Environmental Review
~~~:-=i~:1J:)r
/'
SEPA NO 8262
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
Proponent:
Bo Norbjerg, 2000 Group L.L.C , PO Box 1177, Puyallup, WA 98371
Description of Proposal
Subdivide 4 92 acres into 20 single family residential lots. The project
includes the construction of a new street, improvements to Mill Road and
stormwater facilities
Location of the Proposal
West side of Mill Road and adjacent to the south side of 10Jlh Ave
Section/Township/Range
NE 1/4, Section 25, Township 17N Range 1E
Threshold Determination
The City of Yelm as lead agency for this action has determined that this
proposal does not have a probable significant adverse impact on the
environment. Therefore, an environmental impact statement (EIS)will not
be required under RCW 43.21 C 030(2)(c). This decision was made after
review of a completed environmental checklist and other information on file
with the lead agency This information is available to the public on request.
Conditions/Mitigating Measures
SEE ATTACHED
Lead agency.
Responsible Official
City of Yelm
Shelly Badger, City Administrator
Date of Issue
Comment Deadline
October 19, 2000
5.00 pm., November 1, 2000
~1I.fn~
Shelly Badger, City Administrator
This Mitigated Determination of NonSignificance (MDNS) is issued pursuant to Washington Administrative Code 197-
11-340(2) Comments must be submitted to Catherine Carlson, Community Development Director, at City ofYelm,
105YelmAve W,PO Box 479, Yelm, WA 98597,by500pm.,November1, 2000 TheCityofYelmwillnotact
on this proposal prior to 4.00 pm, November 20, 2000
You may appeal this determination to the Yelm City Council, at above address, by submitting a written appeal no later
than 5 00 pm, November 8, 2000 You should be prepared to make specific factual objections. Contact Cathie
Carlson, Community Development Director, to learn more about the procedures for SEPA appeals. This MDNS is
not a permit and does not by itself constitute project approval The applicant must comply with all applicable
requirements of the City of Yelm prior to receiving construction permits which may include but are not limited to the
City ofYelm Comprehensive Plan, Zoning Title (17), Critical Areas Ordinance (1408), Storm water Drainage Design
and Erosion Control Manual (DOE), Uniform Building Code, State Environmental Policy Act (SEPA) Title (14), Road
Design Standards, Platting and Subdivision Title (16), and the Shoreline Master Program
DO NOT PUBLISH BELOW THIS LINE
Published Nisqually Valley News, Friday, October 27,2000
Posted in public areas October 19, 2000
Copies to All agencies/citizens on SEPA mailing list and adjacent property owners, October 19, 2000
Dept. of Ecology w/checklist, October 19, 2000
..
ATTACHMENT
SEPA CASE NO 8262
This Mitigated Determination of Non Significance is based on the project as proposed and impacts and
mitigation reflected in the following
. Environmental Checklist (dated July 28,2000, prepared by Bo Norbjerg, 2000 Group L.L.C )
. Preliminary Storm Drainage and Erosion Control Report ( prepared by John Knowles & Associates,
Inc)
And the following conditions
1 The proponent shall mitigate transportation impacts based on the new residential p m peak hour
trips generated by the project. The Transportation Facility Charge (TFC) shall be based on 1 01
new peak hour trips per residential unit. The proponent will be responsible for a TFC of $757 50
which is payable at time of building permit.
2 The developer shall enter into an agreement with the Yelm School District to mitigate project
impacts to the school district.
YELM COMMUNITY SCHOOLS
Where all students can learn and grow
Erlmg BIrkland
Drrector of FacIlItles
October 16, 2000
Ms. Cathenne Carlson
CIty Planner
CIty ofYelm
PO Box 479
Yelm, Washmgton 98597
RE MIll Valley Estates
SUB-00-8262- YL
Dear Ms Carlson.
Yelm Commumty Schools reqUIres MItigatIOn Agreements for sub-dIvIsIOns of five or
more bUIldmg sItes Please mclude the MItigatIOn provIsIOn as part of the SEPA
reqUIrements
Should you have any questIOns please call me at 458-6128
SIncerely,
~- --
~-y,.~
Er ngM. BIrkland
FacIhtIes DIrector
Yelm Commumty Schools
YELM COMMUNITY SCHOOLS IS AN EQUAL OPPORTUNITY EMPLOYER AND FOLLOWS TITLE IX REQUIREMENTS.
404 Yelm Avenue West, POBox 476, Yelm, Washington 98597, (360) 458-6128, FAX (360) 458-6434
/
CITY OF YELM
ENVIRONMENTAL CHECKLIST
Instructions.
The State Environmental Policy Act (SEPA) requires all governmental agencies to
consider the environmental impacts of a proposal before making decisions The
purpose of this checklist is to provide information to help identify impacts from your
proposal, to reduce or avoid impacts from the proposal if it can be done, and to help the
City decide whether an EIS is required An environmental impact statement (EIS) must
be prepared for any proposal with probable significant adverse impacts on
environmental quality
This environmental checklist asks you to describe some basic information about your
proposal The City will use this checklist to determine whether the environmental
impacts of your proposal are significant and require preparation of an EIS You must
answer each question accurately, carefully and to the best of your knowledge Answer
the questions briefly, but give the best description you can In most cases, you should
be able to answer the questions from your own observations or project plans without
the need for experts If you do not know the answer, or if a question does not apply to
your proposal, write "do not know" or "does not apply" Complete answers to the
questions now may avoid delays later If the space provided is too small, feel free to
attach additional sheets
Some questions ask about governmental regulations, such as zoning, shoreline, and
landmark designations Answer these questions if you can If you have problems, the
city staff can assist you
The checklist questions apply to all parts of your proposal even if you plan to do them
over a period of time or on different parcels of land Attach any additional information
that will help describe your proposal or its environmental effects You may be asked to
explain your answers or provide additional information for determining if there may be
significant adverse impacts
Nonproject Proposals Only'
Complete both the checklist (even though many questions may be answered "does not
apply") and the Supplemental Sheet for Nonproject Actions (part D). For nonproject
actions, the references in the checklist to the words "project," "applicant," and "property
or site" should be read as "proposal," "proposer," and "affected geographic area,"
respectively
,
/
I
~:I &'~a 9
p~~' duo
CITY OF YELM
CITY USE ONL Y
FEE' $150.00
OA TE REC'O
BY:
FILE NO.
ENVIRONMENTAL CHECKLIST
A.
BACKGROUND
1
Name of proposed project, if any.
2.
Name of applicant: :< OOd G .eo''r . L.. (. c:
Y c? Be /'Voh../-j' o!;"L..3
Address and phone number of applicant and of any other contact person.
PO. .eo-Jc 1177
Poy"a.//t/)' 1v-~ 9'[f 371
;:>..{, 2>3- 7?CJ -380 L
Date checklist prepared
7-;2S--~
Agency requesting checklist:
C..X; of' YJ2-LWt
Proposed timing or schedule (including phasing, if applicable).
~.t/~j ot_ -;;"00/ CC"4<j 1..-<, V(:>./ /?,e!4Y
Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain
/VcJ
3
4
5
6
7
8
List any environmental information you know about that has been prepared, or will beJC
prepared, directly related to this proposal ;t.,..0'~. /UcJ e ...-v 1/1 /Z.-c'- ,rl'" ~." ~ (
:t:M-t;~s -0/"-' ?/<-v/,-dl"\. v~_
Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain
--s- &5"+ '{(.J> P ~~ fr. u>(.~ ~ 4--',/ ~L4/- ~
10
List any government approvals or permits that will be needed for your proposal, if known
I'.L~~ A-r/~4-C
CITY OF YELM ENVIRONMENTAL CHECKLIST
C.\OFFICE\FORMS\SEPAFRM'
PAGE 1
~
~
";;E-
'.
711
()1(fv1,
~qf7L PtJ,j
kq1r~6~
wr
12.
B
1
Give brief, complete description of your proposal, including the proposed uses and the
size of the project and site There are several questions later in this checklist that ask
you to describe certain aspects of y~r.qp0sal. You do not need to repeat those
answers on this page P/I/I./~C/L.Q5 ,.;~-4. 5:20 S'/-1.,I"3 L-'<.
FJ+#t/{y~esu.(~~~e_"s;: /./CrvUe/5 lA.4/1 t~ #1(/4~ -J~
Location of the proposal Give sufficient information for a person to understand the
precise location of your proposed project, including a street address, if any, and section,
township, and range, if known If a proposal would occur over a range of area, provide
the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map,
and topographic map, if reasonably available. You need not duplicate maps or detailed
plans submitted with any permit applications related to this checklist. ~
(?kjP-e,Q.'fy IS JdCQ. ~ {O/L (I.e s: lv. Co~e~ Ov
rl.e T,v'iell-se-c';;cv-- o'f ;t1/I/ ;(L:llc. ,4~ 107 LC'l> SF
ENVIRONMENTAL ELEMENTS
1
Earth
a General description of the site (circle one):
@rolling, hilly, steep slopes, mountainous, other.
b What is the steepest slope on the site (approximate percent slope)?
..oz(;-
c. What general types of soils are found on the site (for example, clay, sand, gravel,
peat, muck)? If you know the classification of agricultural soils, specify them and"
note any p~ime farmland 3 1&t4l/12-//1 S LJ ~t / ,{, C/<::<.....
d Are there surface indications or history of unstable soils in the immediate vicinity?
If so, describe ,A/"CJ - .~
e
Describe the purpose, type, and approximate quantities of any filling or grading
proposed fndicate source offill. jVc/ -All ( {,vt/ / /1e... fi,'tr~(:f'~1
(j-,\..-V( l5 S'/ ~
f Could erosion occur as a result of clearing, construction, or use? If so, generally
describe NO
CITY OF YELM ENVIRONMENTAL CHECKLIST
C"\OFFICE\FORMS\SEP AFRM
PAGE 2
g
About what percent of the site will be covered with impervious su.rfaces after
project construction such as asphalt or buildings? c::. J2;.S.s y!c -e .2..s~)lc
h.
..
Proposed measures to reduce or control erosion, or other impacts to the earth, if
any. !/(YA.rfL CA..t3 IN ~~ ..<-<; ~/'( C~S'tJ M..... s ~,e."-f
Sygt1e..u
2.
Air
a.
What types of emissions to the air would result from the proposal (i e , dust,
automobile exhaust, odors, industrial wood smoke) during construction and when
the project is completed? If any, generally describe and give approximate
quantities if known. C-/VC....I NO/{.~~14 L ~e.s,~-<-/~L CE-t/ss/O'l..--S
b Are there any off-site sources of emissions or odor that may affect your proposal?
If so, generally describe. NO 0
l~~~
apt d~l
c.
Proposed measures to reduce or control emissions or other impacts to air, if any'
IV ~ IV e...
3
Water
a. Surface Water
1) Is there any surface water body or wetland on or in the immediate vicinity of the
site (including year-round and seasonal streams, saltwater, lakes, ponds)? If yes,
describe type and provide names State what stream or river it flows into?
/VC/
.~
2) Will the project require any work over, in, or adjacent to (within 300 feet) the
described waters? If yes, please describe and attach available plans
NO "J
3) Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected Indicate the source of fill material
/V1f9
4) Will the proposal require surface water withdrawals or diversions?
/l/IPJ_
CITY OF YELM ENVIRONMENTAL CHECKLIST
C"\OFFICE\FORMS\SEPAFRM
Give general
~" PAGE 3
description, purpose, and approximate quantities if known.
5) Does the proposal lie within a 1 OO-year floodplain? If so, note elevation on the
site plan. ,NO
6) Does the proposal involve any discharges of waste materials to surface waters?
If so, describe the type of waste and anticipated volume of discharge
;va
b Groundwater.
1) Will groundwater be withdrawn, or will water be discharged to groundwater? Give
general description, purpose, and approximate quantities if known !\Ie)
No, fJ/l.cr") c>-c---I IS 0.1'\.../ '^- 4-YC"'vl t;v sV~"1
0- ~OiJ-~.
~rl' ~.-- 2)
1ft l2*~ .'DJLJ
VJ W'~\ \- r
~ J1Q} . 3)
ftU\
c
1)
Describe the underlying aquifer with regard to quality and quantity, sensitivity,
protection, recharge areas, etc. 4t.L ~~~f~/'\. c;'; s C II4A-J-€/
tvlll 6-e 7'tL~W
Describe .waste material that will be discharged into or onto the ground from
septic tanks or other sources, if any (such as domestiC' sewage, industrial
byproducts, agricultural chemicals) P/f..c/-l^4 O-ltV Sew Pl^--5
Water Runoff (including storm water).
Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known) Where will this water flow?
Will this water flow into other waters? If so, describe A- I( t' k I{.. Ie c v
sys/e....., Will bp ~~j ("--"~"1....-CF(
2)
Could waste materials enter ground or surface waters? If so, generally describe
NO
d Proposed measures to reduce or control surface, ground, and runoff water
impacts, if any.
SjSieh15 14-iI16< EK.-JUuu",-/ 7cJ 0ySj4~~
CITY OF YELM ENVIRONMENTAL CHECKLIST
C.\OFFICE\FORMS\SEP AFRM
PAGE 4
4 Plants
a Check or circle types of vegetation found on the site
_ deciduous tree ~ maple, oak, aspen, other
~vergreen tree fir, cedar, pine, other
-1Y. ~hrubs
~ grasses
pasture
crops or grains
wet soil plants. cattail, buttercup, bulrush, skunk cabbage, other
water plants water lily, eelgrass, milfoil, other
other types of vegetation
(l uJrtfl'
V~;
P ~d
b
What kind and amount of vegetation will be removed or altered?
e,~s.f'..._,.,.. t-c...~~1 P-..e I'('''--~O-V-<.r/~~ iDCSp5.
,.fJ.--~ ,4~
List threatened or endangered species known to be on or near the site.
/V~-e k" ,ve-~r\.-
c.
Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any. ,(}AI fV4 -.j~tt~(VV....c. tfd I( ~ v<-
k-( (( t:J e ~tJ w4 .€~(-e /,vSS /6/.e
~
5
Animals
a Circle any birds and animals which have been observed on or near the site -or are
known to be on or near the site '
birds. hawk, heron, ducks, eagle, ~
other.
mammals. deer, bear, elk, beaver, other.
fish. bass, salmon, trout, shellfish, other.
..
b list any priority, threatened or endangered species known to be on or near the
site. /VC7IV e.-- 1...( rvVIA.r tv
c. Is the site part of a migration route? If so, explain.
/Ve
d Proposed measures to preserve or enhance wildlife, if any'
NeILl?
6 Energy and Natural Resources
a What kinds of energy (eJectric, natural gas, gasoline, heating oil, wood, solar etc.)
will be used to meet the completed project's energy needs? Describe whether it
will be used for heating, manufacturing, transportation, etc.
b L.e. c {/LU f-{~,a.. 't, / Iv a;1--c~ L C;; 4.$} /:A ;4---vrt-~ /4 ~I...
CITY OF YELM ENVIRONMENTAL CHECKLIST
C.\OFFICE\FORMS\SEPAFRM
"Q=-.
PAGE 5
b Would your project affect the potential use of solar energy by adjacent
properties? If so, generally describe NO
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts, if
any'
#i..L I-IvU1e~ (A./{(I 6~ Jv,/j- 7r;I CC~~fL..e~'(
(; IA- b<--CS 'i Co-k ,
7 Environmental Health
a. Are there any environmental health hazards, including .exposure to toxic
chemicals, risk of fire ~nd explosion, spills, of hazardous'Waste, that could occur
as a result of this proposal? If so, describe. NO
"'>.
1 ) Describe special emergency services that might be required
/VVlV< ~t/lrhC'~ ~
2) Proposed measures to reduce or control environmental health hazards, if any.
Nq/'v-J2..
b Noise
1) What types of noise exist in the area which may affect your project (for example
traffic, equipment operation, other)? (Vd /'J Q
2) What types and levels of noise would be created by or associated with the project
on a short-term or a long-term basis (for example traffic, construction, operation,
other)? Indicate what hours noise would come from the site
/VC/IIAVI tvL /(es I C~t-l. ia-L 6c/{ .L.I; ""-J /Vel 15 .Q. NOILMa-L
tvclt.kt~ ~c;1C/It.S
3) Proposed measures to reduce or control noise impacts, if any'
IV C'It.- .( ,.q--{ .,.,." ( 5 71 ~ ..R
8 Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
01' I?..<--- f' IJ 5 iCA'C..fJ
b Has the site been used for mineral excavation, agriculture or forestry? If so,
describe IV 0
CITY OF YELM ENVIRONMENTAL CHECKLIST
C'\OFFICE\FORMS\SEPAFRM
PAGE 6
~J~
CJ.
~~
c.
Describe any structures on the site /
(J I'f/<?--.- /!O 0 -f' &~ CfJ uTI- be I Io-t- '-L1
d
Will any structures be demolished? If so, what?
Yt?$ {jercse ~ GiRLI
e
What is the current comprehensive plan designation of the site?
,f: 51 {lie' (fi.;L~ {,
f
What is the current zoning classification of the site?
^. ICe6 tde ~pLd/{ r< -1
g
If applicable. what is the current shoreline master program designation of the
site? /L-//.J
h
Has any part of the site been classified as a "natural resource", "critical" or
"environmentally sensitive" area? If so, specify jL/(J
Approximately how many people would reside or work in the completed project?
,f r P ~?l (...p
Approximately how many people would the completed project displace?
-B-
k. Proposed measures to avoid or reduce displacement impacts, if any.
/vclVe
Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any. tJe.S{j /V <=<.-{ N ~(
c {'/..-( $ i-A.C.L./-r- Il-,( ~_
9 Housing
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing
20 {VI { rt/~ -~L~55 1/c"~PS
b Approximately how many units, if any, would be eliminated? Indicate whether
high, middle, or low-income housing /Vo/v./'
CITY OF YELM ENVIRONMENTAL CHECKLIST
C'\OFFICE\FORMS\SEP AFRM
~.
PAGE 7
c Proposed measures to reduce or control housing impacts, if any'
!l./c/V ( 1Y1 ,It (.. 7 r ( Wl .p .
10 Aesthetics
a. What is the talle.st height of any proposed structure(s), not including antennas,
what is the principal exterior building material( s) proposed?
:>S-PL~ 1
b What views in the immediate vicinity would be altered or obstructed?
j'VO'l\..o-e
c. Proposed measures to reduce or control aesthetic impacts, if any.
Iv?;<- ~
11 Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur? jV'C/lLj-kt.IJ;L R.~'h/.e.....{;4 t... si-<~A--r J{3 A. It- -:;
b Could light or glare from the finished project be a safety hazard or interfere with
views? It- "'"t1-A +1- S {..1I-......tVy Q. /....44t-e
c. What existing off-site sources of light or glare may affect your proposal?
;V~1t..- p
d Proposed measures to reduce or control light and glare impacts, if any.
/VC/A-P
12.
Recreation
a. What designated and informal recreational opportunities are in the immediate
vicinity? F4y 51LC::--ll ,I(..~/ /1-1.-- -!9c,{ c= L /1- CACC.5
S(~.(7.eY
Would the proposed project displace any existing recreational uses? If so,
describe /&'0
b
&Jt{or-
DjV'7 ~(
kJOS
~;
J(M c.
17(0 Or L\~
O_7t;yl~ or
r I CITY OF YELM ENVIRONMENTAL CHECKLIST
C.\OFFICE\FORMS\SEPAFRM
Proposed measures to reduce or control impacts or provide recreation
opportunities 1'/'/ vi
PAGE 8
"
13 Historic and Cultural Preservation
a Are there any places or objects listed on, or proposed for, national, state, or local
preservation registers known to be on or next to the site? If so, generally
describe IV @ ,
b Generally describe any landmarks or evidence of historic, archeological,
scientific, or cultural importance known to be on or next to the site IV/#
c. Proposed measures to reduce or control impacts, if any.
/v/lJ
~ J 14 Transportation
. V I /\?-_.._-,,~ a. Identi!y sidewalks, trails, public stre"et~ and highways serving the si~e, and .
. (}lJC:..., desCribe proposed access to the eXisting street system Show on site plans, If
(lJt(V,~W any
-tv JfL
'fIlzYV
\~~Q ~.
(\ ~
~ \\ -
~v
: L'7 X \6 c:V
\ijY\V I e
.NJIt~
(\ r\ "l \ \.
\IJ \ \
b
Is site currently served by public transit? By what means? If not, what plans exist
for transit service? N () Se. r v/ ~ e IS ?"t:; /4. <? ~ ~-
c
How many parking spaces would the completed project have? How many would
the project eliminate? f-c -'fZ r
Will the proposal require any new sidewalks, trails, roads or streets, or
improvements to existing sidewalks, trails, roads or streets, not including
driveways? If so, generally describe (indicate whether public or private)
NO
Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe ~o
f
How many vehicular trips per day would be generated by the completed project?
If known, indicate when peak volumes would occur '2' .>'-30
CITY OF YELM ENVIRONMENTAL CHECKLIST
C"\OFFICE\FORMS\SEP AFRM
v.r:-
PAGE 9
&
rA'
{,\vl!
Proposed measures to reduce or control transportation impacts, if any'
!vOIv{J
15 Public Services
a. Would the project result in an increased need for public services (for example
fire protection, police protection, health care, schools, other)? If so, generally
describe /i",tJ
b
Proposed measures to reduce or control direct impacts on public services, if any
(VcILP
16
tly available at the site el~atural gas, ~€:~
anltary sewe , septic system, other
b
Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate
vicinity which might be needed !;J-etlv.e- jV( ~
C SIGNATURE
The above answers are true and complete to the best of my knowledge I understand
that the City of y~ re~~em to make its decision
Signature ~4~
Date Submitted
CITY OF YELM ENVIRONMENTAL CHECKLIST PAGE 10
C'\OFFICE\FORMS\SEP AFRM
.,
SUPPLEMENTAL ENVIRONMENTAL CHECKLIST FOR NON PROJECT ACTIONS
(Do not use this sheet for project actions)
When answering these questions, be aware of the extent of the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or at a
faster rate than if the proposal were not implemented Respond briefly and in general terms
1 How would the proposal be likely to increase discharge to water; emissions to air;
production, storage, or release of toxic or hazardous substances, or production of noise?
f?e.ojecf 1'5 4- t( e_.>~(/..",-I?1( S'0U,l/lS(C...... r 411 ~/1fIJ.5"/C<A-5
/.,vi 1/ be..- 0 +- l.IM.y II 'AI {s> cca...-..s'.e.rCA_~-<..c..s
Proposed measures to avoid or reduce such increases are "f,.
Sc 6C-/VlStC"- ~/I( b--(' bel I~I- r-c c( Xy S" 4~'v-tf
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
r1f? Sctc--;:VCSf'C"-'1... t.vff( +KC/e....e45e t(~ TUJl"cl'-Gre:..c...?
..s .~/L/>AC(?_
Proposed measures to protect or conserve plants, animals, fish, or marine life. are
A- C)(y A-/1'11CV-l'~/ s 7-d!/A. '-"f tv'1-'fe/<- rg ys'A.;o"..-1
3 How would the proposal be likely to deplete energy or natural resources?
;1//4
Proposed measures to protect or conserve energy and natural resources are
!LxrLP
4 How would the proposal be likely to use or affect critical or environmentally sensitive
areas or areas designated (or eligible or under study) for governmental protection, such
as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat,
historic or cultural sites, wetlands, floodplains, or natural resource areas?
rl-e1ie tlftfle /L'C'/ S-e A- s /"f.cv-t> 4!L-f>/1f) 4Qs.~/-'Y':._/"
1.<.[ t-/ tit, (' 11.",./ ' ,
CITY OF YELM ENVIRONMENTAL CHECKLIST
C.\OFFICE\FORMS\SEPAFRM
PAGE 11
,.
Proposed measures to protect such resources or to avoid or reduce impacts are
;Z(11
5 How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
1V/f1
Proposed measures to avoid or reduce shoreline and land use impacts are
T4r) t1w-J ~(I/ )p Iv(lt Iv CC/LA--ev<." ^
17 CA /tl CA-;) If1-- '-i. ~p1 L 4."'-o! 0 s ;? Cc ""Ip
6 How would the proposal be likely to increase demands on transportation or public
services and utilities? ,/l.LJ
Proposed measures to reduce or respond to such demand(s) are
IVc/N e
7 Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment. (-It. I ;; j1~ C? dt .:..
W( I ( /Vc.f COt'l-}/rc'Y
CITY OF YELM ENVIRONMENTAL CHECKLIST
C '\OFFICE\FORMS\SEP AFRM
"
PAGE 12