Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
20170205 Permit Pkg 06122017
City of Yelm Community Development Department Building Division Phone: (360) 458 -8407 Fax: (360) 458 -3144 Applicant: Name: SOUNDBUILT NW LLC Address: PO BOX 73790 PUYALLUP WA 98373 Property Information: Site Address: 1AAn,% RUTH AVF CF Assessor Parcel No.: 78640118000 Contractor Information: Name: SOUNDBUILT NW LLC Address: PO BOX 73790 PUYALLUP WA 98373 Contractor License No.: SOUNDHL831CL Permit No.: 20170205 Issue Date: 6/12/2017 (Work must be completed within 180 days) Phone: 253 - 848 -0820 Owner: SOUNDBUILT NW LLC Subdivision: TAHOMA TERRA Lot: 180 Phone: Expires: 2/13/2019 Project Information: Project: NEW RESIDENTIAL BUILDING Description of Work: LOT 180, PLAN 2385A Sq. Ft. per floor: First 1063 Heat Type (Electric, Gas, Other): GAS Second 1322 Third Garage 391 Basement Fees: Item NEW RESIDENTIAL BUILDING MECHANICAL PLUMBING Contractor Fees SOUNDBUILT NW LLC $22,846.30 SOUND HEATING & AC $ 84.75 RAINIER VIEW ROOTER $ 125.00 TOTAL FEES: $ 23,056.05 Applicant's Affidavit: I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easements and restrictions of record. If applying as a contractor, I further certify that I am currently registered in the State of Washiplon. Signaturq zL ii Date ✓^ Firm C�x (Yl �/it 1 OFFICIAL USE ONLY # Sets of Prints: Final Inspection: Date: By: Of lei, (36N 458 -3244 RECt: 00271765 6/12/2017 4 - :26 PM OPEP: AS TERM: 001 REFt: 10030 PAIL BY: TRAN: 33.0000 BUILDING PERMITS 20170203 23,171.9-CR SOUNDBUILT NW LLC 14526 98TH WAY SE BLD -RES1 22,975.6(CR MECH 78.Z CR PL 118.0(CR TRAN: 33.0000 BUILDING PERMITS 210170204 22,682.1'CR SOUNDBUILT NW LLC 9867 JENSEN RD SE BLD -RES1 22,485.8(CR MECH 78.2`.CR F'L 118.0(CR TRAN: 33.0000 BUILDING PIRMI13 20170205 23,056.0`.CR SOUNDBUILT NW LLC 14403 99TH AVE SE EiLD -RES1 22,846.3(CR MECH 84.7`.CR PL 125.0(CR TRAN: 33.0000 BUILDING PERMIT'S 20170214 22,372.1'CR SOUNDBUILT NW LLC 15435 92ND AVE SE BLD -RES1 22,175.8(CR MECH 78.2`.CR F'L 118.0(CR TRAM: 33.0000 BUILDING PERMITS 20170216 22 , 364.1(CR SOUNDBUILT NW LLC 15411 92ND AVE SE 8LD -RES1 22,167.9'CR MECH 78.2' CR PL 118.0(CR TENDERED: 113,646.34 (HECK PPPLIED: 113,646.34- CHANGE: 0.00 CITY OF YELM RESIDENTIAL BUILDING PERMIT APPLICATION FORM Project Address: 14403 99th Ave SE Subdivision: TahomaTerra Parcel #: 7864011800 Lot #:180 Plan #:2385 -A Zoning: 0 New Construction ❑ Re -Model / Re -Roof / Addition a Home Occupation Sign LEI Plumbing 0 Mechanical a Mobile / Manufactured Home Placement a Other Project Description /Scope of Work: Construct new SFR using base plan 2385 -A elevation Project Value: Building Area (sq. ft) 1 st Floor 1063 2nd Floor 1322 3rd Floor Garage -2 car 391 3 car. Covered Patio 109 Covered Porch 77 Patio Deck # Bedrooms 4 # Bathrooms 2_5 Heating GAS /OTHER r ELECTRIC (Circle One) Are there any environmentally sensitive areas located on the parcel? No If yes, a completed environmental checklist must accompany permit application. BUILDING OWNER NAME: SoundbuiltHomes ADDRESS PO Box 73790 EMAIL meganp @soundbuilthomes.com CITY Puyallup STATE wA ZIP 98373 TELEPHONE 253 -848 -0820 ARCHITECT/ENGI NEER Landmark Design/Sega Engineers LICENSE # ENG -#26606 (Greg Thesencitz) ADDRESS 1202 Main St #104 EMAIL kevin @landmarkdesign.com CITY Sumner STATE wA ZIP 98390 TELEPHONE 253 - 826 -7808 GENERAL CONTRACTOR Soundbuilt Homes TELEPHONE 253 -848 -0820 ADDRESS PO Box 73790 EMAIL meganp @soundbuiRhomes.com CITY Puyallup STATE wA ZIP 98373 FAX n/a CONTRACTOR'S LICENSE # SOUNDHL831CL EXP DATE 2119 CITY LICENSE # PLUMBING CONTRACTOR Rainier view Rooter LLC TELEPHONE 253-435-1996 ADDRESS PO Box 73070 —EMAIL CITY Puyallup STATE wA ZIP 98373 FAX CONTRACTOR'S LICENSE # PAINIVR942DF EXP DATE 3/18 CITY LICENSE # MECHANICAL CONTRACTOR Sound Heating &AC TELEPHONE 253 - 875 -3350 ADDRESS 5526 184th St E #A —EMAIL CITY Puyallup STATE wA ZIP 98375 FAX CONTRACTOR'S LICENSE # SOUNDHC867DE EXP DATE 3/18 CITY LICENSE # Copy of mitigation agreement with Yelm Community Schools, if applicable. I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above described property will be in accordance with the laws, rules and regulations of the State of Washington and the City of Yelm. Megan Parsons Ogtlally sign by Megan Parsons Dale: 2017.05.1010:20:14 -0PO V 5/10/2017 Applicant's Signature Date Owner / Contractor / Owner's Agent / Contractor's Agent (Please circle one.) All permits are non - transferable and will expire if work authorized by such permit is not begun within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days 105 Yelm Avenue West (360) 458 -3835 Yelm, WA 98597 (360) 458 -3144 FAX www.ci.yelm.wa.us a w 690 I� 3S aS °IJ I I M M APPROVED by City of Yelm John Rowland 05/31/2017 3:42:16 PM I I I ---- T--- - - - - -- ST CIO (TYP) D . 27' -04" 10' 39' -6" N01 "40'08 "E 100.01' TAHOMA TERRA LOT 180 23' -54" ' STORM — o i■■�in�■■= ■.■. =■■■io ■��■ ■■.■.■■■■.■■■■■■■■.■■■■.■ ...........................�'�? ■■■■■� 23'$4" STEP TANK r ■ , 5' BSBL / I O D . 18' -114" I I I I IMPERVIOUS AREA ROOF =1,882 S.F. DRIVEWAY & SIDEWALK =371 S.F. TOTAL= 2,253 S.F. LOT S.F.= 4,000 5' rurc� - : 2' MIN SETBACK BETWEEN CURTAIN DRAIN is SIDEWALKS, DRIVEWAYS, WITH PERFORATED : EASEMENTS & STEP TANKS ■ W /5' MIN FROM PROPERTY SS CIO PIPE (TYP) -.4 LINES, HOUSE & PORCH FOUNDATIONS & 2' MIN FROM UTILITY EASEMENTS. ■ ■ co LOT 180 1=m 2385A -2 1 1 ■ ■ ■ 57' ■ 1 SILT FENCE 5' BSBL 24' ■ ■ ....Emmons ...■.■.....................■ ... ■............. ■...........1C0 ■.r ■ SF SF SF S01 "40'08 "W 100.01' 52' APPROVED By Randy at 2:57 pm, May 12, 2017 SCALE: 1"=10' 0 5 10 20 I I I 81.1 M O 0 �o W 0 o� co 1. FRONT PORCH FOUNDATION AND STEP TANK LOCATION SHALL BE STAKED OUT FOR SET BACK INSPECTION. CONTACT INFO MEGAN: (253) 256 -8748 12' I I 2, CV I LO � � •Z 'o I ' ° :• I I o . O }�- W ,. ■ z o W ° N o • cQ �ZZ °O"' `. ■ II :a ' U '• d �• � ■ I o , 19, • c i-. ' ■ ■ _ —f7-`WATER 18' -114" I I I I IMPERVIOUS AREA ROOF =1,882 S.F. DRIVEWAY & SIDEWALK =371 S.F. TOTAL= 2,253 S.F. LOT S.F.= 4,000 5' rurc� - : 2' MIN SETBACK BETWEEN CURTAIN DRAIN is SIDEWALKS, DRIVEWAYS, WITH PERFORATED : EASEMENTS & STEP TANKS ■ W /5' MIN FROM PROPERTY SS CIO PIPE (TYP) -.4 LINES, HOUSE & PORCH FOUNDATIONS & 2' MIN FROM UTILITY EASEMENTS. ■ ■ co LOT 180 1=m 2385A -2 1 1 ■ ■ ■ 57' ■ 1 SILT FENCE 5' BSBL 24' ■ ■ ....Emmons ...■.■.....................■ ... ■............. ■...........1C0 ■.r ■ SF SF SF S01 "40'08 "W 100.01' 52' APPROVED By Randy at 2:57 pm, May 12, 2017 SCALE: 1"=10' 0 5 10 20 I I I 81.1 M O 0 �o W 0 o� co 1. FRONT PORCH FOUNDATION AND STEP TANK LOCATION SHALL BE STAKED OUT FOR SET BACK INSPECTION. CONTACT INFO MEGAN: (253) 256 -8748 �1 18' -114" I I I I IMPERVIOUS AREA ROOF =1,882 S.F. DRIVEWAY & SIDEWALK =371 S.F. TOTAL= 2,253 S.F. LOT S.F.= 4,000 5' rurc� - : 2' MIN SETBACK BETWEEN CURTAIN DRAIN is SIDEWALKS, DRIVEWAYS, WITH PERFORATED : EASEMENTS & STEP TANKS ■ W /5' MIN FROM PROPERTY SS CIO PIPE (TYP) -.4 LINES, HOUSE & PORCH FOUNDATIONS & 2' MIN FROM UTILITY EASEMENTS. ■ ■ co LOT 180 1=m 2385A -2 1 1 ■ ■ ■ 57' ■ 1 SILT FENCE 5' BSBL 24' ■ ■ ....Emmons ...■.■.....................■ ... ■............. ■...........1C0 ■.r ■ SF SF SF S01 "40'08 "W 100.01' 52' APPROVED By Randy at 2:57 pm, May 12, 2017 SCALE: 1"=10' 0 5 10 20 I I I 81.1 M O 0 �o W 0 o� co 1. FRONT PORCH FOUNDATION AND STEP TANK LOCATION SHALL BE STAKED OUT FOR SET BACK INSPECTION. CONTACT INFO MEGAN: (253) 256 -8748 Prescriptive Energy Code Compliance for All Climate Zones in Washington Project Information Contact Information L2 -2385 This project will use the requirements of the Prescriptive Path below and incorporate the the minimum values listed. In addition, based on the size of the structure, the appropriate number of additional credits are checked as chosen by the permit applicant. Authorized Representative All Climate Zones Efficient Building Envelope 1a R- Value a U- Factor a Fenestration U- Factor b n/a 0.30 Skylight U- Factor n/a 0.50 Glazed Fenestration SHGCb'e n/a n/a Ceilingk 49' 0.026 Wood Frame Wall9,"'," 21 int 0.056 Mass Wall R- Value' 21/21h 0.056 Floor 309 0.029 Below Grade Wall""' 10/15/21 int + TB 0.042 ISlab R -Value & Depth 10, 2 ft n/a *Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2. Date APPROVED by City of Yelm John Rowland 05/31/2017 4:40:24 PM Each dwelling unit in a residential building shall comply with sufficient options from Table R406.2 so as to achieve the following minimum number of credits: 1. Small Dwelling Unit: 1.5 credits ❑ Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration area. Additions to existing building that are greater than 500 square feet of heated floor area but less than 1500 square feet. ❑2. Medium Dwelling Unit: 3.5 credits All dwelling units that are not included in #1 or #3. Exception: Dwelling units serving R -2 occupancies shall require 2.5 credits. ❑3. Large Dwelling Unit: 4.5 credits Dwelling units exceeding 5000 square feet of conditioned floor area. 4. Additions less than 500 square feet: .5 credits Table R406.2 Summary Option Description Credit(s) 1a Efficient Building Envelope 1a 0.5 1 b Efficient Building Envelope lb 1.0 1c Efficient Building Envelope 1c 2.0 1d Efficient Building Envelope 1d 0.5 2a Air Leakage Control and Efficient Ventilation 2a 0.5 2b Air Leakage Control and Efficient Ventilation 2b 1.0 2c Air Leakage Control and Efficient Ventilation 2c 1.5 3a High Efficiency HVAC 3a 1.0 3b High Efficiency HVAC 3b 1.0 3c High Efficiency HVAC 3c 1.5 3d High Efficiency HVAC 3d 1.0 4 High Efficiency HVAC Distribution System 1.0 5a Efficient Water Heating 5a 0.5 5b Efficient Water Heating 5b 1.0 5c Efficient Water Heating 5c 1.5 5d Efficient Water Heating 5d 0.5 6 lRenewable Electric Energy 0.5 Total Credits *Please refer to Table R406.2 for complete option descriptions ❑ 0.5 ❑ 1.0 ❑ 0.5 ❑ 1.5 *1200 kwh 0.0 3.50 Table R402.1.1 Footnotes For SI: 1 foot .= 304.8 mm, ci .= continuous insulation, int .= intermediate framing. a R- values are minimums. U- factors and SHGC are maximums. When insulation is installed in a cavity which is less than the label or design thickness of the insulation, the compressed R -value of the insulation from Appendix Table A101.4 shall not be less than the R -value specified in the table. b The fenestration U- factor column excludes skylights. The SHGC column applies to all glazed fenestration. "10/15/21. +TB" means R -10 continuous insulation on the exterior of the wall, or R -15 on the continuous insulation on the interior of the wall, or R -21 cavity insulation plus a thermal break between the slab and the basement wall at the interior of the basement wall. "10/15/21. +TB" shall be permitted to be met with R -13 cavity insulation on the interior of the basement wall plus R -5 continuous insulation on the interior or exterior of the wall. "10/13" means R -10 continuous insulation on the interior or exterior of the home or R -13 cavity insulation at the interior of the basement wall. "TB" means thermal break between floor slab and basement wall. d R -10 continuous insulation is required under heated slab on grade floors. See R402.2.9.1. e There are no SHGC requirements in the Marine Zone. f Reserved. g Reserved. h Reserved. The second R -value applies when more than half the insulation is on the interior of the mass wall. 'Reserved. k For single rafter- or joist-vaulted ceilings, the insulation may be reduced to R -38. Reserved. M Int. (intermediate framing) denotes standard framing 16 inches on center with headers insulated with a minimum of R -10 insulation. Table R402.1.3 Footnote a Nonfenestration U- factors shall be obtained from measurement, calculation or an approved source or as specified in Section R402.1.3. Window, Skylight and Door Schedule Project Information L2 -2385 Exempt Swinging Door (24 sq. ft. max.) Exempt Glazed Fenestration (15 sq. ft. max.) Vertical Fenestration (Windows and doors) Component Description Ref. U- factor Ref. U- factor ENTRY DOOR 0.20 POWDER 0.28 GREAT ROOM 0.28 GREAT ROOM ©©©©E 0.28 DINING ROOM 0.28 DINING ROOM 0.28 DINING ROOM 0.28 KITCHEN 0.28 DEN MMEME 0.28 BEDROOM 4 0.28 BEDROOM 4 0.28 OPEN TO BELOW 0.28 OPEN TO BELOW 0.28 BEDROOM 3 MMEME 0.28 MASTER BEDROOM 0.28 MASTER BATH 0.28 BEDROOM 2 0.28 UTILITY ROOM 0.28 BATH MMEME 0.28 PLAYROOM 0.28 MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME Contact Information Width Height Qt. Feet Inch Feet Inch Width Height Qt. Feet Inch Feet Inch MMEME MMEME ©©©©E MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME MMEME Area UA Area UA Sum of Vertical Fenestration Area and UA Vertical Fenestration Area Weighted U = UA /Area Overhead Glazing (Skylights) Component Description Ref. U- factor Width Height Qt. Feet Inch Feet Inch Sum of Overhead Glazing Area and UA Overhead Glazing Area Weighted U = UA/Area Total Sum of Fenestration Area and UA (for heating system sizing calculations) 383.5 105.78 0.28 Area UA 383.5 105.78 Simple Heating System Size: Washington State This heating system sizing calculator is based on the Prescriptive Requirements of the 2015 Washington State Energy Code (WSEC) and ACCA Manuals J and S. This calculator will calculate heating loads only. ACCA procedures for sizing cooling systems should be used to determine cooling loads. The glazing (window) and door portion of this calculator assumes the installed glazing and door products have an area weighted average U- factor of 0.30. The incorporated insulation requirements are the minimum prescriptive amounts specified by the 2015 WSEC. Please fill out all of the green drop -downs and boxes that are applicable to your project. As you make selections in the drop -downs for each section, some values will be calculated for you. If you do not see the selection you need in the drop -down options, please call the WSU Energy Extension Program at (360) 956 -2042 for assistance. Project Information Contact Information L2 -2385 Heating Svstem Tvpe: O All other systems O Heat Pump To see detailed instructions for each section, place your cursor on the word 'Instructions ". Design Temperature Instructions Design Temperature Difference (AT) Lacey AT = Indoor (70 degrees) - Outdoor Design Temp Area of Building 17,591 Btu / Hour Sum of UA XAT Conditioned Floor Area Air Leakage Heat Load 11,604 Btu / Hour VolumeX 0.6XATX.018 Instructions Conditioned Floor Area (sq ft) 2,385 29,195 Btu / Hour Average Ceiling Height Conditioned Volume 32,114 Instructions Average Ceiling Height (ft) Ducts in unconditioned space: Sum of Building Heat Loss X 8.5 20,273 Ducts in conditioned space: Sum of Building Heat Loss X 1 Glazing and Doors U- Factor X Area = UA Instructions Building and Duct Heat Loss X 1.25 for Heat Pump 0.30 384 115.20 Skylights U- Factor X Area = UA 0.50 - -- Insulation Attic U- Factor X Area = UA Instructions �49 0.026 J 1,465 38.09 Single Rafter or Joist Vaulted Ceilings U- Factor X Area UA Instructions Select R -Value No selection j --- Above Grade Walls (see Figure 1) U- Factor X Area UA Instructions `R -21 Intermediate 1 0.056 2,535 141.96 Floors U- Factor X Area UA Instructions 0.025 1,466 36.65 11-38 � 1 Below Grade Walls (see Figure 1) U- Factor X Area UA Instructions L Select R -value No selection j - -- Slab Below Grade (see Figure 1) F- Factor X Length UA Instructions L Select conditioning No selection / - -- Slab on Grade (see Figure 1) F- Factor X Length UA Instructions L Select R -Value No selection - -- Location of Ducts Instructions Duct Leakage Coefficient Unconditioned Space � 1.10 Sum of UA 331.90 Figure 1. Above Grade 53 Envelope Heat Load 17,591 Btu / Hour Sum of UA XAT Air Leakage Heat Load 11,604 Btu / Hour VolumeX 0.6XATX.018 Building Design Heat Load 29,195 Btu / Hour Air Leakage + Envelope Heat Loss Building and Duct Heat Load 32,114 Btu / Hour Ducts in unconditioned space: Sum of Building Heat Loss X 1.10 Ducts in conditioned space: Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 44,960 Btu / Hour Building and Duct Heat Loss X 1.40 for Forced Air Furnace Building and Duct Heat Loss X 1.25 for Heat Pump (07/01/13)