Borman washington not presub just mtg
City of Yelm
Site Plan Review Committee
105 Yelm Avenue West
Yelm, WA 98597
July 21, 2016
These comments are preliminary in nature and are not intended to represent final
comments and or requirements for the City of Yelm. Until a complete application is made, the Community Development Department can only attempt to inform the applicant of general requirements
as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Steve Borman
Project Proposal:
Project Location: Washington
Parcel Numbers: 75300901200,
75600901400
Property Background and Characteristics
The property is vacant. Although it has two parcel numbers, a lot determination could be made that there are 5 individual lots,
each approximately .14 acres.
Zoning
The property is identified by the Yelm Comprehensive Plan Map as (CBD) Central Business District. Most all commercial uses, including mixed
use retail and residential uses are allowed, subject to site plan review approval.
Allowed residential density is 16 units per acre, subject to R-16 development standards. Building
setbacks are 15 feet from the front, 10 from the side and 25 feet for the rear. The maximum height of buildings is 35 feet or 3 stories, whichever is lesser.
Critical Areas
The City
critical area maps indicate that the property is located outside of wetlands, flood zones, and high ground water areas.
All of Yelm is considered a critical aquifer recharge area.
Protection measures for development within a critical aquifer recharge area are met through treating and disposing of stormwater through an approved stormwater system.
Fish and Wildlife Habitat Conservation Areas
The Critical Areas Code maps indicate the property contains soils possibly suitable as habitat for the Mazama Pocket Gopher, a protected
species listed on the Washington Priority Species and
Habitat List as well as the Federal Threatened Species List. If members of the species are found on the property, a critical areas
report is required.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance with the provisions of the Endangered Species Act. The applicant should
contact Tim Romanski of the US Fish and Wildlife Service at 360.753.5823 or tim.romanski@fws.gov with any questions about compliance with Federal standards for threatened species.
Development
Standards
Water
The proposed project is located in the City of Yelm’s water service area. There is a water main located in the alley.
All commercial buildings and irrigation systems
are required to provide for cross-connection control through the provisions of a back flow prevention device (reduced pressure backflow assembly) installed on the water services. A
list of approved devices can be found at Chapter 246-290-490 WAC. The backflow device is required to be installed after the meter and tested by a certified backflow tester. If a separate
irrigation meter is installed, an approved backflow prevention device shall be provided.
The Unified Development Code, Title 18 YMC, requires the Community Development Department to
make a written finding of concurrency for any approval for a land division or site plan (including any development activity). For water, the finding must include the fact that “improvements
necessary to provide city standard facilities and services are present or are in an approved and funding plan to assure availability in a time to meet the needs of the proposed development.”
The
State Subdivision Act, Chapter 58.17 RCW, requires that the City of Yelm make a written determination that appropriate provisions are made for potable water supplies as part of the preliminary
land division process.
The State Building Code at Section 19.27.097 RCW requires evidence of water availability and the issuance of a building permit by the City of Yelm is the City’s
commitment to serve a proposal with potable water. If the City does not have sufficient approved water connections at the time a building permit for the proposed development is ready
to issue, the permit will be denied until additional water resources are available.
The City currently has sufficient water connections to serve some anticipated growth. A site plan review approval is good for 18 months. It is anticipated that the City will have adequate
water at the time of development of this proposal.
Sewer
The site is within the City of Yelm sewer service area. There is a sewer main located in the alley.
S.T.E.P. tank sizing
is governed by the Criteria for Sewage Works Design (Orange Book) published by the Washington State Department of Ecology.
A properly sized oil/water separator is required if there
is any potential for oil to enter the sanitary sewer system. A properly sized grease interceptor will be required if there is any potential for the introduction of fats, oils, or greases
from food preparation to enter the sanitary sewer system.
Stormwater
The City of Yelm has adopted the 2012 Stormwater Management Manual for Western Washington published by the Washington
Department of Ecology. Stormwater from new impervious surfaces is required to be treated and released. Roof runoff shall be distributed to individual dry wells.
Transportation
The
City of Yelm Development Guidelines and the concurrency requirements of Chapter 18.16 YMC require all new developments to improve street frontages to current City standards. Washington
Avenue is classified as a local access residential street and requires an 11 foot drive lane, a 7 foot parking lane, concrete curb and gutter, 6’ planter strip and 5 foot sidewalk (on
one side). Rice Street is considered a Local Access Commercial street, and includes an 11 foot travel lane, a 7 foot parking lane, a 6 foot planter strip and 5 foot sidewalk (both sides).
While frontage improvements are required for all new development in the City, partial improvements are typically not encouraged. A deferral request would be considered.
Parking
Although
the CBD allows minimum parking requirements to be waived where on street parking is available, the owner, developer or operator of the premises shall be responsible for providing adequate
amounts of, and arrangement of parking space.
Chapter 18.54 YMC requires one parking space for every 200 square feet of gross floor area for restaurants, one parking space for every
250 square feet of gross floor area for retail establishments, and one parking space for every 300 square feet of gross floor area for
professional offices. Residential dwelling units require two parking spaces for each unit. In the case of two or more uses in the same building, the total requirements shall be the
sum of the requirements for the several uses computed separately.
Full size parking spaces in banks of 90 degrees are 9 feet in width by 20 feet in length and require a 23 foot drive
aisle.
Parking areas are required to be landscaped to provide visual relief and shade. At least 24 square feet of landscaping is required for each parking stall proposed. Each area
of landscaping must contain at least 100 square feet of area and must be at least six feet in any direction. Each planting area must contain at least one tree, and no parking stall
shall be located more than 50 feet from a tree. Live groundcover shall be provided throughout each landscaping area.
Building and Design Guidelines
Design Standards
For Commercial:
The
maximum floor area is 20,000 square feet per floor.
At least two of the following pedestrian amenities near the sidewalk are required:
Pedestrian furniture such as seating, lighting
drinking fountain
Pedestrian weather protection
Pedestrian lighting
Substantial perimeter landscape
Transit stop
Decorative screen wall, trellis or other building or site feature
Architecturally
accentuate building corners with the following design elements:
Substantial landscaping of at least 200 square feet at or near the corner of the lot
Decorative screen wall at least
three foot high, a trellis or other continuous architectural element
Corner entrance to courtyard, lobby, atrium or pedestrian pathway
Bay windows, roof deck or balconies on upper stories,
sculpture or artwork
Weather protection canopy
Building corner entry
Service areas, outdoor storage areas and other intrusive site features must be located at the rear of the lot to
reduce conflicts with adjacent uses. All trash enclosures must incorporate the architectural features of the primary structures and landscaping to minimize visual impacts of the Enclosure.
Trash enclosures will be reviewed by Pacific Disposal to ensure adequate service can be provided.
Perimeter landscaping is required and is characterized by an 8 foot landscape strip
along property lines of any combination of evergreen and deciduous trees (with no more than 50
percent being deciduous), and shrubs. The intent is to provide partial screening and buffering between uses and of softening the appearance of streets, parking and structures.
A
dense sight barrier landscaping is required between the site and the residential use to the south. A dense sight barrier is required to be 15 feet wide and include a combination of
trees, shrubs, walls, earthen berms and related plant materials so that the resultant effect is sight-obscuring. This landscape is required on the northwest property line adjacent to
the residential home.
Parking lots must be lit to the standards of the design guidelines and include non glare, shielded fixtures no higher than 20 feet above grade. A lighting plan
is required as part of civil construction plan review.
Pedestrian circulation paths within the property require paved walkways from sidewalks to the building, should tie into neighboring
properties when feasible, and provide pathways through parking lots. Within parking lots, the path material must be different than asphalt.
Buildings over three stories or up to 5,000
square feet in gross building footprint shall include at least one of the following elements, and buildings over 5,000 square feet in gross building footprint shall include 2 or more
of the following elements along their facades:
A minimum 10 foot setback from the face of a building on an upper story. Building facades visible from a public right of way or park shall
be modulated horizontally every 100 feet, with a minimum depth of 6 feet. Roof deck or balconies as part of the building modulation shall be a minimum of 60 square feet.
Roof lines visible
from a public Right-of-Way or park shall be modulated vertically every 100 feet. Gable, hipped or shed roofs shall have a slope of at least 3’ vertical to 12’ horizontal. Arched, vaulted,
dormer or saw-toothed roof lines shall have a change in slope, within every 100 foot width.
Building facades shall include repeating elements such as distinctive window patterns, porch,
patio, alternate dormers, gables, or other roof elements, changing materials, lighting fixtures, trellis, substantial landscaping and/or pedestrian oriented open spaces along the building
façade.
Buildings facing a public street or park shall be enhanced with at least one of the following elements:
Decorated rooflines, such as an ornamental molding, entablature, frieze
or other roofline device visible from the ground level.
Decorative window and door treatments such as a decorative molding or framing details around all ground floor windows and doors.
Decorative
railings, grill work or landscape guards.
Landscape trellises.
Decorative light fixtures with a diffuse visible light source.
Decorative building materials.
Blank walls visible from the street, parking or adjacent lot shall be treated in one or
more of the following ways:
Vertical trellis in front of the wall with climbing vines or plant materials.
Landscaped planting bed at least 5’-0” wide or raised planter bed at least
2’-0” high and 3’ wide in front of the wall, and plant materials that obscure or screen at least 35% of the wall’s surface within 3 years.
The following materials are allowed as described
below:
Metal siding over 25% of a building’s façade must have a matted finish in a neutral or earth tone color, and must include visible window and door trim painted or finished in
a complimentary color and corner and edge trim that cover exposed edges of the sheet metal panels.
Pre-finished metal roofing must have standing seams & muted colors.
Concrete block
walls, or exposed concrete surfaces that are visible from a public street or park must be architecturally treated by split face or grooved surface, colored mortar, or other masonry types
in conjunction with concrete blocks.
Roof-mounted mechanical equipment shall be screened so as not to be visible from the street or from the ground-level of adjacent properties.
Screening
shall blend with the architecture of the building.
Building shell colors shall be earth tones such as taupe, brown, red-brown, buff, gray, cream, white natural wood, brick or stone.
Trim should be white, black, dark blue, dark green, or other deep saturated colors.
Permit Process
State Environmental Policy Act
A SEPA threshold determination is required if there
are more than 24 dwelling units or a commercial building with more than 10,000 square feet.
Critical Areas Report
If a critical areas report is required, it must be prepared by a qualified
professional using scientifically valid method and studies in the analysis of critical area data and field reconnaissance, and reference the source of science used. The report must
evaluate the proposal and all probable impacts to critical areas in accordance with Chapter 18.21 YMC. Minimum report requirements may be found in Chapter 18.11 YMC.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance with the provisions of the Endangered Species Act. The applicant should contact Tim Romanski
of the US Fish and Wildlife Service at 360.753.5823 or tim.romanski@fws.gov with any questions about compliance with Federal standards for threatened species
Land Use Review Process
The
Site Plan Review process is an administrative approval designed to ensure compliance with development regulations. The process is codified at Chapter 18.10 YMC. A notice of application
may be required.
A site plan review approval typically contains conditions of approval that the applicant must complete prior to receiving a building permit. Upon satisfactory completion
of all conditions of land use approval, the applicant can submit building plans for approval.
Civil Plan Review
Civil Plan review generally takes place after a land use approval.
The Yelm Development Guidelines contain standard details for all infrastructure requirements, including parking lot layout, sewer and water lines, S.T.E.P. tank design, and stormwater
control.
The City uses a third party engineer for peer review of civil plans. Depending on the number of revisions, the process can take 2 to 4 weeks for each revision.
Building
Permit Process
The City of Yelm has adopted the International Codes as amended by the State Building Code Council for Building, Fire, Mechanical, Fuel Gas, Existing Building, the Uniform
Plumbing Code and the Washington State Energy Code.
Building elevations, site utility screening and refuse enclosure shall meet the design standards in the Unified Development Code,
and shall be submitted with the site plan review application.
Spaces used for food service shall be reviewed and approved by the Thurston County Health Department prior to building permit
issuance.
Building plans may be submitted after site plan review approval, along with civil engineering plans, although they will not be reviewed until the civil plans have undergone
at least one review cycle.
Prior to permit issuance two complete revised plan sets will be required for approval. Integrated sprinkler and fire alarm system permits may be deferred.
Building
permit review typically takes 8 to 12 weeks.
Fees & Charges
Site Plan Review Depends on project, fee schedule on city website
SEPA Review $150.00
Civil Plan Review Billed on a cost recovery basis
Building Plan Review Based on
1997 UBC fee Schedule
Building Permit Based on 1997 UBC fee Schedule
Sewer Connection Fee $6,394.00 per ERU*
Sewer Inspection Fee $145.00 per ERU*
Water Connection Fee $6,159.99 per
ERU*
Water Meter Fee Based on meter size*
Transportation Facilities Charge $1,497.00 per peak PM trip*
*Paid at the time of building permit
Utility connection fees for multi-family
(greater than 4 units) is 75%
The Transportation Facility Charge (TFC) is per new PM peak trip generated by the development. Trip generation will be determined through the trip generation
analysis and is payable at building permit issuance.
Examples include:
Single family dwelling creates 1.01 trips $1,511.97
Multi family dwelling creates .60 trips per unit. $898.20
per unit
Retail and office 3.6 trips per 1,000 square feet
Restaurants 6.13 trips per 1,000 square feet.