Loading...
20170142 ROW Permit Pkg 03212017RNi City of Yelm PUBLIC WORKS 901 Rhoton Rd NW Yelm, WA 98597 Phone: 360- 458 -8406 FAX: 360- 458 -8417 Permit No. 201!10149-- Application to Perform Work on Public Right of Way and /or Connect to Utilities APPLICATION The undersigned hereby makes application to: Work in ROW to set new pole and transfer overhead electric service due to conflict with new sidewalk location No asphalt cuts/ No trenching ml Project Manager: Ryan Walsh (253) 245 -0798 Location of work: 305 1 st St. S. I agree to perform the work in strict compliance with Yelm Municipal Code, Chapter , the special conditions enumerated herein and the attached conditions I have read and will adhere to the general provisions applicable to permits contained on this form. The Public Works Department (360- 458 -8406) must be contacted for inspection 24 hours before work commences or this permit will be void. The Underground Utilities Coordinating Council (1- 800 - 424 -5555) must be contacted two (2) working days before proceeding with any excavation associated with this permit. Name: Sara Wattenberg Address: 2711 Pacific Ave. S.E., Olympia, WA 9 01 Phone: (253) 306 -2255 Proposed starting date of installatio Duration: 1 day Date: JL --- Signature: PERMIT REQUIREMENTS For Official Use Only Fee $ Issued 3 �, Fee Received $ Application Approval Signature: Receipt Number To Be Completed By City Permission is hereby granted to perform the above described work subject to the general provisions contained on this form, and the followingspecial conditions: A bond in the amount of is required to insure compliance with the above conditions, refundable upon satisfactory completion of work. No work shall be done under this permit until the party or parties to whom it is granted shall have communicated with and received instructions from: Remarks: First Inspection Date: Inspector Final Project Completion Approval: Date: Revised 03/09/2011 V'MAR Lil i I BY: -------------- - - - - -- Chapter 2 0 O rn F c � z Z � J Z Z V E F o � a C7 v b rn w U J ye o� w o > a M W O N e a W Q F- C7 a O Q a cN m cS Z N EW Z ° Z o zQ a O N U m N Z ° w m N � U O W O O a m >S 0 0 B B C IMIN, T m N « +I m O E E 3 W N m J N N ca () W N m a O Z �O v E T °v o d n w n a u > W M N a' N.° C m ° X Q O J II Q j U p -O N U U Z W Q F Y m C H O wN IX Q Q N0 m N W Z QN m Z m A Z Z x m N � c E j m N ? m c E d rn q Q< Q m W K Z m Z Q d l9 y 0 U I O U z m y J Q Q 2 Q N 0 Q O 7 W J W w Q v ° 0� -s - tan- " �— 3 d a: c� Ld 28 of Q Eta LLJ Lj- .4 o m a LL. Z M N v .- > a ° °o Em °c x i- N a > (7 N m Z m n12 O ^ m ;vim a w I SZ s fj ma+ Z 2. N w a � 3 O h LLI Stationary Work Zones U O 0 N N a ai o U t m 1 N a Y @ 0 m N N iU � C T 30 E ° I N .s, N 'O O N M E E E U O N U ° O N U _O U N > a N � m U C N N O w a` N 0 Z W J w 0 S a 0 W W a- 0 J Lo wa � U Q U ff w 0 CO J a U a. 1' 0 W i O U K w U w W U W O O > F Z W Q N > OJ W U Z O = w Z U a W (D w J a ® ¢ Work Zone Traffic Control Guidelines M 54 -44.04 Page 2 -7 February 2012 From: Maryanne Zukowski To, Walsh, Ryan Cc: "Cory Taylor "; Brian Sourwine; Chad Bedlington; Karen Bennett Subject: FW: 1st Street Pole Relocation - Sidewalk RFP Date: Wednesday, February 22, 2017 10:05:57 AM Hi Ryan, By this email I am checking for the G -0 schedule for the final plans that shows the new location. We shall check the new location and see if it will work moving it prior to construction and get back to you. Cory and Brian's Contract for the survey and construction goes to council for approval on 2/28/17. We will execute the contract to G -0 and they can get that work done for you if the pole does not interfere with existing traffic patterns before construction. 1. Yes - we need Right of Way permit for the relocation for traffic control and liability purposes — but we can waive the fee. We should get you the drawing from G -0 for the proposed location and submit to Karen at City Hall. We will notify her that the fee is to be waived. 2. By this email, asking Brian and Cory to add the work of the pole relocation to the WSDOT permit we have already. Maryanne Zukowski, PE Public Works Manager 901 Rhoton Road SE Yelm, WA 98597 360.458.8499 maryannez @ci.yelm.wa.us From: Walsh, Ryan [mailto:Ryan.Walsh @pse.com] Sent: Wednesday, February 22, 2017 9:18 AM To: Maryanne Zukowski Subject: 1st Street Pole Relocation - Sidewalk RFP Maryanne, It was mentioned that the city wanted the pole moved prior to construction. If that is most convenient method for the city, PSE will need staking /Survey benchmarks of new sidewalk preferred front and rear of curb) and right of way. If that is not going to be possible please let us know the construction window, so we can schedule the pole relocation. The city of Yelm use permit for relocation of the pole (is this going to be waived by the city)? Are we required to apply for a WSDOT permit? PSE will not be seeking charges for the pole relocation. Thanks Ryan Walsh Project Manager Customer & System Projects Southwest - Electric PUGET SOUND ENERGY 360- 570 -6833 253 - 245 -0798 2711 Pacific Avenue SE Olympia, WA 98501 htt{Z//pse.com City of Yelm Community Development Department Building Division Phone: (360) 458 -8407 Fax: (360) 458 -3144 Applicant: Name: PUGET SOUND ENERGY OLYMPIA Address: 2711 PACIFIC AVE SE OLYMPIA WA 98506 Property Information: Site Address: ing FIRCT CT C Assessor Parcel No.: 64420200100 Contractor Information: Name: PUGET SOUND ENERGY OLYMPIA Address: 2711 PACIFIC AVE SE OLYMPIA WA 98506 Contractor License No.: Permit No.: 20170142 Issue Date: 3/21/2017 (Work must be completed within 180 days) Phone: 253 - 306 -2255 Owner: Subdivision: Lot: Phone: Expires: 0 /00 /0000 Project Information: Project: UTILITY Description of Work: NO ASPHALT CUTS. NO TRENCHING. WORK IN ROW TO SET NEW POLE AND TRANSFER OVERHEAD ELECTRIC SERVICE DUE TO CONFLICT WITH NEW SIDEWALK LOCATION Sq. Ft. per floor: First Heat Type (Electric, Gas, Other): Second Third Garage Basement Fees: Item RIGHT OF WAY Contractor PUGET SOUND ENERGY OLYMPIA TOTAL FEES: Applicant's Affidavit: I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easement estric4ions of record. If applying as a contractor, I further certify that I am currently registered in t e Stat of Washington. Signature L-JAAX�A- /y Date ' 2 •' 1 Firm ./1r Fees $ 0.00 $ 0.00 OFFICIAL USE ONLY # Sets of Prints: Final Inspection: Date: By: Sara Wattenberg Pemtit Specialist Street Use Permitting Sara.Wattenberg@pse.com PUGET 360 - 570 -6890 tel ' SOUND 253- 306 -2255 cell ENERGY 2711 Pacfic Ave SE Olympia, WA 98506 1 �1