Loading...
20170370 Traffic Impact AnalysisTraffic Impact Analysis f SCJ ALLIANCE CONSULTING SERVICES Traffic Impact Analysis Proiect Information Project: Yelm High School Bypass Road Prepared for: Yelm Community Schools JW Morrisette 1700 Cooper Point Road SW Olympia, WA 98502 Reviewing Agency Jurisdiction: City of Yelm Project Representative Prepared by: SCJ Alliance 8730 Tallon Lane NE, Suite 200 Lacey, WA 98516 360.352.1465 scjalliance.com Contact: George Smith, Senior Transportation Planner Project Reference: SCJ #2396.01 Ph 20 Path: N: \Projects \2396 JW Morrissette & Associates Inc., P.S \2396.01 Yelm HS Bypass Road Traffic Analysis \Phase 20 - Bypass Road Traffic Impact Analysis \2017 -1006 Yelm HS bypass road TIA.docx SCJ Alliance October 2017 Yelm HS Bypass Road CERTIFICATION Traffic Impact Analysis The technical material and data contained in this document were prepared under the supervision and direction of the undersigned, whose seal, as a professional engineer licensed to practice as such, is affixed below. WAg O It GA :7, 1 h b � � 7� � W ► S 8ISO ♦ GISTE ► IONAL t104 s►.W+10 Prdpay'ed by Geor&- Smith, Senior Transportation Planner Prepared by Ryan Shea, Professional Transportation Planner Approved by Eric Wnston, PE, Principal SQ Alliance October 2017 Yelm HS Bypass Road Traffic Impact Analysis TABLE OF CONTENTS 1. INTRODUCTION .............................................................................. ..............................1 1.1 Project Overview .................................................................................... ............................... 1 1.2 Study Context ......................................................................................... ............................... 1 2. PROJECT DESCRIPTION ................................................................... ..............................2 3. BACKGROUND INFORMATION ........................................................ ..............................4 3.1 Existing Roadways .................................................................................. ............................... 4 3.2 Traffic Volume Data ................................................................................. ..............................4 3.3 School Traffic .......................................................................................... ............................... 5 3.4 Public Transportation ............................................................................. ............................... 9 3.5 Roadway Collision Analysis ..................................................................... ............................... 9 4. PROJECT TRAFFIC CHARACTERSITICS ............................................. .............................10 4.1 Project Traffic Volumes ........................................................................ ............................... 10 4.2 Pedestrian and Bicycle Volumes ........................................................... ............................... 10 5. FUTURE TRAFFIC CONDTIONS ........................................................ .............................15 5.1 Roadway Improvements ...................................................................... ............................... 15 6. SIGHT DISTANCE AND WARRANT ANALYSIS .................................. .............................19 6.1 Sight Distance Analysis ......................................................................... ............................... 19 6.2 Intersection Control Warrant Analysis ................................................. ............................... 21 6.3 Turn Lane Warrant Analysis ................................................................. ............................... 22 7. TRAFFIC OPERATIONS ANALYSIS .................................................... .............................22 7.1 Level of Service Criteria ........................................................................ ............................... 23 7.2 Vehicle queuing .................................................................................... ............................... 25 7.3 Operational Analysis Summary ............................................................ ............................... 23 7.4 Yelm High School Bypass Road Intersection Summary ........................ ............................... 25 8. CONCLUSIONS ............................................................................... .............................27 LIST OF TABLES Table 1. Yelm High School - Existing 2017 Passenger Vehicle Traffic Volumes ........ ............................... 5 Table 2. Collision Summary - 01/01/2012 through 12/31/ 2016 ............................... ............................... 9 Table 3. Level of Service Criteria ............................................................................. ............................... 23 Table 4. Level of Service (LOS) Summary -AM Peak Hour ...................................... ............................... 24 Table 5. Level of Service (LOS) Summary - PM Peak Hour of School ...................... ............................... 24 Table 6. Level of Service (LOS) Summary- PM Peak Hour of Street ....................... ............................... 25 Table 7. 95th Percentile Queue Summary -Terra Vista St /Tahoma Blvd ................ ............................... 25 SCJ Alliance October 2017 Page i Yelm HS Bypass Road TABLE OF CONTENTS LIST OF FIGURES Traffic Impact Analysis Figure 1. Site Vicinity and Project Site ...................................................................... ............................... 1 Figure2. Preliminary Site Plan .................................................................................. ............................... 3 Figure 3. Existing 2017 AM Peak Hour Traffic Volume ............................................. ............................... 6 Figure 4. Existing 2017 PM Peak Hour of School Traffic Volume .............................. ............................... 7 Figure 5. Existing 2017 PM Peak Hour of Street Traffic Volume ............................... ............................... 8 Figure 6. AM Peak Hour Rerouted High School Traffic ........................................... ............................... 12 Figure 7. PM Peak Hour of School Rerouted High School Traffic ............................ ............................... 13 Figure 8. PM Peak Hour of Street Rerouted High School Traffic ............................ ............................... 14 Figure 9. Projected 2019 AM Peak Hour Traffic Volumes With Bypass Road ......... ............................... 16 Figure 10. Projected 2019 PM Peak Hour of School Traffic Volumes With Bypass Road ...................... 17 Figure 11. Projected 2019 PM Peak Hour of Street Traffic Volumes With Bypass Road ....................... 18 Figure 12. Bypass Road Sight Distance .................................................................... ............................... 20 LIST OF APPENDICES Appendix A Traffic Volume Count Worksheets Appendix B Collision Data Appendix C Traffic Volume Calculations Appendix D Warrant Analysis Worksheets Appendix E Capacity Analysis Worksheets Appendix F Predictive Crash Analysis SCJ Alliance October 2017 Page ii Yelm HS Bypass Road Traffic Impact Analysis 1. INTRODUCTION 1.1 Project Overview Yelm High School is located in northwest Yelm on Yelm Avenue (SR 510) across from Mountain View Road SE. The school has a current enrollment of approximately 1200 students. Yelm Community Schools is considering constructing a new access to the school via Tahoma Boulevard SE. The Yelm High School Bypass Road would run north -south and intersect Tahoma Boulevard SE at Terra View Street SE. Yelm High School and the site vicinity are shown in the Figure 1 below. Figure 1. Site Vicinity and Project Site 1.2 Study Context The proposed project will not generate new traffic, but it will redistribute a significant amount of existing high school traffic. Currently all passenger vehicle traffic to /from the school uses driveways directly onto Yelm Avenue. The proposed project would allow a new full access driveway from Tahoma Boulevard SE and restrict the existing driveway on Yelm Avenue at Mountain View to entering traffic only. This report documents the results of a Traffic Impact Analysis of existing and future traffic conditions. The study was prepared according to City of Yelm guidelines as part of the required development review SCJ Alliance October 2017 Page 1 Yelm HS Bypass Road Traffic Impact Analysis and permit procedures for the proposed project. The following intersections in the study area were analyzed: 1. Terra View Street SE /Tahoma Boulevard SE 2. Yelm Avenue /Tahoma Boulevard SE 3. Berry Valley Road /Tahoma Boulevard SE The scope of work for this study was determined through a scoping process involving representatives of the City of Yelm, the project developer, and SO Alliance. 2. PROJECT DESCRIPTION The proposed project will be a new roadway connection from the south edge of the existing Yelm High School to Tahoma Boulevard SE. The new Yelm High School Bypass Road is proposed to intersect Tahoma Boulevard SE at Terra View Street SE making the existing tee intersection a four -way intersection. The roadway will provide a single lane in each direction. The new intersection at Tahoma Boulevard SE /Terra View Street SE will provide full access movements in and out of the school parking areas. The current Main Driveway on Yelm Avenue, across from Mountain View Road SE, will be converted to an entry -only driveway. The North Driveway will continue to serve outbound buses and passenger vehicles that have used the drop -off loop. The primary entrance and exit to Yelm High School is currently located on Yelm Avenue. Yelm Avenue experiences periods of congestion that can make accessing the school difficult. Conversely, peak school traffic times create increased congestion on Yelm Avenue along the school frontage. Yelm Community Schools is proposing the Yelm High School Bypass Road as a means of improving the traffic conditions for the school and Yelm Avenue. Relocating most of the exiting high school traffic to the new driveway on Tahoma Boulevard SE will allow easier, safer access to /from the school. The new driveway will also allow high school traffic to enter Yelm Avenue via Tahoma Boulevard at a signalized intersection. The Preliminary Yelm High School Bypass Road design is shown in Figure 2. SCJ Alliance October 2017 Page 2 won,V i U -U U 11 YELM HIGH SCHOOL l � U I� rrN: 717. . - -• . "�1-1 u U U ii l U 'I U U U II n� ;L71 I � 7� i� - --__ -• [ S [� >• f�Ef !i]til �Y. S [ U .- • fPraJY17l47iDaoU u ,f A n -rl n n n E U. • •.. U U U ST 1f )INI DROPOil SIGN y � �" y ' ST DUFNF DROP OFF SIGN TP _ i✓ __�_ -1L __� fUTU I Sl DE •�lK Furuut f•�clq lvt'ngxfNr; I ` U1 URI I D �1N j+ Ai�IN lj j TPN: 101 . -. DC1[7RS I U1 [1RC 5ui 1001 _ I 11UII DING I I `l2301 a�3. !i! iRl1, RIO PROPO-q I7 I HIGH GROUND WA I 19 I PN: WE I POND HAZARD 2172.1740300 1PN: I 7171.174D00D 40 t nfI'm !I:)4240200 I WURE FR I II.l E7 7j.1740102. .w t+�•+c rl�+ it N:717)A240).01 PROPO-q I7 I HIGH GROUND WA I 19 I PN: WE I POND HAZARD 2172.1740300 1PN: I 7171.174D00D 40 t PROPOSE D F11RN POCKED I TAHQMA BOULEVARI Yelm High School Bypass Road SCJ P-.LLIANCE Traffic Analysis Figure 2 PreliminaryYelm High School Bypass Road Design I WURE FR I II.l E7 PROPOSE D F11RN POCKED I TAHQMA BOULEVARI Yelm High School Bypass Road SCJ P-.LLIANCE Traffic Analysis Figure 2 PreliminaryYelm High School Bypass Road Design Yelm HS Bypass Road Traffic Impact Analysis 3. BACKGROUND INFORMATION 3.1 Existing Roadways 3.1.1 Yelm Avenue (SR 510) Yelm Avenue is a three -lane roadway with a single lane in each direction and a center turn lane. The roadway is designated an urban -minor arterial by WSDOT with a posted speed limit of 35 mph. In the project vicinity the roadway has sidewalks, bicycle lanes and street lighting. 3.1.2 Tahoma Boulevard SE Tahoma Boulevard SE is a five -lane boulevard roadway that extends from Yelm Avenue to a dead -end approximately 1 mile to the southwest. The roadway has two lanes in each direction, and a landscaped median section with left -turn lanes at intersections. The roadway has sidewalks, bicycle lanes, street lighting and a posted speed limit of 35 mph. Eventually Tahoma Boulevard SE will continue to the south and intersect SR 507 west of Yelm. The roadway is planned to be part of the City's overall arterial network and a primary access to the Thurston Highlands Master Planned Community (MPC). 3.1.3 Terra View Street SE Terra View Street SE is a local access roadway that serves a residential neighborhood south of Tahoma Boulevard SE. The roadway is approximately 30 feet wide with sidewalks and landscaping on both sides. It has a posted speed limit of 25 mph. School Driveway Accesses The school currently has three primary access points as described below: 3.1.4 93rd Avenue (Bus Access) Buses currently access the site by turning onto 93rd Avenue SE and accessing the school at a driveway located at the west edge of the school site along the tennis courts. The driveway is signed as a one -way entry -only for buses. 3.1.5 Yelm Avenue North Driveway There is an exit -only driveway located on Yelm Avenue approximately 700 feet south of 93rd Avenue. This driveway is used for exiting buses. Passenger vehicle traffic also uses this exit, primarily those who have parked in the north parking area between the main school building and Yelm Avenue, or vehicles who are dropping off or picking up a student. 3.1.6 Yelm Avenue South Driveway The south driveway is located on Yelm Avenue across from Mountain View Road SE. This is the primary access point for student traffic using the main lot at the southeast corner of the school property. The driveway offers full access in and out. 3.2 Traffic Volume Data Traffic Count Consultants Inc., a traffic data collection firm, provided turning movement counts at the study intersections. The counts were collected on February 23rd, 2017 at the school driveways and Tahoma Boulevard SE /Terra View Street on a day identified by the school district as a "typical" day. SCJ Alliance October 2017 Page 4 Yelm HS Bypass Road Traffic Impact Analysis Additional counts were collected on September 19th, 2017 at Tahoma Boulevard SE /Berry Valley Road SE and Tahoma Boulevard SE /Yelm Avenue 3.3 School Traffic Traffic volume counts were conducted at the school driveways to collect existing traffic patterns for the school. The counts were collected at the North Driveway and South Driveway on Yelm Avenue to capture all passenger vehicle traffic accessing the school. The counts were collected between 6:00 AM and 9:00 AM and between 1:30 PM to 5:30 PM. These hours were selected to capture the highest individual peak hour volumes at the driveways for the morning school peak, afternoon school peak and evening commute peak. The traffic volume counts were summarized in Table 1 showing the existing traffic using the existing parking lots. Buses were not included in traffic volume totals because they are not expected to relocate to the proposed driveway. Based on the counts the school currently generates the following traffic volumes during the peak periods: Table 1. Yelm High School - Existing 2017 Passenger Vehicle Traffic Volumes The existing traffic volumes at the school driveways and at the Tahoma Boulevard SE /Terra View Street intersection are shown on Figure 3, Figure 4 and Figure 5. 3.3.1 Cut - Through Traffic During congested periods of the day, some drivers will use alternate routes to avoid Yelm Avenue. Yelm High School staff have described that some school and non - school traffic heading eastbound on Yelm Avenue will divert to local streets. These routes include turning right onto Solberg Street or Edwards Street to get to 1st Street via Mosman Avenue. The City is currently working to construct an extension of Mosman Avenue from Solberg St to Longmire Street, which would allow Longmire Street and Tahoma Boulevard SE (via Berry Valley Drive) to serve as additional routes to 1st Street via Mosman Avenue. This is an existing phenomenon that is unlikely to change substantially with completion of the High School Bypass Road, although the Berry Valley Drive route may become slightly more attractive to cut - through traffic from the High School. SCJ Alliance October 2017 Page 5 Morning School Peak Hour Afternoon School Peak Hour Evening Commute Peak Hour (6:30 AM - 7:30 AM) (1:30 PM — 2:30 PM) (4:15 PM 5:15 PM) In Out Total In Out Total In Out Total North Driveway N/A 39 39 N/A 98 98 N/A 25 25 South Driveway 411 79 490 79 183 262 38 18 56 School 411 118 529 79 281 360 38 43 81 Tota I The existing traffic volumes at the school driveways and at the Tahoma Boulevard SE /Terra View Street intersection are shown on Figure 3, Figure 4 and Figure 5. 3.3.1 Cut - Through Traffic During congested periods of the day, some drivers will use alternate routes to avoid Yelm Avenue. Yelm High School staff have described that some school and non - school traffic heading eastbound on Yelm Avenue will divert to local streets. These routes include turning right onto Solberg Street or Edwards Street to get to 1st Street via Mosman Avenue. The City is currently working to construct an extension of Mosman Avenue from Solberg St to Longmire Street, which would allow Longmire Street and Tahoma Boulevard SE (via Berry Valley Drive) to serve as additional routes to 1st Street via Mosman Avenue. This is an existing phenomenon that is unlikely to change substantially with completion of the High School Bypass Road, although the Berry Valley Drive route may become slightly more attractive to cut - through traffic from the High School. SCJ Alliance October 2017 Page 5 High School m� t SCJ P'- LLIANCE EN- NEER- AND PLANNING SERVICES 4-20 X10 0 h 0- o0 y0�1 91k0 Yelm High School Bypass Road Traffic Analysis s r� ;00 ,ti //" j h ti r �s Berry Valley D Figure 3 Existing 2017 AM Peak Hour High School 4--55 35 4 1 0 r C y% 9t-0 IN Yelm High School Bypass Road SCJ P'- LLIANCE Traffic Analysis EN- NEER- AND PLANNING SERVICES ,moo sus 3 r-O J Berry Valley D .s' 'tQ�o 6090 Figure 4 Existing 2017 PM Peak Hour of School High School 4--70 t SCJ P'- LLIANCE EN- NEER- AND PLANNING SERVICES y0�1 91k0 ,moo �y Yelm High School Bypass Road Traffic Analysis sQS � d� �S o i h r �s S Berry Valley D KZ� Figure 5 Existing 2017 PM Peak Hour of Street Yelm HS Bypass Road Traffic Impact Analysis 3.4 Public Transportation Intercity Transit (IT) route 94 runs between the Olympia Transit Center and the Walmart in Yelm. The route provides at least hourly service between 6:00 AM and 8:00 PM on weekdays and limited service on Saturday and Sunday. Transit stops in both directions are located on Yelm Avenue just east of the Yelm High School Main Driveway. 3.5 Roadway Collision Analysis Washington State Department of Transportation provided collision data for Yelm Avenue and Tahoma Boulevard SE in the vicinity of the Yelm High School. The data includes all reported collisions occurring over the most current complete five -year span of January 1, 2012 through December 31, 2016. A collision frequency rate per Millions of Entering Vehicles (MEV) was calculated for the study intersections based on the following formula: Collision Rate = 1,000,000 X Total Collisions 365 X Number of Years X Average Daily Entering Traffic The average daily traffic entering each study intersection was estimated by adding the entering PM peak hour turning movements and multiplying by a factor of 10. We have summarized the collision data for the study intersections on Tahoma Boulevard SE in Table 2. Table 2. Collision Summary - 01/01/2012 through 12/31/2016 Total Daily Total Number Number Number Average Entering of Reported of Injury Involving Collisions Collisions Intersection Traffic Collision Collisions Pedestrians per Year per MEV Terra View St SE /Tahoma Blvd SE 1,670 1 0 0 0.2 0.33 Berry Valley Rd /Tahoma Blvd SE 1,820 0 0 0 0.0 0.00 Yelm Ave /Tahoma Blvd SE 14,610 17 7 0 3.4 0.64 At Terra View Street SE /Tahoma Boulevard SE there has been one reported crash over the last five years. This crash occurred on Terra View St SE and was related to an on- street parking maneuver. The annual average of 0.2 collisions per year and collision rate per MEV of 0.33 are both low and do not indicate a collision problem. At Berry Valley Road /Tahoma Boulevard SE there have been zero reported crashes over the last five years. Three crashes have been reported in the vicinity of Berry Valley Road, but all three have been flagged as unrelated to the intersection and involved a single vehicle. The Yelm Avenue /Tahoma Boulevard SE intersection has experienced seventeen reported crashes over the last five years. The predominant crash type has been rear -end collisions along Yelm Avenue. The intersections of Berry Valley Road /Tahoma Boulevard SE and Yelm Avenue/Tahoma Boulevard SE are pending traffic counts. The individual reported collisions on Tahoma Boulevard SE in the study area between 01/01/2012 and 12/31/2016 are provided in Appendix B. SCJ Alliance Page 9 October 2017 Yelm HS Bypass Road Traffic Impact Analysis 4. PROJECT TRAFFIC CHARACTERSITICS 4.1 Project Traffic Volumes This project will not generate any new vehicular traffic. The project will reassign a significant portion of the existing vehicular traffic to /from Yelm High School. For this study, the "project traffic" represents the change in traffic volumes that will be caused by the new High School Bypass Road. The changes in circulation will almost entirely occur only on Yelm Avenue between the existing Main Driveway and Tahoma Boulevard SE and Tahoma Boulevard SE between Yelm Avenue and the proposed Bypass Road. The existing driveways will remain after completion of the High School Bypass Road, but the Main (south) Driveway will be redesigned to allow only inbound traffic. We have prepared an estimate of traffic volumes that will use the new High School Bypass Road, and how they will distribute to local roadways. The estimated traffic assignment for the new driveway is based on the traffic volumes counted at the existing school driveways. The following assumptions were made in re- assigning existing school traffic: • School buses will continue to use the routes they currently use • Passenger vehicles that currently use the north driveway to exit the school will continue to do so • All other exiting passenger vehicle traffic will use the new Bypass Road • All traffic currently entering the Main Driveway from Eastbound Yelm Avenue will continue to do so • Most traffic entering from westbound Yelm Avenue will continue to use the Main Driveway, but a small percentage will turn left onto Tahoma Boulevard SE to enter at the Bypass Road • A small amount of school traffic traveling to /from Is' Street (SR 507) may divert to Mosman Avenue and Berry Valley Drive. The rerouted peak hour high school traffic volumes are shown on Figure 6, Figure 7 and Figure 8. 4.2 Pedestrian and Bicycle Volumes It is expected that the current model split of vehicles, bicycles and pedestrians will not be impacted by the construction of the Bypass Road. As with the vehicle traffic, this project will not generate any new non - motorized traffic. All bicycle and pedestrian activity currently occurring from neighborhoods north of Yelm Avenue will not be impacted by the construction of the Bypass Road. The pedestrians and bicycles from neighborhoods along Tahoma Boulevard SE would be expected to use the Bypass Road. However, it is likely that most of these trips currently occur across the undeveloped field between Tahoma Boulevard SE and the high school. To accommodate the pedestrian traffic south of Tahoma Boulevard SE, the new intersection should include the following crossing treatments: SCJ Alliance October 2017 Page 10 Yelm HS Bypass Road Traffic Impact Analysis • Handicap ramps should be installed on the NE and NW corner of the intersection with a striped crosswalk on the north side of Tahoma Boulevard across the new Bypass Road. The design will be like the existing handicap ramps and crossing located on Terra View Street. • A striped crosswalk should be installed on Tahoma Boulevard SE across the west leg of the intersection. The design will be like the existing crosswalk on Tahoma Boulevard SE at Berry Valley Road SE SCJ Alliance October 2017 Page 11 SCJ P'- LLIANCE EN- NEER— AND PLANNING SERVICES 5 n h — w IN/1 a`O h o%I/y +52 a �w 3 X Yelm High School Bypass Road Traffic Analysis Gl C M c AM, , 4-- XX Peak HourVolumes Volumes Estimated Figure 6 Projected AM Peak Hour Traffic Change with Bypass Road SCJ P'- LLIANCE EN-NEERI- AND PLANNING SERVICES r] - 3 Gl M x x6 - O >> ^. Cr - a �� S S �x8 hA.n low -5 � •xti'1•xy �, . L. Longmire St ` O -q f � LEGEND 4-- XX Peak Hour Volumes Volumes Estimated Yelm High School Bypass Road Traffic Analysis Figure 7 Projected PM Peak Hour of School Traffic Change with New Driveway SCJ P'- LLIANCE EN- NEER— AND PLANNING SERVICES 5 n h — yr O /y XA +2 Yelm High School Bypass Road Traffic Analysis Gl C M c AM, , X X ;fir 4-- XX Peak HourVolumes Volumes Estimated Figure 8 Projected PM Peak Hour of Street Traffic Shift with New Driveway Yelm HS Bypass Road 5. FUTURE TRAFFIC CONDTIONS Traffic Impact Analysis 5.1 Roadway Improvements In the project area, one improvement has been identified that will affect traffic flows in the area; the City of Yelm six -year Transportation Improvement Plan (TIP) identifies plans to extend Mosman Avenue from Solberg Street to Longmire Street. This connection, when completed, will provide a continuous parallel route to Yelm Avenue between 15t Street (SR 507) and Tahoma Boulevard SE. 5.1.1 Background Traffic Growth It is anticipated that this Bypass Road will be constructed and operational in 2019. To account for the growth of traffic through the study intersections, an annual growth rate of 4% was used. With this growth rate, two years of growth were calculated. The projected 2019 analysis volumes with the High School Bypass Road are shown on Figure 9, Figure 10 and Figure 11. The traffic volume calculations are provided in Appendix C. SCJ Alliance October 2017 Page 15 _ h Yelm High School f I'llm- LIM Ln o Y 91ke 0 N �AM t-- 50 4-20 r- 10 = r�4$' o � S �60 s �o�� 0 t Figure 9 Yelm High School Bypass Road Projected 2019 AM Peak Hour SCJ P'- LLIANCE Traffic Analysis with Bypass Road EN-NEERI- AND PLANNING SERVICES _ a Yelm High School f 111im- Y0/1 9t-(Q v► m �` ,r o 0 a 4=M- ft- �o y o t-- 10 Ln o °r 4--55 J1� r- 30 Al oi'' ,moo �S 0 SAS N �) 00 Berry Valley Dry Figure 10 Yelm High School Bypass Road Projected 2019 PM Peak Hour SCJ P'- LLIANCE Traffic Analysis of School with Bypass Road EN- NEER- AND PLANNING SERVICES _ h Yelm High School f I'llm- Y 91ke o 0 s v a h t-- 5 o 4--75 r- 50 ryh N S 1S s8s � 30 'cuss s oh t Figure 1 1 Yelm High School Bypass Road Projected 2019 PM Peak Hour SCJ P'- LLIANCE Traffic Analysis of Street with Bypass Road EN- NEER- AND PLANNING SERVICES Yelm HS Bypass Road Traffic Impact Analysis 6. SIGHT DISTANCE AND WARRANT ANALYSES The construction of the proposed High School Bypass Road will add a fourth approach to the existing Tahoma Boulevard SE /Terra View St SE intersection. With this fourth approach the character of the intersection will change. Analysis of the geometric and traffic volume impacts to the intersection are addressed below. 6.1 Sight Distance Analysis We performed an analysis at the proposed Bypass Road location to determine if adequate sight distance is available for vehicles entering Tahoma Boulevard SE from the Bypass Road. The analysis was based or the methodology described in the current AASHTO Policy on Geometric Design of Highways and Streets. The recommended design intersection sight distance was calculated for vehicles exiting the site onto Tahoma Boulevard SE using the following equation: Intersection Sight Distance (ISD) = (1.47) X (design speed of the major road) X (time gap required) Passenger Vehicle • Right turn ISD = 1.47 X 35 X 6.5 = 335 feet • Left -turn ISD = 1.47 X 35 X 8.5 = 440 feet The AASHTO methodology calls for modifying the required time gap for every additional lane that the entering vehicle must cross after one lane. For vehicles making a right -turn onto Tahoma Boulevard SE, the default time gap value of 6.5 was used. For vehicles making a left -turn, they will need to cross two through lanes and the center median space, which was assumed to represent a third lane being crossed. The default time gap of 7.5 seconds was increased by 1 second (0.5 seconds for each lane) to account for this additional crossing width. For the passenger vehicle sight distance measurements, a driver eye height of 3.5 feet was used for both the vehicle entering the major road from the driveway and the vehicle approaching on the major road. For this analysis, the driver's eye for the vehicle entering the major road from a driveway was placed 14.5 feet back from the edge of traveled way. Based on the field sight distance measurement, the sight distance requirement for a passenger vehicle can be met in both directions for right -turn and left -turn maneuvers, with 530+ feet available for right - turns and 450 feet available for left- turns. The available sight distance for left -turns is only slightly more than the minimum and is limited by the landscaping in the center median. The dirt and plants currently within the median block the line of sight past 450 feet of sight distance at the driver eye height. However, it was observed in the field that at a height of 5 feet much more sight distance was provided. If the landscaping were removed from the center median 200 feet back from the intersection, much more sight distance would be available. The sight distance measurement results are shown on Figure 12. SCJ Alliance October 2017 Page 19 Im ►* a) a) U U c + c N 0 0 N O in Ln m -ct m p Ln D m Lx w RWaJ aJ � aJ aJ - r'i I- H i -0 W E/}� m i w iw4 tn LI 1 N U a--+ C -1 E o c� CL 4— O O to 4-J a) a) (L) 4 Ln m a, � Co o 0 L ! I U- CO O +' O L s s � Ln � U s i -0 (D � N a G t]A � L Lu s U O L Q Q CC 1T N a o ICI �^ K7I .Imp. m Q it � s � a s - M81 eJJa Is .n 1 �i - -• �`: Ln 14r J Yelm HS Bypass Road Traffic Impact Analysis 6.2 Intersection Control Warrant Analysis The Terra View Street SE /Tahoma Boulevard SE intersection currently operates under stop -sign control for the minor street, Terra View Street SE. Construction of the High School Bypass Road will reroute most of the exiting school trips to this intersection. To help inform the appropriate intersection control after completion of the Bypass Road, the warrant analysis guidance provided in the Manual on Uniform Traffic Control Devices ( MUTCD) was used. 6.2.1 Two -Way Stop - Control (TWSC) The guidance for stop sign applications indicates that the use of stop signs on the minor street approaches should be considered if engineering judgement indicates a stop is always required because of one of the following: • The vehicular traffic volumes on the through street exceed 6,000 vehicles a day • A restricted view exists Crash records indicate three or more crashes in a year that could be corrected with installation of a stop sign. The average daily traffic along Tahoma Boulevard SE was estimated by adding the approach PM peak hour turning movements at the Terra View Street SE intersection and multiplying by a factor of 10. This results in approximately 1,500 daily vehicle trips on Tahoma Boulevard SE. Based on the field sight distance analysis, adequate sight distance for all maneuvers is provided. The existing crash analysis indicates that there has been only one crash at the Tahoma Boulevard SE/Terra View Street SE intersection over the last five years. None of the three thresholds for installation of a stop -sign for the minor street approach appear to be met for the High School Bypass Road /Terra View Street SE intersection with Tahoma Boulevard SE, indicating that yield signs at the minor street approaches would be sufficient. Terra View Street SE is currently under stop -sign control. 6.2.2 All -Way Stop - Control (AWSC) Multi -way stop control is used in instances where the volume of traffic on the intersecting roads is approximately equal. There are safety concerns regarding the road user's expectations of other road users stopping. The MUTCD provides multiple criteria for considering AWSC. None of these criteria are met with the High School Bypass Road /Terra View Street SE/Tahoma Boulevard SE intersection. 6.2.3 Traffic Signal Control The MUTCD provides several different signal warrant options to determine if the installation of a traffic signal is warranted at an intersection. While the projected volumes at the High School Bypass Road /Terra View Street SE/Tahoma Boulevard SE intersection are not large enough to meet the criteria for stop control, the peak hour volume signal warrant (warrant 3) was assessed. The 70% factor warrant was used, as the City of Yelm has a population of less than 10,000 people. The projected 2019 volumes with the Bypass Road do not meet this signal warrant. The peak hour traffic signal warrant sheet is included in Appendix D. 6.2.4 Intersection Control Recommendation Although volume warrants are not met for installing a stop sign for the southbound approach at this intersection, two -way stop - control is recommended as the control type for the opening condition with completion of the High School Bypass Road. The considerations for this recommendation include the SCJ Alliance October 2017 Page 21 Yelm HS Bypass Road Traffic Impact Analysis crossing width of Tahoma Boulevard, peaking characteristics of the traffic flows from the high school and that the existing northbound approach is controlled by a stop sign. 6.3 Turn Lane Warrant Analysis With the completion of the High School Bypass Road, an assessment of the Tahoma Boulevard SE approaches and the new Bypass Road approach was done to determine which, if any, turn lanes would be warranted under the projected 2019 volume condition. 6.3.1 Right -turn Lane Warrants A right -turn lane warrant analysis was conducted for the WB Tahoma Boulevard SE approach and the SB High School Bypass Road approach using the right -turn lane guidelines outlines in the 2015 WSDOT Design Manual. For both roadway approaches each analysis period was assessed, the AM peak hour, the PM peak hour of School and the PM peak hour of Street. For both approaches the projected volumes are well below the line to consider a right -turn pocket or taper, falling in the radius only section. The right -turn guideline sheet for each approach are included in Appendix D. 6.3.2 Left -turn Lane Warrants A left -turn lane warrant was conducted for the eastbound approach of Tahoma Boulevard SE using guidelines from the Highway Research Record 211. The Warrant for four -lane highways was used. Each of the analysis periods was assessed and fell under the no left -turn lane required portion of the graph. The left -turn lane warrant sheet is included in Appendix D. The left -turn lane warrant guidance contained in the Highway Research Record 211 were all for left -turn movements from a major street. Assessment of the need for a left -turn lane on Terra View Street SE and the proposed High School Bypass Road using these guidelines did not seem appropriate considering they will operate under stop -sign control. To determine an appropriate method for assessing the need for left -turn lanes on the minor street approaches, the WSDOT design manual was consulted. The general guidance in the WSDOT manual is that left -turn lanes can be warranted if they provide congestion relief or crash reduction. The need for a left -turn lane at one or both of the minor street approaches will be further discussed in the operational results section, below. 7. TRAFFIC OPERATIONS ANALYSIS Traffic analyses were conducted to identify any existing deficiencies within the study area and for the project completion horizon year. The acknowledged source for determining overall capacity for arterial segments and independent intersections is the current edition of the Highway Capacity Manual (HCM). Capacity analyses were completed for the existing conditions and the project horizon year with the High School Bypass Road for the AM peak hour, PM peak hour of School and PM peak hour of Street for all intersections. Intersection analysis was performed using version 9 of the Synchro /SimTraffic software package. This software implements the methods of the 2010 HCM. Capacity analysis results are described in terms of Level of Service (LOS). LOS is a qualitative term describing operating conditions a driver will experience while traveling on a particular street or highway during a specific time interval. It ranges from A (very little delay) to F (long delays and congestion). The City of Yelm has adopted a minimum LOS D standard. SCJ Alliance October 2017 Page 22 Yelm HS Bypass Road Traffic Impact Analysis 7.1 Level of Service Criteria Level of service calculations for intersections determine the amount of "control delay' (in seconds) that drivers will experience while proceeding through an intersection. Control delay includes all deceleration delay, stopped delay and acceleration delay caused by the traffic control device. The LOS is directly related to the amount of delay experienced. The overall LOS grade represents the weighted average of all movements at the intersection. For intersections under Two -Way- Stop - Control (TWSC), the LOS /delay criteria are different than for signalized intersections because driver expectation is that a signalized intersection is designed to carry higher traffic volumes and experience greater delay. Table 3 shows the Level of Service criteria for signalized and stop sign - controlled intersections. Table 3. Level of Service Criteria 7.2 Operational Analysis Summary The analysis was conducted for the following traffic volume scenarios: • Existing 2017 traffic volumes • Projected 2019 traffic volumes with High School Bypass Road The following intersections were studied: 1. Terra View Street SE/Tahoma Boulevard SE 2. Yelm Avenue /Tahoma Boulevard SE 3. Berry Valley Road /Tahoma Boulevard SE The Synchro operational analysis worksheets are provided in Appendix E. 7.2.1 Terra View Street SE /Tahoma Boulevard SE This is a tee intersection with stop control for the northbound approach. The northbound approach has a single lane. The westbound approach provides two through lanes and a left -turn lane while the eastbound approach has a through lane and a shared through -right lane. The intersection currently operates at an LOS A during all three peak hours. The proposed High School Bypass Road will construct a southbound approach at this intersection. This approach will provide a single lane in each direction and operate under stop -sign control. The northbound approach on Terra View Street SE will remain a single lane. The westbound approach provides a through lane, shared through -right lane and a left -turn lane. After the Bypass Road is completed, the eastbound approach will provide a shared through -right lane and a shared through -left lane. In the 2019 horizon the intersection will operate at a LOS B for the southbound approach during all three peak hours. SCJ Alliance October 2017 Page 23 Traffic Signal Control Stop Sign Control Average Control Delay Average Control Delay Level of Service (seconds /vehicle) (seconds /vehicle) A <_10 <_10 B >10 -20 >10 -15 C >20 -35 >15 -25 D >35 -55 >25 -35 E >55 -80 >35 -50 F >80 >50 7.2 Operational Analysis Summary The analysis was conducted for the following traffic volume scenarios: • Existing 2017 traffic volumes • Projected 2019 traffic volumes with High School Bypass Road The following intersections were studied: 1. Terra View Street SE/Tahoma Boulevard SE 2. Yelm Avenue /Tahoma Boulevard SE 3. Berry Valley Road /Tahoma Boulevard SE The Synchro operational analysis worksheets are provided in Appendix E. 7.2.1 Terra View Street SE /Tahoma Boulevard SE This is a tee intersection with stop control for the northbound approach. The northbound approach has a single lane. The westbound approach provides two through lanes and a left -turn lane while the eastbound approach has a through lane and a shared through -right lane. The intersection currently operates at an LOS A during all three peak hours. The proposed High School Bypass Road will construct a southbound approach at this intersection. This approach will provide a single lane in each direction and operate under stop -sign control. The northbound approach on Terra View Street SE will remain a single lane. The westbound approach provides a through lane, shared through -right lane and a left -turn lane. After the Bypass Road is completed, the eastbound approach will provide a shared through -right lane and a shared through -left lane. In the 2019 horizon the intersection will operate at a LOS B for the southbound approach during all three peak hours. SCJ Alliance October 2017 Page 23 Yelm HS Bypass Road Traffic Impact Analysis 7.2.2 Berry Valley Road /Tahoma Boulevard SE This is a tee intersection with stop sign - control for Berry Valley Road, the northbound approach. The northbound approach provides a single lane. The eastbound approach has a through lane and a shared through -right lane. The westbound approach provides a left -turn lane and a two through lanes. The intersection currently operates at a LOS A for all three peak hours. With the completion of the Bypass Road, this intersection is projected to operate at a LOS B for the AM school peak hour, and remain at a LOS A during the PM peak hour of the school and the street. 7.2.3 Yelm Avenue /Tahoma Boulevard SE This is a four -leg intersection under traffic signal control. The eastbound and northbound approaches each have a left -turn lane, through lanes and right -turn lane. The southbound and westbound approaches provide a left -turn lane and shared through -right lane. This intersection currently operates at a LOS C for the AM and PM of school peak hours and at LOS B for the PM of street peak hour. With completion of the Bypass Road the intersection is projected to remain at LOS C for the AM and PM of school peak hours, and LOS B for the PM of street peak hour. The level of service results are provided in Table 4, Table 5 and Table 6. Table 4. Level of Service (LOS) Summary — AM Peak Hour Existing 2017 Projected 2019 Volumes with Bypass Road Control LOS LOS Intersection Type (Delay) (Delay) Terra View Street SE /Tahoma Boulevard SE TWSC A (9.1) B (11.1) Berry Valley Road /Tahoma Boulevard SE TWSC A (9.4) B (10.2) Yelm Avenue /Tahoma Boulevard SE SIGNAL C (29.7) C (32.7) NOTE: TWSC = Two -Way Stop - Controlled; Stop -sign on the minor approach(es). SIGNAL = Traffic signal control Table S. Level of Service (LOS) Summary — PM Peak Hour of School Existing 2017 Projected 2019 Volumes with Bypass Road Control LOS LOS Intersection Type (Delay) (Delay) Terra View Street SE /Tahoma Boulevard SE TWSC A (8.8) B (13.3) Berry Valley Road /Tahoma Boulevard SE TWSC A (8.8) A (9.6) Yelm Avenue /Tahoma Boulevard SE SIGNAL C (26.8) C (27.6) NOTE: TWSC = Two -Way Stop - Controlled; Stop -sign on the minor approach(es). SIGNAL = Traffic signal control SCJ Alliance Page 24 October 2017 Yelm HS Bypass Road Intersection Traffic Impact Analysis Table 6. Level of Service (LOS) Summary — PM Peak Hour of Street Existing 2017 Projected 2019 Volumes with Bypass Road Control LOS LOS Type (Delay) (Delay) Terra View Street SE /Tahoma Boulevard SE TWSC A (8.9) B (10.4) Berry Valley Road /Tahoma Boulevard SE TWSC A (8.8) A (8.8) Yelm Avenue /Tahoma Boulevard SE SIGNAL B (16.1) B (16.7) NOTE: TWSC = Two -Way Stop - Controlled; Stop -sign on the minor approach(es). SIGNAL = Traffic signal control 7.3 Vehicle queuing The vehicle queue is the number of stopped vehicles waiting to travel through an intersection. The queue length includes all vehicles that stop at an intersection even after vehicles at the front begin to move forward. The 95th percentile queue value reflects the "peak typical" queue that occurs during the analysis period, discarding the highest 5 percent of queue occurrences. The queue study was performed using the SimTraffic microsimulation program. The average of five simulations was calculated. The SimTraffic queue analysis worksheets are in Appendix E. With construction of the Yelm High School Bypass Road, the existing intersection of Terra View Street SE /Tahoma Boulevard SE will provide a fourth approach. A queue analysis was conducted for this intersection for all three analysis hours. The existing intersection currently has 95th percentile queues on Terra Vista Street of 50 feet or less for all three peak hours. With the completion of the Bypass Road, the longest queue will typically be the new southbound approach. The southbound approach 95th percentile queue is projected to be no higher than 70 feet, or approximately 3 vehicles, during all three peak hours. The full queue analysis results are provided in Table 7. Table 7. 95th Percentile Queue Summary — Terra Vista St /Tahoma Blvd PM Peak Hour of PM Peak Hour of Approach AM Peak Hour (feet) School (feet) Street (feet) Existing 2017 Eastbound 0 feet 0 feet 0 feet Westbound 9 feet 13 feet 15 feet Northbound 49 feet 49 feet 39 feet Southbound N/A N/A N/A Projected 2019 with Bypass Road Eastbound 4 feet 6 feet 8 feet Westbound 0 feet 12 feet 14 feet Northbound 53 feet 49 feet 40 feet Southbound 50 feet 70 feet 40 feet SCJ Alliance October 2017 Page 25 Yelm HS Bypass Road Traffic Impact Analysis 7.4 Yelm High School Bypass Road Intersection Summary Tahoma Boulevard SE currently experiences very low traffic volumes. The roadway is designed to accommodate the much higher traffic volumes anticipated when Tahoma Boulevard SE extends further west and south. In the future when traffic volumes increase on Tahoma Boulevard SE, the operation of the Terra View Street SE/Tahoma Boulevard SE intersection will degrade. It is likely that by the time Tahoma Boulevard SE connects to SR 507 additional control will be required at the Terra View Street SE /Tahoma Boulevard SE intersection. Under stop -sign control for the minor approaches, a predictive crash analysis was performed using the Highway Safety Manual (HSM) methodology. This analysis determines the predicted annual crashes given ADT for the major and minor street approaches, control type and number of lanes provided at the intersection. To determine the ADT for the major street and the existing Terra View Street approach, ten times the PM peak hour was used. To determine the ADT for the proposed Bypass Road, the trip rate relationship between AM peak hour, PM peak hour and daily was used to factor up the rerouted school trips. Under the projected 2019 volume scenario, the HSM methodology predicts this intersection to experience 0.2 crashes per year. The daily school volume calculations and the predictive crash analysis summary sheet are provided in Appendix F. Review of the traffic signal volume warrants indicates that the through traffic on Tahoma Boulevard SE would have to increase from the forecasted 135 vehicles in the afternoon school peak hour to over 500 vehicles to meet the thresholds to consider a traffic signal. If additional control is required in the future, options to consider could be all -way stop - control, a traffic signal system or a modern roundabout. The future needs of the intersection should be considered in the current design so if additional control is required it can be more easily accommodated. We recommend the following design features to be implemented to accommodate potential future design needs: Initial Design Recommendations: The new High School Bypass Road intersection approach should be constructed with curb returns and not as a driveway apron. The new approach should generally match the design characteristics of the existing Terra View Street SE approach. A stop bar and stop sign should be installed at the intersection on the new southbound approach. The intersection should be constructed with handicap ramps on the NW and NE corners of the intersection and a striped crosswalk installed across the west leg of Tahoma Boulevard and the new Bypass Road approach. Future Design Considerations: • The intersection will eventually require additional control, which would likely be a traffic signal or a modern roundabout. Sufficient property on the north side of Tahoma Boulevard SE adjacent to the intersection needs to be preserved to accommodate either a traffic signal or a modern roundabout. A conceptual layout of a modern roundabout is recommended to ensure adequate setback for future improvements. • An eastbound to northbound left -turn lane is not warranted at the opening of the High School Bypass Road. However, to accommodate anticipated future traffic volumes, the existing median on Tahoma Boulevard SE may need to be reconstructed to install an eastbound to northbound left -turn lane. If a modern roundabout is determined by the City to be the preferred future control of the intersection, a left -turn lane would not be required. SCJ Alliance October 2017 Page 26 Yelm HS Bypass Road 8. CONCLUSIONS Traffic Impact Analysis Yelm Community Schools proposes to construct the Yelm High School Bypass Road that will connect the south end of the existing student parking area to Tahoma Boulevard SE. The new connection will add a fourth leg to the existing Terra View Street SE intersection. The new driveway will reduce congestion on Yelm Avenue and will allow students to access Yelm Avenue at a signalized intersection (Tahoma Boulevard SE /Yelm Avenue). Currently Tahoma Boulevard SE experiences very low traffic volumes at Terra View Street SE. Under stop sign - control the proposed Yelm High School Bypass Road — Terra View Street SE /Tahoma Boulevard SE intersection will operate at a LOS B condition with minimal delay. The intersection will likely need additional control in the future. It is recommended that adequate property on the north side of Tahoma Boulevard SE be set aside to accommodate a modern roundabout, if that is the design option preferred in the future. This setback should also accommodate a traffic signal if that is the design option desired in the future. SCJ Alliance October 2017 Page 27 APPENDIX A TRAFFIC VOLUME COUNT WORKSHEETS Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE/DBE Intersection: Yehn High School North Drwy& W Yehn Ave (Turns Only) Date oFCount: Thurs 2/23/2017 Location: Yehn, Washington Checked By: Jess Time From North on (SB) From South on (NB) From Easton (WB) From West on (EB) InteM Interval 0 Yehn HS North Drwy WYehn Ave WYehn Ave Total Ending at T L S R T L S R T L S R T L S R 6:15A 0 0 0 0 0 2 0 2 0 0 0 0 0 0 0 0 4 6:30A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 645A 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 2 7:00 A 0 0 0 0 14 2 0 21 1 0 0 0 0 0 0 0 0 23 7:15A 0 0 0 0 16 6 0 24 0 1 0 0 0 0 0 0 31 7:30A 0 0 0 0 2 8 0 8 0 0 0 0 0 0 0 0 16 745A 0 0 0 1 0 0 1 0 2 0 1 0 0 0 0 0 0 0 3 8:00A 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 8:15A 0 0 0 0 1 2 1 0 2 0 0 0 0 0 0 0 0 4 8:30A 0 0 0 0 2 2 0 4 0 0 0 0 0 0 0 0 6 8:45A 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 9:00A 0 0 0 0 1 0 3 0 3 0 0 0 0 0 0 0 0 6 Total Peak Hour: 6:45 AM Total 0 1 0 0 1 0 32 17 0 Approach 0 72 %Hv v/a 44.4% ME n/a 0.60 1 W Yelm Ave 17 I Ped 0 i Bike: 3 17 to 7:45 AM 0 1 1 1 0 1 0 0 1 0 1 0 1 0 73 1 0 73 v/a v/a 43.8% 0.25 n/a 0.59 0 I 0 6:45 AM to 7:45 AM 0 PEDs ......................... n��oss: N S E W Pod: 6 17 ........... ENT 01 1 1 Bike 0 ENT 02 0 - -- ---. ENT 03 0 72 ENT 04 1 4 5 ENT 05 2 2 73 ENT 06 0 Yelm HS North Drwy ENT 07 0 Bicycles From: N S E ENT 08 0 ENT 01 ENT 09 2 2 ENT 02 ENT 10 0 ENT 03 ENT 11 0 ENT 04 ENT 12 0 ENT 05 10 ENT 06 ENT 07 1 ENT 08 ENT 09 ENT 10 ENT 11 ENT 12 11. W Yelm Ave 0 1 1 56 1 ,Bike 0 :Pod 55 55 124J 1.0 PHF Peak Hour Volume PHF %HV EB n/a n/a Check WE 0.25 n/a In: 73 NB 0.60 44.4% Out: 73 SB n/a n/a T Int. 0.59 43.80% W Conditions: 11. Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE/DBE Intersection: Yehn High School North Drwy& W Yehn Ave (Turns Only) Date oFCount: Thurs 2 /23/2017 Location: Yehn, Washington Checked By: Jess Time From North on (SB) From South on (NB) From Easton (WB) From West on (EB) Interval Interval 0 Yehn HS North Drwy WYehn Ave WYehn Ave Total Ending at T L S R I L S R T L S R T L S R 1:45P 0 0 0 0 0 3 0 3 0 0 0 0 0 0 0 0 6 2:00 P 0 0 0 0 12 14 0 38 0 0 0 0 0 0 0 0 52 2:15 P 0 0 0 0 0 22 0 21 0 0 0 0 0 0 0 0 43 2:30P 0 0 0 0 0 3 0 6 0 0 0 0 0 0 0 0 9 2:45P 0 0 0 0 0 2 0 3 0 0 0 0 0 0 0 0 5 3:00P 0 0 0 0 0 2 0 2 0 0 0 0 0 0 0 0 4 3.15P 0 0 0 0 0 2 0 5 0 0 0 0 0 0 0 1 8 3:30P 0 0 0 0 0 1 0 4 0 0 0 0 0 0 0 1 6 3:45P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 4:00P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15P 0 0 0 1 0 1 0 1 0 1 0 1 0 1 0 0 0 0 0 0 0 0 0 4:30P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 0 0 0 0 12 49 0 82 0 0 0 0 0 0 0 133 Peak Hour: 1:30 PM to 2:30 PM Total 0 0 1 0 0 12 42 0 68 0 0 1 0 0 0 0 0 0 110 Approach 0 110 0 0 110 %14V a1a 10.91 a1a a1a 10.9% ME n/a 0.53 n/a n/a 0.53 Z W Yelm Ave W Yelm Ave 42 I Ped l Bike: 0 0 68 42 2 ,Bike 0 I 0 1:30 PM to 2:30 PM _: ,0 ....... €Ped 6% 0 ......................... PEDs N S E W Ped: 2 42 6% L20.j 1.0 PHF Peak Hour Volume across: wT01 1 1 2 Bike 0 l PHF %HV 1NT 02 1 1 EB n/a n/a 1NT 03 1 1 tt0 Check WE n/a n/a 1NT o4 2 2 In: 110 NB 0.53 10.9% 1NT 05 0 110 Out: 110 SB n/a n/a 1NT 06 0 Yelm HS North Drwy T Int. 0.53 10.9% INT07 1 1 Bicycles From: N S E W Conditions: 1NT 08 0 1NT 01 0 1NT 09 0 wT 02 0 7NT 10 0 1NT 03 2 2 7NT 11 0 1NT 04 0 7NT 12 0 1NT 05 0 7 1NT 06 0 Special Notes 1NT 07 0 EB trathe backed -up blocking driveway from 1NT 08 0 13:54 - 14:10. NT 09 0 wT 10 0 NT 11 0 NT lz 0 0 0 2 02 SCJ17028M 01 1 Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE/DBE Intersection: Yehn High School North Drwy& W Yehn Ave (Turns Only) Date oFCount: Thurs 2 /23/2017 Location: Yehn, Washington Checked By: Jess Time From North on (S B) From South on (NB) From Easton (WB) From West on (EB) Interve Interval 0 Yehn ITS North Drwy WYehn Ave WYehn Ave Total Ending at T L S R T L S R T L S R T L S R 3:45P 0 0 0 0 0 1 0 5 0 1 0 0 0 0 0 0 7 4:00P 0 0 0 0 0 1 0 2 0 0 0 0 0 0 0 0 3 4:15P 0 0 0 0 0 3 0 16 0 1 0 0 0 0 0 0 20 4:30P 0 0 0 0 0 0 0 5 1 0 2 0 0 0 0 0 1 8 4:45P 0 0 0 0 0 4 0 7 0 0 0 0 0 0 0 0 11 5:00P 0 0 0 0 0 0 0 7 0 1 0 0 0 0 0 0 8 5:15P 0 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 2 5:30P 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5:45P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 6:00P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30P 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 Total Peak Hour: 4:00 PM Total 0 1 0 0 1 0 0 7 0 Approach 0 42 %Hv aia aia PfIF n/a 0.55 1 W Yelm Ave 7 I Pod! 0 i Bike; 1 8 to 5:00 PM 0 1 4 1 0 1 0 0 1 0 1 0 1 1 47 4 1 47 a/a aia o.oi 0.50 0.25 0.59 1 I 0 4:00 PM to 5:00 PM 1 PEDs ......................... n��oss: N S E W Pod: 0 7 ........... ENT 01 0 Bike 0 ENT 02 0 - -- ---. ENT 03 0 42 ENT 04 0 ENT 05 1 1 47 ENT 06 0 Yelm HS North Drwy ENT 07 0 Bicycles From: N S E ENT 08 0 ENT 01 ENT 09 0 ENT 02 ENT 10 0 ENT 03 ENT 11 0 ENT 04 ENT 12 0 ENT 05 1 ENT 06 ENT 07 1 ENT 08 ENT 09 ENT 10 ENT 11 ENT 12 1 0 1 W Yelm Ave 0 4 4 39 0 ,Bike 0 :Pod 35 35 80 1.0 PHF Peak Hour Volume PHF %HV EB 0.25 n/a Check WE 0.50 n/a In: 47 NB 0.55 n/a Out: 47 SB n/a n/a T Int. 0.59 0.0% W Conditions: 1 0 1 Prepared for SCJ Alliance Z ffi Tr ac Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE/DBE Intersection: Mountain View Rd SE/Yelm High School South Drwy & W Yelm Ave Date oFCount: Thurs 2/23/2017 Location: Yelm, Washington Checked By: Jess Time From No on (SB) From South on (NB) From Easton (WB) From West on (EB) Interval Interval Mountain View Rd SE Yelm HS South Drwy W Yelm Ave W Yelm Ave Total Ending at T L S R T L S R T L S R T L S R 6:15 A 0 0 0 1 0 1 0 0 2 5 105 0 6 0 30 2 144 6:30 A 0 1 0 0 0 0 0 3 0 6 126 0 2 0 18 4 158 645A 0 2 0 2 0 3 0 3 3 37 101 0 4 0 38 9 195 7:00 A 3 0 0 2 0 0 0 9 21 93 88 2 17 1 62 27 284 7:15 A 0 1 0 5 6 1 0 37 14 102 102 6 19 1 49 63 367 7:30 A 0 0 0 5 1 1 0 32 2 58 167 1 2 8 1 1 50 22 338 745A 0 5 0 0 5 1 0 5 8 12 132 5 5 0 46 1 207 8:00 A 0 4 0 0 0 1 0 10 98 3 3 1 56 2 1" 8:15 A 2 7 1 0 0 1 0 4 7 12 131 4 3 1 66 4 231 830A 0 1 0 0 0 3 0 7 6 13 148 4 12 1 74 5 256 845A 0 4 1 0 0 :E 0 1 5 5 114 4 10 2 67 1 200 9:00 A 1 6 0 1 0 1 0 3 4 7 106 2 8 0 76 2 204 Total Survey 6 31 2 16 12 14 0 106 79 360 1418 32 97 8 632 142 2761 Peak Hour: 6:45 AM to 7:45 AM Total 3 6 0 12 12 1 3 1 0 1 83 1 45 265 489 15 49 3 207 113 1196 Approach 18 86 769 323 1196 %HV 16.7% 14.0% 5.9% 15.2% 9.1% PHF 0.75 0.57 0.85 0.71 0.81 Mountain View Rd SE 36 18 18 1------!Bike W Yehn Ave 12 0 6 35 iPed : ......................: W Yehn Ave 15 504 I Ped:..... 6....E 489 769 Bike' 2 265 1065 LL 2 Bike 323 I ED 207 6:45 AM to 7:45 AM 2 ................. EPed 296 113 ........................ tans N S APfKC E W Ped: 2 3 0 83 1468 LO PHFPeak Haur Volume mr of 1 1 � .....................i Bike 0 PHF %HV I 02 0 EB 0.71 15.2% a 03 2 2 378 86 Check WB 0.85 5.9% I 04 8 1 4 13 In: 1196 NB 0.57 14.0% I 05 8 2 2 12 464 Out 1196 SB 0.75 16.7% w 06 11 11 Yehn HS South Drwy T Int. 0.81 9.1% I 07 8 1 9 Bieyeles From: N 3 B w Conditions: Irvr oa 0 I 01 0 I 09 3 1 1 5 Irvr oz 0 I 10 1 1 I 03 I I I II 0 I 04 0 Irvr Iz 1 I 05 1 2 3 55 I 06 0 Special Notes I 07 1 1 11 Irvr oa 0 rvr 09 0 I 10 0 I II 0 112 1 1 0 0 3 3' 6 SCJ17028M 02a Prepared for SCJ Alliance Z ffi Tr ac Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE/DBE Intersection: Mountain View Rd SE/Yelm High School South Drwy & W Yelm Ave Date oFCount: Thurs 2/23/2017 Location: Yelm, Washington Checked By: Jess Time From No on (SB) From South on (NB) From Easton (WB) From West on (EB) Interval Interval Mountain View Rd SE Yelm HS South Drwy W Yelm Ave W Yelm Ave Total Ending at T L S R T L S R T L S R T L S R 1:45 P 0 6 0 1 0 2 0 8 16 16 105 5 2 0 101 4 248 2:00 P 0 2 0 1 7 1 5 58 17 21 80 4 17 1 102 4 279 2:15 P 0 5 1 3 0 10 0 64 9 13 98 7 3 6 141 6 354 230P 1 1 0 1 0 4 1 37 7 12 90 3 5 0 96 2 247 245P 1 6 0 2 0 5 0 15 4 3 103 3 4 1 119 1 258 3:00 P 0 2 0 1 0 6 0 11 6 9 97 1 7 5 0 1 111 0 244 3:15 P 1 6 0 0 1 6 1 19 5 9 95 10 6 1 139 3 289 3:30 P 1 7 0 0 0 1 0 12 2 4 75 4 2 2 129 1 235 3:45P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 4 35 1 9 8 35 7 224 66 87 743 43 44 11 938 21 2154 Peak Hour: 145 PM to 2:45 PM Total 2 14 1 20 6 1 174 37 49 371 17 29 8 458 13 1138 Approach 22 200 437 479 1138 %HV 9.1% 3.5% 8.5% 6.1% 6.6% PHF 0.61 0.68 0.93 0.78 0.80 Mountain View Rd SE 53 22 31 1------!Bike W Yehn Ave 7 1 t 1 to 1 Ped : ......................: W Yehn Ave 17 398 I Ped.: ........... 371 437 Bike' 0 49 1083 877 8 3 Bike 479 I 458 145 PM to 245 PM 1 ................. ;Ped 646 13 ........................ tans N S APfKC E W Ped: 19 20 6 174 6 L O PHF Peak Ha Volume 141 ur mr of 1 1 2 � .....................i Bike 0 PHF %HV 1 02 1 16 1 18 EB 0.78 6.1% m 03 1 2 3 63 200 Check WB 0.93 8.5% 1 04 1 1 2 4 In: 1138 NB 0.68 3.5% 1 05 1 1 263 Out 1138 SB 0.61 9.1% w 06 0 Yehn H S South Drwy T Int. 0.80 6.6% 1 09 5 1 6 Bieyeles From: N S B w Conditions: mr oa 1 3 4 1 01 1 1 1 09 0 1rvr oz 0 1 10 0 1rvr 03 3 3 1 11 0 1rvr 04 0 1 1z 0 1rvr 05 0 38 mr 06 0 Special Notes 1rvr 07 1 10 1rvr oa 0 rvr 09 0 1 10 0 1 11 0 � 12 0 0 0 4 04 SCJ17028M 02 1 LLZ Prepared for SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE/DBE Intersection: Mountain View Rd SE/Yelm High School South Drwy & W Yelm Ave Date oFCount: Thurs 2/23/2017 Location: Yelm, Washington Checked By: Jess Time From No on (SB) From South on (NB) From Easton (WB) From West on (EB) Interval Interval Mountain View Rd SE Yelm HS South Drwy W Yelm Ave W Yelm Ave Total Ending at T L S R T L S R T L S R T L S R 3:45 P 0 5 0 1 0 5 0 12 4 7 108 4 2 1 151 2 296 4:00 P 0 5 0 1 0 0 0 10 5 3 102 7 3 2 156 2 288 4:15 P 0 6 0 0 0 2 1 14 4 8 102 7 3 4 143 3 290 430P 0 1 0 1 0 2 0 6 0 6 100 7 0 1 146 0 270 445P 0 9 0 1 0 1 0 6 3 10 95 12 1 3 150 0 287 5:00 P 0 10 0 2 0 0 0 1 1 14 104 1 4 1 2 1 138 1 276 5:15 P 0 6 0 0 0 1 0 1 1 7 100 10 3 2 170 0 297 5:30 P 1 6 0 0 0 0 0 0 3 1 85 6 2 1 140 0 239 545P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:OOP 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 1 1 1 1 Survey 1 48 0 6 0 11 1 50 21 56 796 57 15 16 1194 8 2243 Peak Hour: 3:30 PM to 4:30 PM Total 0 17 0 3 0 1 9 1 1 42 13 24 412 25 8 1 8 1 596 1 7 1 1144 Approach 20 52 461 611 1144 %HV v/a v/a 2.8% 1.3% 1.8% PHF 0.83 0.76 0.97 0.95 0.97 Mountain View Rd SE 54 20 34 1------!Bike W Yehn Ave 3 o 17 0 Wed : ......................: W Yehn Ave 25 424 I Ped:....2....i 412 461 Bike' 1 24 1116 LEE1035 8 0 Bike . 596 3:30 PM to 4:30 PM o ;Ped 655 7 ........................ tans N S E W Ped: 3 9 1 42 1188 1.0 PHF Peak Ho Volume 1 01 1 1 Bike l PHF %HV m 02 2 2 EB 0.95 1.3% a 03 0 3t 52 Check WB 0.97 2.8% wr 04 2 2 In 1144 NB 0.76 n/a 1 05 0 83 Out 1144 SB 0.83 n/a w 06 0 Yehn HS South Drwy T Int. 0.97 1.8% m 07 0 Bieyeles From: N S B w Conditions: mr oa 0 1 01 0 mr ov 0 1 02 0 m 10 0 m 03 1 1 2 1 11 0 1 04 0 1 12 0 1 05 0 $ D 06 0 Special Notes 1 07 1 1 11 mr oa 0 mr 09 0 m 10 0 wr 11 0 � 12 0 0 1 1 13 SCJ17028M 02 2 Prepared for: SCJ Alliance lk Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBF/DBE Intersection: Terra View St SE &Tahoma Blvd SE Date of Count: Thurs 2 /23/2017 Location: Yehn, Washington Checked By: Jess Time From North on (S B) From South on (NB) From Easton (WB) From Weston (EB) Interval Interval 0 Te— View St SE Taboma Blvd SE Tahoma Blvd SE Total Ending at T L S R T L S R T L S R T L S R 6:15A 0 0 0 0 0 0 0 4 1 0 5 0 0 0 13 0 22 6:30 A 0 0 0 0 0 0 0 8 0 1 0 0 0 0 13 0 22 645A 0 0 0 0 0 0 0 13 1 1 3 0 0 0 19 0 36 7:00 A 0 0 0 0 1 0 0 12 0 2 3 0 1 0 17 0 34 7:15 A 0 0 0 0 0 0 0 13 0 6 8 0 0 0 23 0 1 50 7:30 A 0 0 0 0 0 0 0 14 0 0 8 0 1 0 23 0 45 745A 0 0 0 0 0 0 0 11 0 1 4 0 0 0 9 0 25 8:00 A 0 0 0 0 1 0 0 12 2 2 3 0 1 0 13 0 30 8:15A 0 0 0 0 0 0 0 12 0 1 4 0 1 0 18 0 35 830A 0 0 0 0 0 0 0 8 2 4 7 0 0 0 7 0 26 845A 0 0 0 0 1 0 0 10 0 1 7 0 0 0 10 0 28 9:00 A 0 0 0 0 0 0 0 5 1 0 3 0 1 0 9 0 17 Total Survey 0 0 0 0 3 0 0 122 7 19 55 0 5 0 174 0 370 Peak Hour: 6:30 AM to 7:30 AM Total 0 0 0 0 1 0 0 52 1 9 22 0 2 0 82 0 165 Approach 0 52 31 82 165 %HV ./a 1.9% 3.2% 2.4% 2.4% PHF n/a 0.93 0.55 0.89 0.83 I z Tahoma Blvd SE Tahoma Blvd SE 22 I Ped', I .............: 22 31 Bike; 0 9 165 104 0 ,Bike 82 I 82 6:30 AM to 7:30 AM _____: , 2 ....... Ped 134 0 . ....................... tans N S Across E W Ped€ 0 0 L 2 0 Oj 1.0 PHF PeakHaur Volume wr 0I 0 : ......................: Biked 0 . PHF %HV wr 02 0 EB 0.89 2.4% wr 03 0 52 Check WB 0.55 3.2% wr 04 2 2 In: 165 NB 0.93 1.9% I 05 1 1 2 61 Out 165 SB n/a n/a wr 0e 0 Terra View St SE T Int. 0.83 2.4% m 07 0 Bieyeles F— N 3 E w Conditions: a 08 2 2 a 0I 0 wr 09 0 I 02 0 D 10 0 ➢ 03 0 DVT II 0 ➢ 04 0 DVT I2 0 ➢VT 05 0 6 mr 00 0 S eend Notes I 07 0 m 08 0 m 09 0 I 10 0 m II o DVT 12 0 0 0 0 00 SCJ17028M 03a Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBF/DBE Intersection: Terra View St SE &Tahoma Blvd SE Date oFCount: Thurs 2 /23/2017 Location: Yelm, Washington Checked By: Jess Time From North on (SB) From South on (NB) From Easton (WB) From Weston (EB) Interval Interval 0 Terra View St SE Taboma Blvd SE Tahoma Blvd SE Total Ending at T L S R T L S R T L S R T L S R 1:45 P 0 0 0 0 1 0 0 7 0 3 10 0 0 0 9 0 29 2:00 P 0 0 0 0 0 0 0 2 0 5 11 0 1 0 10 0 28 2:15P 0 0 0 0 0 1 0 5 1 11 19 0 1 0 7 0 43 2:30P 0 0 0 0 0 0 0 7 0 10 16 0 1 0 8 0 41 2:45 P 0 0 0 0 1 0 0 7 0 8 15 0 0 0 14 0 1 44 3:00 P 0 0 0 0 0 0 0 5 1 4 9 0 1 0 11 0 29 3:15P 0 0 0 0 0 0 0 1 1 9 10 0 0 0 5 0 25 3:30 P 0 0 0 0 1 0 0 3 2 6 18 0 0 0 8 0 35 3:45P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15P 0 E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30P 0 0 0 — 0 — 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 1 1 Survey f f f f 3 1 0 37 5 56 108 0 4 f f 274 Peak Hour: 2:00 PM to 3:00 PM Total 0 0 0 0 1 1 0 24 2 33 59 0 3 0 40 0 157 Approach 0 25 92 40 157 %HV ./a 4.0% 2.2% 7.5% 3.8% PHF n/a 0.89 0.77 0.71 0.89 Tahoma Blvd SE Tahoma Blvd SE 60 I Ped', 59 92 Bike; .0.F ..........: 0 33 156 100 0 ,Bike 40 I 40 2:00 PM to 3:00 PM , 0 ...... Ped 64 . 0 . ......................: tans N S Across E W Ped€ 4 1 24 L 17 6j 1.0 PHF PeakHaur Volume wr 0I 0 : ......................: Biked 0 . PHF %HV wr 02 0 EB 0.71 7.5% wr 03 2 2 33 25 Check WB 0.77 2.2% wr 04 2 2 In: 157 NB 0.89 4.0% wr 0s 0 58 Out 157 SB n/a n/a wr 06 1 1 Terra View St SE T Int. 0.89 3.8% I 07 0 Bieyeles F— N 3 E w Conditions: wr 08 1 1 m01 0 wr 09 0 I 02 0 D 10 0 ➢ 03 0 DVT II 0 ➢ 04 0 DVT I2 0 ➢VT 05 0 6 mr 06 0 Special Notes I 07 0 m 08 0 m 09 0 I 10 0 m II o DVT 12 0 0 0 0 00 SCJ17028M 03pl LJ , Prepared for SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBF/DBE Intersection: Terra View St SE &Tahoma Blvd SE Date of Count: Thurs 2 /23/2017 Location: Yehn, Washington Checked By: Jess Time From North on (S B) From South on (NB) From Easton (WB) From Weston (EB) Interval Interval 0 Terra View St SE Taboma Blvd SE Tahoma Blvd SE Total Ending at T L S R T L S R T L S R T L S R 3:45 P 0 0 0 0 1 0 0 8 1 11 17 0 2 0 11 0 47 4:00 P 0 0 0 0 0 0 0 2 1 5 17 0 1 0 3 1 28 4:15P 0 0 0 0 1 0 0 5 1 9 11 0 1 0 13 0 38 4:30 P 0 0 0 0 0 0 0 6 0 13 19 0 0 0 10 0 48 4:45 P 0 0 0 0 0 0 0 2 0 13 17 0 0 0 6 0 1 38 5:00 P 0 0 0 0 0 0 0 2 0 5 13 0 0 0 9 0 29 5:15 P 0 0 0 0 0 0 0 5 0 13 23 0 0 0 11 0 52 5:30 P 0 0 0 0 0 0 0 3 0 12 12 0 1 0 16 0 43 5:45P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15P 0 E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 630P 0 0 0 - 0 - 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 1 Survey 0 0 0 0 2 0 0 33 3 81 129 0 5 0 79 1 323 Peak Hour: 4:15 PM to 515 PM Total 0 0 0 0 0 0 0 15 0 44 0 0 0 36 0 167 Approach 0 15 116 36 167 %HV via via via o.oi PHF n/a 0.63 0.81 0.82 0.80 Tahoma Blvd SE Tahoma Blvd SE 72 I Ped', 0€ 72 116 Bike; ...... 0 , 44 167 108 2 ,Bike 36 I 36 4:15 PM to 5:15 PM , 0 ...... Ped . 51 0 . ......................: tans N S Across E W Ped€ 2 0 : ......................: 15 L 2 0 8j 1.0 PHF PeakHaur Volume wr 01 1 1 Biked 0 . PHF %HV wr 02 0 EB 0.82 n/a wr 03 0 44 Check WB 0.81 n/a wr 04 0 In: 167 NB 0.63 n/a wr 05 2 2 59 Out 167 SB n/a n/a 1 06 0 Terra View St SE T Int. 0.80 0.0% m 07 1 1 1 1 Bieyeles From: N 3 E w Conditions: wr OF 2 1 3 1 01 1 1 wr 09 0 1 02 1 1 D 10 0 ➢ 03 0 D 11 0 ➢ 04 0 DVT 12 0 ➢ 05 2 2 7 1 06 0 Special Notes m07 0 m OF 0 m 09 0 mr 10 0 DVT 11 0 rvr 12 0 0 1 2 14 SCJ17028M 03p2 Prepared for: SCJ Alliance 12 Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2ino.com WBF/DBE Intersection: Tahoma Blvd SE & Berry Valley Rd SE Date of Count: Tues 9/19/2017 Location: Yelm, Washington Checked By: Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Tahoma Blvd SE Tahoma Blvd SE Berry Valley Rd SE 0 Total Ending at T L I S R T L S R T L S R T L S R 6:15A 0 1 0 0 0 0 16 1 0 0 0 2 0 0 0 0 20 6:30 A 2 0 4 0 0 0 17 0 0 1 0 2 0 0 0 0 24 6:45 A 0 2 7 0 1 0 25 1 1 0 0 17 0 0 0 0 52 7:00 A 1 2 8 0 0 0 35 0 0 1 0 45 0 0 0 0 91 7:15 A 1 3 21 0 0 0 36 2 0 0 0 14 0 0 0 0 76 7:30 A 1 1 7 0 0 0 26 0 0 0 0 1 0 0 0 0 35 7:45 A 0 0 4 0 2 0 22 2 2 1 3 0 5 0 0 0 0 36 8:00 A 1 1 11 0 0 0 26 0 0 1 0 4 0 0 0 0 43 8: 15A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:OOA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 6 10 62 0 3 0 203 6 3 6 0 90 0 0 0 0 377 Peak Hour: 6:30 AM to 7:30 AM Total 3 8 43 0 1 0 122 3 1 1 0 77 0 0 0 0 254 Approach 51 125 78 0 254 %HV 5.9% 0.8% 1.3% n/a 2.0% PHF 0.53 0.82 0.42 n/a 0.70 Tahoma Blvd SE 250 51 199 r 0 __,Bike 43 s 0 Ped Berry Valley Rd SE 1 7s 0 1 89 0 0 !Bike 0 6:30 AM to 7:30 AM 6 _Ped 11 0 ,. ..... PEDS A­.: N S E W Ped= 0 122 3 L364J I.OPHFPeakHour Vol- INT 01 1 1 2 Bike_ PHF %HV INT 02 0 EB n/a n/a INT 03 2 1 3 44 125 Check WB 0.42 1.3% INT 04 2 2 In: 254 NB 0.82 0.8% INT 05 1 1 169 Out: 254 SB 0.53 5.9% INT O6 1 1 1 Tahoma Blvd SE T Ink 0.70 2.0% INT 07 0 Bicycles From: N S E W Conditions: INT 01 1 1 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 1 1 INT 11 0 INT 04 2 2 INT 12 0 INT 05 1 1 1 0 8 1 10 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 E0[� 0 4 0 04 SCJ17112M 102a Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2ino.com WBE /DBE Intersection: Tahoma Blvd SE & Berry Valley Rd SE Date of Count: Tues 9/19/2017 Location: Yelm, Washington Checked By: Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Tahoma Blvd SE Tahoma Blvd SE Berry Valley Rd SE 0 Total Ending at T L S R T L S R T L S R T L S R 1:15P 1 2 11 0 2 0 16 0 0 1 0 1 0 0 0 0 31 1:30 P 1 2 17 0 1 0 16 1 1 0 0 6 0 0 0 0 42 1:45 P 0 1 8 0 0 0 11 0 0 1 0 5 0 0 0 0 26 2:00 P 2 14 19 0 1 0 7 1 0 0 0 6 0 0 0 0 47 2:15 P 2 9 24 0 0 0 14 0 0 0 0 7 0 0 0 0 54 2:30 P 0 8 14 0 4 0 16 2 0 1 0 4 0 0 0 0 45 2:45 P 2 1 13 0 1 0 11 1 0 0 0 1 0 0 0 0 27 3:00 P 0 2 15 0 1 0 12 2 0 0 0 1 0 0 0 0 1 32 3:15P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:30P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:45P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 prvey 8 ;39 121 0 10 0 103 7 1 3 0 31 0 0 0 0 304 Peak Hour: 1:45 PM to 2:45 PM Total 6 32 70 0 6 0 48 4 0 1 0 18 0 0 0 0 173 Approach 102 52 19 0 173 %HV 5.9% 11.5% n/a n/a 609% PHF 0.77 0.72 0.68 n/a 0.80 Tahoma Blvd SE 168 102 66 ____,Bike 0 32 0 Ped erry Valle Rd SE Lis 3 19 0 1 55 0 'L 0 Bike 0 1:45 PM to 2:45 PM 8 Ted 36 0 ,.... .... PEDS Heroes: N S E W Ped= 3 _ 48 4 216 I.OPHFPeakHaurVol- INT 01 0 Bike_ PHF %HV INT 02 0 EB n/a n/a INT 03 1 1 F 71 F 52 Cheek WB 0.68 n/a INT 04 1 5 1 7 In: 173 NB 0.72 11.5% INT 05 1 1 2 123 Out: 173 SB 0.77 5.9% INT O6 2 2 Tahoma Blvd SE T Ink 0.80 6.9% INT 07 1 1 1 3 Bicycles From: N S E W Conditions: INT 08 1 1 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 2 2 INT 12 0 INT 05 0 0 4 9 3 16 INT 06 0 S eeial Notes INT 07 1 1 INT 08 1 1 INT 09 0 INT 10 0 NT 11 0 INT 12 0 2 2 0 04 SCJ17112M 102p Prepared for: City of 1 elm Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE /DBE Intersection: Tahoma Blvd SE & Berry Valley Rd SE Date of Count: Tues 9/19/2017 Location: Yelm, Washington Checked By: Jess Time From North on (SB) From South on (NB) From East on (WB) From Weston (EB) Interval Interval Tahoma Blvd SE Tahoma Blvd SE Berry Valley Rd SE 0 Total Ending at T L S R T L S R T L S R T L S R 4:15 P 0 6 23 0 2 0 15 0 1 1 0 8 0 0 0 0 53 430 P 0 2 24 0 0 0 11 1 1 0 0 4 0 0 0 0 42 445 P 0 3 21 0 0 0 11 0 0 6 0 2 0 0 0 0 43 5:00 P 0 0 23 0 0 0 15 0 0 0 0 4 0 0 0 0 42 5:15P 0 4 31 0 0 0 12 0 0 0 0 1 0 0 0 0 48 5:30 P 0 5 20 0 0 1 0 11 1 0 0 0 1 1 0 0 0 0 38 5:45 P 0 4 29 0 0 0 12 0 0 0 0 6 0 0 0 0 51 6:00 P 0 1 32 0 0 0 3 0 0 4 0 5 0 0 0 0 45 6:15P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 0 25 203 0 2 0 90 2 2 11 0 31 0 0 0 0 362 Peak Hour: 5:00 PM to 6:00 PM Total 0 14 112 0 0 0 38 1 0 4 0 L 13 0 0 0 0 182 Approach 126 39 17 0 182 %HV n/a n/a n/a n/a 0.0% THE 0.90 0.81 0.47 n/a 0.89 Tahoma Blvd SE 177 126 51 �- — 0 — -_!Bike nz 14 0 . Ped .............................. Berry Valley Rd SE 13 0 17 0 4 32 0 1 Bike 0 5:00 PM to 6:00 PM = ........0......!Ped 15 0 PEDs Across. N S E W Ted_ 0 .............. 38 1 L212J 1.0 PHF Peak Hour Volume INT 01 2 2 Bike............1 PHF %HV INT 02 0 EB n/a n/a INT 03 0 116 39 Check WB 0.47 n/a INT 04 0 In: 182 NB 0.81 n/a INT 05 0 155 Out: 182 SB 0.90 n/a INT O6 0 Tahoma Blvd SE T Int. 0.89 0.0% INT 07 0 Bicycles From: N S E W Conditions: INT 08 0 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 0 2 INT O6 1 Special Notes INT 07 0 INT 08 1 INT 09 0 NT 10 0 NT 11 0 NT 12 0 0 1 1 02 Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE /DBE Intersection: Killion Rd SE/Tahoma Blvd SE & W Yelm Ave Date of Count: Tues 9/19/2017 Location: Yelm, Washington Checked By: Jess Time From North on (SB) From South on (NB) From Easton (WB) From West on (EB) Interval Interval Killion Rd SE Tahoma Blvd SE W Yelm Ave W Yelm Ave Total Ending at T L S R T L S R T L S R T L S R 6:15 A 0 4 2 2 0 16 5 3 3 2 129 5 3 0 26 1 195 6:30 A 0 1 0 2 0 11 10 3 4 1 148 4 1 0 38 2 220 6:45 A 1 3 2 6 1 16 4 3 3 8 179 3 3 1 53 4 282 700A 0 3 0 7 1 48 10 12 23 6 195 2 16 5 91 5 384 7:15 A 0 7 12 10 0 47 18 6 8 7 158 7 19 9 104 9 394 730A 0 5 2 4 0 1 16 10 6 4 3 167 5 6 1 79 5 303 745A 0 3 1 0 2 22 5 5 3 7 115 10 2 0 70 3 241 8:00 A 1 2 1 1 1 17 3 8 3 9 134 4 4 0 68 7 254 8:15A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:OOA 1 0 0 0 0 0 0 0 1 0 1 0 0 1 0 0 0 0 0 0 0 Total 1 Survey 2 28 20 32 5 193 65 46 51 43 1225 40 54 16 529 36 2273 Peak Hour: 6:30 AM to 7:30 AM Total 1 18 16 27 2 1 127 1 42 27 38 24 1 699 17 44 16 327 23 1363 Approach 61 196 740 366 1363 %HV 1.6% 1.0% 5.1% 12.0% 6.2% THE 0.53 0.69 0.91 0.75 0.86 Killion Rd SE 136 61 75 jBike W Yelm Ave 27 r 16 1 18 2 Ped :.............................: W Yelm Ave 17 857 I Ted 4 699 1 740 Bikes 1 1 24 1112 1219 16 1 _ IBike 366 _I 327 6:30 AM Tp 7:30 AM 8 3..........'Ped 372 23 PEDs Armes. N S E W Ped_ 25 - 127 42 27 Ll 576 j LO PHF Peak Hour Volume INT 01 1 1 Bikej.__0____I PHF %HV INT 02 1 1 2 EB 0.75 12.0% INT 03 2 2 63 196 Check WB 0.91 5.1% INT 04 5 3 8 In: 1363 NB 0.69 1.0% INT 05 17 5 4 26 259 Out: 1363 SB 0.53 1.6% INT 06 3 3 Tahoma Blvd SE T lot. 0.86 6.2% INT 07 0 Bicycles From: N S E W Conditions: INT 08 1 1 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 1 1 INT 11 0 INT 04 3 1 4 INT 12 0 INT 05 1 1 43 INT O6 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 5 16 SCJ17112M 003a Prepared for: SCJ Alliance L9 Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE /DBE Intersection: Killion Rd SE/Tahoma Blvd SE & W Yelm Ave Date of Count: Tues 9/19/2017 Location: Yelm, Washington Checked By: Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Killion Rd SE Tahoma Blvd SE W Yelm Ave W Yelm Ave Total Ending at T L S R T L S R T L S R T L S R 1:15 P 1 4 1 2 2 6 2 15 2 9 122 8 3 0 105 10 284 1:30 P 1 3 1 1 1 14 6 9 3 14 126 9 6 0 109 12 304 1:45 P 0 4 1 2 0 3 3 10 20 14 136 6 3 0 115 8 302 2:00 P 1 4 4 3 1 8 5 3 12 13 122 4 23 4 150 11 331 2:15 P 0 8 4 3 0 11 2 8 9 14 117 6 8 7 164 20 364 2:30 P 1 7 5 1 2 3 10 7 1 14 4 1 15 127 9 1 7 153 19 375 2:45 P 0 6 2 1 0 11 1 8 5 18 126 1 11 1 148 6 329 3:00 P 1 4 5 0 1 7 6 9 4 15 113 4 5 0 139 8 310 3: 15P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 1 0 3:30P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:45P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00P FO 0-1 0 1 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 Total Survey 5 40 23 14 8 70 32 76 59 112 989 47 60 19 1083 94 2599 Peak Hour: 1:45 PM to 2:45 PM Total 2 25 15 9 4 40 15 33 30 60 492 20 43 19 615 56 1399 Approach 49 88 572 690 1399 %HV 4.1% 4.5% 5.2% 6.2% 5.6% THE 0.82 0.71 0.95 0.90 0.93 Killion Rd SE 103 z z 49 54 jBike W Yelm Ave 9 15 1 25 8 Ped ............................... WY Ina Ave 20 541 I Ped 21..... 492 572 Bikes 5 � 60 1245 1231 19 1 4 IBike 690 1 615 1:45 PM Tp 2:45 PM 4 _ Ped 673 56 PEDs n­ss: N S E W Ped_ 84 40 15 33 1500 LO PHF Peak Hour Volume INT 01 0 Bikej 2 PHF %HV INT 02 1 1 EB 0.90 6.2% INT 03 0 131 88 Check WB 0.95 5.2% INT 04 4 25 7 36 In: 1399 NB 0.71 4.5% INT 05 1 48 4 10 63 219 Out: 1399 SB 0.82 4.1% INT o6 3 7 3 13 Tahoma Blvd SE T Int. 0.93 5.6% INT 07 4 1 5 Bicycles From: N S E W Conditions: INT 08 1 7 2 10 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 5 5 INT 12 0 INT 05 2 2 4 9 91 128 INT 06 0 Special Notes INT 07 2 2 INT 08 1 1 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 3 4 512 SCJ17112M 003m Prepared for: City of Yelm Traffic Count Consultants, Inc. Phone: (253) 926 -6009 FAX: (253) 922 -7211 E -Mail: Team @TC2inc.com WBE /DBE Intersection: Killion Rd SE/Tahoma Blvd SE & W Yelm Ave Date of Count: Tues 9/19/2017 Location: Yelm, Washington Checked By: Jess Time From North on (SB) From South on (NB) From East on (WB) From Weston (EB) Interval Interval Killion Rd SE Tahoma Blvd SE W Yelm Ave W Yelm Ave Total Ending at T L S R T L S R T L S R T L S R 4:15 P 0 6 0 1 2 12 2 16 7 15 141 7 6 3 171 20 394 4:30 P 0 4 2 1 1 9 3 16 3 14 127 4 3 0 153 19 352 4:45 P 0 7 3 1 0 7 2 9 1 11 112 17 2 1 171 13 354 5:00 P 0 3 4 2 0 12 4 14 0 11 140 4 1 4 149 14 361 5:15 P 0 3 0 4 0 12 4 16 0 9 123 5 3 3 174 22 375 5:30 P 0 3 2 0 0 1 5 3 12 1 19 110 1 1 0 2 191 15 363 5:45 P 0 1 4 2 0 7 1 15 3 14 83 2 0 2 169 18 318 6:00 P 0 4 5 2 0 4 3 8 0 12 113 4 1 1 153 23 332 6:15P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 0 31 20 13 3 68 22 106 15 105 949 44 16 16 1331 144 2849 Peak Hour: 4:00 PM to 5:00 PM Total 0 20 9 5 3 1 40 11 55 11 51 1 520 32 12 8 644 66 1461 Approach 34 106 603 718 1461 %HV n/a 2.8% 1.8% 1.7% 108% THE 0.77 0.88 0.92 0.93 0.93 Killion Rd SE ss VL 34 51 — !- - 0 — -_!Bike W Yelm Ave 5 v 20 4 Ped W Yelm Ave F5_65_1 Ted 1 _ 520 603 Bikel.....1......1 51 1322 1253 4 ;Bike � 4:00 M Tp P 5:00 M P 2 , Ped PEDs Across. N S E W Ted _ 12 40 .............0 11 55 1576 LOPHF Peak Hour Volume INT 01 7 2 1 10 Bike: PHF %HV INT 02 2 3 5 EB 0.93 1.7% INT 03 2 1 3 126 106 Check WB 0.92 1.8% INT 04 1 1 In: 1461 NB 0.88 2.8% INT 05 1 1 2 232 Out 1461 SB 0.77 n/a INT O6 5 1 6 Tahoma Blvd SE T Int. 0.93 1.8% INT 07 4 1 5 Bicycles From: N S E W Conditions: INT 08 2 2 INT 01 1 1 INT 09 0 INT 02 3 1 4 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 2 2 34 INT O6 0 Special Notes INT 07 1 2 3 INT 08 0 INT 09 0 NT 10 0 NT 11 0 NT 12 0 1 0 6 3 10 APPENDIX B COLLISION DATA � ) Z,: \� \ \\ \ \\ { \ \� \ j }\ ( }\ \\ \\\ ,;_ :�) \\ _ \ \\ ,,>} {!) {>! ;§: :§ \ \ \ \ \ \�\ } „) \\� \/ o o IE -6 u I )\) \ \\ \ \)\\) \) \ \\ lu T T > u \ j \\ \ \ \\\ \ \ \ \\ \\ aa aa aa aa aa aa aa . . . . . . . . . . . a aa aa aa aa aa aa aa \\ \ \ \ \ \ \ \ \ \ \ \ \v \\\\\ \ \ \ \ \ \ \ \ \ \ \ \\ APPENDIX C TRAFFIC VOLUME CALCULATIONS SCJ ALLIANCE CONSULTING SERVICES Yelm High School Bypass Road AM Peak Hour Volumes (School Peak) Growth Rate:l 4.00% 1 Tahoma Blvd SE Terra View St SE TMC Date: 02/23/2017 Peak Hour: 6:30 -7:30 PHF:0.66 L 0 6 0 6 EB T 82 -6 7 83 R 0 0 0 0 L 9 0 1 10 WB T 22 -3 2 21 R 0 52 0 52 L 0 0 0 0 NB T 0 0 0 0 R 52 0 4 56 L 0 76 0 76 SB T 0 0 0 0 R 0 3 0 3 2 Tahoma Blvd SE Berry Valley Rd SE TMC Date: Peak Hour: 6:30 -7:30 PHF:0.70 L 0 0 0 0 EB T 122 66 10 198 R 3 4 0 7 L 8 0 1 9 WB T 43 35 3 81 R 0 0 0 0 L 1 14 0 15 NB T 0 0 0 0 R 77 0 0 77 L 0 0 0 0 SB T 0 0 0 0 R 0 0 0 0 3 Tahoma Blvd SE Yelm Avenue TMC Date: Peak Hour: 6:30 -7:30 PHF:0.86 L 16 -3 1 14 EB T 327 -68 26 285 R 23 -3 0 20 L 24 38 0 62 WB T 699 -52 56 703 R 17 0 0 17 L 127 -1 10 136 NB T 42 3 3 48 R 27 64 0 91 L 18 0 1 19 SB T 16 0 1 17 R 27 0 0 27 SCJ ALLIANCE CONSULTING SERVICES Yelm High School Bypass Road PM Peak Hour Volumes (School Peak) Growth Rate: 4.00% 1 Tahoma Blvd SE Terra View St SE TMC Date: 02/23/2017 Peak Hour: 1:30 -2:30 PHF:0.71 L 0 1 0 1 EB T 34 -1 3 36 R 0 0 0 0 L 29 0 2 31 WB T 56 -5 4 55 R 0 11 0 11 L 1 0 0 1 NB T 0 0 0 0 R 29 0 2 31 L 0 178 0 178 SB T 0 0 0 0 R 0 5 0 5 2 Tahoma Blvd SE Berry Valley Rd SE TMC Date: Peak Hour: 1:45 -2:45 PHF:0.80 L 0 0 0 0 EB T 48 169 4 221 R 4 8 0 12 L 32 0 3 35 WB T 70 3 6 79 R 0 0 0 0 L 1 3 0 4 NB T 0 0 0 0 R 18 0 0 18 L 0 0 0 0 SB T 0 0 0 0 R 0 0 0 0 3 Tahoma Blvd SE Yelm Avenue TMC Date: Peak Hour: 1:45 -2:45 PHF:0.93 L 19 -5 0 14 EB T 615 -150 49 514 R 56 -5 0 51 L 60 8 0 68 WB T 492 -11 39 520 R 20 0 0 20 L 40 22 0 62 NB T 15 5 0 20 R 33 142 0 175 L 25 0 2 27 SB T 15 0 1 16 R 9 0 1 10 SCJ ALLIANCE CONSULTING SERVICES Yelm High School Bypass Road PM Peak Hour Volumes (School Peak) Growth Rate: 4.00% 1 Tahoma Blvd SE Terra View St SE TMC Date: 02/23/2017 Peak Hour: 4:15 -5:15 PHF:0.80 L 0 1 0 1 EB T 36 -1 3 38 R 0 0 0 0 L 44 0 4 48 WB T 72 -1 6 77 R 0 6 0 6 L 0 0 0 0 NB T 0 0 0 0 R 15 0 1 16 L 0 17 0 17 SB T 0 0 0 0 R 0 1 0 1 2 Tahoma Blvd SE Berry Valley Rd SE TMC Date: Peak Hour: 5:00 -6:00 PHF:0.89 L 0 0 0 0 EB T 38 15 3 56 R 1 1 0 2 L 14 0 1 15 WB T 112 3 9 124 R 0 0 0 0 L 4 2 0 6 NB T 0 0 0 0 R 13 0 0 13 L 0 0 0 0 SB T 0 0 0 0 R 0 0 0 0 3 Tahoma Blvd SE Yelm Avenue TMC Date: Peak Hour: 4:00 -5:00 PHF:0.93 L 8 -1 0 7 EB T 644 -12 52 684 R 66 -1 0 65 L 51 4 0 55 WB T 520 -6 42 556 R 32 0 0 32 L 40 3 0 43 NB T 11 1 0 12 R 55 11 0 66 L 20 0 2 22 SB T 9 0 1 10 R 5 0 0 5 APPENDIX D WARRANT ANALYSIS WORKSHEETS Figure 4C -4. Warrant 3, Peak Hour (70% Factor) (COMMUNITY LESS THAN 10,000 POPULATION 0 ABOVE 44 MPH ON MAJOR STREET) • Ir i MINOR STREET 300 HIGHER - VOLUME APPROACH- 20 VPH 183 100 2 OR MORE LANES & 2 IIOR MORE I` LANES .2 OR MORE LANES & 1 LANE 1 LANE & 1 LANE 100* 75* 135 300 400 500 500 700 800 900 1000 1100 1200 1300 MAJOR STREET —TOTAL OF BOTH APPROACHES- - VEHICLES PER HOUR (VPH) *Note: 100 vph applies as the lower threshold volume for a minor- street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor - street approach with one lane. SOURCE: Manual on Uniform Traffic Control Devices (MUTCD), 2009 Edition LEGEND Projected 2019 PM Peak Hour --Imp Yelm High School Bypass Road �f Signal Warrant 3 - Peak Hour Projected 2019 Yelm High School Bypass Road at Tahoma Boulevard Yelm, Washington SCJ ALLIANCE Traffic Analysis ENG lNttR i NG AN 00- NIN: sEGVl CEG Chapter 1310 Intersections Exhibit 1310 -11 Right -Turn Lane Guidelines 100 (V 80 a) E 0 c 60 L I— 2) L 40 O 2 3 M d 20 a Notes: 0 100 200 300 400 500 600 700 Peak Hour Approach Volume (DDHV) [1] [1] For two -lane highways, use the peak hour DDHV (through + right - turn). For multilane, high -speed highways (posted speed 45 mph or above), use the right -lane peak hour approach volume (through + right- turn). [2] When all three of the following conditions are met, reduce the right -turn DDHV by 20: • The posted speed is 45 mph or below • The right -turn volume is greater than 40 VPH • The peak hour approach volume (DDHV) is less than 300 VPH [3] For right -turn corner design, see Exhibit 1310 -6. [4] For right -turn pocket or taper design, see Exhibit 1310 -12. [5] For right -turn lane design, see Exhibit 1310 -13. WSDOT Design Manua! M 22 -01.12 November 2015 Right Turn Warrant Analysis - WB Tahoma Blvd 400- Projected 2019 PM Peak Hour 5CJ ALLIANCE with Bypass Road ENGINEERING AND PLANNING 5HRVICES LEGEND AM Peak Hour PM Peak Hour of School PM Peak Hour of Street Page 1310 -27 Chapter 1310 Intersections Exhibit 1310 -11 Right -Turn Lane Guidelines 100 80 (V a) . - E ..- 0 c 60 H rn L 40 O 2 ^M W d 20 0 3 0 100 200 300 400 500 600 700 Peak Hour Approach Volume (DDHV) [1] Notes: [1] For two -lane highways, use the peak hour DDHV (through + right - turn). For multilane, high -speed highways (posted speed 45 mph or above), use the right -lane peak hour approach volume (through + right- turn). [2] When all three of the following conditions are met, reduce the right -turn DDHV by 20: • The posted speed is 45 mph or below • The right -turn volume is greater than 40 VPH • The peak hour approach volume (DDHV) is less than 300 VPH [3] For right -turn corner design, see Exhibit 1310 -6. [4] For right -turn pocket or taper design, see Exhibit 1310 -12. LEGEND [5] For right -turn lane design, see Exhibit 1310 -13. AM Peak Hour PM Peak Hour of School PM Peak Hour of Street WSDOT Design Manua! M 22 -01.12 Page 1310 -27 November 2015 Right Turn Warrant Analysis - Bypass Approach 400- Projected 2019 PM Peak Hour 5CJ ALLIANCE with Bypass Road ENGINEERING AND PLANNING 5HRVICES 111100 lfoo Grade, Unsignalized Intersections S= Storage Length Required 1400 Itoo •:;: 1000. s n C 0 ~ � Z o a � a goo ! r o � � > o: 400 •iii_ ' € 3 0 200: O 85 76 71 16 50 loo Igo 200 250 700 350 400 450 500 550 goo 1 VL : LErT TURNING VOLUME (VPX) Figure 1. Warrant for left -turn storage ......................... ............................... lanes on four -lane highways. LEGEND AM Peak Hour — PM Peak Hour of School PM Peak Hour of Street Left Turn Warrant Analysis Projected 2019 PM Peak Hour 5CJ ALLIANCE with Bypass Road ENGINEERING AND PLANNING SHRVICl3 APPENDIX E CAPACITY ANALYSIS WORKSHEETS HCM 2010 TWSC Existing 2017 1: Terra View St & Tahoma Boulevard AM Peak Hour Ltersectio Int Delay, s /veh 3.4 EBR WBL WBT NBL NBR Lane Configurations tip Minorl I tt Y 0 170 Traffic Vol, veh /h 80 5 10 20 5 50 Future Vol, veh /h 80 5 10 20 5 50 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized Stage 1 None - None - None Storage Length - Platoon blocked, % 125 - 0 Mov Cap -1 Maneuver Veh in Median Storage, # 0 987 - 0 0 - Grade, % 0 887 - 0 0 962 Peak Hour Factor 66 66 66 66 66 66 Heavy Vehicles, % 2 2 3 3 2 2 Mvmt Flow 121 8 15 30 8 76 Major /Minor Majorl Major2 Minorl HCM Lane V/C Ratio Conflicting Flow All 0 0 129 0 170 64 Stage 1 - - - - 125 - Stage 2 - 45 - Critical Hdwy 4.16 6.84 6.94 Critical Hdwy Stg 1 - 5.84 - Critical Hdwy Stg 2 - 5.84 - Follow -up Hdwy 2.23 3.52 3.32 Pot Cap -1 Maneuver 1447 804 987 Stage 1 - 887 - Stage 2 - 972 - Platoon blocked, % Mov Cap -1 Maneuver 1447 796 987 Mov Cap -2 Maneuver - 796 - Stage 1 887 Stage 2 962 Approach EB WB NB HCM Control Delay, s 0 2.5 9.1 HCM LOS A Minor Lane / Maior Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh /h) 966 1447 HCM Lane V/C Ratio 0.086 0.01 HCM Control Delay (s) 9.1 7.5 HCM Lane LOS A A HCM 95th %tile Q(veh) 0.3 0 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Existing 2017 2: Tahoma Boulevard & Berry Valley Dr AM Peak Hour LtersectioM Int Delay, s /veh 3.2 NWL NWR NET NER SWL SWT Lane Configurations Y Major2 ti� 236 11 tt Traffic Vol, veh /h 5 75 120 5 10 45 Future Vol, veh /h 5 75 120 5 10 45 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 150 - Veh in Median Storage, # 0 Mov Cap -2 Maneuver 0 - - 0 Grade, % 0 0 947 - 0 Peak Hour Factor 70 70 70 70 70 70 Heavy Vehicles, % 1 1 1 1 6 6 Mvmt Flow 7 107 171 7 14 64 Major /Minor MEW Majorl Major2 Conflicting Flow All 236 89 0 0 179 0 Stage 1 175 - - - - - Stage 2 61 - A Critical Hdwy 6.82 6.92 4.22 Critical Hdwy Stg 1 5.82 - - Critical Hdwy Stg 2 5.82 - - Follow -up Hdwy 3.51 3.31 2.26 Pot Cap -1 Maneuver 734 955 1365 Stage 1 841 - - Stage 2 957 - - Platoon blocked, % Mov Cap -1 Maneuver 726 955 1365 Mov Cap -2 Maneuver 732 - - Stage 1 841 Stage 2 947 Approach NW NE HCM Control Delay, s 9.4 0 1.4 HCM LOS A Minor Lane /Major Mvmt NET NERNWLn1 SWL SWT Capacity (veh /h) 937 1365 HCM Lane V/C Ratio 0.122 0.01 HCM Control Delay (s) 9.4 7.7 HCM Lane LOS A A HCM 95th %tile Q(veh) 0.4 0 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 Lanes, Volumes, Timings --NJ2 03 T 04 13s 64.9s 05 06 D: 08 Existing 2017 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) 1 , AIM Peak Hour --1. .4--- t i Lane Group IBL EBR WBL WBT WBR NBL NBT NBR j SBL SBT SBR Lane Configurations + r + r Vii Traffic Volume (vph) 15 325 25 25 700 15 125 40 25 20 15 25 Future Volume (vph) 15 325 25 25 700 15 125 40 25 20 15 25 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 12 11 Grade ( %) 0% 0% 0% -5% Storage Length (ft) 150 100 75 0 200 0 200 0 Storage Lanes 1 1 1 0 1 1 1 0 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 35 35 35 35 Link Distance (ft) 1416 913 1051 1042 Travel Time (s) 27.6 17.8 20.5 20.3 Turn Type Prot NA Perm Prot NA Prot NA Perm Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 8 Detector Phase 5 2 2 1 6 3 8 8 7 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 6.0 10.0 6.0 6.0 6.0 6.0 6.0 Minimum Split (s) 10.5 35.6 35.6 13.0 30.6 10.5 33.5 33.5 12.5 35.5 Total Split (s) 10.6 64.9 64.9 13.0 67.3 16.6 39.5 39.5 12.6 35.5 Total Split ( %) 8.2% 49.9% 49.9% 10.0% 51.8% 12.8% 30.4% 30.4% 9.7% 27.3% Yellow Time (s) 3.5 3.6 3.6 3.5 3.6 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.6 4.6 4.5 4.6 4.5 4.5 4.5 4.5 4.5 Lead /Lag Lead Lag Lag Lead Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None Min Min None Min None None None None None Intersection Summar Area Type: Other Cycle Length: 130 Actuated Cycle Length: 89.5 Natural Cycle: 115 Control Type: Actuated - Uncoordinated Splits and Phases: 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) D1 --NJ2 03 T 04 13s 64.9s 05 06 D: 08 10.6sl 167.3s 1 , Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 Signalized Intersection Summary Existing 2017 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) AM Peak Hour � � i Movement EBL EBIJ EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r Traffic Volume (veh /h) 15 325 25 25 700 15 125 40 25 20 15 25 Future Volume (veh /h) 15 325 25 25 700 15 125 40 25 20 15 25 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 0.97 1.00 0.95 1.00 0.93 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh /h /In 1696 1696 1696 1810 1810 1900 1881 1881 1881 1909 1909 1948 Adj Flow Rate, veh /h 17 378 29 29 814 17 145 47 29 23 17 29 Adj No. of Lanes 1 1 1 1 1 0 1 1 1 1 1 0 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 12 12 12 5 5 5 1 1 1 2 2 2 Cap, veh /h 36 896 740 56 950 20 175 449 356 51 105 180 Arrive On Green 0.02 0.53 0.53 0.03 0.54 0.54 0.10 0.24 0.24 0.03 0.17 0.17 Sat Flow, veh /h 1616 1696 1401 1723 1764 37 1792 1881 1489 1818 622 1062 Grp Volume(v), veh /h 17 378 29 29 0 831 145 47 29 23 0 46 Grp Sat Flow(s),veh /h /In 1616 1696 1401 1723 0 1801 1792 1881 1489 1818 0 1684 Q Serve(g_s), s 1.1 14.2 1.0 1.7 0.0 41.6 8.4 2.1 1.6 1.3 0.0 2.5 Cycle Q Clear(g_c), s 1.1 14.2 1.0 1.7 0.0 41.6 8.4 2.1 1.6 1.3 0.0 2.5 Prop In Lane 1.00 1.00 1.00 0.02 1.00 1.00 1.00 0.63 Lane Grp Cap(c), veh /h 36 896 740 56 0 970 175 449 356 51 0 285 V/C Ratio(X) 0.47 0.42 0.04 0.52 0.00 0.86 0.83 0.10 0.08 0.45 0.00 0.16 Avail Cap(c_a), veh /h 94 973 803 139 0 1074 206 626 496 140 0 497 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s /veh 50.8 15.0 11.9 50.0 0.0 20.8 46.6 31.2 31.1 50.3 0.0 37.3 Incr Delay (d2), s /veh 8.4 0.4 0.0 6.5 0.0 6.7 20.5 0.1 0.1 5.6 0.0 0.2 Initial Q Delay(d3),s /veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50 %),veh /In 0.6 6.7 0.4 0.9 0.0 22.3 5.1 1.1 0.7 0.7 0.0 1.2 LnGrp Delay(d),s /veh 59.2 15.4 12.0 56.5 0.0 27.5 67.1 31.3 31.1 55.9 0.0 37.5 LnGrp LOS E B B E C E C C E D Approach Vol, veh /h 424 860 221 69 Approach Delay, s /veh 16.9 28.4 54.8 43.7 Approach LOS B C D D Timer 6 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G +Y +Rc), s 7.9 60.2 14.8 22.3 6.8 61.2 7.4 29.6 Change Period (Y +Rc), s 4.5 4.6 4.5 4.5 4.5 4.6 4.5 4.5 Max Green Setting (Gmax), s 8.5 60.3 12.1 31.0 6.1 62.7 8.1 35.0 Max Q Clear Time (g_c +I1), s 3.7 16.2 10.4 4.5 3.1 43.6 3.3 4.1 Green Ext Time (p-c), s 0.0 22.3 0.1 0.3 0.0 13.1 0.0 0.3 Intersection Summa? 1W gF HCM 2010 Ctrl Delay 29.7 HCM 2010 LOS C Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Existing 2017 1: Terra View St & Tahoma Boulevard PM Pk of School LtersectioM Int Delay, s /veh 3.3 EBT EBR WBL WBT NBL NBR Lane Configurations tip Minorl I tt Y 0 176 Traffic Vol, veh /h 35 5 30 55 5 30 Future Vol, veh /h 35 5 30 55 5 30 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized Stage 1 None - None - None Storage Length - Platoon blocked, % 125 - 0 Mov Cap -1 Maneuver Veh in Median Storage, # 0 1034 - 0 0 - Grade, % 0 957 - 0 0 859 Peak Hour Factor 71 71 71 71 71 71 Heavy Vehicles, % 8 8 3 3 4 4 Mvmt Flow 49 7 42 77 7 42 Major /Minor Mal 985 Minorl HCM Lane V/C Ratio Conflicting Flow All 0 0 56 0 176 28 Stage 1 - - - - 53 - Stage 2 - 123 - Critical Hdwy 4.16 6.88 6.98 Critical Hdwy Stg 1 - 5.88 - Critical Hdwy Stg 2 - 5.88 - Follow -up Hdwy 2.23 3.54 3.34 Pot Cap -1 Maneuver 1540 791 1034 Stage 1 - 957 - Stage 2 - 883 - Platoon blocked, % Mov Cap -1 Maneuver 1540 769 1034 Mov Cap -2 Maneuver - 769 - Stage 1 957 Stage 2 859 Approach EB WB NB HCM Control Delay, s 0 2.6 8.8 HCM LOS A Minor Lane / Maior Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh /h) 985 1540 HCM Lane V/C Ratio 0.05 0.027 HCM Control Delay (s) 8.8 7.4 HCM Lane LOS A A HCM 95th %tile Q(veh) 0.2 0.1 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Existing 2017 2: Tahoma Boulevard & Berry Valley Dr PM Pk of School LtersectioM Int Delay, s /veh 2.4 NWL NWR NET NER SWL SWT Lane Configurations Y Major2 — ti� 185 I Tt Traffic Vol, veh /h 5 20 50 5 30 70 Future Vol, veh /h 5 20 50 5 30 70 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 150 - Veh in Median Storage, # 0 Mov Cap -2 Maneuver 0 - - 0 Grade, % 0 0 876 - 0 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles, % 0 0 12 12 6 6 Mvmt Flow 6 25 63 6 38 88 Major /Minot Minorl Major1—I Major2 — Conflicting Flow All 185 34 0 0 69 0 Stage 1 66 - - - - - Stage 2 119 - Critical Hdwy 6.8 6.9 4.22 Critical Hdwy Stg 1 5.8 - - Critical Hdwy Stg 2 5.8 - - Follow -up Hdwy 3.5 3.3 2.26 Pot Cap -1 Maneuver 792 1038 1501 Stage 1 955 - - Stage 2 899 - - Platoon blocked, % Mov Cap -1 Maneuver 772 1038 1501 Mov Cap -2 Maneuver 765 - - Stage 1 955 Stage 2 876 Approach NW NE SW HCM Control Delay, s 8.8 0 2.2 HCM LOS A Minor Lane /Major Mvmt NET NERNWLn1 SWL SWT Capacity (veh /h) 969 1501 HCM Lane V/C Ratio 0.032 0.025 HCM Control Delay (s) 8.8 7.5 HCM Lane LOS A A HCM 95th %tile Q(veh) 0.1 0.1 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 Lanes, Volumes, Timings --NJ2 03 T 04 13s 69.5s 12s 35.5s 05 Existing 2017 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) 10.5 sl 172 s 12,5s I NONE" PMIIPkof School --1. .4--- t i Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR I SBL! SBTWERR Lane Configurations + r + r Vii Traffic Volume (vph) 20 615 55 60 490 20 40 15 35 25 15 10 Future Volume (vph) 20 615 55 60 490 20 40 15 35 25 15 10 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 12 11 Grade ( %) 0% 0% 0% -5% Storage Length (ft) 150 100 75 0 200 0 200 0 Storage Lanes 1 1 1 0 1 1 1 0 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 35 35 35 35 Link Distance (ft) 1416 913 1051 1042 Travel Time (s) 27.6 17.8 20.5 20.3 Turn Type Prot NA Perm Prot NA Prot NA Perm Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 8 Detector Phase 5 2 2 1 6 3 8 8 7 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 6.0 10.0 6.0 6.0 6.0 6.0 6.0 Minimum Split (s) 10.5 35.6 35.6 13.0 30.6 10.5 33.5 33.5 12.5 35.5 Total Split (s) 10.5 69.5 69.5 13.0 72.0 12.0 35.0 35.0 12.5 35.5 Total Split ( %) 8.1% 53.5% 53.5% 10.0% 55.4% 9.2% 26.9% 26.9% 9.6% 27.3% Yellow Time (s) 3.5 3.6 3.6 3.5 3.6 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.6 4.6 4.5 4.6 4.5 4.5 4.5 4.5 4.5 Lead /Lag Lead Lag Lag Lead Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None Min Min None Min None None None None None Intersection Summar Area Type: Other Cycle Length: 130 Actuated Cycle Length: 74.2 Natural Cycle: 95 Control Type: Actuated - Uncoordinated Splits and Phases: 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) D1 --NJ2 03 T 04 13s 69.5s 12s 35.5s 05 06 07 X s 10.5 sl 172 s 12,5s I NONE" Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 Signalized Intersection Summary Existing 2017 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) PM Pk of School � � i Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBR Lane Configurations + r + r Traffic Volume (veh /h) 20 615 55 60 490 20 40 15 35 25 15 10 Future Volume (veh /h) 20 615 55 60 490 20 40 15 35 25 15 10 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 0.92 1.00 0.89 1.00 0.79 1.00 0.94 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh /h /In 1792 1792 1792 1810 1810 1900 1810 1810 1810 1873 1873 1948 Adj Flow Rate, veh /h 22 661 59 65 527 22 43 16 38 27 16 11 Adj No. of Lanes 1 1 1 1 1 0 1 1 1 1 1 0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 6 6 6 5 5 5 5 5 5 4 4 4 Cap, veh /h 46 868 680 83 867 36 70 485 324 55 261 179 Arrive On Green 0.03 0.48 0.48 0.05 0.51 0.51 0.04 0.27 0.27 0.03 0.26 0.26 Sat Flow, veh /h 1707 1792 1405 1723 1715 72 1723 1810 1208 1783 1008 693 Grp Volume(v), veh /h 22 661 59 65 0 549 43 16 38 27 0 27 Grp Sat Flow(s),veh /h /In 1707 1792 1405 1723 0 1787 1723 1810 1208 1783 0 1702 Q Serve(g_s), s 1.4 32.3 2.4 4.0 0.0 23.5 2.6 0.7 2.5 1.6 0.0 1.3 Cycle Q Clear(g_c), s 1.4 32.3 2.4 4.0 0.0 23.5 2.6 0.7 2.5 1.6 0.0 1.3 Prop In Lane 1.00 1.00 1.00 0.04 1.00 1.00 1.00 0.41 Lane Grp Cap(c), veh /h 46 868 680 83 0 903 70 485 324 55 0 440 V/C Ratio(X) 0.48 0.76 0.09 0.78 0.00 0.61 0.62 0.03 0.12 0.49 0.00 0.06 Avail Cap(c_a), veh /h 96 1085 851 137 0 1123 121 515 344 133 0 492 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s /veh 51.4 22.6 14.9 50.5 0.0 18.9 50.6 29.0 29.7 51.1 0.0 30.0 Incr Delay (d2), s /veh 6.9 2.7 0.1 13.6 0.0 0.8 7.8 0.0 0.1 6.0 0.0 0.1 Initial Q Delay(d3),s /veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50 %),veh /In 0.7 16.6 0.9 2.2 0.0 11.8 1.4 0.4 0.9 0.9 0.0 0.6 LnGrp Delay(d),s /veh 58.3 25.3 14.9 64.0 0.0 19.7 58.4 29.0 29.8 57.1 0.0 30.0 LnGrp LOS E C B E B E C C E C Approach Vol, veh /h 742 614 97 54 Approach Delay, s /veh 25.5 24.4 42.4 43.6 Approach LOS C C D D Timer 1 2 3 6 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G +Y +Rc), s 9.7 56.5 8.8 32.2 7.4 58.8 7.8 33.2 Change Period (Y +Rc), s 4.5 4.6 4.5 4.5 4.5 4.6 4.5 4.5 Max Green Setting (Gmax), s 8.5 64.9 7.5 31.0 6.0 67.4 8.0 30.5 Max Q Clear Time (g_c +I1), s 6.0 34.3 4.6 3.3 3.4 25.5 3.6 4.5 Green Ext Time (p-c), s 0.0 17.6 0.0 0.2 0.0 21.0 0.0 0.2 Intersection Summa? HCM 2010 Ctrl Delay 26.8 HCM 2010 LOS C Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Existing 2017 1: Terra View St & Tahoma Boulevard PM Pk of Street Ltersectio Int Delay, s /veh 2.9 EBR WBL WBT NBL NBR Lane Configurations tip Minorl I tt Y 0 203 Traffic Vol, veh /h 35 5 45 70 5 15 Future Vol, veh /h 35 5 45 70 5 15 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized Stage 1 None - None - None Storage Length - Platoon blocked, % 125 - 0 Mov Cap -1 Maneuver Veh in Median Storage, # 0 1045 - 0 0 - Grade, % 0 970 - 0 0 825 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 44 6 56 88 6 19 Major /Minor Majorl Major2 Minorl Capacity (veh /h) Conflicting Flow All 0 0 50 0 203 25 Stage 1 - - - - 47 - Stage 2 - 156 - Critical Hdwy 4.14 6.84 6.94 Critical Hdwy Stg 1 - 5.84 - Critical Hdwy Stg 2 - 5.84 - Follow -up Hdwy 2.22 3.52 3.32 Pot Cap -1 Maneuver 1555 767 1045 Stage 1 - 970 - Stage 2 - 856 - Platoon blocked, % Mov Cap -1 Maneuver 1555 739 1045 Mov Cap -2 Maneuver - 739 - Stage 1 970 Stage 2 825 Approach EB WB NB HCM Control Delay, s 0 2.9 8.9 HCM LOS A Minor Lane /Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh /h) 947 1555 HCM Lane V/C Ratio 0.026 0.036 HCM Control Delay (s) 8.9 7.4 HCM Lane LOS A A HCM 95th %tile Q(veh) 0.1 0.1 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Existing 2017 2: Tahoma Boulevard & Berry Valley Dr PM Pk of Street LtersectioM Int Delay, s /veh 1.5 NWL NWR NET NER SWL SWT Lane Configurations Y Major2 ti� 144 I Tt Traffic Vol, veh /h 5 15 40 5 15 110 Future Vol, veh /h 5 15 40 5 15 110 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 150 - Veh in Median Storage, # 0 Mov Cap -2 Maneuver 0 - - 0 Grade, % 0 0 913 - 0 Peak Hour Factor 89 89 89 89 89 89 Heavy Vehicles, % 0 0 0 0 0 0 Mvmt Flow 6 17 45 6 17 124 Major /Minot Minorl Majorl Major2 Conflicting Flow All 144 25 0 0 51 0 Stage 1 48 - - - - - Stage 2 96 - - Critical Hdwy 6.8 6.9 4.1 Critical Hdwy Stg 1 5.8 - - Critical Hdwy Stg 2 5.8 - - Follow -up Hdwy 3.5 3.3 2.2 Pot Cap -1 Maneuver 840 1052 1568 Stage 1 974 - - Stage 2 923 - - Platoon blocked, % Mov Cap -1 Maneuver 831 1052 1568 Mov Cap -2 Maneuver 806 - - Stage 1 974 Stage 2 913 Approach NW NE SW HCM Control Delay, s 8.8 0 0.9 HCM LOS A Minor Lane /Major Mvmt NET NERNWLn1 SWL SWT Capacity (veh /h) 977 1568 HCM Lane V/C Ratio 0.023 0.011 HCM Control Delay (s) 8.8 7.3 HCM Lane LOS A A HCM 95th %tile Q(veh) 0.1 0 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 Lanes, Volumes, Timings --NJ2 03 T 04 13s 69.5s 12s 35.5s 05 Existing 2017 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) 10.5 sl 172 s 12,5s I NONE" PMII Pk of Street --1. .4--- t i Lane Group JBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r Vii Traffic Volume (vph) 10 645 65 50 520 30 40 10 55 20 10 5 Future Volume (vph) 10 645 65 50 520 30 40 10 55 20 10 5 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 12 11 Grade ( %) 0% 0% 0% -5% Storage Length (ft) 150 100 75 0 200 0 200 0 Storage Lanes 1 1 1 0 1 1 1 0 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 35 35 35 35 Link Distance (ft) 1416 913 1051 1042 Travel Time (s) 27.6 17.8 20.5 20.3 Turn Type Prot NA Perm Prot NA Prot NA Perm Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 8 Detector Phase 5 2 2 1 6 3 8 8 7 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 6.0 10.0 6.0 6.0 6.0 6.0 6.0 Minimum Split (s) 10.5 35.6 35.6 13.0 30.6 10.5 33.5 33.5 12.5 35.5 Total Split (s) 10.5 69.5 69.5 13.0 72.0 12.0 35.0 35.0 12.5 35.5 Total Split ( %) 8.1% 53.5% 53.5% 10.0% 55.4% 9.2% 26.9% 26.9% 9.6% 27.3% Yellow Time (s) 3.5 3.6 3.6 3.5 3.6 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.6 4.6 4.5 4.6 4.5 4.5 4.5 4.5 4.5 Lead /Lag Lead Lag Lag Lead Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None Min Min None Min None None None None None Intersection Summar Area Type: Other Cycle Length: 130 Actuated Cycle Length: 70 Natural Cycle: 95 Control Type: Actuated - Uncoordinated Splits and Phases: 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) D1 --NJ2 03 T 04 13s 69.5s 12s 35.5s 05 06 07 X s 10.5 sl 172 s 12,5s I NONE" Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 Signalized Intersection Summary Existing 2017 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) PM Pk of Street � � i Movement EBL EBIJ EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r Traffic Volume (veh /h) 10 645 65 50 520 30 40 10 55 20 10 5 Future Volume (veh /h) 10 645 65 50 520 30 40 10 55 20 10 5 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 0.95 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh /h /In 1863 1863 1863 1863 1863 1900 1845 1845 1845 1948 1948 1948 Adj Flow Rate, veh /h 11 694 70 54 559 32 43 11 59 22 11 5 Adj No. of Lanes 1 1 1 1 1 0 1 1 1 1 1 0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 3 3 3 0 0 0 Cap, veh /h 29 1036 864 91 1030 59 80 271 219 53 164 75 Arrive On Green 0.02 0.56 0.56 0.05 0.59 0.59 0.05 0.15 0.15 0.03 0.13 0.13 Sat Flow, veh /h 1774 1863 1553 1774 1741 100 1757 1845 1493 1855 1259 572 Grp Volume(v), veh /h 11 694 70 54 0 591 43 11 59 22 0 16 Grp Sat Flow(s),veh /h /In 1774 1863 1553 1774 0 1841 1757 1845 1493 1855 0 1831 Q Serve(g_s), s 0.5 22.0 1.7 2.5 0.0 16.1 2.0 0.4 2.9 1.0 0.0 0.6 Cycle Q Clear(g_c), s 0.5 22.0 1.7 2.5 0.0 16.1 2.0 0.4 2.9 1.0 0.0 0.6 Prop In Lane 1.00 1.00 1.00 0.05 1.00 1.00 1.00 0.31 Lane Grp Cap(c), veh /h 29 1036 864 91 0 1089 80 271 219 53 0 239 V/C Ratio(X) 0.38 0.67 0.08 0.59 0.00 0.54 0.54 0.04 0.27 0.41 0.00 0.07 Avail Cap(c_a), veh /h 127 1448 1207 181 0 1486 158 674 545 178 0 680 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s /veh 40.7 13.1 8.6 38.8 0.0 10.3 39.0 30.6 31.6 39.9 0.0 31.9 Incr Delay (d2), s /veh 7.4 0.9 0.0 5.5 0.0 0.5 5.1 0.1 0.6 4.6 0.0 0.1 Initial Q Delay(d3),s /veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50 %),veh /In 0.3 11.4 0.8 1.4 0.0 8.2 1.1 0.2 1.2 0.6 0.0 0.3 LnGrp Delay(d),s /veh 48.1 14.0 8.7 44.2 0.0 10.8 44.1 30.6 32.2 44.4 0.0 32.0 LnGrp LOS D B A D B D C C D C Approach Vol, veh /h 775 645 113 38 Approach Delay, s /veh 14.0 13.6 36.6 39.2 Approach LOS B B D D Timer 1 2 3 4 5 6 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G +Y +Rc), s 8.8 51.1 8.3 15.4 5.9 54.0 6.9 16.8 Change Period (Y +Rc), s 4.5 4.6 4.5 4.5 4.5 4.6 4.5 4.5 Max Green Setting (Gmax), s 8.5 64.9 7.5 31.0 6.0 67.4 8.0 30.5 Max Q Clear Time (g_c +I1), s 4.5 24.0 4.0 2.6 2.5 18.1 3.0 4.9 Green Ext Time (p-c), s 0.0 22.5 0.0 0.2 0.0 24.7 0.0 0.2 Intersection Summa ? W - HCM 2010 Ctrl Delay 16.1 HCM 2010 LOS B Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Projected 2019 1: Terra View St/High School Bypass Road & Tahoma Boulevard AM Peak Hour LtersectioM Int Delay, s /veh 4.9 ITI 1.1 WITA : ITI U11= ►: 0 1011111111111110 :: 1.1 Oki Lane Configurations Majorl 4M Minorl ) 0 Minor2 0.005 0.011 0.172 HCM Control Delay (s) Conflicting Flow All 106 0 Traffic Vol, veh /h 5 85 5 10 20 50 5 1 50 75 1 5 Future Vol, veh /h 5 85 5 10 20 50 5 1 50 75 1 5 Conflicting Peds, # /hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized Follow -up Hdwy 2.22 None - 4.02 None 3.51 4.01 None Pot Cap -1 Maneuver 1483 None Storage Length 624 981 770 125 1006 Stage 1 - - 840 774 - 901 Veh in Median Storage, # - 0 - - 0 783 - 0 773 - 0 Grade, % 0 - 0 Mov Cap -1 Maneuver 0 1439 732 0 981 Peak Hour Factor 66 66 66 66 66 66 66 66 66 66 66 66 Heavy Vehicles, % 2 2 2 3 3 3 2 2 2 1 1 1 Mvmt Flow 8 129 8 15 30 76 8 2 76 114 2 8 Major /Minor Majorl Major2 Minorl 713 HCM Lane V/C Ratio Minor2 0.005 0.011 0.172 HCM Control Delay (s) Conflicting Flow All 106 0 0 136 0 0 194 284 68 178 250 53 Stage 1 - - - - - - 148 148 - 98 98 - Stage 2 - - 46 136 - 80 152 - Critical Hdwy 4.14 4.16 7.54 6.54 6.94 7.52 6.52 6.92 Critical Hdwy Stg 1 - - 6.54 5.54 - 6.52 5.52 - Critical Hdwy Stg 2 - - 6.54 5.54 - 6.52 5.52 - Follow -up Hdwy 2.22 2.23 3.52 4.02 3.32 3.51 4.01 3.31 Pot Cap -1 Maneuver 1483 1439 748 624 981 770 654 1006 Stage 1 - - 840 774 - 901 815 - Stage 2 - - 962 783 - 922 773 - Platoon blocked, % Mov Cap -1 Maneuver 1483 1439 732 614 981 700 643 1006 Mov Cap -2 Maneuver - - 732 614 - 700 643 - Stage 1 835 769 896 807 Stage 2 943 775 844 768 Approach EB WB SB HCM Control Delay, s 0.4 0.9 9.2 11.1 HCM LOS A B Minor Lane / Maior Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh /h) 942 1483 1439 713 HCM Lane V/C Ratio 0.09 0.005 0.011 0.172 HCM Control Delay (s) 9.2 7.4 0 7.5 11.1 HCM Lane LOS A A A A B HCM 95th %tile Q(veh) 0.3 0 - 0 0.6 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Projected 2019 2: Tahoma Boulevard & Berry Valley Dr AM Peak Hour LtersectioM Int Delay, s /veh 2.6 NWL NWR NET NER SWL SWT Lane Configurations Y Majorl ti� Conflicting Flow All I Tt Traffic Vol, veh /h 15 75 200 5 10 80 Future Vol, veh /h 15 75 200 5 10 80 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Platoon blocked, % 150 - Veh in Median Storage, # 0 1237 0 634 - 0 Grade, % 0 0 Stage 2 - 0 Peak Hour Factor 70 70 70 70 70 70 Heavy Vehicles, % 1 1 1 1 6 6 Mvmt Flow 21 107 286 7 14 114 Major /Minor Minorl Majorl Major2 Conflicting Flow All 375 146 0 0 293 0 Stage 1 289 - - - - - Stage 2 86 - HCM 95th %tile Q(veh) Critical Hdwy 6.82 6.92 4.22 Critical Hdwy Stg 1 5.82 - - Critical Hdwy Stg 2 5.82 - - Follow -up Hdwy 3.51 3.31 2.26 Pot Cap -1 Maneuver 602 878 1237 Stage 1 738 - - Stage 2 930 - - Platoon blocked, % Mov Cap -1 Maneuver 595 878 1237 Mov Cap -2 Maneuver 634 - - Stage 1 738 Stage 2 919 Approach N HCM Control Delay, s 10.2 0 0.9 HCM LOS B Minor Lane /Major Mvmt NET NERNWLn1 SWL SWT Capacity (veh /h) 825 1237 HCM Lane V/C Ratio 0.156 0.012 HCM Control Delay (s) 10.2 7.9 HCM Lane LOS B A HCM 95th %tile Q(veh) 0.6 0 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 Lanes, Volumes, Timings -0�7 03 T 04 16s 60.9s 17.6s Projected 2019 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) 06 07 os AIM Peak Hour 12,6s a0,5s .4--- t i Lane Group WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r Vii Traffic Volume (vph) 15 285 20 60 705 15 135 50 90 20 15 25 Future Volume (vph) 15 285 20 60 705 15 135 50 90 20 15 25 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 12 11 Grade ( %) 0% 0% 0% -5% Storage Length (ft) 150 100 75 0 200 0 200 0 Storage Lanes 1 1 1 0 1 1 1 0 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 35 35 35 35 Link Distance (ft) 1416 913 1051 1042 Travel Time (s) 27.6 17.8 20.5 20.3 Turn Type Prot NA Perm Prot NA Prot NA Perm Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 8 Detector Phase 5 2 2 1 6 3 8 8 7 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 6.0 10.0 6.0 6.0 6.0 6.0 6.0 Minimum Split (s) 10.5 35.6 35.6 13.0 30.6 10.5 33.5 33.5 12.5 35.5 Total Split (s) 10.6 60.9 60.9 16.0 66.3 17.6 40.5 40.5 12.6 35.5 Total Split ( %) 8.2% 46.8% 46.8% 12.3% 51.0% 13.5% 31.2% 31.2% 9.7% 27.3% Yellow Time (s) 3.5 3.6 3.6 3.5 3.6 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.6 4.6 4.5 4.6 4.5 4.5 4.5 4.5 4.5 Lead /Lag Lead Lag Lag Lead Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None Min Min None Min None None None None None Intersection Summar Area Type: Other Cycle Length: 130 Actuated Cycle Length: 90.5 Natural Cycle: 125 Control Type: Actuated - Uncoordinated Splits and Phases: 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) 1 -0�7 03 T 04 16s 60.9s 17.6s 35,5s 05 06 07 os 10.6sl 166.3s 12,6s a0,5s Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 Signalized Intersection Summary Projected 2019 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) AM Peak Hour � � i Movement EBL EB]J EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r + r Traffic Volume (veh /h) 15 285 20 60 705 15 135 50 90 20 15 25 Future Volume (veh /h) 15 285 20 60 705 15 135 50 90 20 15 25 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 0.97 1.00 0.95 1.00 0.93 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh /h /In 1696 1696 1696 1810 1810 1900 1881 1881 1881 1909 1909 1948 Adj Flow Rate, veh /h 17 331 23 70 820 17 157 58 105 23 17 29 Adj No. of Lanes 1 1 1 1 1 0 1 1 1 1 1 0 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 12 12 12 5 5 5 1 1 1 2 2 2 Cap, veh /h 36 854 705 90 941 20 187 462 366 51 105 179 Arrive On Green 0.02 0.50 0.50 0.05 0.53 0.53 0.10 0.25 0.25 0.03 0.17 0.17 Sat Flow, veh /h 1616 1696 1400 1723 1764 37 1792 1881 1492 1818 622 1062 Grp Volume(v), veh /h 17 331 23 70 0 837 157 58 105 23 0 46 Grp Sat Flow(s),veh /h /In 1616 1696 1400 1723 0 1801 1792 1881 1492 1818 0 1684 Q Serve(g_s), s 1.1 12.7 0.9 4.3 0.0 42.9 9.1 2.5 6.0 1.3 0.0 2.5 Cycle Q Clear(g_c), s 1.1 12.7 0.9 4.3 0.0 42.9 9.1 2.5 6.0 1.3 0.0 2.5 Prop In Lane 1.00 1.00 1.00 0.02 1.00 1.00 1.00 0.63 Lane Grp Cap(c), veh /h 36 854 705 90 0 960 187 462 366 51 0 284 V/C Ratio(X) 0.47 0.39 0.03 0.78 0.00 0.87 0.84 0.13 0.29 0.45 0.00 0.16 Avail Cap(c_a), veh /h 93 902 744 187 0 1049 222 640 507 139 0 493 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s /veh 51.2 16.2 13.3 49.6 0.0 21.6 46.5 31.1 32.4 50.7 0.0 37.6 Incr Delay (d2), s /veh 8.4 0.3 0.0 12.5 0.0 7.9 20.5 0.1 0.4 5.7 0.0 0.2 Initial Q Delay(d3),s /veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50 %),veh /In 0.6 6.1 0.3 2.3 0.0 23.3 5.6 1.3 2.5 0.7 0.0 1.2 LnGrp Delay(d),s /veh 59.6 16.6 13.3 62.1 0.0 29.4 67.0 31.2 32.8 56.3 0.0 37.8 LnGrp LOS E B B E C E C C E D Approach Vol, veh /h 371 907 320 69 Approach Delay, s /veh 18.3 31.9 49.3 44.0 Approach LOS B C D D Timer 1 - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G +Y +Rc), s 10.0 57.9 15.6 22.4 6.9 61.1 7.4 30.5 Change Period (Y +Rc), s 4.5 4.6 4.5 4.5 4.5 4.6 4.5 4.5 Max Green Setting (Gmax), s 11.5 56.3 13.1 31.0 6.1 61.7 8.1 36.0 Max Q Clear Time (g_c +I1), s 6.3 14.7 11.1 4.5 3.1 44.9 3.3 8.0 Green Ext Time (p-c), s 0.1 20.9 0.1 0.6 0.0 11.5 0.0 0.6 Intersection Summa? - HCM 2010 Ctrl Delay 32.7 HCM 2010 LOS C Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Projected 2019 1: Terra View St/High School Bypass Road & Tahoma Boulevard PM Pk of School LtersectioM Int Delay, s /veh 8.4 0 15MVITI : ITI 1.1 MVITI :: 0 INIIIIIIIIIIIII LI 1*31111111111111 ►:: 1.1 Oki Lane Configurations Major 4M Minorl ) 0 Minor2 0.005 0.027 0.379 Conflicting Flow All 92 0 0 56 Traffic Vol, veh /h 5 35 5 30 55 10 5 1 30 180 1 5 Future Vol, veh /h 5 35 5 30 55 10 5 1 30 180 1 5 Conflicting Peds, # /hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized 2.28 2.23 None - 3.34 None 4.01 3.31 None 1458 1540 None Storage Length 1034 734 663 125 Stage - - 930 834 - 819 760 Veh in Median Storage, # Stage 2 0 - - 0 - 974 0 - Platoon blocked, % 0 Grade, % 0 - 0 Mov Cap -1 Maneuver 1458 0 721 632 0 686 Peak Hour Factor 71 71 71 71 71 71 71 71 71 71 71 71 Heavy Vehicles, % 8 8 8 3 3 3 4 4 4 1 1 1 Mvmt Flow 7 49 7 42 77 14 7 1 42 254 1 7 Major /Minor Major Major2 Minorl � HCM Lane V/C Ratio Minor2 0.005 0.027 0.379 Conflicting Flow All 92 0 0 56 0 0 191 243 28 208 239 46 Stage 1 - - - - - - 67 67 - 169 169 - Stage 2 - - 124 176 - 39 70 - Critical Hdwy 4.26 4.16 7.58 6.58 6.98 7.52 6.52 6.92 Critical Hdwy Stg 1 - - 6.58 5.58 - 6.52 5.52 - Critical Hdwy Stg 2 - - 6.58 5.58 - 6.52 5.52 - Follow -up Hdwy 2.28 2.23 3.54 4.04 3.34 3.51 4.01 3.31 Pot Cap -1 Maneuver 1458 1540 746 653 1034 734 663 1017 Stage - - 930 834 - 819 760 - Stage 2 - - 861 748 - 974 838 - Platoon blocked, % Mov Cap -1 Maneuver 1458 1540 721 632 1034 686 642 1017 Mov Cap -2 Maneuver - - 721 632 - 686 642 - Stage 1 925 830 815 739 Stage 2 830 728 928 834 Approach EB WB HCM Control Delay, s 0.8 2.3 9 13.3 HCM LOS A B Minor Lane / Maior Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh /h) 959 1458 1540 692 HCM Lane V/C Ratio 0.053 0.005 0.027 0.379 HCM Control Delay (s) 9 7.5 0 7.4 13.3 HCM Lane LOS A A A A B HCM 95th %tile Q(veh) 0.2 0 - 0.1 1.8 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Projected 2019 2: Tahoma Boulevard & Berry Valley Dr PM Pk of School LtersectioM Int Delay, s /veh 1.4 NWL NWR NET NER SWL SWT Lane Configurations Y Major2 ti� 419 11 tt Traffic Vol, veh /h 5 20 220 10 35 80 Future Vol, veh /h 5 20 220 10 35 80 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 150 - Veh in Median Storage, # 0 Mov Cap -2 Maneuver 0 - - 0 Grade, % 0 0 849 - 0 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles, % 0 0 12 12 6 6 Mvmt Flow 6 25 275 13 44 100 Major /Minor Minorl Major1-I Major2 Conflicting Flow All 419 144 0 0 288 0 Stage 1 281 - - - - - Stage 2 138 - Critical Hdwy 6.8 6.9 4.22 Critical Hdwy Stg 1 5.8 - - Critical Hdwy Stg 2 5.8 - - Follow -up Hdwy 3.5 3.3 2.26 Pot Cap -1 Maneuver 568 884 1242 Stage 1 747 - - Stage 2 880 - - Platoon blocked, % Mov Cap -1 Maneuver 548 884 1242 Mov Cap -2 Maneuver 610 - - Stage 1 747 Stage 2 849 Approach NW NE SW HCM Control Delay, s 9.6 0 2.4 HCM LOS A Minor Lane /Major Mvmt NET NERNWLn1 SWL SWT Capacity (veh /h) 811 1242 HCM Lane V/C Ratio 0.039 0.035 HCM Control Delay (s) 9.6 8 HCM Lane LOS A A HCM 95th %tile Q(veh) 0.1 0.1 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 Lanes, Volumes, Timings -11j2 03 T 04 16s 63.4s 15.1s 05 06 07 tiDS Projected 2019 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) PMIIPkof School --1. .4--- t i Lane Group EBL- EBR WBL WBT WBR NBL NBT NBR SBL! SBT WORM Lane Configurations + r + r Vii Traffic Volume (vph) 15 515 50 70 520 20 60 20 175 25 15 10 Future Volume (vph) 15 515 50 70 520 20 60 20 175 25 15 10 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 12 11 Grade ( %) 0% 0% 0% -5% Storage Length (ft) 150 100 75 0 200 0 200 0 Storage Lanes 1 1 1 0 1 1 1 0 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 35 35 35 35 Link Distance (ft) 1416 913 1051 1042 Travel Time (s) 27.6 17.8 20.5 20.3 Turn Type Prot NA Perm Prot NA Prot NA Perm Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 8 Detector Phase 5 2 2 1 6 3 8 8 7 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 6.0 10.0 6.0 6.0 6.0 6.0 6.0 Minimum Split (s) 10.5 35.6 35.6 13.0 30.6 10.5 33.5 33.5 12.5 35.5 Total Split (s) 10.5 63.4 63.4 16.0 68.9 15.1 38.1 38.1 12.5 35.5 Total Split ( %) 8.1% 48.8% 48.8% 12.3% 53.0% 11.6% 29.3% 29.3% 9.6% 27.3% Yellow Time (s) 3.5 3.6 3.6 3.5 3.6 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.6 4.6 4.5 4.6 4.5 4.5 4.5 4.5 4.5 Lead /Lag Lead Lag Lag Lead Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None Min Min None Min None None None None None Intersection Summar Area Type: Other Cycle Length: 130 Actuated Cycle Length: 75.2 Natural Cycle: 95 Control Type: Actuated - Uncoordinated Splits and Phases: 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) 1 -11j2 03 T 04 16s 63.4s 15.1s 05 06 07 tiDS 10.5 sl 168.9s Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 Signalized Intersection Summary Projected 2019 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) PM Pk of School � � i Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL J= SBR Lane Configurations + r + r Traffic Volume (veh /h) 15 515 50 70 520 20 60 20 175 25 15 10 Future Volume (veh /h) 15 515 50 70 520 20 60 20 175 25 15 10 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 0.92 1.00 0.89 1.00 0.80 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh /h /In 1792 1792 1792 1810 1810 1900 1810 1810 1810 1873 1873 1948 Adj Flow Rate, veh /h 16 554 54 75 559 22 65 22 188 27 16 11 Adj No. of Lanes 1 1 1 1 1 0 1 1 1 1 1 0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 6 6 6 5 5 5 5 5 5 4 4 4 Cap, veh /h 37 786 612 96 813 32 87 529 360 57 276 190 Arrive On Green 0.02 0.44 0.44 0.06 0.47 0.47 0.05 0.29 0.29 0.03 0.27 0.27 Sat Flow, veh /h 1707 1792 1395 1723 1720 68 1723 1810 1233 1783 1010 694 Grp Volume(v), veh /h 16 554 54 75 0 581 65 22 188 27 0 27 Grp Sat Flow(s),veh /h /In 1707 1792 1395 1723 0 1787 1723 1810 1233 1783 0 1704 Q Serve(g_s), s 0.9 25.0 2.3 4.3 0.0 25.3 3.7 0.9 12.7 1.5 0.0 1.2 Cycle Q Clear(g_c), s 0.9 25.0 2.3 4.3 0.0 25.3 3.7 0.9 12.7 1.5 0.0 1.2 Prop In Lane 1.00 1.00 1.00 0.04 1.00 1.00 1.00 0.41 Lane Grp Cap(c), veh /h 37 786 612 96 0 845 87 529 360 57 0 466 V/C Ratio(X) 0.43 0.70 0.09 0.78 0.00 0.69 0.75 0.04 0.52 0.48 0.00 0.06 Avail Cap(c_a), veh /h 103 1059 824 199 0 1155 184 611 416 143 0 531 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s /veh 48.1 22.7 16.3 46.4 0.0 20.5 46.6 25.2 29.4 47.4 0.0 26.7 Incr Delay (d2), s /veh 7.2 1.6 0.1 11.7 0.0 1.2 11.1 0.0 1.1 5.6 0.0 0.0 Initial Q Delay(d3),s /veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50 %),veh /In 0.5 12.7 0.9 2.4 0.0 12.7 2.0 0.4 4.4 0.8 0.0 0.6 LnGrp Delay(d),s /veh 55.2 24.3 16.4 58.1 0.0 21.7 57.7 25.3 30.5 52.9 0.0 26.7 LnGrp LOS E C B E C E C C D C Approach Vol, veh /h 624 656 275 54 Approach Delay, s /veh 24.4 25.9 36.5 39.8 Approach LOS C C D D Timer 1 4 5 6 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G +Y +Rc), s 10.0 48.2 9.5 31.7 6.6 51.6 7.7 33.6 Change Period (Y +Rc), s 4.5 4.6 4.5 4.5 4.5 4.6 4.5 4.5 Max Green Setting (Gmax), s 11.5 58.8 10.6 31.0 6.0 64.3 8.0 33.6 Max Q Clear Time (g_c +I1), s 6.3 27.0 5.7 3.2 2.9 27.3 3.5 14.7 Green Ext Time (p-c), s 0.1 16.6 0.0 0.9 0.0 18.0 0.0 0.8 Intersection Summa - HCM 2010 Ctrl Delay 27.6 HCM 2010 LOS C Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Projected 2019 1: Terra View St & Tahoma Boulevard PM Pk of Street LtersectioM Int Delay, s /veh 3.7 BL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations EB 4M WB ) 0 HCM Control Delay, s 0.7 2.9 9.2 10.4 HCM LOS Traffic Vol, veh /h 5 40 5 50 75 5 5 1 15 15 1 5 Future Vol, veh /h 5 40 5 50 75 5 5 1 15 15 1 5 Conflicting Peds, # /hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized None - None None None Storage Length 125 Veh in Median Storage, # 0 - 0 0 0 Grade, % 0 - 0 0 0 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 1 1 1 Mvmt Flow 6 50 6 63 94 6 6 1 19 19 1 6 Majoror /Minim Majorl Major♦ Minorl Min Conflicting Flow All 100 0 0 56 0 0 239 291 28 260 291 50 Stage 1 - - - - - - 66 66 - 222 222 - Stage 2 - - 173 225 - 38 69 - Critical Hdwy 4.14 4.14 7.54 6.54 6.94 7.52 6.52 6.92 Critical Hdwy Stg 1 - - 6.54 5.54 - 6.52 5.52 - Critical Hdwy Stg 2 - - 6.54 5.54 - 6.52 5.52 - Follow -up Hdwy 2.22 2.22 3.52 4.02 3.32 3.51 4.01 3.31 Pot Cap -1 Maneuver 1490 1547 695 618 1041 675 621 1011 Stage - - 937 839 - 763 721 - Stage 2 - - 812 716 - 975 839 - Platoon blocked, % Mov Cap -1 Maneuver 1490 1547 666 590 1041 639 593 1011 Mov Cap -2 Maneuver - - 666 590 - 639 593 - Stage 1 933 836 760 692 Stage 2 773 687 952 836 Approach EB WB HCM Control Delay, s 0.7 2.9 9.2 10.4 HCM LOS A B Minor Lane /Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 T Capacity (veh /h) 889 1490 1547 698 HCM Lane V/C Ratio 0.03 0.004 0.04 0.038 HCM Control Delay (s) 9.2 7.4 0 7.4 10.4 HCM Lane LOS A A A A B HCM 95th %tile Q(veh) 0.1 0 - 0.1 0.1 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 TWSC Projected 2019 2: Tahoma Boulevard & Berry Valley Dr PM Pk of Street LtersectioM Int Delay, s /veh 1.3 NWL NWR NET NER SWL SWT Lane Configurations Y Majorl ti� Conflicting Flow All 11 tt Traffic Vol, veh /h 5 15 55 5 15 125 Future Vol, veh /h 5 15 55 5 15 125 Conflicting Peds, # /hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Platoon blocked, % 150 - Veh in Median Storage, # 0 1547 0 788 - 0 Grade, % 0 0 Stage 2 - 0 Peak Hour Factor 89 89 89 89 89 89 Heavy Vehicles, % 0 0 0 0 0 0 Mvmt Flow 6 17 62 6 17 140 Majoror/M Minorl Majorl Major2 Conflicting Flow All 169 34 0 0 67 0 Stage 1 65 - - - - - Stage 2 104 - - Critical Hdwy 6.8 6.9 4.1 Critical Hdwy Stg 1 5.8 - - Critical Hdwy Stg 2 5.8 - - Follow -up Hdwy 3.5 3.3 2.2 Pot Cap -1 Maneuver 811 1038 1547 Stage 1 956 - - Stage 2 915 - - Platoon blocked, % Mov Cap -1 Maneuver 802 1038 1547 Mov Cap -2 Maneuver 788 - - Stage 1 956 Stage 2 905 Approach NW NE HCM Control Delay, s 8.8 0 0.8 HCM LOS A Minor Lane /Major Mvmt NET NERNWLn1 SWL SWT Capacity (veh /h) 962 1547 HCM Lane V/C Ratio 0.023 0.011 HCM Control Delay (s) 8.8 7.4 HCM Lane LOS A A HCM 95th %tile Q(veh) 0.1 0 Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 Lanes, Volumes, Timings --NJ2 03 T 04 13s 69.5s 12s 35.5s 05 Projected 2019 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) 10.5 sl 172 s 12,5s I NONE" PMII Pk of Street --1. .4--- t i Lane Group EBL EBR WBL WBT WBR NBL NBT NBR J SBL! SBT 9W Lane Configurations + r + r Vii Traffic Volume (vph) 5 685 65 55 555 30 45 10 65 20 10 5 Future Volume (vph) 5 685 65 55 555 30 45 10 65 20 10 5 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 12 11 Grade ( %) 0% 0% 0% -5% Storage Length (ft) 150 100 75 0 200 0 200 0 Storage Lanes 1 1 1 0 1 1 1 0 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 35 35 35 35 Link Distance (ft) 1416 913 1051 1042 Travel Time (s) 27.6 17.8 20.5 20.3 Turn Type Prot NA Perm Prot NA Prot NA Perm Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 2 8 Detector Phase 5 2 2 1 6 3 8 8 7 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 6.0 10.0 6.0 6.0 6.0 6.0 6.0 Minimum Split (s) 10.5 35.6 35.6 13.0 30.6 10.5 33.5 33.5 12.5 35.5 Total Split (s) 10.5 69.5 69.5 13.0 72.0 12.0 35.0 35.0 12.5 35.5 Total Split ( %) 8.1% 53.5% 53.5% 10.0% 55.4% 9.2% 26.9% 26.9% 9.6% 27.3% Yellow Time (s) 3.5 3.6 3.6 3.5 3.6 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.6 4.6 4.5 4.6 4.5 4.5 4.5 4.5 4.5 Lead /Lag Lead Lag Lag Lead Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None Min Min None Min None None None None None Intersection Summar Area Type: Other Cycle Length: 130 Actuated Cycle Length: 73 Natural Cycle: 105 Control Type: Actuated - Uncoordinated Splits and Phases: 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) D1 --NJ2 03 T 04 13s 69.5s 12s 35.5s 05 06 07 X s 10.5 sl 172 s 12,5s I NONE" Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 HCM 2010 Signalized Intersection Summary Projected 2019 3: Tahoma Boulevard /Killion Road & Yelm Avenue (SR 510) PM Pk of Street � � i Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL Lane Configurations + r + r Traffic Volume (veh /h) 5 685 65 55 555 30 45 10 65 20 10 5 Future Volume (veh /h) 5 685 65 55 555 30 45 10 65 20 10 5 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 0.95 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh /h /In 1863 1863 1863 1863 1863 1900 1845 1845 1845 1948 1948 1948 Adj Flow Rate, veh /h 5 737 70 59 597 32 48 11 70 22 11 5 Adj No. of Lanes 1 1 1 1 1 0 1 1 1 1 1 0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 3 3 3 0 0 0 Cap, veh /h 14 1059 883 92 1071 57 83 270 219 53 161 73 Arrive On Green 0.01 0.57 0.57 0.05 0.61 0.61 0.05 0.15 0.15 0.03 0.13 0.13 Sat Flow, veh /h 1774 1863 1553 1774 1749 94 1757 1845 1493 1855 1258 572 Grp Volume(v), veh /h 5 737 70 59 0 629 48 11 70 22 0 16 Grp Sat Flow(s),veh /h /In 1774 1863 1553 1774 0 1842 1757 1845 1493 1855 0 1830 Q Serve(g_s), s 0.2 25.0 1.8 2.9 0.0 17.7 2.4 0.5 3.7 1.0 0.0 0.7 Cycle Q Clear(g_c), s 0.2 25.0 1.8 2.9 0.0 17.7 2.4 0.5 3.7 1.0 0.0 0.7 Prop In Lane 1.00 1.00 1.00 0.05 1.00 1.00 1.00 0.31 Lane Grp Cap(c), veh /h 14 1059 883 92 0 1128 83 270 219 53 0 234 V/C Ratio(X) 0.36 0.70 0.08 0.64 0.00 0.56 0.58 0.04 0.32 0.42 0.00 0.07 Avail Cap(c_a), veh /h 121 1369 1141 171 0 1406 149 637 516 168 0 642 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s /veh 43.6 13.6 8.6 41.1 0.0 10.1 41.2 32.4 33.8 42.2 0.0 33.9 Incr Delay (d2), s /veh 13.6 1.2 0.0 6.5 0.0 0.5 5.7 0.1 0.8 4.7 0.0 0.1 Initial Q Delay(d3),s /veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50 %),veh /In 0.2 13.1 0.8 1.6 0.0 9.1 1.3 0.2 1.6 0.6 0.0 0.3 LnGrp Delay(d),s /veh 57.2 14.8 8.7 47.6 0.0 10.6 47.0 32.4 34.5 46.9 0.0 34.0 LnGrp LOS E B A D B D C C D C Approach Vol, veh /h 812 688 129 38 Approach Delay, s /veh 14.6 13.8 39.0 41.5 Approach LOS B B D D Timer 13 6 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G +Y +Rc), s 9.1 54.8 8.7 15.8 5.2 58.7 7.0 17.4 Change Period (Y +Rc), s 4.5 4.6 4.5 4.5 4.5 4.6 4.5 4.5 Max Green Setting (Gmax), s 8.5 64.9 7.5 31.0 6.0 67.4 8.0 30.5 Max Q Clear Time (g_c +I1), s 4.9 27.0 4.4 2.7 2.2 19.7 3.0 5.7 Green Ext Time (p-c), s 0.0 23.2 0.0 0.3 0.0 26.6 0.0 0.3 Intersection Summa HCM 2010 Ctrl Delay 16.7 HCM 2010 LOS B Yelm High School Bypass Road Synchro 9 Report SCJ Alliance 09/28/2017 Existing 2017 Queuing and Blocking Report AM Peak Hour Intersection: 1: Terra View St & Tahoma Boulevard Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time ( %) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time ( %) Queuing Penalty (veh) Yelm High School Bypass Road SCJ Alliance 11: 125 NB LR 57 26 49 158 SimTraffic Report 09/29/2017 Existing 2017 Queuing and Blocking Report PM Pk of School Intersection: 1: Terra View St & Tahoma Boulevard Movement WB NB Directions Served L LR Maximum Queue (ft) 25 50 Average Queue (ft) 2 21 95th Queue (ft) 13 49 Link Distance (ft) 158 Upstream Blk Time ( %) Queuing Penalty (veh) Storage Bay Dist (ft) 125 Storage Blk Time ( %) Queuing Penalty (veh) Yelm High School Bypass Road SimTraffic Report SCJ Alliance 09/29/2017 Existing 2017 Queuing and Blocking Report PM Pk of Street Intersection: 1: Terra View St & Tahoma Boulevard Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time ( %) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time ( %) Queuing Penalty (veh) Yelm High School Bypass Road SCJ Alliance WB L 30 2 15 125 NB LR 31 15 39 158 SimTraffic Report 09/29/2017 Projected 2019 Queuing and Blocking Report AM Peak Hour Intersection: 1: Terra View St /High School Bypass Road & Tahoma Boulevard Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time ( %) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time ( %) Queuing Penalty (veh) Yelm High School Bypass Road SCJ Alliance EB NB SB LT LTR LTR 6 59 53 0 29 32 4 53 50 970 158 410 SimTraffic Report 09/29/2017 Projected 2019 Queuing and Blocking Report PM Pk of School Intersection: 1: Terra View St /High School Bypass Road & Tahoma Boulevard Movement EB WB NB SB Directions Served LT L LTR LTR Maximum Queue (ft) 6 31 62 84 Average Queue (ft) 0 1 21 43 95th Queue (ft) 6 12 49 70 Link Distance (ft) 970 158 410 Upstream Blk Time ( %) Queuing Penalty (veh) Storage Bay Dist (ft) 125 Storage Blk Time ( %) Queuing Penalty (veh) Yelm High School Bypass Road SimTraffic Report SCJ Alliance 09/29/2017 Projected 2019 Queuing and Blocking Report PM Pk of Street Intersection: 1: Terra View St & Tahoma Boulevard Movement EB WB NB SB Directions Served LT L LTR LTR Maximum Queue (ft) 12 31 31 35 Average Queue (ft) 1 2 15 15 95th Queue (ft) 8 14 40 40 Link Distance (ft) 970 158 410 Upstream Blk Time ( %) Queuing Penalty (veh) Storage Bay Dist (ft) 125 Storage Blk Time ( %) Queuing Penalty (veh) Yelm High School Bypass Road SimTraffic Report SCJ Alliance 09/29/2017 APPENDIX F PREDICTIVE CRASH ANALYSIS : � � c Q t � V @ > v � @ � O c O � � v � V u � � 0 0 t u � � _ D , E » 7 » 7 0 -1 � > \ v S > \ } } u m 00\ / 0 j 7 \ 7 \ u \ \ \ Ez = « j 2 / + � > § 2 > § u } } C / \ 0 L / 5 & .2�\\ \ \/\ E= e » j ƒ % 7 > E k � 2 g/§ 0 / / u u \0\ uu& \ � \ \ \ \ / u f > \ \/% 0 o o / »%fo § % r ® 2]/: « 2 a \d\ƒ J%° \ 5 =a� EEaQS E� \� §/\ y E j { k § _ o ± \ } \ \ J « 2 { 5 0 &\�o� § \ > \ u = z E \ a u § m Q 2 2 & ± a +I u vi I / } o 0-0 -0 o a dk \ \§ 0 0 \ 2 2 \ m -0 a) \ k � )j / \ \ } E ) d ® > 2 \ 2 � 0 C =33 k \ / A § \o U & ƒ Q § LU k± > .7 - 0 0 / / 0 CL ® E f Q > \ j ) } \ \ \ / / } s e < /§m»g �k �E o 0 \ G 2 \ / -0 m CL _ E e S o o ® e 3 < 6 6 / \ G G a a a t \ @ 3 / 2 J d d - @ \ { } } } \ ;g»»»w E \ \ § Ln J- ° LLI / \ a 7 m > 7 � R » K f > \ \/% 0 o o / »%fo § % r ® 2]/: « 2 a \d\ƒ J%° \ 5 =a� EEaQS E� \� §/\ y E j { k § _ o ± \ } \ \ J « 2 { 5 0 &\�o� § \ > \ u = z E \ a u § m Q 2 2 & ± a +I u vi I / } o 0-0 -0 o a dk \ \§ 0 0 \ 2 2 \ m -0 a) \ k � )j / \ \ } E ) d ® > 2 \ 2 � 0 C =33 k \ / A § \o U & ƒ Q § LU k± > .7 - 0 0 / / 0 CL ® E f Q > \ j ) } \ \ \ / / } s e < /§m»g �k �E o 0 \ G 2 \ / -0 m CL _ E e S o o ® e 3 < 6 6 / \ G G a a a t \ E \ \ § Ln m > 2 CL m _ m ; 0 CL � \ \ \ m / 55& \ \ § c < F ) / / \ \ f > \ \/% 0 o o / »%fo § % r ® 2]/: « 2 a \d\ƒ J%° \ 5 =a� EEaQS E� \� §/\ y E j { k § _ o ± \ } \ \ J « 2 { 5 0 &\�o� § \ > \ u = z E \ a u § m Q 2 2 & ± a +I u vi I / } o 0-0 -0 o a dk \ \§ 0 0 \ 2 2 \ m -0 a) \ k � )j / \ \ } E ) d ® > 2 \ 2 � 0 C =33 k \ / A § \o U & ƒ Q § LU k± > .7 - 0 0 / / 0 CL ® E f Q > \ j ) } \ \ \ / / } s e < /§m»g �k �E o 0 \ G 2 \ / -0 m CL _ E e S o o ® e 3 < 6 6 / \ G G a a a t PROJECT SAFETY PERFORMANCE SUMMARY REPORT Project Name Total Crashes /yr Yelm High School Bypass Road Project Description Predicted average crash Bypass Road /Tahoma Boulevard Intersection Reference Number (PDO) 2396.01 Analyst - Actual long -term safety Ryan Shea Agency /Company performance of projects SO Alliance Contact Email ryan.shea @scjalliance.com Contact Phone average crash (360) 352 -1465 Date ComDleted average crash 09/07/17 0.3 0.2 0.2 0.1 0.1 0.0 Summary of Anticipated Safety Performance of the Project (average crashes /yr) Fatal and injury (KABC) Property damage only (PDO) Total (KABCO) • Predicted average crash frequency - Average safety performance of projects consisting of similar elements (anticipated average crashes /yr) • Expected average crash frequency - Actual long -term safety performance of the project (anticipated average crashes /yr) W Potential for Safety Improvement (anticipated average crashes /yr) PROJECT SUMMARY -- Site - Specific EB Method Summary Results for Urban and Suburban Arterial Project Total Crashes /yr Fatal and Injury Crashes /yr Property Damage Only Crashes /yr Predicted average crash (KABCO) (KABC) (PDO) Predicted Expected - Actual long -term safety Predicted Expected performance of projects Predicted Expected consisting of similar elements Project Element average crash average crash Potential for average crash average crash Potential for average crash average crash Potential for Property damage only (PDO) frequency frequency Improvement frequency frequency Improvement frequency frequency Improvement NpJedixed(KABCO) Nexpexed(KABCO) Npredic (.EC) Nexpe d(KABC) No,edic d(0) Nexpexed(0) INDIVIDUAL INTERSECTIONS Intersection 1 0.2 0.0 0.0 0.1 1 0.0 0.0 0.1 1 0.0 0.0 COMBINED (sum of column) 0.2 0.0 0.0 0.1 1 0.0 0.0 0.1 1 0.0 0.0 PROJECT SUMMARY -- Site - Specific EB Method Summary Results for Urban and Suburban Arterial Project Discussion of Results Given the potential effects of project characteristics on safety performance, results indicate that: 1. It is anticipated that the project will, on average, experience 0 crashes per year (0 fatal and injury crashes per year; and 0 property damage only crashes per year). 2. A similar project is anticipated, on average, to experience 0.2 crashes per year (0.1 fatal and injury crashes per year; and 0.1 property damage only crashes per year). Fedeeallow23 USCy 409 prohibits [he discovery or admission into evidence of etpom, swwys, scheoules, lisrs, aeOno' compiled orcdilectedfor the purpose of hJghwoy sofery impmvemenr pmjectr Mat mightqualifyforfedemisafety impnrn r*Eatfunding. N pretlid,d(PROJECT) IN .p,d,d(PROJECT) N Po ,EWfo,improvement(PROJECT) Predicted average crash Expected average crash frequency Crash severity level frequency - Average safety - Actual long -term safety Potential for Safety Improvement performance of projects performance of the project (anticipated average crashes /yr) consisting of similar elements (anticipated average crashes /yr) ( anticipated average crashes /yr) Fatal and injury KABC 0.1 0.0 N/A Property damage only (PDO) 0.1 0.0 N/A Total (KABCO) 0.2 0.0 N/A Discussion of Results Given the potential effects of project characteristics on safety performance, results indicate that: 1. It is anticipated that the project will, on average, experience 0 crashes per year (0 fatal and injury crashes per year; and 0 property damage only crashes per year). 2. A similar project is anticipated, on average, to experience 0.2 crashes per year (0.1 fatal and injury crashes per year; and 0.1 property damage only crashes per year). Fedeeallow23 USCy 409 prohibits [he discovery or admission into evidence of etpom, swwys, scheoules, lisrs, aeOno' compiled orcdilectedfor the purpose of hJghwoy sofery impmvemenr pmjectr Mat mightqualifyforfedemisafety impnrn r*Eatfunding.