20170160 Incomplete ltrApril 5, 2017 Joe and Constance Standley 1062711 th Ave Ct SE Tacoma, WA 98444 C ity of Yelm Community Development Department Re: Standley Commercial Development Dear Joe &Constance: 105 Yelm Avenue West Yelm, WA 98597 The Community Development Department received the preliminary site plan review application for the above referenced project, and finds that the application is incomplete. The application shows a future building addition of 1,369 sq. ft. This is more than a 25% increase in building size and requires an administrative site plan review. This requires public notice and a fee of $750.00. Please provide the following: El Map and mailing labels for property owners within 300 feet of the site El Preliminary stormwater report. (The statement of "proposed rain garden /retention pond" is not adequate to show how the rain garden will meet the treatment and release requirements of the SWMMWW for the amount of impervious surface proposed.) El Payment of an additional $500.00. did a preliminary review of the site plan, and found several items that do not meet City of Yelm standards and will require changes that will affect the overall site plan. We can continue review with this site plan, or you may elect to address these items and resubmit. The site plan shows a 5 foot dedication for sidewalk; however shows site improvements within the dedication area. If the 5 foot is required for right -of -way, which includes an 11 foot travel lane, a 5 foot shoulder, 7 foot planter strip and 5 foot sidewalk, on site improvements cannot be located in this area. This would also make the proposed ADA parking stall out of compliance. Centerline of right of way should be shown on the plans to clearly show that all on site improvements are located outside of the right of way. It is probable that a 1 gallon STEP tank will not be adequate to serve this size of commercial building. The tank must be at least 5 feet from building foundation and property line with an (360) 458 -3835 (360) 458 -3144 FAX www.ci.yelm.wa.us additional 2 feet from any utility easement. STEP tank sizing is governed by the Criteria for Sewage Works Design published by the Washington State Department of Ecology. A 15 foot landscape area is required between the commercial and residential uses. As we discussed on the phone, if you proposed substantial landscaping we could look at landscape averaging or a letter from the adjoining residential properties that the fence and 8 foot landscape strip is adequate. In regards to the request for deferral of frontage improvements,, that must be reviewed during the land use process and determined by the Public Works Department. There is no way that we can defer the asphalt prior to opening, as the asphalt and stormwater are required to protect ground water. If you have any questions, please do not hesitate to contact me. Sincerely, JIM Tami Merriman, Associate Planner Community Development Department copy: Debbie Maroon, PE, Skillings Connolly, Inc April 4, 2017 Page 2 of 2