Loading...
TIA^The Shea Group a Parametrrx company Yelm Avenue Waigreens Traffic Impact Analysis July, 2001 Engineering • Planning • Environmental Sciences ®The Shea Group a Parametrix com/~any August 7, 2001 PMX# 244-1781-017 Cathie Carlson, Community Development Director City of Yelm P O Box 479 Yelm, WA 98597 8830 Tallon Lane, Suite B, Lacey, WA 98516 • PO Box 3427, Lacey WA 98509-3427 Re: Yelm Avenue Walgreens Transportation Impact Analysis Dear Cathie: We are pleased to present the Transportation Impact Analysis for the proposed Yelm Avenue Walgreens. Our analysis indicates that the Yelm Avenue Walgreens will add approximately 76 new PM peak hour trips to the area roadways after completion. The study indicates that the increase in traffic generated by the proposed project will be accommodated by the planned roadway improvements within the area. Traffic generated by the proposed Walgreens will have a measurable impact on the local roadway system. The project should be required to construct half street frontage improvements along the property frontage on Creek Street and Yelm Avenue and to pay a Transportation Facility Charge to the City of Yelm. °. Sincerely, -, ~ Geor .e- mith Transportation Planner cvc\gls (k:\1781\Walgreens tia\Carlson 080701) 360.459-3609 • 360-459-0154 fax Engineering • Panning • Environmental Sciences TRANSPORTATION IMPACT ANALYSIS Yelm Avenue Walgreens Yelm, WA July, 2001 Project Information Project: Yelm Avenue Walgreens Prepared for: City of Yelm Community Development Deparhnent Contact: Cathie Carlson, Community Development Director City of Yelm P O Box 479 Yelm, WA 98597 (360) 458-8408 Project Engineer Prepared by: The Shea Group 8830 Tallon Lane, Suite B, Lacey, WA 98516 P.O. Box 3427 Lacey, WA 98509-3427 (360) 459-3609 FAX (360) 459-0154 Contact: Perry A. Shea, P.E., Principal George Smith, Transportation Planner Shea Group Project: 244-1781-017 File Number: k:\1781\Contracts\Walgreens TIA ~~~~~ C ~ ~ _.~®~ Yelm Avenue Walgreens Traffic Impact Analysis TABLE OF CONTENTS I. INTRODUCTION ................................................................................................................................1 PROJECT OVERVIEW ............................................................................................................................. ..'I STUDY CONTEXT ................................................................................................................................. ..') II. PROJECT DESCRIPTION ................................................................................................................ ..3 DEVELOPMENT PROPOSAL .................................................................................................................... ..3 III. BACKGROUND INFORMATION .................................................................................................... ..5 AREA LAND USES ................................................................................................................................ ..5 ROADWAY INVENTORY ......................................................................................................................... ..5 TRAFFIC VOLUME DATA ....................................................................................................................... ..5 PUBLIC TRANSPORTATION .................................................................................................................... ..8 IV. PROJECT TRAFFIC CHARACTERISTICS .................................................................................... ..8 TRAFFIC GENERATION .......................................................................................................................... .. $ TRIP DISTRIBUTION .............................................................................................................................. ..9 V. FUTURE TRAFFIC CONDITIONS ................................................................................................... 12 ROADWAY IMPROVEMENTS ................................................................................................................... 12 PIPELINE DEVELOPMENT PROJECTS ........................................................................................................ 'I Z PROJECTED TRAFFIC VOLUMES ............................................................................................................. 'I4 VI. TRAFFIC OPERATIONS ANALYSIS .............................................................................................. 17 SIGNALIZED INTERSECTIONS .................................................................................................................. 'I8 SITE DRIVEWAY ANALYSIS ................................................................................................................... ZO VII. MITIGATION ................................................................................................................................... 22 VIII. CONCLUSIONS ................................................................................................................................23 The Shea Group - a Parametrix company Page I July, 2001 Yelm Avenue Walgreens Traffic Impact Analysis List of Figures Figure 1 Site Vicinity Map Figure 2 Preliminary Site Plan Figure 3 Existing 2001 PM Peak Hour Traffic Volumes Figure 4 Site-Generated Traffic Volumes Figure 5 Site Generated Traffic Volumes -Site Detail Figure 6 Pipeline Development Traffic Figure 7 Projected 2002 PM Peak Hour Traffic Volumes Without Project Figure 8 Projected 2002 PM Peak Hour Traffic Volumes With Project Appendices Appendix A Turning Movement Count Worksheets Appendix B Capacity Analysis Worksheets The Shea Group - a Parametrix company July, 2001 Page ii Yelm Avenue Walgreens Traffic Impact Analysis I. INTRODUCTION Project Overview The Yelm Avenue Walgreens project will consist of a 14,490 square foot drugstore on 1.86 acres at the NW corner of Yelm Avenue and Bald Hill Road-Creek Street in Yelm. Access to the project will be provided through a driveway to Creek Street and a driveway directly onto Yelm Avenue. Figure 1 illustrates the site vicinity and the transportation network serving the project area. Study Context This report by The Shea Group documents the results of a Traffic Impact Analysis (TIA) of existing and future traffic conditions in the project vicinity. The study was prepared according to City of Yelm TIA guidelines for new developments as part of the required environmental review submittal for the proposed project. Two intersections in the study area were analyzed. The project is expected to be completed by 2002, which was used as the horizon year for this study. The work scope for this study was determined through a scoping process involving representatives of the developer, the City of Yelm, and The Shea Group. The intersections to be analyzed were identified with input from City staff. The Shea Group - a Parametrix company July, 2001 Page 1 W ~ ~~ C7 Z Q U O J i- ~~c ~, % = o ~~o ~J a`' Cy J ~ `~~ ~~ ~ pla'.~'~~~ G 1 4 \ Q' /~ ~ ~ ; 1 V BV ~ zr oho J - + if' L1~ ~ ~' ~ bJS`JY aW `~ ~~ ~ m ~ ~ E ~ ` ~K ~`S' W ~ ONOV . Z ~yy ~J ~, ~ ~ o"G < e g ; ~ 1] 138 t; / Sk a 3 e °°W ' 1J fJ ` ~~Otl N08NINlIM w~ 1] ago 3 `4 x3N3% au ]3in] d 8 0 ` / 3 J J ~ "S' ~ u w P ~\~ `~ . i ~ b3 ~Y=.~ ~ , _ tlMh] ~ J C~ 3 ~i4 ~ , 80 M31 hiYl I u ~ w s n sioi ~.u ~.6 ~ ~ 6 e ~ ~ ~~ _ _~ ~~ / h~HO t ~~ ~ ~ ~ Odd: ~ ~~ s ~.~ ; ~ ~ 5 u 1 ~ ,~,. 4 ~' NS hJ ~~ ~ ~, ~ ~ -~ W O ~ ~ CQ J_ G Q W I"' w Z z U W W Q ~~. ~~ ~~ ~~ a N Q E 0 L U O / R ` C V °' n, E E o 0 o '> a- w (~ o ~• c v J ~ c a rn c c .~ ^ ~ c Yelm Avenue Walgreens Traffic Impact Analysis II. PROJECT DESCRIPTION Development Proposal The Yelm Avenue Walgreens project consists of construction of a 14,490 square foot Walgreen's drugstore with adrive-through pharmacy and 57 parking spaces. The site is located on 1.86 acres at the northwest corner of the intersection of SR 507 and Bald Hills Road-Creek Street. Access to the site will be from two driveways, one from Yelm Avenue (SR 507) and one from Creek Street. The project site is located within the C-1 Commercial Zone in Yelm's Mixed Use Downtown District. A drugstore with drive-through is a permitted use in this zone. The site is currently occupied by a 10-unit apartment complex and a small commercial building. All of the existing buildings will be removed prior to constructing the Walgreens project. There are several existing driveway access points on Yelm Avenue and Creek Street serving the subject property. The existing accesses will be replaced by the two access points shown on the proposed site plan. A reduced copy of the site plan showing the proposed building configuration and internal roadway network is provided on Figure 2. The Shea Group - a Parametrix company July, 2001 Page 3 N raw-s~ ~ Z CREEK STREET W O ~ ~ N 0 C~ ~ .~ ~_ ~~~~~ ~ !% ~~ ; ~,-~ ~~~ / ~I/ J 7 I f •~ I s, o`~ i, j~. !;'r / `~. /%, i ? 0 z N ~_ J Q Z a Z ~ Q a" ~~ d~ W ~ f" ~ N ~ ~ ~ ~ ~ a~ ZW W ~~ _~ W ~ W ~ Z W Q J W Q a U X .~. u 0 a O W ^ y! N U N ~ O C O~ ~~ ~ W C C i d i Yelm Avenue Walgreens Traffic Impact Analysis III. BACKGROUND INFORMATION Area Land Uses Prairie Plaza, a strip mall containing several small retail uses, is located immediately north of the project site. A Chevron station is situated across Creek Street from the project site, and an Arco station is located at the southeast corner of the Yelm AvenueBald Hill Road-Creek Street intersection. A mobile home park is located across Yelm Avenue from the subject property. Other commercial uses are located along Yelm Avenue. Roadway Inventory Creek Street NE is a two-lane roadway running north-south between SR 507 (Yelm Avenue) and 103rd St. It is designated a commercial collector, with shoulders on both sides of the road and a sidewalk on the east side. There is a stop sign on Creek St. at 103rd St. SE. The intersection at Yelm Avenue and Creek St. is signalized. There is a center turn lane along the portion of Creek Street near Yelm Avenue, extending from the intersection to Prairie Plaza. The posted speed limit is 25 mph. 103rd Avenue 103rd Avenue is a two-lane roadway which runs east-west between Yelm Avenue and Bridge St. SE. In the project vicinity, 103rd Avenue has no shoulders, and the posted speed limit is 25 mph. There is a stop on 103rd Avenue at Grove Rd. SE. The intersection at Yelm Avenue is under stop sign control. Morris Road Morris Road begins just south of the intersection of SR 507/Creek St. NEBaId Hill Road SE, and runs southerly from its intersection with Bald Hill Road. It is a two-lane roadway with paved shoulders. There is a stop-sign on Morris Road at the intersection with Bald Hill Road. Bald Hills Road Bald Hills Road runs generally east-west from the intersection of SR507/Creek St. NE. It is a two-lane roadway with paved shoulders. Yelm Avenue (SR 507) Yelm Avenue (State Route 507) is a State facility classified as an urban arterial. There are no bike lanes or sidewalks in the immediate vicinity of the project site. East of the project site, Yelm Avenue has two lanes and a posted speed limit of 35 mph. West of the site, the roadway has athree-lane section and a speed limit of 25 mph. Traffic Volume Data Trafficount, a local traffic data collection firm, provided evening peak period turning movement counts for the following locations: • Yelm Avenue/First Street • Yelm AvenueBald Hill Road-Creek Street The Shea Group - a Pararnetrix company July, 2001 Page 5 Yelm Avenue Walgreens Traffic Impact Analysis These traffic volumes were used for our base year operations analysis, and as the basis for future year traffic volume projections. Figure 3 represents the 2001 base year peak hour traffic volumes for this study. The turning movement count worksheets are provided in Appendix A. Public Transportation Public Transit is provided to the site by Intercity Transit via Yelm Avenue. Two routes serve the area: The South County Special, Route 92, provides mid-day service one day a week, on Friday. Route 94 provides two morning and two afternoon commuter hour runs to Yelm on weekdays, terminating at the Nisqually Plaza on Yelm Avenue. The Shea Group - a Parametrix company July, 2001 Page 6 Yelm Avenue Walgreens Traffic Impact Analysis IV. PROJECT TRAFFIC CHARACTERISTICS The two project-related characteristics having the most effect on area traffic conditions are peak hour traffic generation and the directional distribution of these traffic volumes. Traffic Generation Vehicle trip generation was calculated for this project using the current edition of the Trip Generation report by the Institute of Transportation Engineers (ITE). The Pharmacy/Drugstore with Drive-Through Window land use (land use code 881) was determined to be the most applicable to the project. The trip generation rate used for this analysis is shown below in Table 1. Table 1 Trip Generation Characteristics Yelm Avenue Walgreens ITE Land Use PM Peak Hour (L.U. Code) Daily Trip Rate Trip Rate Inbound Outbound PharmacylDrugstore with Drive-Through Window 88.16 per 1,000 10.40 per 1000 (L.U. 881) square feet square feet 49% 51% The total trip generation expected from this development is calculated by applying the total square footage to the appropriate trip generation rate. It is expected that some of the project traffic will constitute pass-by traffic as described below. Pass-by Traffic A project such as a drugstore with adrive-through pharmacy tends to attract a large amount of traffic from people already driving on the area roadways. These trips are not new trips added to the local roadways (primary trips) but represent "pass-by" trips according to the following definition: Pass-bv Triers are trips made as an intermediate stop from an origin to a primary destination (i.e. stopping to shop on the way home from work) by vehicles passing directly by the project driveway. Documentation provided by the Institute of Transportation Engineers (ITE) indicates land uses such as pharmacies with drive-through windows commonly experience pass-by rates of 50 to 60%. In previous discussions between the developer and the City of Yelm, a pass-by rate of 50% was agreed to. For this analysis, we have reduced the total project trips by 50% to reflect the occurrence of pass-by trips. Project traffic volumes after this reduction represent the "new-to- network" trips. The project trip generation calculations are shown on Table 2. The Shea Group - a Parametrix company July, 2001 Page 8 Yelm Avenue Walgreens Traffic Impact Analysis Table 2 Project Trip, Generation Yelm Avenue Walgreens PM Peak Hour Trip Generation Total Driveway New-to- Land Use (LU) Unit (SF) Trips Network Trips Enter Exit Pharmacy/Drugstore with Drive-Through Window (L.U.881) 14,490 152 76 37 39 Trip Distribution The vehicle directional trip distribution to and from the site will distribute onto the area roadways based primarily on the following factors: • the area street system characteristics • current travel patterns on the area roadways • the proposed access system for the project • locations of residential areas, employment bases, and shopping/commercial centers For this analysis, the directional distribution of traffic to and from the proposed project was estimated using the regional transportation model. The Thurston Regional Planning Council (TRPC) created the area-wide transportation model with cooperation from the local jurisdictions within the County. The model, developed using the Tmodel2 software package, has been calibrated to accurately represent the existing vehicle travel patterns throughout the entire county. In the transportation model, the county-wide transportation network is divided into 483 "Traffic Analysis Zones" (TAZs). The Yelm Avenue Walgreens property is located within TAZ number 397. A distribution analysis was performed for this project by conducting a "Select Zone Analysis" for TAZ 397. This feature of the TMode12 software package allows all of the traffic into and out of a particular zone to be isolated and shown separately from the rest of the traffic on the network. This graphically shows the percentage of vehicles currently using each of the available routes into and out of the area (SR 507, Morris Road SE, Bald Hill Road SE, Creek Street, 103rd Street, etc.). From this information we calculated distribution percentages for future traffic from the proposed Yelm Avenue Walgreens project. The "pass-by" trips were distributed onto the roadway network based on current PM peak hour directional traffic volumes on Yelm Avenue and Bald Hill Road. The new-to-network distribution for this project is shown on Figure 4, with a site area detail, including pass-by trips, on Figure 5. The Shea Group - a Parametrix company July, 2001 Page 9 0 .~ ail ~ ~.... ~ ~ N z Q 0 M O ~ O ~'~' 4 GROVE RD ~ r W ~ ~ ~ N v U ~ ¢ QW~ ~ ~ ~ a ~- cn -- co F ~ w z ~ ~ r ~ 0 Y 0 ~ ~ t4 Q ~ 0 m M ~ ~- ~ 2 CREE w w o K ST Z ~- z a N C~ I ~ PLAZA DR I ~ ~~ IW- Z 0] ~ N Z ~ ~ 2 VANCIL RD ~ L~ ~ ~~ ~ ~~ ~ ~~ ~ ~ CLARK RD ^~ 1 ~ ~ o ~ ~ ~ N ~~~ ~ ~ ^ ~ s ~s ~ R 0 0 ~ ~ ~ ~~ ~ ~I ~s `~ y~x ~ O 01 1~ 11~ Z ~ `o ~ ~ s W J~ ~`S'J -1 ,1~ v~ ~~ ~~" '~S ~S! ~ ~ ~ O ~ ~ l"' ~p 0 ~" 2 MORRIS RD 2 -- 0 L!~ O O ~ i v ~ N c O 0 U 0 ~ (~ o 0 x aci V U J u c (U ~ o o !- o ~ y c r~ a V J ~ c ~~ ~ o+ .~ ~~ c a+ ^I ~ c w 0 z ~ /a ~I vi ,nrti.. ~ Z ~-- 6 ~- 8 CREEK ST `~ 2 8 -~ 6 -- ~- N 0 w J Q N PLAZA DR y ~ 2 ~ 2 7, f~ ~ j 1 U Q Q Q N ,~ r L~ ~ p~ O~ ~ O~ ~ a ~ ~ ~ ~ ~ ~ Y p d p } p ~ O Z ~ ~ H Z ~ Q ~ Z ~ W > W O O O ~ Q Q ~ m M m m~ j m ~ ~ w Z O O ~ N p O ~ p O 0 w r Z ~ O Q J W F- p a p ~ p ~ W Z ~ p Z O F- Z O .~ o ~ O O r7 ~ OM F- Z m ~] m ~ Z Z Z ~ I M r 13(11) 8'~ h ~ (12)101 (11)6 -- _ M N ~ v ~~ ~~1 ~ ~ ~~ / U ~ w ~ > ~ ~ (0)O.t (16)15 0_ o Z ~~ ~ 011 ~ ~~ ~ A ~1 O ~ ~~1 t O r W ~ I r ~ J Z M d W V ~ ~ ~ Q ~ Q ~- (3) W ~ 3 `~ (1590) ~ 6 F` ~ W l ~ c" ~ ~1 ~ ~ (30~) 6 -~- ~ H N w w ~-Oa ~ ~ ~~ Z ~ W' W ~ ; ~ w' W ¢~ N ~~ W >- 1 N a 0 o z IIAA W ! nn V J Q ^h ^~ z W Q k- Z W U ~ W W w ~ N na a ~ w F- Z J ~ Z O ~ J U ~ ~ o ~ m ~ N ~ a ~ ° ~ U F-- ~ m ~ Q f--' F- Q ~ N ~ ~ W Q] ~ ~] U W N W N F- Q ~ Q v> a r- a ~ ~' ° x .. X X v NI U C ~ ~ O ~ U ~ a N S.. o /~ V V x a~i ~ w E~ m c~ ~ oI o :~ a° c w o . ~ ~~ ~, ~~ c -a°~ c; a`~ .~ °' I ~~ Yehn Avenue Walgreens Traffic Impact Analysis V. FUTURE TRAFFIC CONDITIONS Roadway Improvements The City of Yelm, in conjunction with the Washington State Department of Transportation (WSDOT), has identified several improvements that will be required to maintain acceptable traffic flows along the SR 507 corridor. The initial phase of improvements has been completed, and the City has received a grant to widen Yelm Avenue (SR 507) to urban arterial standards between 3rd Street and Five Corners (the intersection of Yelm AvenueBald Hill Road-Creek Street). In addition to the Yelm Avenue improvements, the City of Yelm has identified other roadway improvements in the project area. These include the following; • 103rd St. from West Road to Creek Street -widen to urban standards • West Road from 4r'' Avenue to 103rd St. -widen to minor arterial standards Pipeline Development Projects A pipeline development project is defined as a development in the project area that is either under construction, approved for construction, or in the permitting process. In the study area, three pipeline projects were identified that will add traffic to the study area. A fast food restaurant will be constructed on Yelm Avenue at Plaza Drive, and a 48-unit apartment complex is planned on Vancil Road. The third pipeline project is Prairie Park mixed use development. The first phase of Prairie Park, a cinema, has been completed. Phase 2 consists of retail/commercial uses. Table 3 below shows an estimate of the new-to-network trips these projects will add to the area roadway network. Table 3 Pipeline Projects PM Peak Hour Trip. Generation Project New-to-Network Trips Inbound Outbound Apartments 29 19 10 Fast Food Restaurant 42 21 21 Prairie Park Phase 2 263 124 139 Total 334 164 170 The traffic volumes in Table 3 were distributed onto the roadway network using the same methodology described for projected Yelm Avenue Walgreens site traffic. The total pipeline traffic volumes used for this analysis are shown on Figure 6. The Shea Group - a Parametrix company July, 2001 Page 12 iar-aw N H ~ Z ~ ~O v v Q ~'~ ~Fy ~- 145 `v _ j ~, j 26 CREEK ST ~- 190 ~ f~ ~- ~ ~ MORRIS RD Z I I N N ~j~ ~~ ~~ in r ~~ U _ W~ ', ~ o~ _ ~ ° 7' ~~` PLAZA DR VANCIL RD ~~~ S S` ~~~~~ ~~ ~~ 0, ~~ v~~ S~sJ~ ~ ~`~~s^ ~l) Q LI__I LLI N ~ W W ~ ~ J O ~ > ~ O U_ 2 W Y L~ Q Q W d ~ ~ ~ ~ O = z Y Q Q a cn d. J x I X Yelm Avenue Walgreens Traffic Impact Analysis Projected Traffic Volumes In addition to traffic from the identified pipeline developments, it is anticipated that background traffic growth will occur within the study area. To estimate the traffic volumes that will be present at the study intersections during the 2002 project horizon year, we applied a growth rate of 4% to the base year traffic volumes. The 4% growth rate is based on historical growth trends and was determined by the City of Yelm. The projected 2002 traffic volumes without the Yelm Avenue Walgreens project are shown on Figure 7. We then added the estimated traffic from the proposed Yelm Avenue Walgreens project to calculate the horizon year total traffic assignment. The projected 2002 traffic volumes including project site traffic are shown on Figure 8. The Shea Group - a Parametrix company July, 2001 Page 14 vi z ~O 1` ~ ~ ~ ~~o ~~ MORRIS RD ~` S sS~ l 1 ~ ~~ ~~ ~v~ .~. 0 v W Q ~ VANCIL RD N N W ~ ~ ~ J ~. 1 U_ 2 4- Y l~ Q Q W ~ W ~ ~ O 2 Z Y Q Q F W a N ~ w a ~ x I x x v~ r z ~-- 145 0 Q CREEK ST ,~ 25 190 -. h ~ 10 ~, o w t- Nr F- U ~ W o~ a° PLAZA DR o`n~n X25 ~'n~' x-55 ~! ~, y r 265 so ~' ~ } r- 90 -- 60~ o ~ ~~ M ~ ~O ~ ~ _ 1` ~ 30 7, ,,~0~ VANCIL RD ~~ ~~ S ~ ~ ~ ~~ s0``S'~ ~Op`~'~ ~~ X01 ~~~ ~O h ~ ~~~ o S ~~v"~ WSJ ~~ ~s '~S z W W J N N W ~- ~ ~ J W. 0 ~ 0 U 2 ~ Y Q ~ W r a ~ ~ 0 _ z Y Q Q W d N ~ w a ~ X I X ~o v O ~~v MORRIS RD N V ~ ~~ ~, p Vi O a NI L o of U C x a~ ~ EI. ~ ~ ~~ o; a ~€ ° c~ a w; ~/~ o • cI V J °1 'c o~ o~ d c! 'rn; ^ °' ; c~ w. Yelm Avenue Walgreens Traffic Impact Analysis VI. TRAFFIC OPERATIONS ANALYSIS Traffic analyses were conducted to determine any capacity deficiencies within the study area for the base year 2001 and project completion 2002 horizon year. The acknowledged source for determining overall capacity for arterial segments and independent intersections is the current edition of the Highway Capacity Manual. Capacity analyses were completed for the base year 2001 and projected 2002 peak period traffic volume scenarios. Capacity analysis results are described in terms of Level of Service (LOS). LOS is a qualitative term describing operating conditions a driver will experience while traveling on a particular street or highway during a specific time interval. It ranges from A (very little delay) to F (long delays and congestion). Level of Service C is the concurrency standard for the City of Yelm, with the exception of the designated "urban core" area, which includes the Yelm Avenue corridor. The City has adopted a lower service level (LOS F) for this area of the city. The capacity analyses were completed for traffic volume conditions expected to occur during the evening peak period at all study intersections. The analyses were performed using Highway Capacity Software for stop sign controlled intersections and Signa12000 software for the signalized intersections. The capacity analysis worksheets are provided in Appendix B. Following is a description of the level of service analysis for the study intersections. The Shea Group - a Parametrix company July, 2001 Page 17 Yelm Avenue Walgreens Traffic Impact Analysis Signalized Intersections Yelm Avenue/First Street This operates under actuated traffic signal control with protected left-turns at each approach. The eastbound and westbound approaches on Yelm Avenue each have single exclusive lanes for each movement. The northbound and southbound approaches on First Street provide exclusive left-turn lanes and shared through-right lanes. The intersection currently operates at a LOS D condition during the evening peak hour. By the 2002 horizon, the intersection will degrade to a LOS E condition with the addition of background and pipeline traffic growth. After completion of the proposed Walgreens project the intersection delay will increase slightly, but the intersection will remain at a LOS E condition. There is an existing concern at this intersection involving the turning radius of the westbound to northbound right-turn movement. Because of the limited turning radius, trucks occasionally cross the sidewalk with the back axles of the trailer. The awning on the adjacent building has been damaged by encroaching trucks. The City, in conjunction with WSDOT, has plans to improve the intersection by re-striping the southbound approach on First Street to narrower 11- foot lanes, and to move the southbound left-turn lane stop bar a few feet further back from the intersection. These improvements will give trucks more room to maneuver while making their turn. Even with these improvements, it is anticipated that larger vehicles may encroach onto the sidewalk area, but the number of occurrences will be reduced. As mentioned previously, the Yelm Avenue corridor has an adopted LOS standard of LOS F. The City, in conjunction with WSDOT and the Federal Highway Administration (FHWA), has plans to construct two bypass routes (known as Y-2 and Y-3) around the downtown area. Construction of the bypass routes will reduce the traffic demand on Yelm Avenue and will improve the operation of the intersections through the downtown core area. The two bypass routes are in the preliminary planning stages with no specific construction timeline. The following table summarizes the LOS Analysis results for the intersection: Table 4 Yelm Avenue/First Street LOS Operational Summary PM Peak Hour Base Year 2001 Projected 2002 W/O Project Projected 2002 with Project Approach LOS (Delay) LOS (Delay) LOS (Delay) Southbound D (50) E (67) E (67) Northbound D (45) D (55) E (57) Westbound D (36) D (43) D (44) Eastbound D (44) E (64) E (66) Total Intersection D (42) E (56) E (58) The Shea Group - a Parametriz company July, 2001 Page 18 Yelm Avenue Walgreens Traffic Impact Analysis Yelm Avenue/Bald Hill Road -Creek Street This intersection operates under actuated traffic signal control. The east-west approaches on Yelm Avenue operate with protected left-turns and concurrent through movements. The northbound and southbound approaches (Bald Hill Road and Creek Street, respectively) operate under split phase timing. The eastbound and westbound approaches on Yelm Avenue each have single exclusive lanes for each movement. The northbound and southbound approaches on Creek Street and Bald Hill Road provide exclusive left-turn lanes and shared through-right lanes. For existing 2001 PM peak hour conditions, the intersection operates at a LOS C condition. By the 2002 horizon, with the addition of background and pipeline development traffic, the intersection will remain at LOS C. When the Walgreens project is completed in 2002, overall delay at the intersection will increase slightly, but the intersection will remain at a LOS C condition. The following table summarizes the LOS analysis for the intersection. Table 5 Yelm Avenue/Bald Hill Road -Creek Street LOS Operational Summary PM Peak Hour Base Year 2001 Projected 2002 W/O Project Projected 2002 with Project Approach LOS (Delay) LOS (Delay) LOS (Delay) Southbound D (50) D (49) D (38) Northbound D (38) D (45) D (45) Westbound C (24) C (26) C (32) Eastbound C (23) C (25) C (30) Total Intersection C (28) C (30) C (34) The Shea Group - a Parametrix company July, 2001 Page 19 Yelm Avenue Walgreens Traffic Impact Analysis Site Driveway Analysis As described previously, the proposed project will have two access points: one onto Yelm Avenue and one onto Creek Street. The following is a description of the anticipated operation of the project driveways. North Site Driveway/Creek Street This driveway will be located on Creek Street approximately 330 feet north of Yelm Avenue. The intersection will function as astop-controlled `tee' intersection. Along the project frontage Creek Street has a single through lane in each direction, and atwo-way center turn lane. Just north of the proposed driveway the roadway narrows to two lanes. At project completion the driveway is expected to operate at a LOS B for the eastbound left-turn movement. South Driveway/Yelm Avenue This access will be located on Yelm Avenue approximately 380 feet west of Creek Street. The intersection will function with stop control for the southbound driveway approach. Based on the anticipated traffic volumes, the left-turn movement from the site driveway would operate at a LOS F condition. The right-turn movement from the driveway access would operate at a LOS B condition. Because of the poor level of service anticipated for the left-turn movement at this driveway, we have evaluated the potential safety of that movement from the driveway access. There are a number of factors that indicate that prohibiting the southbound left-turn movement would improve the overall safety and flow of the site. • Poor Level of Service. Because of the high traffic volume on Yelm Avenue, the southbound left-turn movement from the site driveway would operate at a poor LOS F condition at project completion in 2002. • Conflict with Eastbound Vehicles on Yelm Avenue at Creek Street. The proposed site driveway location is approximately 360 feet west of the eastbound through lane stop bar at Creek Street. Based on vehicle "queuing" estimates (the number of vehicles waiting during the red phase of the signal) shown on the Level of Service Worksheets in Appendix B, vehicles in the eastbound through lane will regularly queue past the proposed Walgreens driveway. This condition would make it very difficult for vehicles to turn left onto Yelm Avenue, even when gaps in the westbound traffic flow occur. • Internal Site Circulation. The site design will accommodate a significant vehicle queue for the southbound approach at this driveway. However, the internal access from the south parking area to the Yelm Avenue Site Driveway would be blocked by a queue of two or three vehicles waiting to turn left onto Yelm Avenue. • Other Option Available. The site access to Creek Street would allow another option for vehicles with a destination eastbound on Yelm Avenue or southbound on Bald Hill Road. Rather than turn left from the site driveway on Yelm Avenue, vehicles could circulate to the Creek Street access and utilize the existing traffic signal at the Yelm Avenue/Creek Street intersection. The Shea Group - a Parametrix company July, 2001 Page 20 Yelm Avenue Walgreens Traffic Impact Analysis Based on the factors described above, we recommend that the south site driveway onto Yelm Avenue be constructed to allow full movements inbound, but be limited to only right-turn movements outbound. The additional traffic load at the Creek Street driveway access is reflected in our site-generated traffic distribution. Table 7 shows a summary of the operations analysis results for all study intersections. The capacity analysis worksheets are provided with this report. Table 7 Level of Service (LOS) Summary PM PeakHour Existing Projected 2002 Volumes Intersection Control Type 2001 Volumes Without Project With Project Yelm Avenue/1St Street Signal D (42) E (56) E (58) Yelm Ave/Creek Street Signal C (28) C (30) C (34) Site Driveway/Creek Street Stop Sign B (11) Site Driveway/Yelm Avenue Stop Sign B (11)* *reflects-the. minor street right turn movement. The Shea Group - a Parametrix company July, 2001 Page 21 Yelm Avenue Walgreens Traffic Impact Analysis VII. MITIGATION Traffic generated by the proposed project will have a measurable impact on the area roadways and intersections. Analysis described in the previous section indicates that the area roadways can accommodate the additional traffic generated by the proposed Yelm Avenue Walgreens. Although the project will not create any unacceptable traffic impacts, the project proponent will be responsible for some mitigation to offset the addition of traffic to the area roadway network. Construct Frontage Improvements The project developer will be responsible for half-street frontage improvements along the property frontage on Creek Street and Yelm Avenue. Pay Cif of Yelm Transportation Facility Charge (TFC) To help fund system-wide roadway improvements, the developer of the Yelm Avenue Walgreens will be responsible for a transportation facility charge payment to the City of Yelm. The actual amount will be based on the current city ordinance and will be calculated by City staff. The project developer may be eligible for an existing traffic use credit based on the current apartment and small business usage of the property. An analysis of the existing trip generation of the site would be required to determine the actual traffic credit allowed. Construct the South Site Driveway on Yelm Avenue to Prohibit Left-Turn Movements Out of the Site This driveway location should be designed to prohibit southbound left-turns from the parking area onto Yelm Avenue. The design would include raised curbing and signage, and would require approval of City of Yelm Public Works staff prior to construction. The Shea Group - a Parametrix company July, 2001 Page 22 Yelm Avenue Walgreens Traffic Impact Analysis VIII. CONCLUSIONS The Yelm Avenue Walgreens proposal will consist of one 14,490 square foot drugstore with drive-through pharmacy and 57 parking spaces on a 1.86 acre site at 10540 Hwy 507 SE. This development, which is consistent with the City's land use zoning, will add traffic to the local roadway network. This study has analyzed the peak traffic potential to/from the site following construction. Results of the analysis indicate that the planned roadway improvements within the area will accommodate the increase in traffic generated by the proposed project. The Shea Group - a Parametrix company July, 2001 Page 23 Yelm Avenue Walgreens Traffic Impact Analysis Appendix A Turning Movement Count Worksheets The Shea Group - a Parametrix company Appendix A July, 2001 YELM, WASHINGTON 1ST ST YELM AVE LOC # 01P SHG01199M TRAFFICOUNT, INC. 4820 YELM HWY B-195 LACEY, WASHINGTON 98503 360-491-8116 !]rnnnc Drinfnri_ DRIMARV File Name : SHG20001P Site Code :00000001 Start Date :07/19/2001 Page No : 1 1ST ST YELM AVE 1ST ST YELM AVE From North From East From South From West StartTime Right Thru Left Truck App. Right Thro Left Truck APp' Right Thru Left Truck App' Right Thru Left Truck App. T t l Fxclu. l T t Inclu. T l t Int. T t l Total Total Total a o o a o a o a Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 04:OOPM 24 12 14 0 50 9 97 34 3 140 67 17 37 2 121 29 114 25 3 168 8 479 487 04:15 PM 25 9 14 0 48 6 94 42 4 142 38 10 22 3 70 25 134 44 2 203 9 463 472 04:30 PM 27 15 14 0 56 5 111 45 3 161 46 21 29 4 96 23 123 35 1 181 8 494 502 04:45 PM 24 19 10 0 53 5 87 38 1 130 52 15 28 1 95 26 131 22 4 179 6 457 463 Total 100 55 52 0 207 25 389 159 11 573 203 63 116 10 382 103 502 126 10 731 31 1893 1924 05:00 PM 24 13 SO 1 05:15 PM 24 8 21 1 05:30 PM 12 12 13 0 05:45 PM 17 13 12 0 3 181 3 176 2 208 1 179 Total 77 46 56 2 179 32 398 170 9 600 ~ 160 80 112 9 352 ( 75 531 138 9 744 Grand Total 177 101 108 2 386 57 787 329 20 1173 363 143 228 19 734 178 1033 264 19 1475 Apprch % 45.9 26.2 28.0 4.9 67.1 28.0 49.5 19.5 31.1 12.1 70.0 17.9 Total % 4.7 2.7 2.9 10.2 1.5 20.9 8.7 31.1 9.6 3.8 6.1 19.5 4.7 27.4 7.0 39.1 11 473 484 7 461 468 5 499 504 6 442 448 29 1875 1904 60 3768 3828 1.6 98.4 1ST ST From North YELM AVE From East 1ST ST From South YELM AVE From West StartTime Right Thru Left App. Total Right Thrlt Left App. Total Right ThN Left App. Total Right Thru Left App. Total reaK Hour rrom u4:vu rm to ua:4a rm - reaa i or i Intersection 04:00 PM Volume 100 55 52 Percent 48.3 26.6 25.1 04:30Valume 27 15 14 Peak Factor High Int 04:30 PM Volume 27 15 14 Peak Factor Peak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1 By Approach 04:30 PM Volume 99 55 55 Percent 47.4 26.3 26.3 High Int. 04:30 PM Volume 27 15 14 Peak factor 47 6 94 42 5 142 44 21 38 2 103 20 131 30 53 9 94 49 2 152 34 21 25 1 80 16 128 32 37 11 112 37 0 160 52 20 22 3 94 21 144 43 42 6 98 42 2 146 30 18 27 3 75 18 126 33 207 25 389 159 4.4 67.9 27.7 56 5 111 45 04:30 PM 56 5 111 45 0.924 05:00 PM 209 32 398 170 5.3 66.3 28.3 05:30 PM 56 11 112 37 0.933 573 203 63 116 53.1 16.5 30.4 161 46 21 29 04:00 PM 161 67 17 37 o.8so 04:00 PM 600 203 63 116 53.1 16.5 30.4 04:00 PM 160 67 17 37 0.938 382 103 502 126 14.1 68.7 17.2 96 23 123 35 04:15 PM 121 25 134 44 o.76s 04:15 PM 382 94 519 131 12.6 69.8 17.6 04:15 PM 121 25 134 44 0.789 InL Total 731 1893 181 494 0.958 203 o.soo 744 203 0.916 YELM, WASHINGTON 1ST ST YELM AVE LOC # 01P SHG01199M 1ST ST T al 14 421 Right Thru Left ~ M ~ ~ C ~ -' u Nortn ~ ~, W ~ m g G u°~ L-/ /19101 4:00:00 PM ~-- c `'' D w ~ /19/01 4:45:00 PM m Y ~ rr r. O t ~ ~ ~ ~ IM ~~ o rr `° ~~~fff ~, T ~- T 1 L7 Out In Total 1ST ST From North YELM AVE From East 1ST ST From South YELM AVE From West StartTime Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App.TOtal Right Thru Left App. Peak Hour From u4: W PM to Ub:4b rm - PeaK l or 1 Intersec0on 04:00 PM Volume 100 55 52 Percent 48.3 26.6 25.1 04:30 Volume 27 15 14 Peak Factor High Int. 04:30 PM Volume 27 15 14 Peak Factor TRAFFICOUNT, INC. 4820 YELM HWY B-195 LACEY, WASHINGTON 98503 360-491-8116 207 25 389 159 4.4 67.9 27.7 56 5 111 45 04:30 PM 56 5 111 45 0.924 573 203 63 116 53.1 16.5 30.4 161 46 21 29 04:00 PM 161 67 17 37 0.890 File Name : SHG20001P Site Code :00000001 Start Date : 07/ 19/2001 Page No : 2 382 103 502 126 14.1 68.7 17.2 96 23 123 35 04:15 PM 121 25 134 44 0.789 Total Int. Total 731 1893 181 494 0.958 203 0.900 YELM, WASHINGTON NE CREEK ST YELM AVE LOC# 02P SHG01199M TRAFFICCUNT, INC. 4820 YELM HWY 6-195 LACEY, WASHINGTON 98503 360-491-8116 l3 rni~nc Prin4cri_ PRIMGRY File Name : SHG20002P Site Code :00000002 Start Date :07/19/2001 Page No :1 NE CREEK ST YELM AVE BALD HILL RD SE YELM AVE From North From East From South From West StartTime Right Thru Left Truck App' Right Thru Left Truck App. Right Thru Left Truck App' Right Thru Left Truck App' T t l Fxclu. Total Inciu. Totai Int Totai Total Total Total o a factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 04:00 PM 14 12 9 0 35 10 113 li 1 134 8 12 36 2 56 73 92 14 2 179 5 404 409 04:15 PM 21 13 12 0 46 11 119 10 6 140 6 10 40 3 56 88 89 19 8 196 17 438 455 04:30 PM 11 17 14 0 42 10 107 14 1 131 11 14 53 2 78 64 103 SO 2 177 5 428 433 04:45 PM 20 19 20 5 59 12 116 9 3 137 12 14 53 2 79 66 117 19 5 202 15 477 492 Total 66 61 55 5 182 43 455 44 11 542 37 50 182 9 269 291 401 62 17 754 42 1747 1789 05:00 PM 17 14 13 1 44 8 127 14 4 149 7 9 60 0 76 89 123 9 4 221 9 490 499 05:15 PM 9 19 12 0 40 14 111 11 3 136 5 11 67 1 83 82 117 7 3 206 7 465 472 05:30 PM 12 20 10 0 42 12 115 11 1 138 2 13 43 0 58 88 118 13 4 219 5 457 462 05:45 PM 20 22 9 1 51 4 117 13 1 134 7 12 57 1 76 84 92 13 8 189 11 450 461 Totai 58 75 44 2 177 38 470 49 9 557 21 45 227 2 293 343 450 42 19 835 32 1862 1894 Grand Total 124 136 99 7 359 81 925 93 20 1099 58 95 409 11 562 634 851 104 36 1589 74 3609 3683 Approh % 34.5 37.9 27.6 7.4 84.2 8.5 10.3 16.9 72.8 39.9 53.6 6.5 Total % 3.4 3.8 2.7 9.9 2.2 25.6 2.6 30.5 1.6 2.6 11.3 15.6 17.6 23.6 2.9 44.0 2.0 98.0 NE CREEK ST From North YELM AVE From East BALD HILL RD SE From South YELM AVE From West StartTime Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App reaK Hour rrom ug:uu rm m uo:vo rm - reaR i ui a Intersection 04:45 PM Volume 58 72 55 Percent 31.4 38.9 29.7 05:00 Volume 17 14 13 Peak Factor High Int. 04:45 PM Volume 20 19 20 Peak Factor Peak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1 By Approach 04:15 PM Volume 69 63 59 Percent 36.1 33.0 30.9 High Int 04:45 PM Volume 20 19 20 Peak Factor 185 46 469 45 8.2 83.8 8.0 44 8 127 14 05:00 PM 59 8 127 14 0.784 04:45 PM 191 46 469 45 8.2 83.8 8.0 05:00 PM 59 8 127 14 0.809 560 26 47 223 8.8 15.9 75.3 149 7 9 60 05:15 PM 149 5 li 67 0.940 04:30 PM 560 35 48 233 11.1 15.2 73.7 05:15 PM 149 5 11 67 0.940 296 325 475 48 38.3 56.0 5.7 76 89 123 9 05:00 PM 83 89 123 9 0.892 04:45 PM 316 325 475 48 38.3 56.0 5.7 05:00 PM 83 89 123 9 0.952 .Total Int Total 848 1889 221 490 0.964 221 0.959 848 221 0.959 YELM, WASHINGTON NE CREEK ST YELM AVE LOC# 02P SHG01199M 185 46 469 45 8.2 83.8 8.0 44 8 127 14 05:00 PM 59 8 127 14 0.784 TRAFFICOUNT, INC. 4820YELM HWY B-195 LACEY, WASHINGTON 98503 360-491-8116 NE CREEK ST From North YELM AVE From East BALD HILL RD SE From South YELM AVE From West Start Time Right Thru Left App Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. reaK Hour rrom ua:uu rm to uo:v5 rm - reaK i or i Intersection 04:45 PM Volume 58 72 55 Percent 31.4 38.9 29.7 05:OOVOIume 17 14 13 Peak Factor High Int. 04:45 PM Volume 20 19 20 Peak Factor 560 26 47 223 8.8 15.9 75.3 149 7 9 60 05:15 PM 149 5 11 67 0.940 File Name : SHG20002P Site Code :00000002 Start Date : 07/ 19/2001 Page No : 2 296 325 475 48 38.3 56.0 5.7 76 89 123 9 05:00 PM 83 89 123 9 0.892 NE CREEK ST I 1411 Right Thru Left :.°. °~' F°- ~ ~~ W J Q ~ r ~ r----/ w ~ } ~ ~ L ~ M O)~ C• ~ ~°' ~ A { m r ~-~ ~ ~ ~ D m r ~~ A North /19101 4:45:00 PM !19/01 5:30:00 PM ~ T r r 2 Out In Total 8AI r) HII L RD SF Total Int. Total 848 1889 221 490 0.964 221 0.959 Yelm Avenue Walgreens Traffic Impact Analysis Appendix B Capacity Analysis Worksheets The Shea Group - a Parametrix company Appendix B July, 2001 Yelm Avenue Walgreens TIA 07/26/01 First Street/Yelm Avenue 14:42:38 PM Peak Hour; Existing 2001 traffic volumes SIGNAL2000/TEAPAC[Ver 1.01.00] - Capacity Analysis Summary Intersection Averages for Int # 1 - . Degree of Saturation (v/c) 0.75 Vehicle Delay 42.3 Level of Service D+ ------------------------------------------------------------- Sq 64 ~ Phase l ~ Phase 2 ~ Phase 3 ~ Phase 4 ~ Phase 5 * I ~ + + I ~ ^ ~ * i ~++ I ~ ++++~ v **** I ~ I I ^ I++++ v I I North + ~ * + + + ~ * + + ------------------------- G/C=0.056 ~ G/C=0.044 G= 5.0" ~ G= 4.0" Y+R= 4.0" Y+R= 4.0" OFF= 0.0% ~ OFF=10.0% C= 90 sec G= 70.0 sec * *, * * * * G/C=0.178 G= 16.0" Y+R= 4.0" OFF=18.9% 77.8% Y=2 I I****> I +++v ------------------------- G/C=0.144 ~ G/C=0.356 G= 13.0" ~ G= 32.0" Y+R= 4.0" I Y+R= 4.0" OFF=41.1% ~ OFF=60.0% ------------------------- 0.0 sec = 22.2% Ped= 0.0 sec 0.0% --------- Lane ---------------------- (Width/I g/C ~ --------- Service ----------- Rate Adj -------- ~ ~ ------- HCM ---- ~ L --------- I Queue Group --------- ~ Lanesl Reqd -------------- Used ~ -------- @C (vph) --------- @E ---- ~Volume ------- v/c ~ -------- Delay ------- ~ S ---- Model ------ 1~ --- N Approach 50.0 D --------- ~RT+TH -------------- ~ 12/1 0.222 -------- 0.178 ~ --------- 113 ~ ---- 216 ------- ~ 172 -------- 0.751 ~ ------- 48.1 ---- ~ D ------ ~ 211 --- ft~ LT --------- ~ 12/1 0.141 -------------- 1 0.056 ~ -------- 1 ~ --------- 70 ---- ~ 56 ------- 0.636 ~ ------- 55.9 -------- ~*E+ ---- ~ 73 ------ ft~ --- S Approach 45.1 D --------- RT+TH -------------- ~ 12/1 0.304 ------- 0.267 ---------- ~ 244 ~ ---- 356 ------- 300 I ------- 0.843 -------- ~ 47.8 ---- ~*D ------ ~ 366 --- ft~ LT --------- ~ 12/1 10.170 -------------- 0.144 ------- ~ 65 ~ ---------- 216 ---- 128 ------- 0.557 ------- ~ 38.8 -------- ~*D+ ---- ~ 146 ------ ft~ --- E Approach 35.5 D+ ------------------------------------------------------------------------------- RT ( 12/1 0.136 0.356 ~ 315 ~ 405 28 0.069 ~ 19.2 ~ B ~ 22 ftl TH ~ 12/1 0.328 0.356 ~ 487 ~ 596 433 0.727 ~ 29.6 I C ~ 441 ftf LT ~ 12/1 '0.197 0.144 ~ 65 ~ 216 178 0.774 ~ 52.2 I*D ~ 223 ft~ ------------------------------------------------------------------------------- W Approach 44.0 D+ --------------------- - RT ~ 12/1 0.173 -------- 0.356 ~ ---------------------------- 406 ( 507 I 117 0.231 ~ -------------------- 20.6 ~ C+~ 97 ft TH ~ 12/1 0.392 0.356 ~ 487 ~ 596 ~ 556 0.933 ~ 49.8 ~*D ~ 688 ft LT ~ 12/1 0.175 ----------------------- 0.144 ~ -------- 65 ~ 216 ~ 139 0.604 ~ ---------------------------- 40.6 ~ D+~ 161 ft -------------------- Yelm Avenue Walgreens TIA 07/26/01 First Street/Yelm Avenue 14:42:54 PM Peak Hour; Existing 2001 traffic volumes SIGNAL2000/TEAPAC[Ver 1.01.00] - Summary of Parameter Values Intersection Parameters for Int # 1 METROAREA CBD SIMULATION PERIOD 15 LEVELOFSERVICE C S NODELOCATION 0 0 QUEUEMODELS 1 90 25 40 Approach Parameters APPLABELS N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVELS 0 0 0 0 BIKEVOLUMES 0 0 0 0 PARKINGSIDES BOTH BOTH BOTH NONE PARKVOLUMES 10 20 0 20 BUSVOLUMES 0 0 0 0 RIGHTTURNONREDS 0 0 0 0 UPSTREAMVC 0.00 0.00 0.00 0.00 Movement Parameters MOVLABELS RT TH LT VOLUMES 100 55 50 WIDTHS 0.0 12.0 12.0 LANES 0 1 1 GROUPTYPES NORM NORM NORM UTILIZATIONS 0.00 0.00 0.00 TRUCKPERCENTS 2.0 2.0 2.0 PEAKHOURFACTORS 0.90 0.90 0.90 ARRIVALTYPES 3 3 3 ACTUATIONS YES YES YES REQCLEARANCES 4.0 4.0 4.0 MINIMUMS 5.0 5.0 5.0 STARTUPLOST 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 STORAGE 0 0 0 INITIALQUEUE 0 0 0 IDEALSATFLOWS 1900 1900 1900 FACTORS 1.00 1.00 1.00 DELAYFACTORS 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 SATURATIONFLOWS 0 1287 1593 RT TH 25 390 12.0 12.0 1 1 NORM NORM 0.00 0.00 2.0 2.0 0.90 0.90 3 3 YES YES 4.0 4.0 5.0 5.0 2.0 2.0 2.0 2.0 0 0 0 0 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1140 1676 Phasing Parameters SEQUENCES 64 64 PERMISSIVES NO NO NO OVERLAPS NO NO NO CYCLES 90 90 30 GREENTIMES 5.00 4.00 16.00 YELLOWTIMES 4.00 4.00 4.00 CRITICALS 3 9 8 EXCESS 0 LT 160 12.0 1 NORM 0.00 2.0 0.90 3 YES 4.0 5.0 2.0 2.0 0 0 1900 1.00 1.00 1.00 1593 NO NO 13.00 32.00 4.00 4.00 6 11 RT TH LT 205 65 115 0.0 12.0 12.0 0 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1337 1593 LEADLAGS OFFSET PEDTIME RT TH LT 105 500 125 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1425 1676 1593 NONE NONE o.o0 1 0.0 0 Yelm Avenue Walgreens TIA First Street/Yelm Avenue PM Peak Hour; Projected 2002 volumes w/o project SIGNAL2000/TEAPAC[Ver 1.01.00] - Capacity Analysis Summary 07/26/01 14:43:12 Intersection Averages for Int # 1 - . Degree of Saturation (v/c) 0.83 Vehicle Delay 55.8 Level of Service E+ ------------------------------------------------------------- Sq 64 ~ Phase l ~ Phase 2 ~ Phase 3( Phase 4 ~ Phase 5 * ~ ~++ I ~ I * v ~ ****~ ++++ v North I <+ ~ <* + +>~ * *> ****> + I * + + i * * I i +++v * * * ------------------------------------------------------------- G/C=0.056 ~ G/C=0.044 ~ G/C=0.178 ~ G/C=0.144 ~ G/C=0.356 G= 5.0" ~ G= 4.0" ~ G= 16.0" I G= 13.0" I G= 32.0" Y+R= 4.0" Y+R= 4.0" ( Y+R= 4.0" Y+R= 4.0" Y+R= 4.0" OFF= 0.0% ~ OFF=10.0% ~ OFF=18.9% ~ OFF=41.1% ~ OFF=60.0% ------------------------------------------------------------- C= 90 sec G= 70.0 sec = 77.8% Y=20.0 sec = 22.2% Ped= 0.0 sec = 0.0% ------------------------------------------------------------------------------- Lane (Width/~ g/C I Service Rate Adj ~ ~ HCM ~ L ( Queue Group i Lanes Reqd Used ~ @C (vph) @E ~Volume~ v/c ~ Delay ~ S Model 1~ ------------------------------------------------------------------------------- N Approach 66.9 E+ ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- IRT+TH ~ 12/1 10.227 0.178 ~ 113 I 215 I 178 10.781 I 51.2 I D ~ 222 ft) LT ~ 12/1 0.150 0.056 ~ 1 I 70 78 10.886 1102.5 *F ~ 120 ft~ ------------------------------------------------------------------------------- S Approach 54.7 D ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- IRT+TH ~ 12/1 10.323 0.267 ~ 244 ~ 356 ~ 328 0.921 ~ 60.8 I*E+~ 435 ftI LT 12/1 10.172 0.144 ~ 65 ~ 216 ~ 133 0.578 ~ 39.5 I*D+~ 153 ft ------------------------------------------------------------------------------- E Approach 42.9 D+ ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- RT ~ 12/1 (0.150 0.356 ~ 315 ~ 405 ~ 50 0.123 19.7 B 41 ft~ TH ~ 12/1 0.359 0.356 ~ 487 ~ 596 ~ 494 0.829 36.0 D+` 544 ft LT ~ 12/1 0.210 10.144 ~ 65 ~ 216 ~ 200 0.870 ~ 65.8 *E+~ 269 ft, W Approach 64.0 E+ ----------------------- RT ~ 12/1 0.175 -------- 0.356 ---------------------------- 406 ~ 507 ~ 122 0.241 -------------------- 20.7 ~ C+~ 102 ft TH ~ 12/1 10.426 I 0.356 487 ~ 596 ~ 622 1.044 77.7 ~*E ~ 911 ft LT ~ 12/1 0.177 0.144 ~ 65 ~ 216 ( 144 0.626 ~ 41.5 ~ D+~ 168 ft Yelm Avenue Walgreens TIA 07/26/01 First Street/Yelm Avenue 14:43:22 PM Peak Hour; Projected 2002 volumes w/o project . SIGNAL2000/TEAPAC[Ver 1.01.00] - Summary of Parameter Values Intersection Parameters for Int # 1 METROAREA CBD SIMULATION PERIOD 15 LEVELOFSERVICE C S NODELOCATION 0 0 QUEUEMODELS 1 90 25 40 Approach Parameters APPLABELS N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVELS 0 0 0 0 BIKEVOLUMES 0 0 0 0 PARKINGSIDES BOTH BOTH BOTH NONE PARKVOLUMES 10 20 0 20 BUSVOLUMES 0 0 0 0 RIGHTTURNONREDS 0 0 0 0 UPSTREAMVC 0.00 0.00 0.00 0.00 Movement Parameters MOVLABELS RT TH LT VOLUMES 105 55 70 WIDTHS 0.0 12.0 12.0 LANES 0 1 1 GROUPTYPES NORM NORM NORM UTILIZATIONS 0.00 0.00 0.00 TRUCKPERCENTS 2.0 2.0 2.0 PEAKHOURFACTORS 0.90 0.90 0.90 ARRIVALTYPES 3 3 3 ACTUATIONS YES YES YES REQCLEARANCES 4.0 4.0 4.0 MINIMUMS 5.0 5.0 5.0 STARTUPLOST 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 STORAGE 0 0 0 INITIALQUEUE 0 0 0 IDEALSATFLOWS 1900 1900 1900 FACTORS 1.00 1.00 1.00 DELAYFACTOR5 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 SATURATIONFLOWS 0 1285 1593 Phasing Parameters SEQUENCES 64 64 PERMISSIVES NO NO OVERLAPS NO NO CYCLES 90 90 GREENTIMES 5. 00 4.00 YELLOWTIMES 4. 00 4.00 CRITICALS 3 9 EXCESS 0 RT TH LT 45 445 180 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1140 1676 1593 RT TH LT 225 70 120 0.0 12.0 12.0 0 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1336 1593 RT TH LT 110 560 130 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1425 1676 1593 NO NO LEADLAGS NO NO OFFSET 30 PEDTIME 16.00 13.00 32.00 4.00 4.00 4.00 8 6 11 NONE NONE 0.00 1 0.0 0 Yelm Avenue Walgreens TIA 07/26/01 First Street/Yelm Avenue 14:43:40 PM Peak Hour; Projected 2002 volumes w/project SIGNAL2000/TEAPAC[Ver 1.01.00] - Capacity Analysis Summary Intersection Averages for Int # 1 - . Degree of Saturation (v/c) 0.84 Vehicle Delay 57.5 Level of Service E+ Sq 64 **/** /~~ North ------------------------------------------------------------- Phase l ~ Phase 2 ~ Phase 3 ~ Phase 4 ~ Phase 5 i-----*-----i-----------i-+-+-------i--- * ~ I + + ~ ~ ++++ ! v I **** I I I I I++++ v ~ ~ + * + + + ~ * + + ------------------------- G/C=0.056 ~ G/C=0.044 G= 5.0" ~ G= 4.0" Y+R= 4.0" Y+R= 4.0" OFF= 0.0% OFF=10.0% C= 90 sec G= 70.0 sec * *~ * * * * G/C=0.178 G= 16.0" Y+R= 4.0" OFF=18.9% 77.8% Y=2 ****~ ++++ v ------------------------- G/C=0.144 ~ G/C=0.356 G= 13.0" ( G= 32.0° Y+R= 4.0" ~ Y+R= 4.0" OFF=41.1% ~ OFF=60.0% ------------------------- 0.0 sec = 22.2% Ped= 0.0 sec 0.0% ---------------- Lane Width/ --------------- g/C ~ --------- Service ------ Rate ----- Adj -------- ~ ~ ------- HCM ----- L ~ ~ -------- Queue Group ~ Lanes ---------------- l Reqd ------- Used ~ -------- @C (vph) --------- @E ~Volume~ v/c ------------------- Delay ------- S Model ---------- l~ --- N Approach 66.9 E+ ---------------- RT+TH 12/1 ------- 0.227 -------- 0.178 ~ --------- 113 ~ ------ 215 ~ ----- 178 -------- 0.781 ~ ------- 51.2 ----- ~ D ----- 222 --- ft~ LT 112/1 ---------------- 10.150 ------- 0.056 ~ ------- 1 ~ ---------- 70 ~ ------ 78 ----- 0.886 ~ -------- 102.5 ------- ~*F ----- 120 ----- ft~ --- S Approach 57.3 E+ ---------------- IRT+TH ~ 12/1 ------- 10.328 ------- 0.267 ---------- ~ 244 ~ ------ 356 ~ ----- 334 0.938 ~ 64.4 ~*E+~ 452 ft~ LT ~ 12/1 ---------------- 0.172 ------- 0.144 ------- ( 65 ~ ---------- 216 ( ------ 133 ----- 0.578 ------- ~ 39.5 -------- ~*D+~ ----- 153 ----- ft~ --- E Approach 44.1 D+ ---------------- RT ~ 12/1 ------- 0.150 ------- 0.356 -------- ~ 315 -- ----- 405 ~ - ----- 50 ------- 0.123 -------- ~ 19.7 ----- ~ B ~ ----- 41 --- ft~ TH 12/1 0.366 0.356 ( 487 I 596 I 506 0.849 , ~ 37.9 D+~ ~ 567 ft~ LT ' 12/1 ---------------- 0.210 ------- 0.144 ------- ( 65 ~ ---------- 216 ------ 200 ----- 0.870 ------- ~ 65.8 -------- *E+~ ----- 269 ----- ft~ --- W Approach 66.3 E+ ---------------- RT ~ 12/1 ~0 175 ~0 356 ~ 406 ~ 507 ~ ----- 122 ------- ~0 241 -------- ~ 20 7 ----- I C+~ ----- 102 --- ft~ TH ~ 12/1 0.429 0.356 ( 487 I 596 ~ 628 1.054 ~ 80.8 *F ~ 934 ft~ LT ~ 12/1 ---------------- 0.177 ------- (0.144 ------- ~ 65 ---------- 216 ~ ------ 144 ---- 0.626 -------- ( 41.5 -------- ~ D+~ ----- 168 ----- ft~ --- Yelm Avenue Walgreens TIA First Street/Yelm Avenue PM Peak Hour; Projected 2002 volumes w/project SIGNAL2000/TEAPAC[Ver 1.01.00] - Summary of Parameter Values Intersection Parameters for Int # 1 07/26/01 14:43:57 METROAREA CBD SIMULATION PERIOD 15 LEVELOFSERVICE C S NODELOCATION 0 0 QUEUEMODELS 1 90 25 40 Approach Parameters APPLABELS N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVELS 0 0 0 0 BIKEVOLUMES 0 0 0 0 PARKINGSIDES BOTH BOTH BOTH NONE PARKVOLUMES 10 20 0 20 BUSVOLUMES 0 0 0 0 RIGHTTURNONREDS 0 0 0 0 UPSTREAMVC 0.00 0.00 0.00 0.00 Movement Parameters MOVLABELS RT TH LT VOLUMES 105 55 70 WIDTHS 0.0 12.0 12.0 LANES 0 1 1 GROUPTYPES NORM NORM NORM UTILIZATIONS 0.00 0.00 0.00 TRUCKPERCENTS 2.0 2.0 2.0 PEAKHOURFACTORS 0.90 0.90 0.90 ARRIVALTYPES 3 3 3 ACTUATIONS YES YES YES REQCLEARANCES 4.0 4.0 4.0 MINIMUMS 5.0 5.0 5.0 STARTUPLOST 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 STORAGE 0 0 0 INITIALQUEUE 0 0 0 IDEALSATFLOWS 1900 1900 1900 FACTORS 1.00 1.00 1.00 DELAYFACTORS 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 SATURATIONFLOWS 0 1285 1593 Phasing Parameters SEQUENCES 64 64 PERMISSIVES NO NO OVERLAPS NO NO CYCLES 90 90 GREENTIMES 5. 00 4.00 YELLOWTIMES 4. 00 4.00 CRITICALS 3 9 EXCESS 0 RT 45 12.0 1 NORM 0.00 2.0 0.90 3 YES 4.0 5.0 2.0 2.0 0 0 1900 1.00 1.00 1.00 1140 NO NO 30 16.00 4.00 8 TH LT 455 180 12.0 12.0 1 1 NORM NORM 0.00 0.00 2.0 2.0 0.90 0.90 3 3 YES YES 4.0 4.0 5.0 5.0 2.0 2.0 2.0 2.0 0 0 0 0 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1676 1593 NO NO 13.00 32.00 4.00 4.00 6 11 RT TH LT 230 70 120 0.0 12.0 12.0 0 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1335 1593 LEADLAGS OFFSET PEDTIME RT TH LT 110 565 130 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1425 1676 1593 NONE NONE 0.00 1 0.0 0 Yelm Avenue Walgreens TIA Creek Street/Yelm Avenue PM Peak Hour; Existing 2001 traffic volumes SIGNAL2000/TEAPAC[Ver 1.01.00] - Capacity Analysis Summary 07/26/01 14:44:21 Intersection Averages for Int # 1 - . Degree of Saturation (v/c) 0.60 Vehicle Delay 28.1 Level of Service C Sq 74 **/** /I~ North ------------------------------------------------- Phase 1 ~ Phase 2 ~ Phase 3 ~ Phase 4 ------------------------------------------------- + + + I v I ~ I++++ v+++ I I I <+ + +> ~ + + + ~ ~ + + + ------------------------ G/C=0.111 ~ G/C=0.200 G= 10.0" ~ G= 18.0" Y+R= 4.0" I Y+R= 4.0" OFF= 0.0% ~ OFF=15.6% ------------------------ C= 90 sec G= 74.0 sec I++++> I ~++++ ~ v ----------------------- G/C=0.089 G/C=0.422 G= 8.0" ~ G= 38.0" Y+R= 4.0" ~ Y+R= 4.0" OFF=40.0% ~ OFF=53.3% ----------------------- 82.2% Y=16.0 sec = 17.8% Ped= 0.0 sec = 0.0% --------- Lane ---------------------- Width/~ g/C ~ --------- Service ------------ Rate Adj l --------------- ~ HCM ~ ------------ L Queue , Group --------- ~ Lanes) Reqd Used ~ ---------------------- @C (vph) --------- @E ~Volume ------------ v/c ~ Delay ~ --------------- Model l~ S ------------ N Approach 49.2 D ----------- RT+TH ~ ----- 12/1 ------- 0.171 -------- 0.111 ~ ------- 1 ~ ------- 176 ~ ------ 145 -------- 0.751 ------- 54.0 ----- ~ D ~ ----- 184 --- ft) LT ~ ----------- 12/1 ----- 0.140 ------- 0.111 ~ -------- 1 ------- 180 ~ ------- 61 ------ 0.310 -------- 37.7 ------- ~ D+~ ----- 68 ----- ft~ --- S Approach 37.6 D+ ----------- ~RT+TH ~ ----- 12/1 ------- 0.146 -------- 0.200 ------- 205 ~ ------- 348 ~ ------ 78 -------- 0.222 ~ ------- 30.5 ----- ~ C ~ ---- 78 ---- ft~ LT ~ ----------- 12/1 ----- y0.223 ------- 0.200 I -------- 206 ~ ------- 350 ~ ------- 250 ------ 0.706 ~ -------- 39.9 ------- ~ D+~ ----- 284 ---- ft~ ---- E Approach 23.7 C+ ----------- RT 1 ----- 12/1 ------- 0.139 -------- 0.422 ~ ------- 578 ~ ------- 669 ~ ------ 50 -------- 0.075 ~ ------- 15.6 ----- ~ B ---- 36 ---- ft~ TH ~ 12/1 0.344 0.422 I 691 786 ~ 522 0.664 ~ 23.0 ~ C+ 477 ft~ LT ( ----------- 12/1 ----- 0.136 ------- 0.089 ~ -------- 1 ' ------- 139 ~ ------- 50 ------ 0.318 ~ -------- 39.6 ------- ~ D+ ----- 57 ---- ft~ ---- W Approach 23.1 C+ ---------------- RT ~ 12/1 --------------- 0.303 0.422 ~ ------------------------------------ 578 669 361 0.540 I 20.3 ~ ------------ C+~ 313 ftl TH ~ 12/1 0.347 0.422 ~ 691 786 528 0.672 ~ 23.2 ~ C+~ 485 ft LT ~ 12/1 ---------------- 0.138 0.089 ~ --------------- 1 ~ 139 56 0.357 ~ 40.0 ~ ------------------------------------ D+~ 65 ft ------------ Yelm Avenue Walgreens TIA 07/26/01 Creek Street/Yelm Avenue 14:44:32 PM Peak Hour; Existing 2001 traffic volumes SIGNAL2000/TEAPAC[Ver 1.01.00] - Summary of Parameter Values Intersection Parameters for Int # 1 METROAREA NONCBD SIMULATION PERIOD 15 LEVELOFSERVICE C S NODELOCATION 0 0 QUEUEMODELS 1 90 25 40 Approach Parameters APPLABELS N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVELS 0 0 0 0 BIKEVOLUMES 0 0 0 0 PARKINGSIDES NONE NONE NONE NONE PARKVOLUMES 20 20 20 20 BUSVOLUMES 0 0 0 0 RIGHTTURNONREDS 0 0 0 0 UPSTREAMVC 0.00 0.00 0.00 0.00 Movement Parameters MOVLABELS RT TH LT VOLUMES 60 70 55 WIDTHS 0.0 12.0 12.0 LANES 0 1 1 GROUPTYPES NORM NORM NORM UTILIZATIONS 0.00 0.00 0.00 TRUCKPERCENTS 2.0 2.0 2.0 PEAKHOURFACTORS 0.90 0.90 0.90 ARRIVALTYPES 3 3 3 ACTUATIONS YES YES YES REQCLEARANCES 4.0 4.0 4.0 MINIMUMS 5.0 5.0 5.0 STARTUPLOST 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 STORAGE 0 0 0 INITIALQUEUE 0 0 0 IDEALSATFLOWS 1900 1900 1900 FACTORS 1.00 1.00 1.00 DELAYFACTORS 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 SATURATIONFLOWS 0 1734 1770 RT TH LT 45 470 45 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1583 1863 1770 RT TH LT 25 45 225 0.0 12.0 12.0 0 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1762 1770 RT TH LT 325 475 50 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1583 1863 1770 Phasing Parameters SEQUENCES 74 ALL PERMISSIVES NO NO NO NO OVERLAPS NO NO NO NO CYCLES 90 90 30 GREENTIMES 10.00 18.00 8.00 38.00 YELLOWTIMES 4.00 4.00 4.00 4.00 CRITICALS 0 0 0 0 EXCESS 0 LEADLAGS OFFSET PEDTIME NONE NONE 0.00 1 0.0 0 Yelm Avenue Walgreens TIA 07/26/01 Creek Street/Yelm Avenue 14:44:48 PM Peak Hour; Projected 2002 volumes w/o project SIGNAL2000/TEAPAC[Ver 1.01.00] - Capacity Analysis Summary Intersection Averages for Int # 1 - . Degree of Saturation (v/c) 0.66 Vehicle Delay 30.4 Level of Service C ------------------------- Sq 74 ~ Phase l ~ Phase 2 ~ ------------ Phase 3 ~ ------------ Phase 4 + + + ~ + + + ~ ++++~ /i\ v ~ ++++, ++++ v No th <+ + +>~ I ++++> i i + + + I ++++ + + + ( v ------------- G/C=0.111 ------------ G/C=0.200 ~ ------------ G/C=0.089 ~ ----------- G/C=0.422 - G= 10.0° I G= 18.0" ~ G= 8.0" G= 38.0" Y+R= 4.0" ~ Y+R= 4.0" I Y+R= 4.0" ` Y+R= 4.0" OFF= 0.0% ~ OFF=15.6% ~ OFF=40.0% ~ OFF=53.3% ------------------------- C= 90 sec G= 74.0 sec = ------------ 82.2% Y=16 ------------ .0 sec = 17.8% Ped= 0.0 sec = 0 .0% ------------------------------- Lane (Width/~ g/C ~ --------------------------- Service Rate Adj ~ --------- I HCM ~ ---- L I ----- Queu --- e Group ~ Lanes Reqd Used ~ ------------------------------- @C (vph) @E ------------ ~Volumel v/c --------------- f Delay ~ --------- S Model --------- 1~ --- N Approach 49.2 D ------------------------------- IRT+TH 112/1 0.171 0.111 ~ ------------ 1 ~ 176 --------------- ~ 145 0.751 --------- ~ 54.0 ~ ---- D ----- 184 --- ft~ LT 112/1 0.140 0.111 ~ ------------------------------- 1 ~ 180 ------------ ~ 61 0.310 --------------- ~ 37.7 ~ --------- 1 D+ ---- 68 ----- ft~ --- S Approach 44.5 D+ ------------------------ ~RT+TH 12/1 0.146 1 ------- 0.200 ~ ------------ 205 ~ 348 --------------- ~ 78 0.222 --------- ~ 30.5 ~ ---- C ~ ----- 78 --- ft~ LT ~ 12/1 10.242 10.200 ~ ------------------------------- 206 ~ 350 ------------ ~ 289 (0.816 --------------- ~ 48.2 ~ --------- D ~ ---- 350 ----- ftl --- E Approach 25.5 C+ ------------------------------- RT 12/1 0.139 0.422 ~ ------------ 578 ~ 669 --------- ~ 50 ------ 0.075 --------- ~ 15.6 ~ ---- B ~ ----- 36 --- ft~ TH ` 12/1 0.367 0.422 ~ 691 ~ 786 ~ 572 1 0.728 ~ 25.1 ~ C+ 545 ft~ LT ~ 12/1 0.136 0.089 ~ ------------------------------- l ~ 139 ------------ ~ 50 0.318 --------------- ~ 39.6 I --------- D+I ---- 57 ----- ft~ --- W Approach 24.9 C+ ------------------------------------------------------------------------------- RT ~ 12/1 0.327 0.422 ~ 578 ~ 669 406 0.607 ~ 21.8 C+~ 365 ft~ TH ~ 12/1 0.370 0.422 ~ 691 786 578 0.735 ~ 25.4 I C+~ 554 ft LT ~ 12/1 0.140 10.089 ~ 1 139 61 0.389 ~ 40.3 ~ D+I 71 ftl ------------------------------------------------------------------------------- Yelm Avenue Walgreens TIA 07/26/01 Creek Street/Yelm Avenue 14:44:58 PM Peak Hour; Projected 2002 volumes w/o project SIGNAL2000/TEAPAC[Ver 1.01.00] - Summary of Parameter Values Intersection Parameters for Int # 1 METROAREA NONCBD SIMULATION PERIOD 15 LEVELOFSERVICE C S NODELOCATION 0 0 QUEUEMODELS 1 90 25 40 Approach Parameters APPLABELS N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVELS 0 0 0 0 BIKEVOLUMES 0 0 0 0 PARKINGSIDES NONE NONE NONE NONE PARKVOLUMES 20 20 20 20 BUSVOLUMES 0 0 0 0 RIGHTTURNONREDS 0 0 0 0 UPSTREAMVC 0.00 0.00 0.00 0.00 Movement Parameters MOVLABELS RT TH LT VOLUMES 60 70 55 WIDTHS 0.0 12.0 12.0 LANES 0 1 1 GROUPTYPES NORM NORM NORM UTILIZATIONS 0.00 0.00 0.00 TRUCKPERCENTS 2.0 2.0 2.0 PEAKHOURFACTORS 0.90 0.90 0.90 ARRIVALTYPES 3 3 3 ACTUATIONS YES YES YES REQCLEARANCES 4.0 4.0 4.0 MINIMUMS 5.0 5.0 5.0 STARTUPLOST 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 STORAGE 0 0 0 INITIALQUEUE 0 0 0 IDEALSATFLOWS 1900 1900 1900 FACTORS 1.00 1.00 1.00 DELAYFACTORS 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 SATURATIONFLOWS 0 1734 1770 Phasing Parameters SEQUENCES 74 ALL PERMISSIVES NO NO OVERLAPS NO NO CYCLES 90 90 GREENTIMES 10. 00 1 8.00 YELLOWTIMES 4. 00 4.00 CRITICALS 0 0 EXCESS 0 RT TH LT 45 515 45 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1583 1863 1770 NO NO NO NO 30 8.00 38.00 4.00 4.00 0 0 RT TH LT 25 45 260 0.0 12.0 12.0 0 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1762 1770 LEADLAGS OFFSET PEDTIME RT TH LT 365 520 55 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1583 1863 1770 NONE NONE 0.00 1 0.0 0 Yelm Avenue Walgreens TIA Creek Street/Yelm Avenue PM Peak Hour; Projected 2002 volumes w/project SIGNAL2000/TEAPAC[Ver 1.01.00] - Capacity Analysis Summary 07/26/01 14:45:18 Intersection Averages for Int # 1 - . Degree of Saturation (v/c) 0.69 Vehicle Delay 33.8 Level of Service C ------------------------------------------------- Sq 74 ~ Phase 1 ~ Phase 2 ~ Phase 3 I Phase 4 + + + v ~ ~ ~ ++++ ++++ v North ~ <+ + +>~ ++++> + + + ~ ~ v ------------------------------------------------- G/C=0.156 I G/C=0.200 I G/C=0.089 ~ G/C=0.378 G= 14.0" G= 18.0" I G= 8.0" I G= 34.0" Y+R= 4.0" ~ Y+R= 4.0" Y+R= 4.0" Y+R= 4.0" OFF= 0.0% ~ OFF=20.0% OFF=44.4% ~ OFF=57.8% ------------------------------------------------- C= 90 sec G= 74.0 sec = 82.2% Y=16.0 sec = 17.8% Ped= 0.0 sec = 0.0% --------- Lane ------------- (Width/) -------- g/C ---------- ~ Service ----------- Rate Adj ------- ~ --------- HCM ~ ---- L -------- Queue Group --------- ~ Lanesl Reqd ------------- Used -------- ~ @C (vph) ---------- @E ---- ~Volume~ v/c -------------- ~ Delay ~ --------- S ---- Model ----- 1~ --- N Approach 37.8 D+ --------- ~RT+TH -------- ~ 12/1 ----- 0.181 -------- 0.156 ---------- ~ 104 ~ ---- 260 ------- I 167 ------- 0.614 --------- ~ 39.6 ---- D+~ ----- 191 --- ft~ LT --------- ~ 12/1 0.150 ------------- 0.156 -------- ~ 105 ~ ---------- 263 ---- I 89 ------- 0.324 ------- I ~ 34.5 --------- C ~ ---- 95 ----- ft~ --- S Approach 45.4 D --------- IRT+TH ------------- ~ 12/1 0.150 -- 1 ------ 0.200 ---------- ~ 207 ~ ---- 351 ------- ~ 89 ------- 0.251 --------- ~ 30.7 ~ ---- C ~ ----- 89 --- ft~ LT --------- ~ 12/1 0.245 ------------- 10.200 -------- ~ 206 ~ ---------- 350 ---- ~ 294 ------- 1 0.831 ------- ~ 49.8 ~ --------- D ( ---- 360 ----- ft~ --- E Approach 31.5 C ------------------------------------------------------------------------------- RT ~ 12/1 0.146 0.378 ~ 497 ~ 598 ~ 67 0.112 ~ 18.3 ~ B ~ 52 ft~ TH ( 12/1 0.367 0.378 I 596 ~ 704 ~ 572 0.813 32.4 ~ C 602 ft~ LT ~ 12/1 0.136 0.089 ~ 1 ~ 139 I 50 0.318 ' 39.6 ~ D+I 57 ft~ ------------------------------------------------------------------------------- W Approach 30.1 C ----------------------- RT ~ 12/1 0.321 --------------- 0.378 497 --------------------- 598 ( 394 0.659 I ------------ 25.9 I C+~ -------- 381 ft~ TH ~ 12/1 0.365 0.378 596 704 ~ 567 0.805 I 31.9 I C ~ 594 ft~ LT ~ 12/1 (0.140 ----------------------- 0.089 ~ 1 ~ --------------- 139 ~ 61 0.389 ~ --------------------- 40.3 ~ D+~ ------------ 71 ft~ -------- Yelm Avenue Walgreens TIA 07/26/01 Creek Street/Yelm Avenue 14:45:27 PM Peak Hour; Projected 2002 volumes w/project SIGNAL2000/TEAPAC[Ver 1.01.00] - Summary of Parameter Values Intersection Parameters for Int # 1 METROAREA NONCBD SIMULATION PERIOD 15 LEVELOFSERVICE C S NODELOCATION 0 0 QUEUEMODELS 1 90 25 40 Approach Parameters APPLABELS N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVELS 0 0 0 0 BIKEVOLUMES 0 0 0 0 PARKINGSIDES NONE NONE NONE NONE PARKVOLUMES 20 20 20 20 BUSVOLUMES 0 0 0 0 RIGHTTURNONREDS 0 0 0 0 UPSTREAMVC 0.00 0.00 0.00 0.00 Movement Parameters MOVLABELS RT TH LT VOLUMES 60 90 80 WIDTHS 0.0 12.0 12.0 LANES 0 1 1 GROUPTYPES NORM NORM NORM UTILIZATIONS 0.00 0.00 0.00 TRUCKPERCENTS 2.0 2.0 2.0 PEAKHOURFACTORS 0.90 0.90 0.90 ARRIVALTYPES 3 3 3 ACTUATIONS YES YES YES REQCLEARANCES 4.0 4.0 4.0 MINIMUMS 5.0 5.0 5.0 STARTUPLOST 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 STORAGE 0 0 0 INITIALQUEUE 0 0 0 IDEALSATFLOWS 1900 1900 1900 FACTORS 1.00 1.00 1.00 DELAYFACTORS 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 SATURATIONFLOWS 0 1751 1770 Phasing Parameters SEQUENCES 74 ALL PERMISSIVES NO NO OVERLAPS NO NO CYCLES 90 90 GREENTIMES 14. 00 18.00 YELLOWTIMES 4. 00 4.00 CRITICALS 0 0 EXCESS 0 RT TH LT 60 515 45 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1583 1863 1770 NO NO NO NO 30 8.00 34.00 4.00 4.00 0 0 RT TH LT 25 55 265 0.0 12.0 12.0 0 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1775 1770 LEADLAGS OFFSET PEDTIME RT TH LT 355 510 55 12.0 12.0 12.0 1 1 1 NORM NORM NORM 0.00 0.00 0.00 2.0 2.0 2.0 0.90 0.90 0.90 3 3 3 YES YES YES 4. 0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1583 1863 1770 NONE NONE 0.00 1 0.0 0 Two-Way Stop Control Page 1 of 2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information nal st geo genc /Co. Shea Grou Date Performed 7/26/2001 nal sis Time Period m k hour Intersection urisdiction Yelm nal sis Year 2002 Pro'ect ID Yelm Avenue Wal teens East/Vllest Street: Site Drivewa North/South Street: Creek Street Intersection Orientation: North-South Stud Period hrs : 0.25 ehicle Volumes and Ad'ustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 25 145 0 0 190 10 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 25 145 0 0 190 10 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 1 1 0 0 1 0 Configuration L T TR U stream Si nal 1 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 10 0 40 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 10 0 40 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 1 Configuration L R Dela ,Queue Length, and Level o f Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R (vph) 25 10 40 C (m) (vph) 1384 607 851 lc 0.02 0.02 0.05 5% queue length 0.06 0.05 0.15 Control Delay 7.6 11.0 9.4 LOS A 8 A pproach Delay -- -- g.g pproach LOS -- -- A file://C:\Documents and Settings\smithgeo\Local Settings\Temp\u2k5A.tmp 7/26/2001 Two-Way Stop Control Page 1 of 2 TWO-WAY STOP CONTROL SUMMARY General Information Site Information nal st geo Intersection enc /Co. Shea Grou urisdiction Date Performed 7/26/2001 nal sis Year 2002 nal sis Time Period m k hour Pro'ect ID Yelm Avenue Wal reens East/West Street: Yelm Avenue North/South Street: Site Drivewa Intersection Orientation: East-West Stud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 30 920 0 0 820 10 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 30 920 0 0 820 10 Percent Heavy Vehicles 0 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 1 1 0 0 2 0 Configuration L T T TR U stream Si nal 0 1 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 5 0 30 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 30 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 1 Configuration L R Dela ,Queue Len th, and Level o f Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration L L R (vph) 30 5 30 C (m) (vph) 807 71 625 lc 0.04 0.07 0.05 95% queue length 0.12 0.22 0.15 Control Delay 9.6 59.5 11.1 LOS A F B pproach Delay -- -- 18.0 pproach LOS -- -- C file://C:\Documents and Settings\smithgeo\Local Settings\Temp\u2k5E.tmp 7/26/2001