Loading...
20170313 ROW Permit Pkg 09112017City of Yelm Permit No. 6d1 V1170-3) X3 PUBLIC WORKS Asphalt cut- 3'x4' 901 Rhoton Rd NW Application to Perform Work on Yelm, WA 98597 Public Right of Way and /or Connect Phone: 360- 458 -8406 to Utilities FAX: 360 -458 -8417 Name: Sara Wattenberg on behalf of Puget Sound Energy /InfraSource APPLICATION The undersigned hereby makes application to: Work in ROW to cut & cap existing 1/2" main. Asphalt cut- 3'x4' t l 1 Location of work: 202 Solberg St. S.W. I agree to perform the work in strict compliance with Yelm Municipal Code, Chapter , the special conditions enumerated herein and the attached conditions I have read and will adhere to the general provisions applicable to permits contained on this form. The Public Works Department (360- 458 -8406) must be contacted for inspection 24 hours before work commences or this permit will be void. The Underground Utilities Coordinating Council (1- 800 - 424 -5555) must be contacted two (2) working days before proceeding with any excavation associated with this permit. Name: Sara Wattenberg on behalf of Puget Sound Energy /InfraSource Address: 2711 Pacific Ave. S.E., Olympia, WA 98501 Phone: (253) 306 -2255 Proposed starting date of installation: ZS Duration: 5 Days Date: ` -,74 1� Signature: PERMIT REQUIREMENTS ' For Official Use Only Fee $ Issued Fee Received $ a Application Approval Signature: Receipt Number 0og To Be Completed By ity Permission is hereby granted to perform the above described work subject to the general provisions contained on this form, and the followingspecial conditions: A bond in the amount of ,lJ is required to insure compliance with the above conditions, refundable upon satisfactory completion of work. No work shall be done under this permit until the party or parties to whom it is granted shall have communicated with and received instructions from: Remarks: First Inspection Date: Inspector Final Project Com letion Approval: Date: Revised 03/09/2011 Applicant: City of Yelm Community Development Department Building Division Phone: (360) 458 -8407 Fax: (360) 458 -3144 Permit No.: 20170313 Issue Date: 9/11/2017 (Work must be completed within 180 days) Name: PUGET SOUND ENERGY OLYMPIA Phone: 253 - 306 -2255 Address: 2711 PACIFIC AVE SE OLYMPIA WA 98506 Property Information: Site Address: 202 SOLBERG ST SW Owner: Assessor Parcel No.: 75300500100 Subdivision: Lot: Contractor Information: Name: PUGET SOUND ENERGY OLYMPIA Phone: Address: 2711 PACIFIC AVE SE OLYMPIA WA 98506 Contractor License No.: Expires: 0 /00 /0000 Project Information: Project: UTILITY Description of Work: WORK ON ROW TO CUT AND CAP EXISTING 1/2 INCH MAIN. ASPHAL CUT 3 FT BY 4 FT Sq. Ft. per floor: Heat Type (Electric, Gas, Other): First Second Third Garage Basement Fees: Item RIGHT OF WAY Contractor PUGET SOUND ENERGY OLYMPIA TOTAL FEES: Applicant's Affidavit: certify that I have read and examined the information contained within the application and know the same to be truJ?anA no orrect. I also certify that the proposed structure is in conformity with all applicable City of Yelm reg s- inctuding those governing zoning and land subdivision, and in addition, all covenants, Basemen restrictions of record. If applying as a contractor, I further certify that I am currently reqistere e State of.Washington. n • , , '•iS � � it li,�._._� Fees $ 125.00 $ 125.00 OFFICIAL USE ONLY # Sets of Prints: Final Inspection: Date: By: p^ °� U°1 N �[ U (3§D| yM�) 458-3244 RECA: 00280923 9/11/2017 12:34 PM OPAP: CO TERM: 007 REFA: 851459 PAID BY: TRAN: 33.0000 BUILDING PLRMI13 20170313 125.UKCR PUG[T SOUND ENERGY (LYNFIA 202 GOLBERG ST 3N ROW 175.O(CA TENDERED: 175.00 (HECK APPLIED: 125.00- CHANGE: O.O� A CHANNELIZATION DEVICE SPACING MPH TAPER TANGENT 55/70 40 80 35/45 30 60 25/30 20 40 PUGET ' SOUND ENERGY Job# 108599739 202 Solberg St SW, Yelm, WA August 24th, 2017 Sheet 1 of 1 everett.walker -paul @pse.com (253) 625 -0964 Puget Sound Energy Traffic Control Supervisor. Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424 -6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Yelm standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. 8. Work area will be 18'S of C/L of Washington Ave SW & 68' E of C/L of Solberg St SW. Puget Sound Energy Gas Pre - Inspect Form Job #: 108599739 Date: 8115/17 Address: Jurisdiction: YELM City /Zip: ROW Permit: Yes Customer: Est. Start Date: 9/25/17 PM / Inspector Est. Duration: 112 Day 202 SOLBERT ST SW YELM, 98597 STEVEN HOWARD (253) 377 -2576 LUTHER RIMORIN (253) 278 -1118 Job Description / Scope of Work CUT & CAP EXISTING 1/2" STW @ MAIN. NO FUTURE RECONNECT HERE. 1" STW IP GAS MAIN, New Construction: No 18'S, WHICH PUTS IT UNDER HARD SURFACE (ASPHALT). 1 CUT TO GET TO MAIN. PM /LUTHER Construction Method RIMORIN 253 - 278 -1118 PLAT Map: 283.043 t ~` 1 1 /2' STW -U 1969 203 2DO MIRE lJ 2� ,I 106 C-D'� 202 f ;! 1 /2'STW 5/8" MPE 2005-E 409 1967 ,tip 416 413 ! � 1997MPE l r! A 1 A Work Location Size of Cut Surface Type 200' West I of CL IOFSOLBERGST & I of CL JONYELMAVE 3 "X4" ASPHALT of CL I & of CL of CL I & I of CL Service Information Street Information Job Type Diameter: 0 Flaggers #: Arterial: No EFV: 0 Police #: TCP: Yes PUGET ENERGY Meter: Speed Limit: No Parks #: Meter Loc: Trolley Lines: Mtr Hoods #: Del Press: Traffic Signal: Bus Stop: Bollards: 2.5" # 4" # ADA Ramps #: Route #'s: