M-05-0640City of Yelm
Community Development Department
Building Division
Phone: (360) 458-8407
Fax: (360) 458-3144
Applicant:
Name: Capital Sheet Metal
Address: 1218 Carpenter Rd. SE City Lacey
Properly Information:
Site Address: 1109 Yelm Avenue East
Assessor Parcel No. 85810000100 Subdivision:
Contractor Information:
Name: Capital Sheet Metal Contact: ,Bill
Address: 1218 Carpenter Rd. SE City: Lacey
Contractor License No: CAPITSM322R3 Expires: 01I17I0817
Project Information:
Project: TCCU TI
Description of Work: HVAC for approx 340 sf. TI
Phone: 491-7450
State: WA Zip 98503
Lot:
Phone: 491-7450
Slate: WA Zip: 98503
Business License:
Sq. Ft. per Floor: (1st) 340 (2nd) 0 (3rd) 0 Garage D Basement 0
Heat Type (Electric, Gas, Other). OTHER
Fees:
Item Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc
Mechanical Permit 44.25 0.00 0.00 0.0000 0.0000
TOTAL FEES: 544.25
Applicant's Affadavit:
I certify that I have read and examined the information contained within the application and know the same
to be true and correct. I also cenify that the proposed structure is in conformity with all applicable City of
Yelm regulations including those governing zoning and land subdivision, and in atldition, all covenants,
easements and restrictions of record. If applying as a contractor, I futher certify that I am currently
registered in the to of W "ngton.
Signature ~ ~ C Date
Firm
Permit No: M-05-0640-YL
Issue Date: 07N4/2006
(Work must be started within 180 days)
Receipt No: 42870
# Sets of Prints:
Final ins
Date
By:
City of Yelm
Community Development Department
Building Division
Phone: (380)468.8407
Faz:(380)468-3144
Permit Fees Schedule
Pennk No: M-05-0640-YL
...,_ h ~ ~: s.a. ]n n . a .-'~.~~. ~'i''x+~a r. :.. {3~.~wxrafPTy..."irl t~ ~.., Y. .~.::
Name: GpMal Sts»t Mehl Phone: 491-7450
Addrosa: 1218 Carpenter Rd. SE City: Lacsy State: WA Zip 98603
Project• rccu n
Description of Work: HVAC for approx 340 s}. TI
Sile Address: 1109 Yelm Avenue East Assessor Parcel No. 86810000100
f
'~v4.•'w`..
1i~T~ .4 .~..
~ -
^
-s - ' v ~ '•~A'u. a .':.i_°a!--, r'.~:;` .. f::ad . •.i; i".'._
hrri Aat Code kem Fee Baas Amt Unit Fee Unit Rate No. Units Un6 Dear
Mechanical PennR 032 001-322-10.00 44.25 0.00 0.00 0.0000 0.0000
TOTAL FEES: 541.25
~ .. - --
~ ~.
~Te~ CITY OF : ,:> > , ,,; > ,
;~ ~ ~YELM ~ RECEIPT No. 4 2 $ ~ (}
PQ Boz 479
®~. Yelm WA 98597 ~ - - '. - ,~
360-458-8403 - - ~s'r
RECEIVED _>,` : ,. ~ t~ .. ~<<~
•*++PORTY POUR DOLLARS & ZS CENTS gEFNO.
- - DATE REC. NO. AMOUNT - _ •
RECEIVED FROM ~ ~ -
eTizeiOS 42878 46.25 CNECS 8705
CAPITAL SHEET METAL ~ .
1218 CARPENTER RD SS BUDGETARY ~ ,
LACEY MA 965®3
PSRHIT MECHANICAL
Received
,fUL l~ 2D06
CITY OF YELM
COMM`E'RCIAL BUILDING/PERMIT APPLICATION FORM 90
Project Address: ~~~~ i ~YI7 ~ C. Parcel#
Zoning; Current Use: Proposed Use:
New Construction Re-Model / Re-Roof /Tenant Improvement
Plumbing Mechanical i Fire PrevenUSuppress/Alarm Other
Project
Project
Building Area (sq. ft) Parking Garage .~ 1 s' Floor 3~ 2ntl Floor ~3ftl Floor
Building Height
Are there any environmentally sensitive areas located on the parcel? If yes, a
completed environmental checklist must accompany permit application.
61,}tLOtPIG t~WNERJT~NANT NAIN~: n / ~~
ADDRESS EMAIL
CITY C STATE ZIP TELEPHONE
ARCHt1'EG1'lE~IG1NEkR LICENSE #
ADDRESS EMAIL
CITY STATE ZIP TELEPHONE
GENERAL;EON'f€i~4G OF2 TELEPHONE 7~0 ~ 07-991't
ADDRESS EMAIL
CITYS ~'~~ida~ STATE ZIP3t17~ FAX
CONTRACTOR'S LICENSE # EXP DATE_CITY LICENSE #
PLUMBING CONTRAGTOFt TELEPHONE
ADDRESS EMAIL
CITY STATE ZIP FAX
CONTRACTOR'S LICENSE # EXP DATE_CITY LICENSE #
l~CNAPt{C.i4t~.~ ~ONTf3ACT~R~tI t TELEPHONE
ADDRESS I EMAILf'i%)~ I' ('YI1
i CITY f:~A2G~" STATE ZIP FAX
CONTRACT R'S LICENSE #c'A,^175//£3aarR3 EXP DATEi-O ITY LICENSE #
Copy of City Mitigation documentation (TFC).
I hereby certify that the above information Is correct and that the construction on, and the occupancy and the use of the
above described property will be in accort~ance with the laws, rules and regulations of the State of Washington and the
City of Yelm.
~~~~~~~ ~ 1a-fl~
Applicant's Signature Date
Owner (Contractor /Owner's Agent /Contractor's Agent /Tenant (Please circle one.)
All permits are non-transferable and will expire if work authorized by such permit is not begun
within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days
105 Yelm Avenue West (360) 958-3835
PO Box 179 (360) 9583799 FAX
Yelm, WA 98597 www.ci.yelm.wo.ua
Look Up a Contractor, Electrician or Plumber License Detail Page 1 of 3
Topic Index ~ Contact Info
Search
Han+e Safety Claims a tMUrance Workplace Rights Trades & Licensfng
Find a Law or Rule Get a Form or Publication
Look Up a Contractor, Electrician or Plumber
Printer Friendly Vey
General/Specialty Contractor
A business registered as a construction contractor with L&I to perform construction work within the scope
of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment
of account and carry general liability insurance.
License Information
License CAPITSM322R3
Licensee Name CAPITAL SHEET MTL WRKS INC
Licensee Type CONSTRUCTION CONTRACTOR
UBI 342008959 Veri Workers Comp Premium
Status
Ind. Ins. Account
Id
Business Type CORPORATION
Address 1 PO BOX 3387
Address 2
City LACEY
County THURSTON
State WA
Zip 985093387
Phone 3604917450
Status ACTIVE
Specialty 1 AIR HEAT,VENTILATION,EVAPORAT
Specialty 2 SHEET METAL
Effective Date 12/23/1968
Expiration Date 1/17/2008
Suspend Date
Separation Date
Parent Company
Previous License
Next License
Associated
License
hops:/Jfortress.wa.gov/lni/bbip/Detail.aspx?License=CAPITSM322R3 7/14/2006
Look Up a Contractor, Electrician or Plumber License Detail
Business Owner Information
Effective Expiration
Name Role Date Date
SCHMIDTKE, LARRY
E 01/01/1980
SCHMIDTKE,
WILLIAM E PRESIDENT 12/23/1968
SCHMIDTKE, ERIN A
K SECRETARY 12/23/1968
SCHMIDTKE,
CHARLES M TREASURER 12/23/1968
SCHMIDTKE, DEAN VICE
W PRESIDENT 12/23/1968
SCHMIDTKE,
DIANNE C 01/01/1980 01/01/1980
Bond Information
Bond Bond
Company Account Effective Expiration Cancel Impaired Band Received
Bond Name Number Date Date Date Date Amount Date
AMERICAN
STATES Until
#4 INS CO EX894601 01/16/1998 Cancelled $6,000.00
AMERICAN
STATES
#3 INS EX894601 01/16/1995 01/16/1998 $6,000.00
OHIO
CASUALTY
#2 INS CO 2700693 01/16/1989 01/16/1995 $4,000.00
FIDELITY
DEPOSIT
#1 CO 9265292A 08/06/1983 01/16/1989
Savingslnformation
No Matching Information
Insurance Information
Page 2 of 3
Company Polity Effective Expiration Cancel Impaired Received
Insurance Name Number Date Date Date Date Amount Date
NORTH
PACIFIC INS
#18 CO 012131641 01/16/2006 01/16/2007 $1,000,000.00 01/16/2006
NORTH
PACIFIC INS Until
#17 CO 009131641 01/16/2003 Cancelled $1,000,000.00 02/28/2003
NORTH Until
#16 PACIFIC INS 004131641 01/16/1998 Cancelled
NORTH
#15 PACIFIC INS 503131641 01/16/1997 01/16/1998
Look Up a Contractor, Electrician or Plumber License Detail
Page 3 of 3
NORTH
#14 PACIFIC INS 002131641 01/16/1996 01/16/1997
NORTH
PACIFIC INS
#13 CO 001131641 01/16/1995 01/16/1996
AMERICAN
#12 STATES 02000241946 01/16/1994 01/16/1995
AMERICAN
#11 STATES 02000241944 01/16/1993 01/16/1994
AMERICAN
#10 STATES 02000241943 01/16/1992 01/16/1993
AMERICAN
#9 STATES 0200241943 01/16/1991 01/16/1992
AMERICAN
STATES INS
#8 CO 02000241942 01/16/1990 01/16/1991
AMERICAN
#7 STATES 02000241941 01/16/1989 01/16/1990
#6 ROYAL INS 011688 01/16/1988 01/16/1989
#5 ROYAL INS GSP066839 01/16/1988 01/16/1989
FIRE 8
CASUALTY Until
#4 CO/CONN BCP886142 01/16/1986 Cancelled
FIRE & CAS
CO OF Until
#3 CONNECTICUT BCP860904 01/16/1986 Cancelled
FIRE &
CASUALTY CO Until
#2 OF CONN BCP8609045AR 01/13/1983 Cancelled
NORTH Until
#1 PACIFIC CP20081 05/02/1980 Cancelled
Summons /Complaints Information
No Matching Information
Start. a New Search Printer Friendly Version
About L&I ~ Find a job at L81 ~ Information en espanol ~ Site Feedback ~
1-800-547-8367
~~ Washington State Dept. of Labor and IndusMes. Use of this site is subject to the laws of the
state of Washington.
Access Agreement ~ GrivaGY and SPCUri[Y statement I Intended use /e%tel'nal content policy ~ Visit dCC255.Wd.gOV
Staff only link
https://fortress.wa.gov/lni/bbip/Detail.aspx?License=CAPITSM322R3 7/14/2006
07!18/2006 17:29 13608679318
5~/~1RCENT
320 Ronlee Lane NW
oympia, wssnhgron sesoz•sza~
Tel 360 667-9264
Fex 360 667-9316
www.sargenlengineers.can
Received
JUL 1 9 2006
July 18, 2006
Mr. Bill Schmidtke
Capital Sheet Metal
1218 Carpenter Road SE
P. O. Box 3387
Lacey, WA 98503
RE: Yelm Safeway Heat Pump
Project No.: A06177.00
Dear Mr. Schrnidtke:
You aze installing a new heat pump on the roof of the Safeway located in Yelm. The heat
pump will weigh 357 pounds and will be mounted on top of a glued laminated beam that is at the
front of the store. It will be installed in the first cleaz bay between the joists which is
approximately eight feet from the end of the beam. The supply and return for the heat pump will
be brought through the roof on one side of the glued laminated beam.
Our scope of work includes:
Check the glued laminated beam to see if it is able to support the additional weight from
the heat pump.
Make recommendation for the installation of the unit.
The joists and other roof framing are not being checked since the cen[er of gravity of the
heat pump will be located over the glued laminated beam.
The addition of the heat pump will only increase the stresses in the glued laminated beam
by at most two percent. The total stresses aze well below the allowable for the beam. The
calculations for the check of the beam are attached. The heat pump should have a curb installed
below the heat pump. The curb should be able to distribute the weight of the heat pump to the
glued laminated beam and span between the joists. At the edge of the opening for the supply and
return, I recommend that you install at 2x4 between the wood joists and attach the 2x4 with a
Simpson LUS24. The web of the joist will have to be installed with a web stiffener (material
matching the web of the joist to build out the thickness to the full width of the beam). This will
have to be glued to the joist.
SARGENT ENGINEERS PAGE 01
07/18/2006 17:29 13608679318 SARGENT ENGINEERS PAGE 02
r~Ill~r \V~~ Mr. Bill Schmidtke
Page 2
July 18, 2006
If you have any other questions regarding this installation, please call.
Sincerely,
Sargent Engineers, Inc.
~j~
Monte Smith
Principal
MJS
\\Serverl\F§Ics\06FileaW06177.00 SakwayHVACUnit\Itccommend.doc
07/18/2006 17:29 13606679318 SARGENT ENGINEERS
~~~~~ Project: Safeway HVAC Design by: MJS
Check by:
Subject: Loads Date: 7/18/2006
Page: 1
Loads applied to the beam.
Place the unit on the glued laminated beam. Approximately 8 feet from the end.
PAGE 03
Contributory span length of the roof is 40 feet on one side of beam and 12 feet on the other side of the b
Beam size is 5 1/8 x 32
Joists aze spaced at four feet on center.
Roofing is single ply roofmg with insulation under the roofing.
Current code is 2003 IBC.
Dead load
lb
5•-
wd1:=0.7.12+2.12+3.212+ 4-~ +1.12
ft ft ft ft
µ'dl = 8.15 12
ft
Live Load
K'll ._ 25 lb
ftz
Uniform loads on beam
40•ft+12ft
Wd] ~= 2 'µ'dl
~'d1=211.9E
40•ft+ 12•ft
Wll ~ 2 'e'll
Roofing + insulation + plywood + joists +
ceiling load
Snow load
I'll = 650 ft
07/18/2006 17:29 13606679318
~~ [ ~-~7
SARGENT ENGINEERS
Project: Safeway HVAC Design by: MJS
Check by:
Subject: Loads Date: 7/18/2006
Page: 2
The load for the new mechanical equipment is 357 pounds.
PAGE 04
Based on the following Enercalc output, the beam will be just fine. The bending stress only increases b'
percent and the sheaz stress increases by 2 percent. Well within the stress limits of the beam.
07/18/2006 17:29 13606679318
5~1RGE11rT
SARGENT ENGINEERS
Title: Seleway HVAC Additlon
Dagnr: MJS
Deserlption
Scope:
PAGE 05
Job # A06177.00
Date: 4:33PM, 18 JUL O6
nee: seoooa
use~.xwcminav, ve~s.e.o. i-~=~zcos _ General Timber Beam ., Page 1
Description
Main GluLam
General Information Cade Ret: 1997/2001 NDS, 2000/20031BC, 2003 NFPA 5000. Base allowables are user donned
Section Name 5.125x31.5 Center Span 34.00 ft .....Lu 4.D0 h
Beam Width 5.125 in Len Cantilever tt .....Lu 0.00 n
Beam Depth 31.500 In Right Cantilever n .....Lu O.DO n
Member Type OluLam Douglas Fir, 24F - V4
Fb Bose Allow 2,400.0 psf
Load Dur. Factor 1.150 Fv Allow 240.0 psI
Beam End Flxity Pin-Pin Fc Allow 650.0 psi
E 1,800.0 ksi
Full Len th UnHorm Loads
Center OL 212.00 #/n LL 650.00 #/n
Left Cantllever DL #/n LL #/n
Right Cantilever DL #/n LL #/n
Beam Dealgn OK
Span= 34.OOn, Beam Width = 5.1251n x Depth = 31.SIn, Ends are Pin-Pin
Max Stress Ratio 0.751 ; t
Maximum Moment 124.6 k-ft Maximum Shear' 1.5 t6.s k
Allowable 1es.s k-n Allowable aa.s k
Mex. Positive Moment 124.58 k-ft at 17.000 ft Shear. ®Len 14.65 k
Mex. NegaWe Moment 0.00 k-n at 34.000 n ®Right 14.65 k
Mex ®Lett Support 0.00 k-tt Comber: ®Len O.000In
Max 61 Right Support 0.00 k-n ® Center 0.3961n
®Right O.000In
Mex. M albw 165.85 Reactions...
fb 1,763.57 psi 1v 115.48 psi Len DL 3.60 k Max 14.BSk
Fb 2,348.22 psi Fv 276.00 psi R{ght DL 3.60 k Max 14.65 k
Deflections
Deflectlon •0.2851n -1.079 In Deflection 0.000 In 0.000 In
,,.Location 17.000 ft 17.000 n ...Length/Defl 0.0 0.0
...Length/Defl 1,538.0 378.25 Right Cannlever...
Camber (using 1.5' D.L De11) ... Deflectlon 0.000 In 0.000 in
® Center 0.3981n ...Length/Defl 0.0 0.0
® Len D.000 In
Right 0.000 In
Stress Calcs
Bending Analysis
Ck 20.711 Le 8.237 n Sxx 647.547 in3 Area 161.436 in2
Cv 0.665 Rb 10.690 G 0.963
Max Moment x Re 'd Allowable fb
®Center 124.56 k-n 636.53 in3 2,348.22 psi
t$ Lek Suppon 0.00 k-tt 0.00 in3 2,368.20 psi
® Right Suppon 0.00 k-n 0.00 in3 2,388.20 psi
Sheer Analysts ~ Len Support ®Rlgh[ Support
Design Shear 18.64 k 18.64 k
Area Required 67.536 in2 67.536 in2
Fv: Allowable 276.00 psi 276.00 psi
Bearing ®Supports
Max. Lan Reaction 14.65 k Bearing Length Req'd 4.399 in
Max. Right Reaction 14.65 k Beadng Length Req'd 4.399 in
07/18/2006 17:29 13608679318
5,1o11'tGEIVT
SARGENT ENGINEERS
TRIe : Safeway HVAC Addition
Dsgnr: MJS
Descrlptlon
Scope:
PAGE 05
Job 8 A06177.00
Date: 4:33PM, 16 JUL O6
I/ser. KW-060146V. ver 5.8.0. I-0ec 2009 g
1iBV General Timber Beam Pa e 2 r
Description
M, V, 8 D ®Specltled Locatkms Moment Shear Deflection
® Center Spen location = 0.00 tt 0.00 k-tt 14.65 k 0.0000 in
®Right Cent. Locatlon = 0.00 ft 0.00 k-ft 0.00 k 0.0000 in
~ Left Cent. Location= 0.00 k 0.00 k-k 0.00 k 0.0000 in
Sketch & Diagram
tt4.be _.
- -
na n
~,-~fl rI 1 TTT7TT71 f~-rrr~ T7 ~7~1
~
Tl
~
~
~~
r ^n~m a
w
7VyVlflll
111 fIf Iff1
11 rf/1f r
/i)i1x1~1
I/ )
-,)a]o
bz2e
-- s1 ez
6).n
~ ~ 31A1
1].46
idb~° I~'~'~ uo
Bondi
y MO B
~IttB .~ 1 .10 .62 .B3
.36 2 .)e ] .Tr .m 31.1
Onax..1,0)9h Locatbn ffl1
Rmax•14Jx
Vm¢, O IM.11.)k
awk • 14.E
vmm a rl • 14.)k
"L'
+~
c
x
Beam hear
n21 _
O
A - _
.
).]0
4.88
2A1
0.0
a.bz .._ _. --
t.r
ib.eb
4
61
.
26 .~ .D 1 .62 m 2 .36 .la 2 .A 3 .SG 31!
Uetlec ion Locbtlan fnl
Lxellon fal
b.n
--
-
r.za
ox
o.ee
--
o.eo - - _--
o.n
~.B/
o.Aa ---
_. _
___.__
-
__
28 .tN 1 .b .62 1 .G3 .33 .70 2 .1l .30 1
07/18/2006 17:29 13608679318
- ~/~1RRGENT
SARGENT ENGINEERS
Tkle :Safeway HVAC Addition
Dsgnr: MJS
DesoripNOn
Scope:
PAGE 07
Job M A06177.00
Date: 4:32PM, 18 JUL 06
...... ,M,w.
User KW-OSDIE69. Ver S.e 0. 1-Dec-2IX73 General Timber Beam age
Description
Main GluLam
General Information
~ Code Ref: 1997/2001 NDS, 2000/2003 IBC, 2003 NFPA 5000. 8ese allowables are user defined
r_ or rrr-~
Section Name 5.125x31.5 Center Span 34.00 k ... .Lu 4.00 ft
Beam Width 5.125 in Left Cantllever tt .....LU 0.00 tt
Beam Depth 31.5001n Rlghl Cantllever tt .....Lu 0.00 k
Member Type CIIuLem Douglas Flr, 24F - V4
Fb Base Allow 2,400.0 psi
Load Dur. Factor 1.15D Fv Allow 240.0 psi
Beam End Fixity Pin-Pin Fc Allow 650.0 psi
E 1,800.0 ksi
~ Full Length Uniform Loads _ J
Center DL 212.00 #/k LL 650.0 #/k
Left Cantlever DL #/fl LL #/k
Right Cantllever DL #/k LL #/k
Point Loads
Live Load Ibs
...distance 8.000 k
Ibs Ibs Ibs
0.000 ft 0.000 tt 0.000 tt
Ibs Ibs Ibs
0.000 k 0.000 ft 0.000 ft
Beam Design OK
Span= 34.OOk, Beam Width = 5.1251n x Depth = 31.Sin, Ends are PIn-Pin
Max Stress Ratio D.7so : 1
Maximum Moment 12s.o k-n Maximum Shear ` 1.5 1s.o k
Allowable 165.9 k-tt Allowable ~.6 k
Max. Posltlve Moment 125.99 k-ft et 16.864 k Shear: ®Lett 14.93 k
Max. Negative Moment 0.00 k-k at 34.000 k ®Right 14.74 k
Max fd Lek Support 0.00 k-tt Camber. ®Lek 0.000In
Max ®Right Support 0.00 k-ft ®Center 0.419 in
Max. M allow 165.&5
Reactions... ®Right O.000In
fb 1,783.84 psi fv 118.00 psi Lett DL 3.66 k Max 14.93 k
Fb 2,348.22 psi Fv 276.00 psi Rlghl DL 3.69 k Max 14.74 k
Deflections
...Location 16.854 tt
... LengtWDef I 1,462.2
Camber (using 1.5 • D.L. De11) ...
~ Center 0.419In
® Left 0.000 in
®Right 0.000In
-1.0921n Deilectlon
17.000 tt ...Length/Defl
373.49 Right Cantllever...
Dekectlon
...Length/Defl
0,000 In 0.000 in
0.0 0.0
0.000 in 0.000 In
0.0 0.0
07/18/2006 17:29 13608679318 SARGENT ENGINEERS PAGE 08
SRIRGENT
Title : Safeway HVAC Addition
Dagnr: MJS
Daecrlptlon
$COpe:
Job p A06177.00
Date: 4:32PM, 16 JUL 06
u~°"`"-°°°'°°9. va, s.e.o. f-o~-zoos General Timber Beam _,_. _ . Page., 2
(c)19I132(xIJ EE&RCAtC Endnawnm s„xw,.o
Description Main Glu
Stress Calcs
Bending Analysts
Ck 20.711 Le 8.237 tt Sxx 847.547 in3 Area 161.438 In2
Cv 0.665 Rb 10.890 CI 0.983
Max Moment $xx Re0'd Allowable fb
® Center 125.99 k-tt 643.&1 in3 2,346.22 psi
® Lek Support 0.00 k-ft 0.00 in3 2,388.20 psi
® RlghtSupport 0.00 k-h 0.00 Ina 2,388.20 psi
Shear Anarysls ®Lefl Support ®Right Suppon
Design Shear 19.05 k 18.77 k
Area Required 69.019 in2 67.992 in2
Fv: Allowable 276.00 psi 276.00 psi
Bearing Q Supports
Mex. Lett Reaction 14.93 k Beadng Length Req'd 4.481 in
Mex. Right Reacllon 14.74 k Beadng Length Req'd 4.424 in
Query Values
M, V,& D ~ SpaeMled Loeetbna Moment Shear De}kiedon
® Center Span Location = 0.00 tt 0.00 k-N 14.93 k 0.0000 (n
®RigM Cant. Location = 0.00 tt 0.00 k-ft 0.00 k 0.0000 In
®Lefl Cant. LocaBOn = 0.00 ft 0.00 k•ft 0.00 k 0.0000 In
Sketch & Diagram
~ r 11 1 i t ~ 1 eea4m
9YIf~-IM.Ok~n
o~„m..l.onr,
RT.o~•14.9Y
vmmekrt. i4.w
Frt~w • luk
vmaxon-14.n
Locann rnl
t~
Beam hear
LRCatbn (at
i3.N
R.or
r.ne
<.ar
~s9
90
a.ee
~r.al
nar
4.ea
.R .fm Id
s2 _
.R3
3! 2 .m z ..n m ~,
Lxatbn fn)