Loading...
20170191 PW Cmt 09192017Karen Bennett From: Tami Merriman Sent: Tuesday, September 19, 2017 9:55 AM To: Karen Bennett Subject: FW: Jeff Mahan Retail Conversion - 130th Lane SE - Public Works review comments Importance: High For LF Tami Merriman, Associate Planner Community and Economic Development 105 Yelm Ave. W Yelm, WA 98597 360.458.8496 tamim(o-)yelmwa.gov From: Chad Bedlington Sent: Thursday, June 15, 2017 5:14 PM To: Tami Merriman Subject: Jeff Mahan Retail Conversion - 130th Lane SE - Public Works review comments Importance: High Tami, See me comments below regarding the project and for you to forward on to the project proponent. Stormwater • Please provide the WWHM analysis results that support the 100 -yr flow being below 0.15 cfs. Wastewater • Is there any proposed action(s) being taken to decommission the existing cesspool? I see the tank is proposed for abandonment and sand fill. Provide an action plan for the decommissioning of the existing septic /cesspool system. Streets Driveway approaches • The southerly property that calls -out for removal of the curb cut is acceptable. Any curb and /or sidewalk replacement needs to be constructed to meet the minimum ADA passage requirements. • The existing 45 -ft driveway located directly in front of the shop for conversion does not meet ADA passage requirements. The driveway slope is to great and the apron transitions are not long enough and cause an uneven transition point or barrier per ADA requirements at each end. • Construct a new 36 -ft wide driveway for access and repair /restore curb /gutter /sidewalk as needed. • Maintain existing centerpoint of driveway access to align with driveway access on the opposite side of Vancil Rd SE. Regards, Chad A. Bedlington, Public Works Director City of Yelm 1901 Rhoton Road SE I Yelm, WA 98597 (360) 458 -8412, office 1 (360) 999 -0496, cell I chadb @ci.yelm.wa.us