Loading...
3012C Structural Drawings4' CONCRETE SLAB W/ THICKENED EDGE #4 @ 24' O.C., 21'- LONG, EPDXY EMBED 3' INTO STEM WALL 7" 2' -6' I 5'-5• LSTHD8RJ / r I 2 -4 DBL JSTS A DBL JSTS I/ LSTHD8RJ 9' 23'-6' 7' -10' 1 I 6r I I LSTHD8RJ -- 4' -6' #4 @ 24' O.C., 21" LONG, EPDXY EMBED 3' INTO STEM WALL 6' -4' 3' 6X6 PT POST W/ PB66 BASE (TYP FOR EXT. POSTS) 4' CONCRETE SLAB W/ THICKENED EDGE 01 1' MI 1 MI Iii 0 CSI _mI WIN SB %X24-7 -41 6' -6' ill 4jr 33' F - - - - - - - - - - - - i � 2 � I I VENT CTYP> 2X10 JSTS @ 164' O.C. (OR EQUIVJ 24'X24'X8' FOOTING PAD W/ (2) #4 REBAR E.W. (TYP) 4X8 F 1 L s 4X8 L J FURNACE BLOCKOUT F -qt-ok- 2' 16'X8' FOOTING I (TYP) -- 39'X39'X8' FOOTING I PAD W/ (3) #4 REBAR { E.W. W/ 6X6 POST [1 -31 I 16' SSTB16 2' op 18' -9` 8'X24' STEM I I I WALL (TYP) I 6' -iok 30'X30'X6' FOOTING PAD W/ (2) #4 REBAR E.W. 11 -21 4" CONCRETE SLAB ON GRADE, SLOPE TO OH DOOR I i 30 'X30 'X6' FOOTING I PAD W/ (2) #4 REBAR EW. 11 -11 I 6'X24' STEM WALL 12'X6' FOOTING — 4k — 22' FOUNDATION PLAN 12'X6' FOOTING- - 6'X24' STEM WALL 30'X30'X6' FOOTING PAD W/ (2) #4 REBAR E.W. 11 -11 NOTES. 1/4" • ALL SAWN LUMBER . BEAMS SHALL BE HF #2 MIN, • E # — #] DENOTES ITEM NUMBER IN ACCORDANCE TO CALCULATION PACKAGE 4j' 2' -10�' 37' -4' NOTES, 1. BASE PLATE NAILING PER SHEAR WALL SCHEDULE 2, PLYWOOD SHEATHING 3. JOIST PER PLAN 4. 2x CONTINUOUS RIM 5. (1) #4 BARS CONTINUOUS CAT TOP> PROVIDE #4 @ 18. O.C. HORIZONTAL 6. 5/8' DIAMETER ANCHOR BOLTS @ 48' O.C. U.N.O. 7. #4 @ 48' O.C. MAXIMUM, ALTERNATE BENDS 8. (2) #4 BARS CONTINUOUS 9, EDGE NAILING 10,16d @6'O.C. TYPICAL FOUNDATION STEM WALL NOT TO SCALE (2) #4 12� �12 THICKENED EDGE SLAB NOTES, 1. (3) 10d PER BLOCK 2. JOIST PER PLAN 3. FLOOR BEAM PER PLAN 4. PLYWOOD SHEATHING 5. BLOCKING 6. 4x OR 6x POST WITH SIMPSON PC AND PB 7, CONCRETE FOOTING 8. EDGE NAILING 9. 2x WOOD CLEAT OR SIMPSON POST CAP TYPICAL INT. SPREAD FOOTING NOT TO SCALE H O COPYRIGHT 2017 V NORTHWEST HOME DESIGNING, INC, I LSITHD�8RJ I II 1[ i' -6' END PAD I z �M� SPACING I) A IIETY ' 6' MAX. PAD , 7`-8r A 0 A 0. SPACING (TYP) o -1 _. I CC -J L _ I 4' -3r d0.. ' ' FURNACE 2 - 6 BLOCKOUT i- r 4,-0;- 1 211 SSTB16 -ii I SSTB16 2' op 18' -9` 8'X24' STEM I I I WALL (TYP) I 6' -iok 30'X30'X6' FOOTING PAD W/ (2) #4 REBAR E.W. 11 -21 4" CONCRETE SLAB ON GRADE, SLOPE TO OH DOOR I i 30 'X30 'X6' FOOTING I PAD W/ (2) #4 REBAR EW. 11 -11 I 6'X24' STEM WALL 12'X6' FOOTING — 4k — 22' FOUNDATION PLAN 12'X6' FOOTING- - 6'X24' STEM WALL 30'X30'X6' FOOTING PAD W/ (2) #4 REBAR E.W. 11 -11 NOTES. 1/4" • ALL SAWN LUMBER . BEAMS SHALL BE HF #2 MIN, • E # — #] DENOTES ITEM NUMBER IN ACCORDANCE TO CALCULATION PACKAGE 4j' 2' -10�' 37' -4' NOTES, 1. BASE PLATE NAILING PER SHEAR WALL SCHEDULE 2, PLYWOOD SHEATHING 3. JOIST PER PLAN 4. 2x CONTINUOUS RIM 5. (1) #4 BARS CONTINUOUS CAT TOP> PROVIDE #4 @ 18. O.C. HORIZONTAL 6. 5/8' DIAMETER ANCHOR BOLTS @ 48' O.C. U.N.O. 7. #4 @ 48' O.C. MAXIMUM, ALTERNATE BENDS 8. (2) #4 BARS CONTINUOUS 9, EDGE NAILING 10,16d @6'O.C. TYPICAL FOUNDATION STEM WALL NOT TO SCALE (2) #4 12� �12 THICKENED EDGE SLAB NOTES, 1. (3) 10d PER BLOCK 2. JOIST PER PLAN 3. FLOOR BEAM PER PLAN 4. PLYWOOD SHEATHING 5. BLOCKING 6. 4x OR 6x POST WITH SIMPSON PC AND PB 7, CONCRETE FOOTING 8. EDGE NAILING 9. 2x WOOD CLEAT OR SIMPSON POST CAP TYPICAL INT. SPREAD FOOTING NOT TO SCALE H -4 V � z z �M� A zz 3 WA U A 0 A 0. o CC cd d0.. pH U A z O 5 a �20 N � � W � o � 10' -10 4' CONCRETE SLAB W/ THICKENED EDGE LSTHD8 24'X24'X8' FOOTING i 1 PAD W/ (2) #4 REBAR E.W. (TYP) 1 -i 6X6 PT POST W/ 43.E PB66 BASE (TYP S1 i r FOR EXT, POSTS) I I M I 1 ~ bA °00' tr N v N 0 o OPT. C 0 V E 1R]LE D PORCH M 1/4" 1' -0" �a N � w � L ` +� N SCALE: AS SHOWN \, DATE: May 2017 DRAWING NUMBER 987117 SHEET S 1 V N � A �M� CC cd d0.. N � � W � o � 10' -10 4' CONCRETE SLAB W/ THICKENED EDGE LSTHD8 24'X24'X8' FOOTING i 1 PAD W/ (2) #4 REBAR E.W. (TYP) 1 -i 6X6 PT POST W/ 43.E PB66 BASE (TYP S1 i r FOR EXT, POSTS) I I M I 1 ~ bA °00' tr N v N 0 o OPT. C 0 V E 1R]LE D PORCH M 1/4" 1' -0" �a N � w � L ` +� N SCALE: AS SHOWN \, DATE: May 2017 DRAWING NUMBER 987117 SHEET S 1 A� LSL 1.3E HUSC412� 11%` TJI 110 JSTS @ 16" D.C. (OR EQUIV,) TU*3'" L88 CTYP) L J L J L_J L J J L JII L J L J L IL-- 117VIL 332'Xll %" LSL 1.3E C2 -11 3Y2'Xll %' LSL 13E C2 =6] "%X6 PT POST (4) 2X4 STUDS OR 4X6 POST C2 -51 HDU5— SDS2,5 W/ <2) 2X4 STUDS SECOND FLOOR FRAMING PLAN NOTESi • ALL SAWN LUMBER BEAMS SHALL BE HF #2 MIN, • ALL HEADERS SHALL BE 4X10 UX0. • ALL COLUMNS SHALL BE (2) 2X STUDS UXO, • OVERFRAMING SHALL BE 2X6 JSTS @ 16" D.C. FOR SPANS FROM 10' -0" TO 13' -0 "; USE 2X8 JSTS @ 16" DEC,; OTHERWISE USE 2X10 JSTS @ 16" D.C. • SHEAR WALLS W/ 3" OR LESS SPACING REQUIRE (2) 2X OR 4X SILL PLATE BEARING EDGE NAIL FLOOR SHEATHING TO BLOCKING i--2X BLOCKING -A35 @ 24' O.C. TO TOP PLATE SHEARWALL SHEATHED PER PLAN FLOOR TO INT. SHEARWALL NOT TO SCALE 2X8 LEDGER W/ C2} 5" LEDGERLOKS @ 16' JOISTS PER BEAM PER ---'Lj PLAN A34 @ EACH RAFTER TO TOP PLATE 1/4" = 1' -0" TEAR WALL PER PLAN DGE NAILING 2X8 RAFTERS @ 24' O.C. W/ LRU26 HANGERS ROOF SHEATHING PER PLAN CLG, JOISTS r-2X BLOCK H2.5 @ EACH JOIST J' OSB W /—' VN—BEAM PER 8d @ 6' O.C. PLAN roj'� SHEAR TRANSFER CONN. NOT TO SCALE ,HDU2— SDS2,5 W/ (2) 2X6 STUDS <4) 2X4 STUDS OR 4X6 POST C2 -53 2X8 W/ 2Xf JSTS (4) 2X4 STUDS OR 4X6 POST 12 -51 START NAILS 1 1/2' UP FROM ;r END OF STUD f BOTTOM NAILS ROOF FRAMING PLAN NOTES: 1/4" = 1' -0" • ALL SAWN LUMBER BEAMS SHALL BE HF #2 MIN, • ALL HEADERS SHALL BE 4X10 U.N.D. • ALL COLUMNS SHALL BE (2) 2X STUDS U,N,O. • OVERFRAMING SHALL BE 2X6 JSTS @ 16" O,C, FOR SPANS FROM 10' -0" TO 13' -0 '; USE 2X8 JSTS @ 16' O,C,; OTHERWISE USE 2X10 JSTS @ 16" O.C. • [# - #] DENOTES ITEM NUMBER IN ACCORDANCE TO CALCULATION PACKAGE N, 2 -2x OR 4x 38 NAILS MIN. LENGTH 21' NO NAILS REWD FACE NAILS BEAM PER PLAN MSTC48B3 INSTALLATION W/ NO RIM JOIST NOT TO SCALE F--- - -F - - --I 6X6 PT POST 7 6X6 PT POST W/ ACE6 CAP W/ ACE6 CAP co col I MANUFACTURED TRUSSES (BY OTHERS) 10 �! HDR OPT. COVERED PORCH iia^ = r -o' 11 h h � sun I N � w 0 H U A COO 0 5 m O 11 tn N C1 r4 cod MQ � W � O 0.4 co Av 4�o ~ m bOi Gh V) 00 � 3 p �o� cd w N yv, O Q �-, 4-4 a o^ ,may o � tn N C1 r4 cod MQ � W � O 0.4 co Av 4�o SCALE: AS SHOWN DATE: May 2017 DRAWING NUMBER 9871 -17 SHEET SZ ~ m bOi n � 3 � *PO4 CJ N yv, O Q a o^ ,may o � r--1 M PON* a� 00 M j a D W as 1 M N SCALE: AS SHOWN DATE: May 2017 DRAWING NUMBER 9871 -17 SHEET SZ STRUCTURAL NOTES: DESIGN CRITERIA: 1. BUILDING CODE: 2015 INTERNATIONAL BUILDING CODE 2. VERTICAL LOADS: ROOF FLOOR SNOW LOAD 25 psf LIVE LOAD 20 psf 40 psf DEAD LOAD 17 psf 12 psf 3. LATERAL LOAD FORCES TRANSMITTED BY DIAPHRAGM ACTION TO SHEARWALLS AND THENCE TO FOUNDATION WHERE DISPLACEMENT IS RESISTED BY PASSIVE PRESSURE AND SLIDING FRICTION OF EARTH. 4. LATERAL WIND LOADS: 110 MPH EXPOSURE " B " (PER ASCE7 -10) 5. LATERAL SEISMIC LOADS (SDs= 0.917) SITE SPECIFIC SEISMIC RESPONSE SEISMIC ZONE I � GENERAL: 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE CONTRACT DRAWINGS. 2. DURING THE CONSTRUCTION PERIOD THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF THE BUILDING. THE CONTRACTOR SHALL PROVIDE ADEQUATE SHORING, BRACING AND GUYS IN ACCORDANCE w/ ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. ANY DEVIATION MUST BE APPROVED PRIOR TO ERECTION. 3. ALL ERECTION PROCEDURES SHALL CONFORM TO OSHA STANDARDS. ANY DEVIATION MUST BE APPROVED BY OSHA PRIOR TO ERECTION. 4. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION PROCEDURES. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES AND SHALL CHECK ALL DIMENSIONS. ALL DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER AND BE RESOLVED BEFORE PROCEEDING WITH THE WORK. 6. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED SUBJECT TO REVIEW BY THE ENGINEER. 7. ALL DETAILS DESIGNATED AS STANDARD OR TYPICAL SHALL OCCUR IN ADDITION TO ANY OTHER SPECIFIC DETAIL CALLED OUT. 8. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE BEST PRESENT KNOWLEDGE BUT WITHOUT GUARANTEE OR ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY. SHALL BE REPORTED TO THE ENGINEER SO THAT THE PROPER REVISIONS MAY BE MADE, MODIFICATIONS TO DETAIL'S OF CONSTRUCTION SHALL NOT BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER. 9. FOR CONCRETE FOOTINGS: FOOTING DEPTH TO BE MIN. 12" TO PREVIOUSLY UNDISTURBED SOIL OR UNDISTURBED FILL. ALL EXTERIOR WALLS TO BE SUPPORTED ON CONTINUOUS FOOTINGS. PIPE PENETRATIONS TO BE SLEEVED. REBAR SHALL BE ASTM A615 GRADE 60 (F = 60 KSI) CONCRETE SHALL BE 2500 PSI (f'c = 2500 PSI) FRAMING NOTES: 1. FRAMING LUMBER SHALL BE HEM -FIR NO. 2; AND HEM -FIR NO. 2 FOR ALL TOP AND BOTTOM PLATES (GRADES ARE TYPICAL UNLESS OTHERWISE NOTED ON PLANS). LUMBER TO BE GRADE MARKED PER WCUB SPECIFICATIONS. 2. STRUCTURAL SHEATHING SHALL BE APA RATED PLYWOOD, EXPOSURE 1, SHEATHING CONFORMING TO EITHER COMMERCIAL STANDARDS P51 -83, APA PRP -108, OR VOLUNTARY PRODUCT STANDARD PSE -92. PROVIDE MINIMUM OF 3/8" EDGE DISTANCE ON ALL NAILS AND 1/8" EXPANSION JOINTS BETWEEN ALL PANEL EDGES. MINIMUM SHEATHING REQUIREMENTS ARE AS FOLLOWS: ROOF SHEATHING TO BE 15/32" C -D INT -APA RATED PLYWOOD WITH EXTERIOR GLUE, P.I. 24/0 (USE 5 -PLY FOR PANELIZED ROOFS). NAILING 10d ® 6 INCHES ON CENTER AT PANEL EDGES AND 12 INCHES ON CENTER AT INTERMEDIATE SUPPORTS. SUB FLOORING TO BE 3/4" T &G C -D INT -APA RATED PLYWOOD WITH EXTERIOR GLUE , P.I. 48/24. GLUE AND NAIL WITH 10d AT 6 INCHES ON CENTER AT PANEL EDGES AND 12 INCHES ON CENTER AT INTERMEDIATE SUPPORTS. 3. NAILING SHALL CONFORM TO TABLE 2304.9.1 OF THE INTERNATIONAL BUILDING CODE UNLESS NOTED OTHERWISE. USE COMMON NAILS THROUGHOUT UNLESS NOTED OTHERWISE. 4. NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED UNLESS SPECIFICALLY DETAILED OR APPROVED IN WRITING BY THE STRUCTURAL ENGINEER. 5. PROVIDE 3 "x3 "x1/4" (USE GALVANIZED ® P.T. MEMBERS) PLATE WASHERS UNDER HEADS AND NUTS OF ALL BOLTS AND LAG SCREWS BEARING ON WOOD UNLESS NOTED OTHERWISE. ALL FASTENERS IN CONTACT WITH PRESSURE TREATED TO BE HOT DIPPED GALVANIZED. 6. BOLT HOLES SHALL BE NOMINAL DIAMETER OF BOLT PLUS 1/16" UNLESS OTHERWISE NOTED. LAG BOLT PILOT HOLES SHALL BE PRE - DRILLED TO 60% OF THE NOMINAL DIAMETER OF THE LAG BOLT UNLESS OTHERWISE NOTED. 7. ALL SILL PLATES SHALL BE BOLTED TO THE FOUNDATION WITH 5/8" MIN 0 STEEL BOLTS SPACED AT 48" o.c. MAX. (EMBED 7" MIN. INTO CONCRETE OR MASONRY). SEE PLANS AND DETAILS FOR SPECIFIC REQUIREMENTS WHERE OCCUR. 8. ALL FRAMING LUMBER IN CONTACT WITH MASONRY OR CONCRETE SHALL BE PRESSURE TREATED. (SEE NOTE 1 FOR MINIMUM GRADE INFORMATION) 9. OSB OF EQUAL OR GREATER THICKNESS MAY BE SUBSTITUTED FOR PLYWOOD USED IN SHEAR PANELS AND ROOF SHEATHING. 10. STUD NOTCHING: BEARING - 25% NOTCH, 40% BORING (607. BORING ® DBL.) NON BEARING - 40% NOTCH, 60% BORING HOLES NO CLOSER THAN 5/8" TO FACE OF STUD SHEARWALL SCHEDULE MARK MINIMUM SHEATHING EDGE NAILING " FIELD NAILING SOLE PLATE NAILING SILL PLATE CONN. @ FND. 1. ALL STUDS AND BLOCKING SHALL BE HF #2 ALL TOP AND BOTTOM 3/8" CDX ONE FACE Sd 0 6 "o.c. d 0 12 "o.c. (2)16d 16 0 % 5/8 "dia. 0 48" O.C. w/ 2x BTM. PLATE ® 3/8" CDX ONE FACE 8d ® 4 "o.c. d 0 12 "o.c. (2)16d ®12 » 0% 5/8 "dia. 0 36" o.c. w/ 2x BTM. PLATE ® 3/8" CDX ONE FACE 8d ® 3 "o.c. d ® 12 "o.c. (2)16d 0 8 "o% 5/8 "dia. ® 30" ;.c. w/ 3x BTM. PLATE ZL 15/32" CDX ONE FACE » 1 O ®4 o.c. » IOd ® 12 o.c. » ' (2)16d ®6 o/c 5/8 "dia. ® 18" o.c. w/ 3x BTM. PLATE ® 15/32" CDX ONE FACE 10d ® 3 "o.c.10d ® 12 "o.c. (2 )16d 6 "o /c 5/8 "dia. ® 18" o.c. w/ 3x BTM. PLATE u,-- -Q E1'-Q H 15/32" CDX ONE FACE 1 O ® 2 "o.c.1Od ® 12 "o.c. (2)16d ® 3 "o /c 5/8 "dia. ® 36" o.c. w/ 3x BTM. PLATE SIMPSON HDU HOLD I SOLE PLATE SUBFLOE RIM JOI, BLOCKING NOT SHOWN FOR CLARITY SIMPSON CNW COUPLER PT SILL PLA STEMW SIMPS ❑N SSTB AIN HDU HOLD DOWN INSTALLATION _ _ - - _ _ -fl (T Tf -1 TT _ -n--5 5 ^ [ F -1 I II II II II ! 1 II I I ii II it II I I Il I II it II _II_ II 11 II_ I I fl I1 it II II J II II { II li {1 I! II II II 1 II Ii Ii _II_ II II ii I I'I li IF=- TF--�i IF= -_TF -_ =9 I II II II !I II II II ! 11 II II !I II 11 II I I II II E 11 II II II I I SHEARWALL NOTES, HOLDOWN SCHEDULE MODEL ANCHOR BOLT THRU BOLTS OR NAILS EMBEDMENT LENGTH MIN. EDGE DISTANCE STHD8 1. ALL STUDS AND BLOCKING SHALL BE HF #2 ALL TOP AND BOTTOM (24) 16d 8' 11-4- IL STHDBRJ STRAP ,L 8' PLATES SHALL BE HF #2. ALL SHEATHING EDGES SHALL BE BACKED STHD10 -�L - 10' 1 1/2' STHD10RJ S RAP WITH 2x OR WIDER FRAMING UNLESS OTHERWISE' NOTED (SEE NOTE #2), 10' t It 1 I i STHD14 SHEATHING MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY, (38) 16d 11 1 1/2' STHD14RJ STRAP tl ti 14' 2. WHERE SHEATHING NAILING IS A ® OR GREATER, FOUNDATION SILL PLATES AND ALL FRAMING MEMBERS RECEIVING EDGE NAILING FROM A$UTTING PANELS HDU2 u,-- -Q E1'-Q H I<6> SDS SCREWS SHALL NOT BE LESS THAN A SINGLE 3 -INCH NOMINAL MEMBER AND SILL PLATES 1 3/4' 4 5/8' DIA NOT BE LESS THAN A SINGLE 3 -INCH NOMINAL MEMBER, ill 1 3/4' HDU5 3. NAILING CRITERIA IS BASED ON IBC 2306.3 AND AF &PA SPDWS TABLE 4.3A FOR (14) SDS SCREW 16' CD PLYWOOD AND HF #2 FRAMING, WIRE STAPLES MAY BE SUBSTITUTED AS HDU8 7/$' DIA OUTLINED IN THE STRUCTURAL NOTES, OTHER SUBSTITUTIONS MUST BE VERIFIED 16' IN WRITING BY THE STRL. ENGINEER. ®DOUBLE TOP PLATE w/ EDGE NAILING (STAGGER ATOP SPLICE AND NAILING PER PLANS. i' DIA .PLATE SEE SHEARWALL SCHEDULE FOR LUMBER GRADE. LAP 4' -0" MINIMUM. CENTER SPLICE ON STUD. 4. HOLDOWNS AND OTHER CONNECTIONS MAY BE REQUIRED AT THE ENDS OF MANY SHEARWALLS. SIZES AND LOCATIONS OF THESE CONNECTORS ARE INDICATED ON B EDGE NAILING AT ALL PANEL EDGES. BACK w/ G HOEDOWN PER SCHEDULE AND PLAN O O THE PLANS, REFER TO THE APPROPRIATE CONNECT13R DETAILS FOR ADDITIONAL 2x BLOCKING OR BACKING (E)COORDINATE ALL STUD AND PLATE SIZES INFORMATION REGARDING ANCHOR BOLTS, EMBEDMENT LENGTH, ETC. @EDGE NAILING TO HOEDOWN POST (FULL HEIGHT) w/ SHEARWALL SCHEDULE REQUIREMENTS 5 ANCHOR BOLTS MUST BE EMBEDDED INTO CONCRETE OR GROUTER CMU A MINIMUM ® STUDS 0 16" o.c. QEDGE NAILING TO POSTS. TRIM STUDS OF 7 ', AND SHALL BE PLACED TO PR ❑VIDE A MINIMUM OF 2' GROUTED CLEAR @ P T. SILL PLATE w/ EDGE NAILING & ANCHOR AND KING STUDS TO THE FACE OF FORMED CONCRETE (PROVIDED 3' CLEAR FOR CONCRETE CAST BOLTS PER SHEARWALL SCHEDULE (PROVIDE AGAINST S ❑IL). A MINIMUM OF 5/8 "dia. ANCHOR BOLTS ® QK BEARING STUD FOR HEADER (18) SDS1 /4x3 48" o.c., ,EMBEDDED 7" MIN.) 6 EDGE OF ANCHOR BOLT WASHER SHALL BE WITHIN 1/2' OF SHEAR WALL SHEATHING PHD8 -SDS3 7/8' DIA STND SHEARWALL ELEVATION 16' MST37 STRAP (42) 16d In DBL. STUD 30' MIN. L STHD CONNECTIONS EBAR IN SHEAR 12' MIN. REBAR LENGTH NOTES, 1. (6) 16d, TYP. 2. (4) 16d, TYP. 3. FULL HEIGHT STUD 4. CONTINUOUS DOUBLE TOP PLATE 5. HEADER AS PER PLAN, SAME WIDTH AS WALL 6. (2) CRIPPLE STUDS 11 BUILT -UP POST PARALLEL TO WALL NOT TO SCALE SIMPSON ST36 STRAP TIE ACROSS TOP PL OR BEND VERT TO POST BEAD (--DOUBLE TOP PLATE (2) 16d BEAM X MFD BY Z❑NE FOUR - USE 1/4x3x3 PLATE WITH DOUBLE NUT AT BOTTOM OF ;ANCHOR BOLT, H❑LDOWN N ❑TESj L ALL THREAD BOLTS SHALL CONFORM TO ASTM A307. 2. MIN. CONCRETE COMPRESSIVE STRENGTH f'c= 2,500 psi. 3. HD14A, HD20A & HD15 REQUIRE A 6x MIN. POST SIZE, U.N.O. 4. MINIMUM EDGE DISTANCE SHOWN IS FOR FORMED CONCRETE EXPOSED TO SOIL OR WEATHER, FOR CONCRETE CAST AGAINST SOIL PROVIDE 3,' CLEAR TO ANCHOR BOLT. 5. NAILS TO HOLD13WN POSTS SHALL BE 10d COMMON. (16d SINKERS MAY BE USED WITH PRIOR WRITTEN APPROVAL BY THE STRUCTURAL ENGINEER), SIMPSON ST STRAP TIE SIMPSON LTP5 EA FACE DOUBLE TOP PLATE BEAM � 7- DOUBLE TOP PLATE (2) 16d IMPSON A35 CLIP I SIMPSON ST STRAP TIE ' DOUBLE 2 X STUDS, MINIMUM DOUBLE 2 X STUDS, MINIMUM DOUBLE STUD CA BEAM PERPENDICULAR B BEAM PARALLEL C BEAM ON TOP PLATE BEAM TO FRAMING !91 WOOD HEADER NOTESi 1. WOOD STUD WALL 2. WOOD HEADER PER PLAN 3. (2) 16d TOENAILS EACH SIDE, EACH END 4. (2) 16d AS SHOWN 5. RUN VERTICAL STUDS UP PAST HEADER AS SHOWN - USE DOUBLE KING STUDS FOR OPENINGS GREATER THAN 5' -0' 6. (2) 16d @ 12' O.C. 7. 16d @ 12' O,C. STAGGERED BOTH SIDES 8. DOUBLE STUDS UNDER HEADER BEARINGS FOR OPENING WIDTHS GREATER THAN 5' -0' FLOOR TO FLOOR STRAP CONNECTION ROOF TRUSS PER PLAN DIAPH. EDGE NAILING 2x CONT. BLOCKING w/ RBC ® 24" o.c. FOR SLOPED BLOCKING. USE A35 0 24" o.c. FOR FLAT BLOCKING. EDGE NAILING NOTE VENTILATION MAY BE REQUIRED AT BLOCKING VERIFY METHOD w/ ENGINEER PRIOR TO CONSTRUCTION. TRUSS /SHEARWALL CONN NOTES, L DOUBLE EDGE NAILING 2. FLOOR SHEATHING 3. JOIST PER PLAN 4. JOIST HANGER PER PLAN 5. WOOD BEAM PER PLAN JOIST AT FLUSH WOOD BEAM NOT Td SCALE NOTES: 1. TOP PLATE SPLICE OVER STUD ONLY. 2. DOUBLE TOP PLATE 3. WOOD STUDS TYPICAL SPLICE OF TOP PLATE NOTES, 1. 16 d @ 6' O.C, 2. EDGE NAILING 3. 2x BLOCKING 4. FLOOR SHEATHING 5. JOISTS PER PLAN 6. SHEARWALL BELOW - SHEATH AND NAIL PER SHEARWALL SCHEDULE JOIST AT WOOD STUD WALL NOT TCI � " / T❑ SCALE �-•� SCA �../ SCALE GABLE (1) HOLDOWN SCHEDULE MODEL ANCHOR BOLT THRU BOLTS OR NAILS EMBEDMENT LENGTH MIN. EDGE DISTANCE STHD8 STRAP (24) 16d 8' 1 1/2' STHDBRJ STRAP 1 (24) 16d 8' 1 1/2' STHD10 STRAP (28) 16d 10' 1 1/2' STHD10RJ S RAP (28) 16d 10' 1 1/2' STHD14 STRAP (38) 16d 14' 1 1/2' STHD14RJ STRAP <38) 16d 14' 1 1/2' HDU2 5/8' DIA I<6> SDS SCREWS 11' 1 3/4' HDU4 5/8' DIA (10) SDS SCREWS ill 1 3/4' HDU5 5/8' DIA (14) SDS SCREW 16' 1 3/4' HDU8 7/$' DIA (20) SDS SCREW 16' 1 3/4' HD14A i' DIA (4) V DIA 21' 1 3/4' HD20A 1' DIA 1 (4) V DIA 21' 1 3/4' PHD5 -SDS3 5/8: DIA (14) SD 1/4x3 Ii' PHD6 -SDS3 7/8' DIA (18) SDS1 /4x3 14' PHD8 -SDS3 7/8' DIA (24) SDSi /4x3 16' MST37 STRAP (42) 16d In DBL. STUD CENTER or RIM JOIST MST48 STRAP (46) 16d In DBL. STUD CENTER or RIM JOIST MST60 13/41 STRAP <56) 16d CENTER o RIM JOIST T2 -84 -6 x A449 (8) 1/2' DIA 14' 3 X MFD BY Z❑NE FOUR - USE 1/4x3x3 PLATE WITH DOUBLE NUT AT BOTTOM OF ;ANCHOR BOLT, H❑LDOWN N ❑TESj L ALL THREAD BOLTS SHALL CONFORM TO ASTM A307. 2. MIN. CONCRETE COMPRESSIVE STRENGTH f'c= 2,500 psi. 3. HD14A, HD20A & HD15 REQUIRE A 6x MIN. POST SIZE, U.N.O. 4. MINIMUM EDGE DISTANCE SHOWN IS FOR FORMED CONCRETE EXPOSED TO SOIL OR WEATHER, FOR CONCRETE CAST AGAINST SOIL PROVIDE 3,' CLEAR TO ANCHOR BOLT. 5. NAILS TO HOLD13WN POSTS SHALL BE 10d COMMON. (16d SINKERS MAY BE USED WITH PRIOR WRITTEN APPROVAL BY THE STRUCTURAL ENGINEER), SIMPSON ST STRAP TIE SIMPSON LTP5 EA FACE DOUBLE TOP PLATE BEAM � 7- DOUBLE TOP PLATE (2) 16d IMPSON A35 CLIP I SIMPSON ST STRAP TIE ' DOUBLE 2 X STUDS, MINIMUM DOUBLE 2 X STUDS, MINIMUM DOUBLE STUD CA BEAM PERPENDICULAR B BEAM PARALLEL C BEAM ON TOP PLATE BEAM TO FRAMING !91 WOOD HEADER NOTESi 1. WOOD STUD WALL 2. WOOD HEADER PER PLAN 3. (2) 16d TOENAILS EACH SIDE, EACH END 4. (2) 16d AS SHOWN 5. RUN VERTICAL STUDS UP PAST HEADER AS SHOWN - USE DOUBLE KING STUDS FOR OPENINGS GREATER THAN 5' -0' 6. (2) 16d @ 12' O.C. 7. 16d @ 12' O,C. STAGGERED BOTH SIDES 8. DOUBLE STUDS UNDER HEADER BEARINGS FOR OPENING WIDTHS GREATER THAN 5' -0' FLOOR TO FLOOR STRAP CONNECTION ROOF TRUSS PER PLAN DIAPH. EDGE NAILING 2x CONT. BLOCKING w/ RBC ® 24" o.c. FOR SLOPED BLOCKING. USE A35 0 24" o.c. FOR FLAT BLOCKING. EDGE NAILING NOTE VENTILATION MAY BE REQUIRED AT BLOCKING VERIFY METHOD w/ ENGINEER PRIOR TO CONSTRUCTION. TRUSS /SHEARWALL CONN NOTES, L DOUBLE EDGE NAILING 2. FLOOR SHEATHING 3. JOIST PER PLAN 4. JOIST HANGER PER PLAN 5. WOOD BEAM PER PLAN JOIST AT FLUSH WOOD BEAM NOT Td SCALE NOTES: 1. TOP PLATE SPLICE OVER STUD ONLY. 2. DOUBLE TOP PLATE 3. WOOD STUDS TYPICAL SPLICE OF TOP PLATE NOTES, 1. 16 d @ 6' O.C, 2. EDGE NAILING 3. 2x BLOCKING 4. FLOOR SHEATHING 5. JOISTS PER PLAN 6. SHEARWALL BELOW - SHEATH AND NAIL PER SHEARWALL SCHEDULE JOIST AT WOOD STUD WALL NOT TCI � " / T❑ SCALE �-•� SCA �../ SCALE GABLE (1) (2) NOTES, EDGE NAILING 1. kn 2. CONTINUOUS FASCIA WITH (2) M 00 10d NAILS INTO EACH OUTRIGGER @ 24' Q.C. (3) 3. 2x4 OUTRIGGER @ 24' O.0 4. (2) 10d NAILS PER TRUSS (4) 5. SIMPSON A35 CLIP AT EACH (5) OUTRIGGER �. 6. GABLE END TRUSS - (6) SHEATHING AND NAILING PER SHEARWALL SCHEDULE (�� 7. 16d @ 6' U.C. BOTTOM (1) TRUSS CHORD TO 2x6 BLOCK �tdl 8. 2x4 BRACE @ 48' O.C. WITH o a SIMPSON A35 CLIP EACH END 9. 2x6 FULL LENGTH, w/ 16d @ 6'O.0 TO TOP PLATE TRUSS NOT TO SCALE , rcz 1. NOTES, 1. BASE PLATE NAILING PER SHEARWALL SCHEDULE 2. FLOOR SHEATHING 3. FLOOR JOISTS PER PLAN 4. 2x CONTINUOUS RIM WITH (2> 10d PER J ❑IST 5. SHEATHING AND NAILING PER SHEARWALL SCHEDULE 6.16d @6. O.C. 7. SHEAR PANEL EDGE NAILING R TO FLOOR WALL CONNECTION NOT TO SCALE Q tA A z z A A W tAr.� a A A U �¢ O OZH rn A 5 G>44 A zz O L- N � � o I� V � ' j o d- kn u M 00 3 �. 0 cq cl 0 �tdl o a N � � o I� V � u M 00 3 �. 0 cq 0 O o a v M � � vQi M p°q � a � � O W I� M J SCALE: AS SHOWN DATE: May 2017 DRAWING NUMBER 9871 -17 SHEET S3