acceptance
Step 3 TH from Minor St
Part 1- First Stage
8
11
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
Probability of Queue free St
976
328
1 00
o 98
321
1 00
973
333
1 00
o 93
308
1 00
Part 2- Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
973
329
1 00
o 93
305
984
329
1 00
o 98
322
Part 3- Single Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
1949
64
1 00
o 91
58
1957
64
1 00
o 91
58
Result for 2 stage process
a
y
C t
Probability of Queue free St
o 98
1 14
257
1 00
o 98
1 19
243
1 00
Worksheet 7b - Computation of the effect of Two-stage gap acceptance
Step 4 LT from Minor St
Part 1- First Stage
-----------------------------------------------------------------------------------------------
7
10
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
976
301
1 00
o 98
295
973
306
1 00
o 93
283
Part 2- Second Stage
-----------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
973
302
1 00
o 93
279
1008
292
1 00
o 78
229
Part 3- Single Stage
-----------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Maj L Min T Impedance factor
Maj L Min T Adj Imp Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
1949
48
1 00
o 91
o 93
o 93
45
1981
47
1 00
o 91
o 93
o 74
35
Result for 2 stage process
-----------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------
a
y
C t
o 98
1 76
169
o 98
1 14
234
-----------------------------------------------------------------------------------------------
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7
-----------------------------------------------------------------------------------------------
9
11
1------
1 -------
1
v(vph)
Movement Capacity
Shared Lane Capacity
5 0
234 257
8
10
12
11-------------------1
II 1
------1 I I
64 0 0 0
317 169 243 355
Worksheet 10 delay queue length and LOS
-----------------------------------------------------------------------------------------------
Movement
1
7
4
v(vph)
C m(vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
1------
I -------
I
16 53 5
772 718 234 257
0 02 0 07 0 02
9 8 10 4 20 8
A B C
19 3
C
8
9
10
12
11
11-------------------1
II I
------11 I
64
317
o 20
19 2
C
HCS Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst Heffron Transportation Inc
Intersection Yelm Avenue/Clark Road
Count Date Future 2005 w/ Project
Time Period PM Peak
Intersection Orientation East-West Major St
Vehicle Volume Data
Movements 1 2 3 4 5 6 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
Volume 102 853 15 50 803 66 5 8 60 75 8 83
HFR 109 907 16 53 854 70 5 9 64 80 9 88
PHF 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94
PHV 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
Pedestrian Volume Data
Movements
Flow
Lane width
Walk speed
% Blockage
Median Type
# of vehicles
TWLTL
5
Flared approach Movements
# of vehicles Northbound 0
# of vehicles Southbound 0
Lane usage for movements 1 2&3 approach
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
Y N N N Y Y N N N
Channelized N
Grade 0 00
Lane usage for movements 4 5&6 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y N N N Y Y N N N
Channelized N
Grade 0 00
Lane usage for movements 7 8&9 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y N N N Y N N N Y
Channelized N
Grade 0 00
Lane usage for movements 10 11&12 approach
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y
Y
Y
N
N
N
N
N
N
Channelized N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles
Shared In volume major th vehicles
Shared In volume major rt vehicles
Sat flow rate major th vehicles
Sat flow rate major rt veh1cles
Number of major street through lanes
Eastbound
o
o
1700
1700
1
Westbound
o
o
1700
1700
1
length of study period hrs
o 25
-----------------------------------------------------------------------------------------------
Worksheet 4 Cri tical Gap and Follow-up time calculation
Critical Gap Calculations
Movement 1 4 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
t c base 4 1 4 1 7 1 6 5 6 2 7 1 6 5 6 2
t c hv 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0
P hv 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
t c g 0 2 0 2 0 1 0 2 0 2 0 1
G 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
t 3 It 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
t c T
1 stage 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
2 stage 0 00 0 00 1 00 1 00 0 00 1 00 1 00 0 00
t c
1 stage 4 1 4 1 7 1 6 5 6 2 7 1 6 5 6 2
2 stage 4 1 4 1 6 1 5 5 6 2 6 1 5 5 6 2
Follow Up Time Calculations
Movement 1 4 7 8 9 10 11 12
-----------------------------------------------------------------------------------------------
t f base 2 2 2 2 3 5 4 0 3 3 3 5 4 0 3 3
t f HV 0 9 0 9 0 9 0 9 0 9 0 9 0 9 0 9
P hv 0 03 0 03 0 03 0 03 0 03 0 00 0 00 0 00
t f 2 2 2 2 3 5 4 0 3 3 3 5 4 0 3 3
-----------------------------------------------------------------------------------------------
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St
9
12
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St
915
329
1 00
329
o 81
889
345
1 00
345
o 74
Step 2 LT from Major St
4
1
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St
923
736
1 00
736
o 93
924
735
1 00
735
o 85
Worksheet 7a - Computation of the effect of Two-stage gap acceptance
Step 3 TH from Minor St
Part 1- First Stage
8
11
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
Probab~lity of Queue free St
1132
277
1 00
o 85
236
o 96
996
325
1 00
o 93
301
o 97
Part 2- Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
1031
309
1 00
o 93
287
1140
278
1 00
o 85
237
Part 3- Single Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
2163
47
1 00
o 79
37
2136
50
1 00
o 79
39
Result for 2 stage process
a
y
C t
Probability of Queue free St
o 98
1 41
167
o 95
o 98
1 82
177
o 95
Worksheet 7b - Computation of the effect of Two-stage gap acceptance
Step 4 LT from Minor St
Part 1- First Stage
7
10
-----------------------------------------------------------------------------------------------
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
1132
246
1 00
o 85
209
996
297
1 00
o 93
276
Part 2- Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
1044
275
1 00
o 67
185
1169
238
1 00
o 66
157
Part 3- Single Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Maj L Min T Impedance factor
Maj L Min T Adj Imp Factor
Cap Adj factor due to Impeding mvmnt
Movement Capacity
2177
33
1 00
o 75
o 81
o 60
20
2164
35
1 00
o 75
o 81
o 65
22
Result for 2 stage process
a
y
C t
o 98
3 36
75
o 98
3 10
102
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7
8
9
10
11
12
v(vph)
Movement Capacity
Shared Lane Capacity
5 9
75 167
11-------------------1
II I
------ I I I
64 80 9 88
329 102 177 345
163
1------
I -------
I
Worksheet 10 delay queue length and LOS
Movement
1
4
7
8
9
10
11
12
v(vph)
C m(vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
1------ 11-------------------1
I ------- II I
I ------ I I I
109 53 5 9 64 177
735 736 75 167 329 163
0 15 0 07 0 07 0 05 0 19 1 09
10 7 10 3 56 8 27 7 18 6 152 0
B B F D C F
22 2 152 0
C F
Prairie Park, Yelm
Yelm Avenue/Clark Road
2005 With Project tAlHqkilC:n l/J 171-1 ~ /4,vkV"
02/02/00
15:24'44
SIGNAL97/TEAPAC[Ver 1 00] - Capacity Analysis Summary
Intersection Averages for Int # 1 - Yelm Avenue/Clark Road
Degree of Saturation (v/c) 0 84 Vehicle Delay 31.8 Level of Service C
-------------------------------------------------
Sq 44
**/**
Phase 1
Phase 2
Phase 3
Phase 4
-------------------------------------------------
/1\
1
I
North
I
* I * * I I ^ I
* 1 * * I I ****1
*> 1<* * I I <****1
1 v 1 ^ ++++1 1
I ^ 1**** v I I
<+ I + +>1 1++++> I
+ I + + I 1++++ I
+ I + + I I v I
-------------------------------------------------
G/C=O 073
G= 6 6"
Y+R= 4 0"
OFF= 0 0%
G/C=O 094
G= 8 5"
Y+R= 4.0"
OFF=11.8%
G/C=0.097
G= 8 7"
Y+R= 4 0"
OFF=25 6%
G/C=0.558
G= 50 2"
Y+R= 4.0"
OFF=39.7%
-------------------------------------------------
C= 90 sec
G= 74.0 sec = 82.2% Y=16.0 sec = 17.8% Ped= 0 0 sec = 0 0%
-------------------------------------------------------------------------------
I Lane IWidth/1 g/C I Service Rate I Adj I
Group I Lanes I Reqd Used 1 @C (vph) @E I Volume 1
1 HCM 1 L 190% Maxi
v/c I Delay I S I Queue I
-------------------------------------------------------------------------------
N Approach
TH+RTI 12/1 10 156 10.094 1
LT I 12/1 10 146 10 073 1
47.7
D
1 I 136 I
1 I 113 1
97 10 630 1 47 3 I*D 1 110 ftl
80 10.606 1 48.2 I*D I 93 ftl
-------------------------------------------------------------------------------
S Approach
40 1
D+
===============================================================================
RT
TH
LT
I 12/1 10.145 10 094 I
I 12/1 10.121 10.094 I
1 12/1 10.120 10.073 1
1 I
1 1
1 I
129 1
155 I
109 I
64 10.435 1
9 10.052 I
5 10 039 I
40.6 1 D+I
37 2 1 D+I
38 9 I D+I
74 ftl
25 ftl
25 ftl
-------------------------------------------------------------------------------
E Approach
29 9
C
====================================================================--==========
29 4 I*C I 520 ftl
38.9 I D+I 61 ftl
TH+RTI 12/1 10.541 10 558 I
LT I 12/1 10 137 10.097 I
961 I 1018 1
1 I 152 I
924 10 908 I
53 10.312 I
-------------------------------------------------------------------------------
W Approach
30 2
C
===============================================--===============================
TH+RTI 12/1 10.536 10 558 I
LT I 12/1 10.157 10 097 1
970 I 1027 I 923 10.899 I 28.3 I C 1 519 ftl
1 I 152 I 109 10 641 I 47 1 I*D I 125 ftl
-------------------------------------------------------------------------------
Prairie Park, Yelm
Yelm Avenue/Clark Road
2005 With Project
02/02/00
15 25 48
SIGNAL97/TEAPAC[Ver 1.00] - Summary of Parameter Values
1 - Yelm Avenue/Clark Road
Intersection Parameters for Int #
METROAREA
SIMULATION PERIOD
LEVELOFSERVICE
NODELOCATION
Approach Parameters
APPLABELS
GRADES
PEDLEVELS
PARKINGSIDES
P~OLUMES
BUSVOLUMES
RIGHTTURNONREDS
Movement Parameters
NONCBD
15
C S
o 0
N
0.0
o
NONE
20
o
o
E
o 0
o
NONE
20
o
o
S
o 0
o
NONE
20
o
o
W
0.0
o
NONE
20
o
o
MOVLABELS RT TH LT RT TH LT RT TH LT RT TH LT
VOLUMES 83 8 75 66 803 50 60 8 5 15 853 102
WIDTHS o 0 12 0 12.0 0.0 12 0 12.0 12.0 12 0 12 0 0.0 12 0 12.0
LANES 0 1 1 0 1 1 1 1 1 0 1 1
UTILIZATIONS 0.00 o 00 0.00 0.00 o 00 0.00 0.00 o 00 o 00 o 00 0.00 o 00
TRUCKPERCENTS 0.0 0.0 o 0 3 0 3.0 3.0 3 0 3.0 3.0 3.0 3 0 3 0
PEAKHOURFACTORS o 94 0.94 o 94 o 94 0.94 o 94 o 94 0.94 0.94 0.94 0.94 0.94
ARRIVALTYPES 3 3 3 3 3 3 3 3 3 3 3 3
ACTUATIONS YES YES YES YES YES YES YES YES YES YES YES YES
REQCLEARANCES 4.0 4.0 4.0 4 0 4.0 4 0 4 0 4 0 4 0 4.0 4.0 4.0
MINIMUMS 5.0 5 0 5.0 5 0 5 0 5.0 5.0 5 0 5.0 5 0 5 0 5 0
IDEALSATFLOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
FACTORS 1.00 1.00 1 00 1 00 1.00 1 00 1 00 1 00 1.00 1 00 1.00 1.00
DELAYFACTORS 1.00 1 00 1.00 1.00 1 00 1 00 1.00 1 00 1 00 1 00 1 00 1.00
NSTOPFACTORS 1 00 1 00 1. 00 1 00 1 00 1. 00 1. 00 1 00 1. 00 1 00 1 00 1. 00
GROUPTYPES NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM NORM
SATURATIONFLOWS o 1641 1805 o 1824 1752 1568 1845 1752 o 1840 1752
Phasing Parameters
SEQUENCES 44
PERMISSIVES NO NO NO NO LEADLAGS NONE NONE
OVERLAPS NO NO NO NO OFFSET 0.00 1
CYCLES 90 90 30 PEDTIME o 0 0
GREENTIMES 6 58 8 46 8 73 50 23
YELLOWTIMES 4.00 4.00 4.00 4 00
CRITICALS 3 2 12 5
EXCESS 0
HCS Unsignalized Intersections Release 3 1 c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Yelm Avenue and Solberg Street
Count Date Existing
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume
HFR:
PHF
PHV'
44 680 121
45 702 125
o 97 0 97 0 97
o 00 0 00 0 00
28 488
29 504
o 97 0 97
o 00 0 00
Pedestrian Volume Data:
Movements:
6 26 2 19 10 3 7
6 27 2 20 10 3 7
097 097 097 097 0.97 097
o 00 0 49 0 49 0 49 0 00 0 00
Flow'
Lane width:
Walk speed:
% Blockage
Median Type. None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Y
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Y
Y
Lane 2
T R
L
Y
N
N
Y
Y
Channelized: N
Grade 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
N
N
Lane 2
T R
L
Y
N
N
Y
Y
Channelized: N
Grade 0 00
N
N
097
000
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
y
y
N
N
N
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
o
o
1700
1700
Westbound
488
6
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
41 41 71 6.5 6.2 71 6.5 6.2
10 10 10 10 10 10 10 10
o 00 0 00 0 49 049 0.49 0 00 0 00 0 00
0.2 0.2 0 1 0.2 0.2 0 1
000 0.00 0.00 000 000 000 000 000
00 00 00 00 QO 00 00 00
0.00 000 000 000 000 000 000 000
tc
1 stage
41 41 76 70 67 71 65 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 35 40 33 3.5 40 33
09 09 09 09 09 09 09 09
o 00 0 00 0 49 0 49 0 49 0 00 0 00 0 00
2.2 2.2 39 44 3.7 35 40 33
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
------------
Conflicting Flows 764 507
Potential Capacity 337 570
Pedestrian Impedance Factor 1 00 100
Movement Capacity 337 570
Probability of Queue free St. 094 099
Step 2: L T from Major St. 4
Conflicting Flows 827 510
Potential Capacity 813 1066
Pedestrian Impedance Factor 1 00 100
Movement Capacity 813 1066
L
Lane 3
T R
N
N
N
Probability of Queue free St. 0 96 0 96
Maj. L Shared In. Prob Queue Free St. 0 95 0 96
Step 3' TH from Minor St.
8
11
Conflicting Flows 1423 1482
Potential Capacity 1 09 126
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 091 0.91
Movement Capacity 99 115
Probability of Queue free St. 0 98 0 97
Step 4 L T from Minor St.
7
10
Conflicting Flows 1425
Potential Capacity 89
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 088
Maj. L, Min T Adj. Imp Factor 0 91
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 81
1430
113
100
089
092
086
090
98
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
II
v(vph)
Movement Capacity
Shared Lane Capacity
27
II
II
2 20
81 99
118
I
I
10 3 7
337 98 115 570
142
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
I II
I II
I II
v(vph) 45 29 49 21
C m(vph) 1066 813 118 142
vlc 0 04 0 04 0 41 0 15
95% queue length
Control Delay 8 5 9 6 55 5 34 6
LOS A A F D
Approach Delay 55 5 34 6
Approach LOS F D
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
V i1
Vi2
S i1
Si2
P* OJ
D maj left
096096
o 488
o 6
1700 1700
1700 1700
o 96 0 95
85 96
N number major st lanes
Delay, rank 1 mvmts
1 1
04 05
HCS' Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Yelm Avenue and Solberg Street
Count Date Future 2005 w/o project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume'
HFR:
PHF
PHV'
50 770 135 30 550
52 795 139 31 568
o 97 0 97 0 97 0 97 0 97
o 00 0 00 0 00 0 00 0 00
6 30 2 20 10 5 10
6 31 2 21 10 5 10
O~ O~ O~ O~ O~ O~
o 00 0 49 0 49 0 49 0 00 0 00
Pedestrian Volume Data:
Movements:
Flow.
Lane width:
Walk speed:
% Blockage
Median Type: None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach.
Lane 1
L T R L
Lane 2
T R
L
Y
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Y
Y
Lane 2
T R
L
Y
N
N
Y
Y
Channelized: N
Grade 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
N
N
Lane 2
T R
L
Y
Y
N
N
N
N
Y
Channelized: N
Grade. 0 00
097
000
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
y
N
N
N
N
y
N
N
y
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
o
o
1700
1700
Westbound
550
6
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
Phv
t c,g
G
t 3,lt
t c,T
1 stage
tc
1 stage
41 41 71 65 6.2 71 65 6.2
10 10 10 10 10 10 10 10
000 000 O.G OG OG 000 000 000
0.2 0.2 0 1 0.2 0.2 0 1
000 000 000 000 000 000 000 000
00 00 00 00 00 00 00 00
000 000 0.00 000 000 000 000 000
41 41 76 70 67 71 6.5 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3.5 4 0 3 3 3 5 4 0 3.3
09 09 09 09 09 09 09 09
000 000 OG OG OG 000 000 000
2.2 2.2 3 9 4 4 3 7 3.5 4 0 3 3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
Conflicting Flows 864 571
Potential Capacity 293 524
Pedestrian Impedance Factor 100 100
Movement Capacity 293 524
Probability of Queue free St. 093 098
Step 2: L T from Major St. 4
Conflicting Flows 934 574
Potential Capacity 741 1009
Pedestrian Impedance Factor 100 100
Movement Capacity 741 1009
Probability of Queue free St. 0.96 095
Maj. L Shared In. Prob Queue Free St. 094 095
Step 3. TH from Minor St.
8
11
Conflicting Flows 1603 1670
Potential Capacity 83 97
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 0 89 0 89
Movement Capacity 74 86
Probability of Queue free St. 0 97 0 94
Step 4 L T from Minor St.
7
10
Conflicting Flows 1608
Potential Capacity 65
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 084
Maj. L, Min T Adj. Imp Factor 0.87
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 56
1611
85
100
087
090
083
086
71
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
II
II I
II I
31 2 21 10 5 10
56 74 293 71 86 524
83 114
-------------
v(vph)
Movement Capacity
Shared Lane Capacity
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
I II
I II
I II
v(vph) 52 31 54
C m(vph) 1009 741 83
vlc 0 05 0 04 0 65
95% queue length
Control Delay 8 8 10 1 107 6
LOS A B F
Approach Delay 1 07 6
Approach LOS F
26
114
0.23
454
E
454
E
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
V i1
Vi2
S i1
Si2
P* OJ
D maj left
o 95 0 96
o 550
o 6
1700 1700
1700 1700
o 95 0 94
88 101
N number major st lanes
Delay, rank 1 mvmts
1 1
04 06
HCS: Unsignalized Intersections Release 3 1 c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Yelm Avenue and Solberg Street
Count Date Future 2005 with project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume
HFR:
PHF
PHV'
50 793 135 33 574
52 818 139 34 592
o 97 0 97 0 97 0 97 0 97
o 00 0 00 0 00 0 00 0 00
9 30 2 23 13 5 1 0
9 31 2 24 13 5 10
O~ O~ O~ O~ O~ O~
000 O~ O~ O~ 000 000
097
000
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage.
Median Type. None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles. Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y N N N Y Y N N N
Channelized: N
Grade 000
Lane usage for movements 4.5&6 approach.
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 7,8&9 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y Y Y N N N N N N
Channelized: N
Grade. 000
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
y
N
N
y
N
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
o
o
1700
1700
Westbound
574
9
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
Phv
t c,g
G
t 3,1t
t c,T
1 stage
41 41 71 65 6.2 71 6.5 6.2
10 10 10 10 10 10 10 10
o 00 0 00 0 49 0 49 0 49 0 00 0 00 0 00
0.2 0.2 0 1 0.2 0.2 0 1
000 000 000 000 000 000 000 000
00 00 00 00 00 00 00 00
000 000 000 000 000 000 000 000
tc
1 stage
41 41 76 70 67 71 65 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3 5 4 0 3 3 3.5 4 0 3 3
09 09 09 09 09 09 09 09
000 000 O~ O~ O~ 000 000 000
2.2 2.2 3.9 44 3.7 3.5 40 33
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
----- --------
Conflicting Flows 888 597
Potential Capacity 283 507
Pedestrian Impedance Factor 100 100
Movement Capacity 283 507
Probability of Queue free St. 092 098
Step 2: L T from Major St. 4
---- ----
Conflicting Flows 958 602
Potential Capacity 726 986
Pedestrian Impedance Factor 1 00 100
Movement Capacity 726 986
L
Lane 3
T R
N
N
N
Probability of Queue free St. 0.95 095
Maj. L Shared In. Prob Queue Free St. 0 93 0 95
Step 3' TH from Minor St.
8
11
Conflicting Flows 1661 1726
Potential Capacity 76 90
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 0 88 0 88
Movement Capacity 67 79
Probability of Queue free St. 097 0.93
Step 4 L T from Minor St.
7
10
Conflicting Flows 1664
Potential Capacity 59
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 082
Maj. L, Min T Adj. Imp Factor 086
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 50
1669
77
1 00
085
089
081
085
63
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement 7 8 9 10 11 12
II
II I
" 1
v(vph) 31 2 24 13 5 10
Movement Capacity 50 67 283 63 79 507
Shared Lane Capacity 78 97
Worksheet 10 delay,queue length, and LOS
Movement 4 7 8 9 10 11 12
----------
I " -I
I "
I "
v(vph) 52 34 57 29
C m(vph) 986 726 78 97
vlc o 05 0 05 0 73 030
95% queue length
Control Delay 89 10.2 128.2 575
LOS A B F F
Approach Delay 128.2 575
Approach LOS F F
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
Vi1
Vi2
S i1
Si2
P* OJ
D maj left
0.95 0 95
o 574
o 9
1700 1700
1700 1700
o 95 0 93
89 10.2
N number major st lanes
Delay. rank 1 mvmts
1 1
05 07
HCS: Unsignalized Intersections Release 3.1 c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Yelm Avenue and 103rd Avenue
Count Date. Existing
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume.
HFR:
PHF
PHV'
716 22 1 0
1 765 24 1 0
094094094094
o 03 0 03 0 03 0 00
7 0 52
7 0 56
094094094
000 0.00 000
88 755 0
94 807 0
094094 094
o 02 0 02 0 02
o
o
094
000
Pedestrian Volume Data:
Movements:
Flow.
Lane width:
Walk speed:
% Blockage:
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Y
N
Y
N
N
N
Y
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Lane 2
T R
L
N
Y
N
N
Y
N
N
Channelized: N
Grade 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
Lane 2
T R
L
Y
Y
N
N
N
N
Y
Channelized: N
Grade: 0 00
094
000
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
y
N
N
N
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
Westbound
o
o
1700
1700
1
o
o
1700
1700
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
41 41 71 65 6.2 71 65 6.2
10 10 10 10 10 10 10 10
O~ O~ 000 000 000 000 000 000
0.2 0.2 0 1 0.2 0.2 0 1
000 000 000 000 000 000 000 000
00 00 00 00 00 QO 00 00
000 000 000 0.00 000 000 000 000
tc
1 stage
4 1 4 1 7 1 6.5 6.2 7 1 6 5 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3.5 4 0 3 3 3.5 4 0 3.3
09 09 09 09 09 09 09 09
o 02 0 03 0 00 0 00 0 00 0 00 0 00 0 00
2.2 2.2 3 5 4 0 3.3 3 5 4 0 3.3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
Conflicting Flows 807 777
Potential Capacity 385 400
Pedestrian Impedance Factor 100 100
Movement Capacity 385 400
Probability of Queue free St. 100 086
Step 2: L T from Major St. 4
Conflicting Flows 807 788
Potential Capacity 814 831
Pedestrian Impedance Factor 1 00 100
Movement Capacity 814 831
L
Lane 3
T R
N
N
N
Probability of Queue free St.
1 00
089
Step 3. TH from Minor St.
8
11
Conflicting Flows 1785 1774
Potential Capacity 82 84
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 0 89 0 89
Movement Capacity 73 74
Probability of Queue free St. 1 00 1 00
Step 4 L T from Minor St.
7
10
Conflicting Flows 1801
Potential Capacity 62
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 89
Maj. L, Min T Adj. Imp Factor 0 91
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 49
1774
65
1 00
089
091
091
079
60
11-
II -I
II I
0 0 7 0 56
49 73 385 60 74 400
49
I"L I' f'
Jt ,
~
J "'-6
2.. ~ ~C;
S~ r4
1 1:
~ !
\
1 tv
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
v(vph)
Movement Capacity
Shared Lane Capacity
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
1----11-
1 II -I
1 II 1
v(vph) 94 1 1 7 56
C m(vph) 831 814 49 60 400
vlc 0 11 0 00 0 02 0 13 0 14
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
9994800
A A F
F
73 9 15 4
C
22.4
C
80.0
F
HCS: Unsignalized Intersections Release 3 1 c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Yelm Avenue and 103rd Avenue
Count Date' Existing with project
Time Period: PM Peak
Intersection Orientation. East-West Major S1.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume
HFR:
PHF
PHV'
7 0 52
7 0 56
094094094
o 00 0 00 0 00
1 723 22 0
1 772 24 1 0
094094094094
o 03 0 03 0 03 0 00
o
o
0.94
000
88 759 0
94 811 0
094094094
o 02 0 02 0 02
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage:
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Y
N
Y
N
N
N
Y
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Lane 2
T R
L
N
N
N
N
Y
Y
N
Channelized: N
Grade. 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
Lane 2
T R
L
Y
Y
N
N
N
Y
N
Channelized: N
Grade' 0 00
094
000
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
y
N
N
y
N
N
N
N
N
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles.
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
o
o
1700
1700
Westbound
o
o
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
tc
1 stage
4 1 4 1 7 1 6.5 6.2 7 1 65 6.2
10 10 10 10 10 10 10 10
o~ oro 000 QOO 000 000 000 000
0.2 0.2 0 1 0.2 0.2 0 1
000 000 000 000 000 000 000 000
00 00 00 00 00 00 00 00
000 000 000 0.00 000 000 000 000
41 41 71 6.5 6.2 71 6.5 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
Phv
tf
2.2 2.2 3.5 4 0 3 3 3.5 4 0 3 3
09 09 09 09 09 09 09 09
o 02 0 03 0 00 0 00 0 00 0 00 0 00 0 00
2.2 2.2 35 40 33 35 40 33
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
----------
Conflicting Flows 811 784
Potential Capacity 383 396
Pedestrian Impedance Factor 100 1 00
Movement Capacity 383 396
Probability of Queue free St. 100 086
Step 2: L T from Major St. 4
Conflicting Flows 811 796
Potential Capacity 811 826
Pedestrian Impedance Factor 100 100
Movement Capacity 811 826
Probability of Queue free St.
100
089
Step 3' TH from Minor St.
8
11
Conflicting Flows 1797 1785
Potential Capacity 81 82
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 0 88 0 88
Movement Capacity 72 73
Probability of Queue free St. 1 00 1 00
Step 4 L T from Minor St.
7
10
Conflicting Flows 1813
Potential Capacity 61
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 88
Maj. L, Min T Adj. Imp Factor 091
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 48
1785
64
1 00
088
091
091
078
58
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
v(vph)
Movement Capacity
Shared Lane Capacity
1-----11-
I II -I
1 II I
007056
48 72 383 58
48
73 396
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
1-------11---
I II -I
I II I
v(vph) 94 1 1 7 56
C m(vph) 826 811 48 58 396
vlc 0 11 0 00 0 02 0 13 0 14
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
9 9 94 81 6
A A F
F
754 156
C
22.7
C
816
F
HCS: Unsignalized Intersections Release 3.1 c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection. Yelm Avenue and 103rd Avenue
Count Date: Future 2005 w/o project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
2 3 4 5 6 7 8 9 10 11 12
Movements.
Volume'
HFR:
PHF
PHV'
o
o
094
002
1 810 25 1 0 0 10
1 865 27 1 0 0 11
o 94 0 94 0 94 0.94 0 94 0 94
oro oro oro 000 000 000
100 855
107 913
094094
o 02 0 02
o 60
o 64
094094
0.00 000
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage
Median Type' None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Y
N
N
Y
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Y
Lane 2
T R
L
N
Y
N
N
N
Y
Channelized: N
Grade 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
N
Lane 2
T R
L
Y
Y
Y
N
N
N
Channelized: N
Grade 0 00
N
094
000
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
N
N
N
y
Channelized: N
Grade 0.00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
Westbound
o
o
1700
1700
1
o
o
1700
1700
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
4 1 4 1 7 1 6 5 6.2 7 1 6 5 6.2
10 10 10 10 10 10 10 10
002 003 000 000 000 0.00 000 000
0.2 0.2 0 1 0.2 0.2 0 1
000 000 000 000 000 000 000 000
00 00 00 00 00 00 00 00
000 000 000 000 000 000 000 000
tc
1 stage
4 1 4 1 7 1 6 5 6.2 7 1 6 5 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3.5 4 0 3 3 3.5 4 0 3 3
09 09 09 09 09 09 09 09
0.02 003 000 0.00 000 000 000 000
2.2 2.2 3.5 4 0 3 3 3.5 4 0 3.3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
Conflicting Flows 913 879
Potential Capacity 334 350
Pedestrian Impedance Factor 1 00 100
Movement Capacity 334 350
Probability of Queue free St. 1 00 082
Step 2: L T from Major St. 4
Conflicting Flows 913 892
Potential Capacity 742 760
Pedestrian Impedance Factor 1 00 100
Movement Capacity 742 760
L
Lane 3
T R
N
N
N
."'
Probability of Queue free St.
1 00
086
Step 3' TH from Minor St.
8
11
Conflicting Flows 2021 2008
Potential Capacity 59 60
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 086 086
Movement Capacity 50 51
Probability of Queue free St. 1 00 1 00
Step 4 L T from Minor St.
7
10
Conflicting Flows 2040
Potential Capacity 42
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 86
Maj. L, Min T Adj. Imp Factor 089
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 31
2008
45
100
0.86
089
089
073
40
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement 7 8 9 10 11 12
1---11-
I II -I
I II I
v(vph) 0 0 11 0 64
Movement Capacity 31 50 334 40 51 350
Shared Lane Capacity 31
Worksheet 10 delay,queue length, and LOS
Movement 4 7 8 9 10 11 12
------
II
II
11-
-I
I
11 64
40 350
0.27 018
v(vph) 107 1 1
C m(vph) 760 742 31
vie 0 14 0 00 0 03
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
105 991260
B A F
F
1260176
C
331
D
126.0
F
HCS: Unsignalized Intersections Release 3 1 c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Yelm Avenue and 103rd Avenue
Count Date Future 2005 with project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
2 3 4 5 6 7 8 9 10 11 12
Movements:
Volume'
HFR:
PHF
PHV'
o
o
094
002
850 25 1 0 0 10
1 908 27 1 0 0 11
OW OW OW OW OW OW
o 03 0 03 0 03 0 00 0 00 0 00
100 903
107 965
094094
o 02 0 02
o 74
o 79
094094
o 00 0 00
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage'
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Y
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Y
Lane 2
T R
N
Y
N
N
Y
Channelized: N
Grade 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
Lane 2
T R
Y
L
N
N
L
Y
Y
N
N
N
Y
Channelized: N
Grade 0 00
N
094
000
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
y
N
N
N
Channelized: N
Grade: 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
o
o
1700
1700
Westbound
o
o
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,lt
t c,T
1 stage
tc
1 stage
41 41 71 65 6.2 71 65 6.2
10 10 10 10 10 10 10 10
o 02 0 03 0 00 0 00 0 00 0 00 0 00 0 00
0.2 0.2 0 1 0.2 0.2 0 1
000 0.00 000 000 000 000 000 000
00 00 00 00 00 00 00 00
o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
41 41 71 65 6.2 71 65 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3.5 4 0 3 3 3 5 4 0 3 3
09 09 09 09 09 09 09 09
o 02 0 03 0 00 0 00 0 00 0 00 0 00 0 00
2.2 2.2 3.5 4 0 3 3 3 5 4 0 3 3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St.
9
12
L
Lane 3
T R
N
N
N
Probability of Queue free St.
100
085
Step 3: TH from Minor St.
8
11
Conflicting Flows 2115 2102
Potential Capacity 51 52
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 0 85 0 85
Movement Capacity 44 45
Probability of Queue free St. 1 00 1 00
Step 4 L T from Minor St.
7
10
Conflicting Flows 2142
Potential Capacity 36
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 85
Maj. L, Min T Adj. Imp Factor 089
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 24
2102
38
100
085
0.89
089
067
34
Worksheet 8 Shared"Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
II--
II -I
II 1
0 0 11 0 79
24 44 312 34 45 330
24
v(vph)
Movement Capacity
Shared Lane Capacity
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
II
II
11--
--I
1
11 79
34 330
031 0.24
I
1
I
v(vph) 107 1 1
C m(vph) 732 710 24
vlc 0 15 0 00 0 04
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
1 0 8 1 0 1 160 6
B B F
F
1540193
C
353
E
1606
F
HCS. Unsignalized Intersections Release 3 1 c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Yelm Avenue and Plaza Drive
Count Date: Existing PM PH
Time Period:
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume'
HFR:
PHF
PHV'
22 598 8 78 591 21 20 4 90 16
23 635 8 83 627 22 21 4 96 17
094 094 094 094 094 094 094 094 0.94
O~ O~ O~ OM OM OM 000 000 000
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage:
Median Type TWL TL
# of vehicles: 5
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
Y
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach.
Lane 1
L T R L
Y
Lane 2
T R
Y
N
N
N
N
Channelized: N
Grade' 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
Y
Lane 2
T R
Y
N
N
Y
Y
Channelized: N
Grade' 0.00
N
8
8
094
000
L
N
L
N
L
N
18
19
094
000
094
000
Lane 3
T R
N
Y
Lane 3
T R
N
Y
Lane 3
T R
N
N
Lane usage for movements 10,11&12 approach.
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
y
y
y
N
N
N
N
N
N
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
o
o
1700
1700
Westbound
o
o
1700
1700
1
Length of study period, hrs. 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base 41 4 1 71 65 6.2 71 6.5 6.2
t c,hv 10 1 0 1 0 10 10 10 1 0 1 0
P hv 002 o 04 0 00 0 00 0 00 0 00 0 00 0 00
t c,g 0.2 0.2 01 0.2 0.2 01
G 000 000 000 000 000 000 000 000
t 3,1t 00 00 00 00 00 00 00 00
t c,T
1 stage 000 000 000 000 000 000 000 000
2 stage 000 000 1 00 1 00 000 100 1 00 000
tc
1 stage 41 4 1 71 65 6.2 7 1 65 6.2
2 stage 4 1 41 61 55 6.2 61 55 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f, base
t f,HV
P hv
tf
2.2 2.2 3 5 4 0 3 3 3 5 4 0 3.3
09 09 09 09 09 09 09 09
o 02 0 04 0 00 0 00 0 00 0 00 0 00 0 00
2.2 2.2 35 40 33 35 40 33
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St.
9
12
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St.
635
482
627
487
1 00
482
080
1 00
487
096
Step 2: L T from Major St.
4
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
643 650
932 936
1 00 1 00
Movement Capacity
Probability of Queue free St.
932
091
936
098
Worksheet 7a - Computation of the effect of Two-stage gap acceptance
Step 3: TH from Minor St.
Part 1- First Stage
682
453
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 442
Probability of Queue free St. 0 99
Part 2- Second Stage
815
394
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 359
8
11
793
403
100
0.98
1 00
091
367
098
690
449
1 00
091
100
098
438
Part 3- Single Stage
1497
124
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 110
Result for 2 stage process:
1483
126
100
089
1 00
089
112
a
y
Ct
Probability of Queue free St.
098
147
318
098
105
314
099
0.97
Worksheet 7b - Computation of the effect of Two-stage gap acceptance
Step 4 L T from Minor St.
Part 1- First Stage
7
10
Conflicting Flows 682 793
Potential Capacity 443 385
Pedestrian Impedance Factor 1 00 1 00
Cap Adj factor due to Impeding mvmnt 0 98 0 91
Movement Capacity 432 351
Part 2- Second Stage
818
373
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 319
736
414
1 00
086
100
077
321
Part 3- Single Stage
Conflicting Flows
Potential Capacity
1499
102
1529
97
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 86
Maj. L, Min T Adj. Imp Factor 090
Cap Adj. factor due to Impeding mvmnt 0 86
Movement Capacity 87
100
088
091
073
70
Result for 2 stage process:
a
y
Ct
098
166
284
098
168
228
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
11-----1
II 1
II I
21 4 96 17 8 19
284 318 482 228 314 487
423 317
------
v(vph)
Movement Capacity
Shared Lane Capacity
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
1-----11---1
1 II 1
1 II I
v(vph) 23 83 121 45
C m(vph) 936 932 423 317
vie 002 009 0.29 0.14
95% queue length
Control Delay 89 9.2 169 18.2
LOS A ACe
Approach Delay 16 9 18.2
Approach LOS C C
HCS' Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Yelm Avenue and Plaza Drive
Count Date Future 2005 w/o project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume.
HFR:
PHF
PHV'
25 675 10
27 717 11
o 94 0.94 0 94
o 02 0 02 0 02
90 670 25 25 5 100 20 10 20
96 711 27 27 5 106 21 11 21
o 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94
o 04 0 04 0 04 0 00 0 00 0 00 0 00 0 00 0 00
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage:
Median Type TWL TL
# of vehicles: 5
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
N
N
N
Y
N
N
N
Y
Channelized: N
Grade. 000
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
N
N
N
Y
N
N
N
Y
Channelized: N
Grade 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
Y
Y
N
N
N
N
N
N
Channelized: N
Grade' 000
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
y
y
N
Channelized: N
Grade 0 00
L
Lane 3
T R
N
N
N
N
N
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
o
o
1700
1700
Length of study period, hrs: 0.25
Westbound
o
o
1700
1700
1
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations.
Movement 1 4 7 8 9 10 11 12
t c,base 41 41 71 6.5 6.2 71 65 6.2
t c,hv 1 0 1 0 10 1 0 1 0 1 0 1 0 1 0
P hv 002 OW 000 000 000 000 000 000
t c,g 0.2 0.2 01 0.2 0.2 01
G o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
t 3,lt 0.0 00 00 00 0.0 0.0 00 00
t c,T
1 stage 000 000 000 000 000 000 000 000
2 stage 000 000 1 00 1 00 000 1 00 100 000
tc
1 stage 41 4 1 7 1 65 6.2 71 65 6.2
2 stage 4 1 41 6.1 55 6.2 61 55 6.2
Follow Up Time Calculations.
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3 5 4 0 3.3 3 5 4 0 3 3
09 09 09 09 09 09 09 09
O~ OW 000 000 000 000 000 000
2.2 2.2 3.5 4 0 3 3 3.5 4 0 3 3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St.
9
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St.
717
433
100
433
075
12
711
436
1 00
436
095
Step 2: L T from Major St.
4
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
727 738
867 868
1 00 1 00
Movement Capacity
Probability of Queue free St.
867
089
868
097
Worksheet 7a - Computation of the effect of Two-stage gap acceptance
Step 3' TH from Minor St.
Part 1- First Stage
8
11
770
413
902
359
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 401
Probability of Queue free St. 0 99
1 00
0.97
1 00
089
320
097
Part 2- Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 311
929
349
Part 3- Single Stage
100
089
780
409
100
097
396
1699
93
1683
95
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 80
Result for 2 stage process:
a 098
Y 157
Ct 271
Probability of Queue free St.
098
1 09
267
098
1 00
086
100
086
82
096
Worksheet 7b - Computation of the effect of Two-stage gap acceptance
Step 4 L T from Minor St.
Part 1- First Stage
770
397
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 384
Part 2- Second Stage
932
323
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 264
Part 3- Single Stage
7
1 00
097
1 00
082
10
902
335
100
089
298
831
367
100
072
265
Conflicting Flows
Potential Capacity
1701
73
1733
70
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 83
Maj L, Min T Adj. Imp Factor 0 87
Cap Adj. factor due to Impeding mvmnt 0 83
Movement Capacity 61
100
085
088
067
46
Result for 2 stage process.
a
y
Ct
098
1 83
229
098
2.04
165
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
11-----1
II 1
II I
27 5 106 21 11 21
229 271 433 165 267 436
363 244
v(vph)
Movement Capacity
Shared Lane Capacity
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
1---------11-------1
I II I
1 II I
v(vph) 27 96 138 53
C m(vph) 868 867 363 244
vie 0 03 0 11 0 38 0.22
95% queue length
Control Delay 9 3 9 7 20 9 23 8
LOS A A C C
Approach Delay 20 9 23 8
Approach LOS C C
HCS' Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS.
Analyst: Christopher P Gendron
Intersection: Yelm Avenue and Plaza Drive
Count Date' Future 2005 with project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume
HFR:
PHF
PHV'
25 714 10
27 758 11
o 94 0.94 0 94
o 02 0 02 0 02
90 702 40 25 5 100 20 10 20
96 745 42 27 5 106 21 11 21
O.W O.W OW QW OW O.W OW OW OW
OW OW QW 000 000 000 000 000 000
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage:
Median Type' TWL TL
# of vehicles: 5
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
N
N
N
Y
N
N
N
Y
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
N
N
N
Y
N
N
N
Y
Channelized: N
Grade: 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
Y
Y
N
N
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
y
y
y
N
N
N
N
N
N
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
o
o
1700
1700
Westbound
o
o
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base 41 4 1 71 6.5 6.2 71 65 6.2
t c,hv 10 1 0 1 0 1 0 10 1 0 10 1 0
P hv 002 O~ 0.00 000 000 000 000 000
t c,g 0.2 0.2 01 0.2 0.2 01
G o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
t 3,1t 00 00 00 00 00 00 00 00
t c,T
1 stage 000 000 000 000 0.00 000 000 000
2 stage 000 000 1 00 1 00 000 100 1 00 000
tc
1 stage 41 4 1 71 65 6.2 71 65 6.2
2 stage 4 1 41 6 1 55 6.2 61 55 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f HV
P hv
tf
2.2 2.2 3 5 4 0 3.3 3 5 4 0 3.3
09 09 09 09 09 09 09 09
O~ O~ 000 000 000 000 000 000
2.2 2.2 3 5 4 0 3 3 3.5 4 0 3 3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
---------
Conflicting Flows 758 745
Potential Capacity 410 417
Pedestrian Impedance Factor 100 100
Movement Capacity 410 417
Probability of Queue free St. 074 0.95
Step 2: L T from Major St. 4
Conflicting Flows 769 788
Potential Capacity 837 832
Pedestrian Impedance Factor 100 1 00
Movement Capacity
Probability of Queue free St.
837
089
832
097
Worksheet 7a - Computation of the effect of Two-stage gap acceptance
Step 3' TH from Minor St.
Part 1- First Stage
8
11
936
346
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 383
Probability of Queue free St. 0 99
811
396
1 00
097
Part 2- Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 293
979
331
Part 3- Single Stage
1 00
089
1 00
089
307
097
822
391
1 00
097
379
Conflicting Flows 1790 1758
Potential Capacity 82 86
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 086 086
Movement Capacity 70 73
Result for 2 stage process:
a
y
Ct
Probability of Queue free St.
098
1 59
254
098
1 11
252
098
096
Worksheet 7b - Computation of the effect of Two-stage gap acceptance
Step 4 L T from Minor St.
Part 1- First Stage
7
10
Conflicting Flows 811 936
Potential Capacity 376 321
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 097 089
Movement Capacity 364 284
Part 2- Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 248
Part 3- Single Stage
Conflicting Flows
Potential Capacity
973
306
1785
64
100
081
872
348
1 00
071
246
1808
62
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 82
Maj. L, Min T Adj. Imp Factor 0 86
Cap Adj. factor due to Impeding mvmnt 0 82
Movement Capacity 53
1 00
084
088
065
40
Result for 2 stage process:
a
y
Ct
0.98
184
214
098
2.20
147
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement 7 8 9 10 11 12
"
" 1
" I
v(vph) 27 5 106 21 11 21
Movement Capacity 214 254 410 147 252 417
Shared Lane Capacity 342 224
Worksheet 10 delay,queue length, and LOS
Movement
4 7 8 9 10 11 12
I "
1 "
1 "
v(vph) 27 96 138
C m(vph) 832 837 342
vie 0 03 0 11 0 40
95% queue length
Control Delay 95 99 22.5
LOS A A C
Approach Delay 22.5
Approach LOS C
---I
53
224
0.24
260
D
260
D
HCS. Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron ",.t\-5+rl.<<
Intersection. Van Trump Avenue NE and ~d
Count Date Existing
Time Period: PM Peak
Intersection Orientation: North-South Major S1.
Vehicle Volume Data:
Movements:
2 5 6 10 12
Volume
HFR:
PHF
PHV'
2
2
083
000
16
19
083
000
5 29 28 0
6 35 34 0
o 83 0 83 0 83 0 83
o 00 0 00 0 00 0 00
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage
Median Type' None
# of vehicles: 0
Flared approach Movements:
# of vehicles. Eastbound 0
# of vehicles. Westbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
Y Y N N N N
Channelized: N
Grade 000
Lane usage for movements 4,5&6 approach:
Lane 1 Lane 2
L T R L T R
N Y Y N N N
Channelized: N
Grade 000
Lane usage for movements 7,8&9 approach.
Lane 1 Lane 2
L T R L T R
N
N
N
N
N
N
Channelized: N
Grade 0 00
L
Lane 3
T R
N N N
Lane 3
L T R
N N N
Lane 3
L T R
N
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
y
N
N
N
N
N
N
y
N
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles.
Northbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles.
Number of major street through lanes:
16
o
1700
1700
Southbound
o
o
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 10 12
t c,base
t c,hv
P hv
t c,g
G
t 3,lt
t c,T
1 stage
tc
1 stage
4 1 7 1 6.2
10 10 10
o 00 0 00 0 00
0.2 0 1
o 00 0 00 0 00
00 07 00
o 00 0 00 0 00
4 1 6.4 6.2
Follow Up Time Calculations:
Movement 1 10 12
t f,base
t f,HV
P hv
tf
2.2 3 5 3.3
09 09 09
o 00 0 00 0 00
2.2 3 5 3.3
Worksheet 6 Impedance and capacity equations
9
12
Step 1 RT from Minor St.
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St.
23
1059
1 00
1059
1 00
4
Step 2: L T from Major St.
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
41
1582
1 00
1582
Probability of Queue free St.
Maj. L Shared In. Prob Queue Free St.
1 00
1 00
Step 4 L T from Minor St.
10
7
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Maj. L, Min T Impedance factor
Maj. L, Min T Adj. Imp Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity
47
967
1 00
100
100
100
966
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
v(vph)
Movement Capacity
Shared Lane Capacity
7 8 9 10 11 12
11- --I
II I
II 1
34 0
966 1059
966
Movement
Worksheet 10 delay,queue length, and LOS
4 7 8 9 10 11 12
v(vph) 2
Cm(vph) 1582
vie 0 00
95% queue length
Control Delay 7 3
LOS A
Approach Delay
Approach LOS
11- -I
II I
II 1
34
966
003
8.9
A
89
A
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
P oj
V i1
Vi2
S i1
Si2
P* OJ
D maj left
N number major st lanes
Delay, rank 1 mvmts
2 5
1 00 1 00
16 0
o 0
1700 1700
1700 1700
1 00 1 00
73 00
1 1
00 00
HCS' Unsignalized Intersections Release 3.1 c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron 'i'f""\ SWt:K
Intersection: Van Trump Avenue NE and ~d
Count Date. Existing with project
Time Period: PM Peak
Intersection Orientation: North-South Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume
HFR:
PHF
PHV'
2
2
083
000
16 0 0 5 29 0
19 0 0 6 35 0
o 83 0 83 0 83 0 83 0 83
o 00 0 00 0 00 0 00 0 00
3 0 28 3 0
4 0 34 4 0
o 83 0 83 0.83 0 83 0 83
0.00 000 000 000 000
Pedestrian Volume Data:
Movements:
Flow.
Lane width:
Walk speed:
% Blockage.
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Eastbound 0
# of vehicles: Westbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Y
N
N
Y
Y
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Y
N
Y
Y
Channelized: N
Grade. 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
N
N
Lane 2
T R
L
N
N
N
Lane 2
T R
L
Y
N
N
Y
Y
Channelized: N
Grade 0 00
N
N
083
000
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
y
N
N
y
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Northbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles.
Number of major street through lanes:
Southbound
5
29
1700
1700
1
16
o
1700
1700
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
Phv
t c,g
G
t 3,1t
t c,T
1 stage
41 41 71 6.5 6.2 71 65 6.2
10 10 10 10 10 10 10 10
000 0.00, 0.00 000 000 000 000 000
0.2 0.2 01 0.2 0.2 01
o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
00 00 QO QO 00 00 00 00
o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
tc
1 stage
4 1 4 1 7 1 6.5 6.2 7 1 6.5 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3 5 4 0 3 3 3 5 4 0 3.3
09 09 09 09 09 09 09 09
o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
2.2 2.2 3 5 4 0 3.3 3.5 4 0 3.3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
Conflicting Flows 19 23
Potential Capacity 1065 1059
Pedestrian Impedance Factor 100 100
Movement Capacity 1065 1059
Probability of Queue free St. 100 100
---
Step 2: L T from Major St. 4
Conflicting Flows 19 41
Potential Capacity 1610 1582
Pedestrian Impedance Factor 100 1 00
Movement Capacity 1610 1582
L
Lane 3
T R
N
N
N
Probability of Queue free S1. 1 00 1 00
Maj. L Shared In. Prob Queue Free St. 1 00 1 00
Step 3 TH from Minor S1. 8 11
Conflicting Flows 65 47
Potential Capacity 830 848
Pedestrian Impedance Factor 1 00 1 00
Cap. Adj. factor due to Impeding mvmnt 1 00 1 00
Movement Capacity 829 847
Probability of Queue free S1. 1 00 1 00
Step 4 L T from Minor S1.
7
10
Conflicting Flows 49
Potential Capacity 956
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 99
Maj. L, Min T Adj. Imp Factor 1 00
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 952
49
956
100
099
100
100
1 00
952
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
7 8 9 10 11 12
II
II I
II 1
0 4 0 34 4 0
952 829 1065 952 847 1059
829 940
v(vph)
Movement Capacity
Shared Lane Capacity
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
V i1
Vi2
S i1
Si2
P*Oj
D maj left
1 00 1 00
16 5
o 29
1700 1700
1700 1700
1 00 1 00
73 00
N number major st lanes
Delay, rank 1 mvmts
1 1
00 00
HCS' Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron ~ 5trut-
Intersection: Van Trump Avenue NE and ~d
Count Date Future 2005 w/o project
Time Period: PM Peak
Intersection Orientation: North-South Major St.
Vehicle Volume Data:
Movements:
2 5 6 10 12
Volume
HFR:
PHF
PHV'
2
2
083
000
20
24
083
000
5 35 30 0
6 42 36 0
o 83 0 83 0 83 0 83
o 00 0 00 0 00 0 00
Pedestrian Volume Data:
Movements:
Flow'
Lane width.
Walk speed:
% Blockage
Median Type. None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Eastbound 0
# of vehicles: Westbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Y
Y
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
N
Y
N
Y
Channelized: N
Grade' 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
N
N
N
N
Channelized: N
Grade 0 00
Lane 2
T R
N
N
L
Lane 3
T R
Lane 2
T R
N
N
N
N
N
Lane 2
T R
N
N
L
Lane 3
T R
N
N
N
L
Lane 3
T R
N
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
N
y
N
Channelized: N
Grade. 000
N
Data for Computing Effect of Delay to Major Street Vehicles:
Northbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
20
o
1700
1700
Length of study period, hrs: 0.25
Southbound
o
o
1700
1700
1
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 10 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
4 1 7 1 6.2
10 10 10
o 00 0 00 0 00
0.2 01
o 00 0 00 0 00
00 07 00
o 00 0 00 0 00
tc
1 stage
4 1 6 4 6.2
Follow Up Time Calculations:
Movement 1 10 12
t f,base
t f,HV
P hv
tf
2.2 35 3.3
09 09 09
o 00 0 00 0 00
2.2 3 5 3.3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
Conflicting Flows 27
Potential Capacity 1054
Pedestrian Impedance Factor 1 00
Movement Capacity 1054
Probability of Queue free St. 100
Step 2: L T from Major St. 4
Conflicting Flows 48
Potential Capacity 1572
Pedestrian Impedance Factor 100
Movement Capacity 1572
L
Lane 3
T R
N
N
N
Probability of Queue free St.
Maj. L Shared In. Prob Queue Free St.
1 00
100
Step 4 L T from Minor St.
10
7
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Maj. L, Min T Impedance factor
Maj. L, Min T Adj. Imp Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity
56
957
1 00
100
1 00
1 00
956
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
v(vph)
Movement Capacity
Shared Lane Capacity
7 8 9 10 11 12
11- --I
II I
II I
36 0
956 1054
956
Movement
Worksheet 10 delay,queue length, and LOS
4 7 8 9 10 11 12
v(vph) 2
C m(vph) 1572
vie 0 00
95% queue length
Control Delay 7 3
LOS A
Approach Delay
Approach LOS
11- --I
II I
II I
36
956
004
89
A
89
A
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
P oj
Vi1
Vi2
S i1
Si2
P* OJ
D maj left
N number major st lanes
Delay, rank 1 mvmts
2 5
1 00 1 00
20 0
o 0
1700 1700
1700 1700
1 00 1 00
73 00
1 1
00 00
HCS: Unsignalized Intersections Release 3.1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron i'rt'\l\~,\-(-(",.__\-
Intersection: Van Trump Avenue NE and ~d
Count Date' Future 2005 with project
Time Period: PM Peak
Intersection Orientation: North-South Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 8 9 10 11 12
Volume.
HFR:
PHF
PHV'
2 20
2 24
o 83 0 83
o 00 0 00
o 0 5 35 0
o 0 6 42 0
083 0.83 083 083
o 00 0 00 0.00 0 00
12
14
083
000
o 30 19 0
o 36 23 0
o 83 0 83 0 83 0 83
o 00 0 00 0 00 0 00
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage:
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Eastbound 0
# of vehicles: Westbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Y
N
N
Y
Y
Channelized: N
Grade' 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Y
Y
Y
N
Channelized: N
Grade: 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
N
N
Lane 2
T R
L
N
N
N
Lane 2
T R
L
Y
Y
N
N
Y
Channelized: N
Grade' 0 00
N
N
083
000
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane 3
T R
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
y
N
N
N
N
N
N
y
y
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Northbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
20
o
1700
1700
Southbound
5
35
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 8 9 10 11 12
t c,base
t c,hv
P hv
t c,g
G
t 3,It
t c,T
1 stage
tc
1 stage
41 41 71 65 6.2 71 6.5 6.2
10 10 10 10 10 10 10 10
000 0.00 000 000 000 000 000 000
0.2 0.2 01 0.2 0.2 01
o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
00 00 QO 00 00 00 00 00
o 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00
41 41 71 6.5 6.2 71 65 6.2
Follow Up Time Calculations:
Movement 1 4 7 8 9 10 11 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3 5 4 0 3 3 3.5 4 0 3.3
09 09 09 09 09 09 09 Q9
000 000 000 000 000 000 000 000
2.2 2.2 3 5 4 0 3 3 3 5 4 0 3 3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
Conflicting Flows 24 27
Potential Capacity 1058 1054
Pedestrian Impedance Factor 100 1 00
Movement Capacity 1058 1054
Probability of Queue free St. 1 00 1 00
Step 2: L T from Major St. 4
Conflicting Flows 24 48
Potential Capacity 1604 1572
Pedestrian Impedance Factor 100 100
Movement Capacity 1604 1572
Probability of Queue free St. 1 00 1 00
Maj. L Shared In. Prob Queue Free St. 1 00 1 00
Step 3: TH from Minor St. 8 11
Conflicting Flows 77 56
Potential Capacity 817 839
Pedestrian Impedance Factor 1 00 1 00
Cap Adj. factor due to Impeding mvmnt 1 00 1 00
Movement Capacity 816 838
Probability of Queue free St. 0 98 0 97
Step 4 L T from Minor St.
7
10
Conflicting Flows 67
Potential Capacity 931
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 97
Maj. L, Min T Adj. Imp Factor 0.98
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 910
63
936
100
098
099
099
098
923
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement 7 8 9 10 11 12
"
" I
" I
v(vph) 0 14 0 36 23 0
Movement Capacity 910 816 1058 923 838 1054
Shared Lane Capacity 816 888
Worksheet 10 delay,queue length, and LOS
Movement 4 7 8 9 10 11 12
"
"
"
v(vph) 2 14 59
C m(vph) 1572 1604 816 888
vie 000 002 007
95% queue length
Control Delay 73 95 93
LOS A A A
Approach Delay 95 93
Approach LOS A A
------------------ -------
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
Vi1
Vi2
S i1
Si2
P* OJ
D maj left
1 00 1 00
20 5
o 35
1700 1700
1700 1700
1 00 1 00
73 00
N number major st lanes
Delay, rank 1 mvmts
1 1
00 00
HCS' Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Bald Hills Rd and Morris Rd
Count Date Existing
Time Period: PM Peak
Intersection Orientation: North-South Major St.
Vehicle Volume Data.
Movements: 2 5 6 10 12
-------------
Volume 6 185 293 116 62 5
HFR: 7 211 334 132 71 6
PHF 088 088 0.88 088 088 088
PHV' 002 002 002 002 004 004
Pedestrian Volume Data:
Movements:
Flow'
Lane width.
Walk speed:
% Blockage
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Eastbound 0
# of vehicles: Westbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
Y
N
N
N
N
Y
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
N
Y
Y
N
Channelized: N
Grade' 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
Lane 2
T R
N
N
Lane 2
T R
N
N
N
N
N
Channelized: N
Grade 0 00
N
L
Lane 3
T R
N
N
N
L
Lane 3
T R
N
N
N
L
Lane 3
T R
N
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
y
Channelized: N
Grade 0 00
N
N
N
Data for Computing Effect of Delay to Major Street Vehicles:
Northbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
Length of study period, hrs: 0.25
185
o
1700
1700
Southbound
o
o
1700
1700
1
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 10 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
4 1 7 1 6.2
10 10 10
002004004
0.2 01
o 00 0 00 0 00
00 0.7 00
o 00 0 00 0 00
tc
1 stage
4 1 6.4 6.2
Follow Up Time Calculations:
Movement 1 10 12
t f,base
t f,HV
P hv
tf
2.2 3.5 3 3
09 09 09
o 02 0 04 0 04
2.2 3 5 3.3
Worksheet 6 Impedance and capacity equations
12
Step 1 RT from Minor St.
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St.
Step 2: L T from Major St.
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
9
400
646
100
646
099
4
466
1096
100
1096
L
Lane 3
T R
N
N
N
Probability of Queue free St.
Maj. L Shared In. Prob Queue Free St.
099
099
Step 4 L T from Minor St.
10
7
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Maj. L, Min T Impedance factor
Maj. L, Min T Adj. Imp Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity
624
446
1 00
099
099
099
444
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
v(vph)
Movement Capacity
Shared Lane Capacity
7 8 9 10 11 12
11--- -I
II I
II I
71 6
444 646
454
Movement
Worksheet 10 delay, queue length, and LOS
v(vph) 7
C m(vph) 1096
v/c 001
95% queue length
Control Delay 8.3
LOS A
Approach Delay
Approach LOS
4 7 8 9 10 11 12
11- --I
II I
II 1
76
454
017
145
B
145
B
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
P oj
V i1
Vi2
S i1
Si2
P* OJ
D maj left
N number major st lanes
Delay, rank 1 mvmts
2 5
o 99 1 00
185 0
o 0
1700 1700
1700 1700
o 99 1 00
83 00
1 1
01 00
HCS: Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Bald Hills Rd and Morris Rd
Count Date Future 2005 w/o project
Time Period: PM Peak
Intersection Orientation: North-South Major St.
Vehicle Volume Data:
Movements:
2 5 6 10 12
Volume
HFR.
PHF
PHV'
6 210 330 130
7 239 376 148
088 088 0.88 088
o 02 0 02 0 02 0 02
70
80
088
004
5
6
088
004
Pedestrian Volume Data:
Movements:
Flow'
Lane width.
Walk speed:
% Blockage
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Eastbound 0
# of vehicles: Westbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Lane 2
T R
L
Lane 3
T R
Y
Y
N
N
N
N
N
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach.
Lane 1 Lane 2 Lane 3
L T R L T R L T R
-------
N Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 7,8&9 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
---------
N N N N N N N N N
Channelized: N
Grade 000
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
y
Channelized: N
Grade 0 00
N
N
N
Data for Computing Effect of Delay to Major Street Vehicles:
Northbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles.
Number of major street through lanes:
Length of study period, hrs: 0.25
210
o
1700
1700
Southbound
o
o
1700
1700
1
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 10 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
4 1 7 1 6.2
10 10 10
002004004
0.2 0 1
o 00 0 00 0 00
00 07 00
o 00 0 00 0 00
tc
1 stage
4 1 6 4 6.2
Follow Up Time Calculations:
Movement 1 10 12
t f,base
t f,HV
P hv
tf
2.2 3 5 3.3
09 09 0.9
o 02 0 04 0 04
2.2 3 5 3 3
Worksheet 6 Impedance and capacity equations
9
12
Step 1 RT from Minor St.
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St.
Step 2: L T from Major St.
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
450
605
100
605
099
4
524
1043
1 00
1043
L
Lane 3
T R
N
N
N
Probability of Queue free St.
Maj. L Shared In. Prob Queue Free St.
099
099
Step 4 L T from Minor St.
10
7
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Maj. L, Min T Impedance factor
Maj. L, Min T Adj. Imp Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity
703
401
1 00
099
099
099
399
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
v(vph)
Movement Capacity
Shared Lane Capacity
7 8 9 10 11 12
-----
11- ---I
II I
II I
80 6
399 605
408
------------
Movement
Worksheet 10 delay, queue length, and LOS
4 7 8 9 10 11 12
v(vph) 7
C m(vph) 1043
v/c 0 01
95% queue length
Control Delay 8.5
LOS A
Approach Delay
Approach LOS
11--- -I
II I
II I
85
408
0.21
161
C
161
C
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
P oj
V i1
Vi2
S i1
Si2
P* OJ
D maj left
N number major st lanes
Delay, rank 1 mvmts
2 5
o 99 1 00
210 0
o 0
1700 1700
1700 1700
o 99 1 00
85 00
1 1
01 00
HCS' Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Bald Hills Rd and Morris Rd
Count Date Future 2005 with project
Time Period: PM Peak
Intersection Orientation: North-South Major St.
Vehicle Volume Data:
Movements:
2 5 6 10 12
Volume.
HFR:
PHF
PHV'
79
90
088
004
5
6
088
004
6 225 346 139
7 256 394 158
0.88 088 088 088
o 02 0 02 0 02 0 02
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage.
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Eastbound 0
# of vehicles: Westbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Y
Y
N
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
N
Y
N
Y
Channelized: N
Grade 0 00
Lane usage for movements 7,8&9 approach.
Lane 1
L T R L
N
N
N
N
Channelized: N
Grade. 0 00
Lane 2
T R
N
N
L
Lane 3
T R
Lane 2
T R
N
N
N
N
N
Lane 2
T R
N
N
L
Lane 3
T R
N
N
N
L
Lane 3
T R
N
N
N
Lane usage for movements 10,11&12 approach:
Lane 1 Lane 2
L T R L T R
L
Lane 3
T R
y
N
N
N
N
N
y
N
N
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Northbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
225
o
1700
1700
Southbound
o
o
1700
1700
1
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 10 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
tc
1 stage
4 1 7 1 6.2
10 10 10
002004004
0.2 0 1
o 00 0 00 0 00
00 07 00
o 00 0 00 0 00
4 1 6.4 6.2
Follow Up Time Calculations:
Movement 1 10 12
t f, base
t f,HV
P hv
tf
2.2 3 5 3.3
09 09 09
002004004
2.2 3 5 3 3
Worksheet 6 Impedance and capacity equations
9
12
Step 1 RT from Minor St.
473
587
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St.
1 00
587
099
4
Step 2: L T from Major St.
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
552
1018
1 00
1018
099
099
Probability of Queue free St.
Maj. L Shared In. Prob Queue Free St.
Step 4 L T from Minor St.
7
10
743
380
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Maj L, Min T Impedance factor
Maj. L, Min T Adj. Imp Factor
Cap Adj. factor due to Impeding mvmnt
Movement Capacity
1 00
099
099
099
377
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
v(vph)
Movement Capacity
Shared Lane Capacity
7 8 9 10 11 12
11--- ----I
II 1
II 1
90 6
377 587
386
--------
Movement
Worksheet 10 delay, queue length, and LOS
v(vph) 7
Cm(vph) 1018
v/c 001
95% queue length
Control Delay 8 6
LOS A
Approach Delay
Approach LOS
4 7 8 9 10 11 12
11--- ----I
II I
II 1
96
386
0.25
174
C
174
C
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
P oj
V i1
Vi2
S i1
Si2
P* OJ
D maj left
N number major st lanes
Delay, rank 1 mvmts
2 5
o 99 1 00
225 0
o 0
1700 1700
1700 1700
o 99 1 00
86 00
1 1
01 00
HCS' Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Prairie Motel Entrance and 1 03rd Avenue
Count Date. Existing
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
2 3 4 5 6 7 9 10 12
Movements:
Volume
HFR:
PHF
PHV'
8 97
9 110
o 88 0 88
o 00 0 00
o 29 49 0 0
o 33 55 1 0 0
088 088 088 088 088
o 00 0 00 0 00 0 00 0 00
Pedestrian Volume Data:
Movements:
Flow'
Lane width.
Walk speed:
% Blockage
Median Type None
# of vehicles. 0
Flared approach Movements.
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Y
Y
N
Y
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Y
Y
N
Y
Channelized: N
Grade' 0.00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
Y
N
Y
N
Channelized: N
Grade 0 00
3 4
3 5
o 88 0 88
o 00 0 00
Lane 2
T R
N
Lane 2
T R
N
Lane 2
T R
N
N
N
N
088
000
L
Lane 3
T R
N
N
N
L
Lane 3
T R
N
N
N
L
Lane 3
T R
N
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
N
N
Channelized: N
Grade: 0 00
N
y
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
97
o
1700
1700
Length of study period, hrs: 0.25
Westbound
49
1
1700
1700
1
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 9 10 12
t c,base
t c,hv
P hv
t c,g
G
t 3,lt
t c,T
1 stage
4 1 4 1 7 1 6.2 7 1 6.2
10 10 10 10 10 10
000 000 000 000 000 000
0.2 0 1 0.2 0 1
000 000 000 000 000 000
00 00 00 00 00 00
000 000 000 000 000 000
tc
1 stage
4 1 4 1 7 1 6.2 7 1 6.2
Follow Up Time Calculations:
Movement 1 4 7 9 10 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3 5 3.3 3.5 3.3
09 09 09 09 09 09
o 00 0 00 0 00 0 00 0 00 0 00
2.2 2.2 3 5 3 3 3 5 3 3
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St.
9
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
Probability of Queue free St.
110
949
100
949
100
Step 2: L T from Major St.
4
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Movement Capacity
110
1493
1 00
1493
12
56
1016
100
1016
1 00
57
1561
1 00
1561
L
Lane 3
T R
N
N
N
Probability of Queue free St. 0 98 0 99
Maj. L Shared In. Prob Queue Free St. 0 98 0 99
Step 4 L T from Minor St.
7
10
Conflicting Flows 252
Potential Capacity 706
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 97
Maj. L, Min T Adj Imp Factor 0 98
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 687
249
708
1 00
097
098
098
097
693
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement
1---
I
I
v(vph)
Movement Capacity
Shared Lane Capacity
7 8 9 10 11 12
1
-I
1
o
--II--
II
II
o 3 5
687 949 693
1016
Movement
Worksheet 10 delay,queue length, and LOS
4 7 8 9 10 11 12
1-----
I
I
v(vph) 9 33
Cm(vph) 1561 1493
v/c 0 01 0 02
95% queue length
Control Delay 7 3 7 5
LOS A A
Approach Delay
Approach LOS
----11------
II
II
1
-I
1
3 5
693
o 00 0 00
10.2 86
B A
93
A
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
P oj
V i1
Vi2
S i1
Si2
P*Oj
D maj left
N number major st lanes
Delay, rank 1 mvmts
2 5
o 99 0 98
97 49
o 1
1700 1700
1700 1700
o 99 0 98
73 75
1 1
o 0 0.2
HCS' Unsignalized Intersections Release 3 1c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection. Prairie Motel Entrance and 1 03rd Avenue
Count Date' Future 2005 w/o project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 9 10 12
Volume
HFR.
PHF
PHV'
10 110 0 35 55
11 124 0 40 62
o 88 0 88 0 88 0 88 0 88
o 00 0 00 0 00 0 00 0 00
005
1 006
o 88 0 88 0 88
o 00 0 00 0 00
5
6
088
000
088
000
Pedestrian Volume Data.
Movements.
Flow'
Lane width:
Walk speed:
% Blockage
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles. Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach.
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 4,5&6 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
--------------
Y Y Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 7,8&9 approach:
Lane 1 Lane 2 Lane 3
L T R L T R L T R
Y N Y N N N N N N
Channelized: N
Grade 000
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
N
N
N
y
Channelized: N
Grade 0 00
Data for Computing Effect of Delay to Major Street Vehicles:
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles:
Number of major street through lanes:
Westbound
55
1
1700
1700
1
110
o
1700
1700
Length of study period, hrs: 0.25
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 9 10 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
41 41 71 6.2 71 6.2
10 10 10 10 10 10
000 000 000 000 000 000
0.2 0 1 0.2 0 1
000 000 000 000 000 000
00 00 00 00 00 00
000 000 000 000 000 000
tc
1 stage
4 1 4 1 7 1 6.2 7 1 6.2
Follow Up Time Calculations:
Movement 1 4 7 9 10 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3 5 3.3 3.5 3 3
09 09 09 09 09 09
o 00 0 00 0 00 0 00 0 00 0 00
2.2 2.2 35 33 35 33
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St.
9
12
Conflicting Flows 124 63
Potential Capacity 932 1008
Pedestrian Impedance Factor 100 1 00
Movement Capacity 932 1008
Probability of Queue free St. 100 099
-------- ------
Step 2: L T from Major St. 4
Conflicting Flows 124 63
Potential Capacity 1475 1552
Pedestrian Impedance Factor 1 00 1 00
Movement Capacity 1475 1552
L
Lane 3
T R
N
N
N
Probability of Queue free St. 0 97 0 99
Maj L Shared In. Prob Queue Free St. 0 97 0 99
Step 4 L T from Minor St.
7
10
Conflicting Flows 292
Potential Capacity 664
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0 96
Maj. L, Min T Adj. Imp Factor 0 97
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 643
289
667
1 00
096
097
097
097
649
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement 7
I-
I
I
8 9 10 11 12
--II- I
II --I
II I
0 6 6
643 932 649
v(vph)
Movement Capacity
Shared Lane Capacity
o
1008
Worksheet 10 delay, queue length, and LOS
Movement
4 7 8 9 10 11 12
1----
1
I
v(vph) 11 40
C m(vph) 1552 1475
v/c 001 003
95% queue length
Control Delay 7 3 7 5
LOS A A
Approach Delay
Approach LOS
---II--
II
II
I
--I
1
6 6
649
001 001
106 86
B A
96
A
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
V i1
Vi2
S i1
Si2
P* OJ
D maj left
N number major st lanes
Delay, rank 1 mvmts
o 99 0 97
11 0 55
o 1
1700 1700
1700 1700
o 99 0 97
73 75
1 1
o 1 0.2
HCS: Unsignalized Intersections Release 3 1 c
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: Christopher P Gendron
Intersection: Prairie Motel Entrance and 1 03rd Avenue
Count Date' Future 2005 with project
Time Period: PM Peak
Intersection Orientation: East-West Major St.
Vehicle Volume Data:
Movements:
2 3 4 5 6 7 9 10 12
Volume
HFR:
PHF
PHV'
1 0 11 0 0 35 55 16 0 0
11 124 0 40 62 18 0 0
o 88 0 88 0 88 0 88 0 88 0 88 0 88
000 000 000 000 000 000 000
15 19
17 21
o 88 0 88
o 00 0 00
Pedestrian Volume Data:
Movements:
Flow'
Lane width:
Walk speed:
% Blockage
Median Type None
# of vehicles: 0
Flared approach Movements:
# of vehicles: Northbound 0
# of vehicles: Southbound 0
Lane usage for movements 1,2&3 approach:
Lane 1
L T R L
Y
Y
Y
N
Channelized: N
Grade 0 00
Lane usage for movements 4,5&6 approach:
Lane 1
L T R L
Lane 2
T R
N
Lane 2
T R
N
Y
N
N
Y
Y
Channelized: N
Grade 0 00
Lane usage for movements 7,8&9 approach:
Lane 1
L T R L
N
Lane 2
T R
Y
N
N
N
Y
Channelized: N
Grade 0 00
N
088
000
L
Lane 3
T R
N
N
N
L
Lane 3
T R
N
N
N
L
Lane 3
T R
N
N
N
Lane usage for movements 10,11 & 12 approach:
Lane 1 Lane 2
L T R L T R
y
N
N
N
Channelized: N
Grade' 0 00
N
y
Data for Computing Effect of Delay to Major Street Vehicles.
Eastbound
Shared In volume, major th vehicles:
Shared In volume, major rt vehicles.
Sat flow rate, major th vehicles:
Sat flow rate, major rt vehicles.
Number of major street through lanes:
110
o
1700
1700
Length of study period, hrs: 0.25
Westbound
55
16
1700
1700
1
Worksheet 4 Critical Gap and Follow-up time calculation.
Critical Gap Calculations:
Movement 1 4 7 9 10 12
t c,base
t c,hv
P hv
t c,g
G
t 3,1t
t c,T
1 stage
41 41 71 6.2 71 6.2
10 10 10 10 10 10
o 00 0 00 0 00 0 00 0 00 0 00
0.2 0 1 0.2 0 1
o 00 0 00 0 00 0 00 0 00 0 00
00 00 00 00 00 00
000 000 000 000 000 000
tc
1 stage
41 41 71 6.2 71 6.2
Follow Up Time Calculations.
Movement 1 4 7 9 10 12
t f,base
t f,HV
P hv
tf
2.2 2.2 3.5 3.3 3 5 3 3
09 09 09 09 09 09
o 00 0 00 0 00 0 00 0 00 0 00
2.2 2.2 35 33 35 33
Worksheet 6 Impedance and capacity equations
Step 1 RT from Minor St. 9 12
-------------
Conflicting Flows 124 71
Potential Capacity 932 997
Pedestrian Impedance Factor 1 00 1 00
Movement Capacity 932 997
Probability of Queue free St. 100 098
-------
Step 2: L T from Major St. 4
Conflicting Flows 124 80
Potential Capacity 1475 1530
Pedestrian Impedance Factor 1 00 1 00
Movement Capacity 1475 1530
L
Lane 3
T R
N
N
N
Probability of Queue free St. 0.97 099
Maj. L Shared In. Prob Queue Free St. 0 97 0 99
Step 4 L T from Minor St. 7 1 0
Conflicting Flows 308
Potential Capacity 648
Pedestrian Impedance Factor 1 00
Maj. L, Min T Impedance factor 0.96
Maj. L, Min T Adj. Imp Factor 097
Cap Adj. factor due to Impeding mvmnt
Movement Capacity 617
298
659
1 00
096
0.97
097
095
641
Worksheet 8 Shared Lane Calculations
Shared Lane Calculations
Movement 7
I-
I
I
8 9 10 11 12
---II-- I
II -I
J/ I
0 17 21
617 932 641
v(vph)
Movement Capacity
Shared Lane Capacity
o
997
Worksheet 10 delay, queue length, and LOS
Movement
4 7 8 9 10 11 12
1----
I
I
v(vph) 11 40
C m(vph) 1530 1475
v/c 001 003
95% queue length
Control Delay 7 4 7 5
LOS A A
Approach Delay
Approach LOS
---11-
II
II
I
-I
I
17 21
641
o 03 0 02
108 87
B A
96
A
Worksheet 11 Shared Major L T Impedance and Delay
Rank 1 Delay Calculations
Movement
2 5
P oj
V i1
Vi2
S i1
Si2
P* OJ
D maj left
N number major st lanes
Delay, rank 1 mvmts
o 99 0 97
110 55
o 16
1700 1700
1700 1700
o 99 0 97
74 75
1 1
01 0.2