386 STP For The CityCITY OF YELM
RESOLUTION N0.386
AMENDED
SIX-YEAR STREET PLAN 2000-2005
WHEREAS, pursuant to the requirements of RCW 35.77.010, the City of Yelm has adopted a
Comprehensive Six-Yeas Transportation Program for the City; and
WHEREAS, by Resolution duly adopted by the City Council of the City of Yehn, the said
comprehensive Six-Yeal• Transportation Program has been revised and extended from time to time; and
WHEREAS, the City Council has determined that the Yelm Comprehensive Six-Year Transportation
Program as presently revised and extended, should be further amended as provided in the document annexed
hereto in order to accommodate recent changes in circumstances which were not anticipated when the Program
was last revised and extended.
NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Yelm that the
Comprehensive Six-Year Transportation Program for the ensuing six years be, and the same is hereby amended
as provided in the document annexed hereto which is by this reference thereto incorporated herein as though
fully set forth hel•ein; and
RESOLVED that a copy of this Resolution be filed by the City Clerk with the Director of
Transportation of the State of Washington.
ADOPTED this 28th day of July 1999.
. IN
Kat n M. olf, Mayor
ATTEST:
fr~z~ ~~~~~rt~
Agnes P. Bennick, City Clerk
PASSED and APPROVED: July 28, 1999
ab\mso\resol\3 S 1-6yr.doc
T Washington State Department of Transportation
Agency Yelm
County No. 34
City No. 1495
MPO TRPC
Page 1 Six Year Transportation Improvement Program
From 2000 to 2005
Hearing Date 7/28/99
Adoption Date 7/28/99
Resolution No. 386
Project Identification Pr oject Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. ~ r m
m
Fund Source Information Expenditure Schedule Pro ects On
J N
m B. Brid a No.
9 m
a ~+ v
c Y ar E
m y
' c
m o F
d
l F
di (Local Agency)
o y
`
°
~- a
E
C. Project Title
~
~
J
~
'
e
era
un
ng R/VN
~
-
c v °
~
a D. Street/Coun Road Name or Number
tY °''
a~-
H
ft ~
Phase
Federal
Federal
State
4th Re wired
Q
LL z E. Terminal Beginning and End E F ~ Project Start Fund Cost by Fund State Local Total
1st
2nd
3rd ThN Envir. Date
F. Describe Work to be Done Phase Immiddyyyy) Code Phase Code Funds Funds Funds 6th Type (M~>7
1 2 3 4 5 6 7 8 9 10 11 12' 13 14 15 16 17 18 19 20 21
O6
1
2 Phases in Project
03
S
.740
C .
ALL
4/19/99
5307
475
TIA
475
75
1025 i
G ALL Yes
Yelm Avenue Improvements P
First St. to Five Corners T
W 01 /2000
Widen to 3/4 lanes, urban arterial standards Totals 475 475 75 1025
07 2 4 Phases in Project 03 S 1.00 G ALL
C ALL Y6S
Yelm Ave. West Improvements
P ALL
ALL 10/1!99 5307 300 TIA 510 210 1020
T
'
' Yelm H.S. to First Street W
Widen roadway to urban arterial standards Totals 300 510 210 1020
06 ~ 3 1 Phases in Project 03 P .210 G ALL 12!20/2001 I I I TIA ' 243 I 67 310
C No
Stevens Avenue Improvements P'
T
First Street to West Road W
Widen roadway and improve to minor urban arterial TOtaIS 243 67 310
07 4 2 Phases in Project 03 P .230 G ALL 6/15120 TIA 280 70 350
C ALL NO
Mosman Street Improvements P
T
SR 507 to Solberg Street W
Widen roadway to neighborhood collector standards ~ TOtaIS 280 70 350
Washington State Department of Transportation
Agency Yelm
County No. 34
City No. 1495
MPO TRPC
Paget Six Year Transportation Improvement Program
From 2000 to 2005
Hearing Date 7/28/99
Adoption Date 7/28/99
Resolution No. 386
Project Identification I Pr oject Costs in Thousands of Dollars Federally Funded
A. Federal Aid No.
B
Bridge No ~_ r
c' m Fund Source Information Expenditure Schedule Projects Only
w ~ ~ .
. e a
m m ~,
~
d c
F
di
d
l F ~Loca/Agency)
o ~,
~ ~
C. Project Title
> c
~
~ era
n
e
un
9 R/1N
V ° ~ D. StreeUCounty Road Name or Number n~ ~ ~ ~
P
t Phase Federal Federal State i 4th Required
~ a. Z E. Terminal Beginning and End ~ ~ ~ rojec
Phase Start Fund Cost by Fund State
Funds Local i Total
F
F
ds
nd
1st
2nd
3rd Thru Envir.
T
e Date
F. Describe Work to be Done Imnyd
d/YYYy)
Code
Phase
Code un
,
u
s 6th yp (M~>7
t 2 3 4 5 6 7 8 9 10 11 12 13 14 I 15 16 17 18 19 20 21
07
5
1 Phases in Project
03
P
.360
(, i i i i
ALL 9/9/2001 TIA ~ 440 110 550
C No
West Road Improvements P
T
4th Street to 103rd Avenue W
Widen to minor arterial standards Totals 440 t 10 550
02 6 1 Phases in Project 01 S 3.0 G PE 1/1/98 I TIA 140 ~ 140
C No
SR510 to SR507 North Loop Study (Y-3) P
T
W
EA, corridor analysis, pre-design engineering TOtaIS 140 140
02 7 1 Phases in Project 01 S 1.5 G PE I 1/1/97 TIA 185 29 ~ 214
C No
SR 507/Five Corners Connector (Y-2) p
T
SR 507 to Five Corners Intersection W
EA, corridor analysis, pre-design engineering Totals 165 29 214
07 8 1 Phases in Project 03 P .190 G PE 1/1/2003 TIA 200 50 j 250
C No
Mosman Street re-alignment P
T
SR 507 to Third Street W
Re-align rdwy, repair shldrs, pave, drainage, partial walks, TOtaIS 200 50 250
Washington State Department of Transportation
Agency Yelm
County No. 34
City No. 1495
MPO TRPC
Page 3 Six Year Transportation Improvement Program
From 2000 to 2005
Hearing Date 7/28/99
Adoption Date 7/28/99
Resolution No. 386
~ Project Identification Project Costs in Thousands of Dollars Federalty Funded
A. Federal Aid No. ~
m L N
~
Fund Source Information Expenditure Schedule Projects Only
m B. Brid a No.
g e ~ ~, ~' 'O (Local Agency)
o ~~ C
P
i
l ' v Federal Fundin
y
`
°
° .
roject T
t
e ; n ~ g R/VU
-
v ~ D. StreeUCounty Road Name or Number a~ w ~ ~ Phase Federal Federal State 4th Required
~ i a z E. Terminal Beginning and End E ~ ~ Project Start Fund Cost by Fund State Local Totat Thru Envir. Date
F. Describe Work to be Done Phase (mm/dd/yyyy) Code Phase Code Funds Funds ;Funds 1st 2nd 3rd 6th Type (M~~
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
07
9
1 Phases in Project
03
P
.170
G i i i i i
CN 1/1/2002 TIA I 245 30 275 i
C No
Solberg Street Improvements T
P
Mosman Street to Yelm Avenue West W
Widen roadway to neighborhood collector standards TOtaIS 245 30 275
O6 10 1 Phases in Project 03 P .140 O CN I 1/1/2003 TIA 275 15 290
No
Stevens Avenue
Edwards Street to First Street
Construct new minor urban arterial segment TOtaIS 275 15 290
07 11 3 Phases in Project 03 P .550 T CN TIA !
Railroad Street Improvements
W ALL
ALL 1/1/2003 297 33 j 330
No
Railway to northeastern city limits
Widen roadway, railroad crossing, new intersection alignment Totals 297 33 330
07 12 1 Phases in Project 03 P .180 C ALL 1/1/2003 TIA 160 20 ' 180
G No
Second Street Improvements P
T
SR 507 to Mosman Street W
Repair shoulders, pave, drainage, walks 8 lighting TOtaIS 160 20 180
Washington State Department of Transportation
Agency Yelm
County No. 34
City No. 1495
MPO TRPC
Page4 Six Year Transportation Improvement Program
From 2000 to 2005
Hearing Date 7/28/99
Adoption Date 7/28/99
Resolution No. 386
Project Identification ~ i Pr oject Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. I ~ r w
Fund Source
Information Expenditure Schedule Projects Only
m B
Brid a No E ~ c' a,
'O
o N
~'~ .
.
9
C
Pro
ect Title y
; a I ~,
3
~
~
Federal Funding ~
i (Local Agency)
R/VV
.
j
-° 3 D. Street/County Road Name or Number ~ n~ y ~ ~ Phase Federal Federal State ~ 4th Required
i? o_ z E. Terminal Beginning and End E F ~ Project Start Fund Cost by Fund State Local i Total 1st 2nd 3rd Thru Envir. Date
F. Describe Work to be Done Phase (mm/ddyyyy) Code Phase Code Funds Funds !
I Funds 6th Type IMhyyy)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 i 15 16 17 18 19 20 21
07
13
3 Phases in Project
03
P
.740
C
ALL
1/1/2003 i
TIA
351
39 ~
390
G ALL !
! No
Rhoton Road Improvements T ALL ~
W
Railroad Avenue to north city limits
Widen roadway, drainage, lighting, resurfacing TOtaIS 351 39 390
07 14 ~ 1 Phases in Project 04 P 0.00 G ALL I 1/1/2002 TIA 135 1 15 1 1501
12 C No
Yelm AveNV, Killion Rd. Intersection 01 P
T
W
Widen roadway, safety improvements Totals 135 15 150
07 15 1 Phases in Project 04 P 0.00 G CN I 11112804 I I TIA 105 I 75 ~ 180
12 C No
Yelm Ave. W/93rd Ave. Intersection 01 P
T
W
Widen roadways, safety improvements, re-alignment
Totals
1os
7s
1so
07 16 1 Phases in Project 01 P 11o G ALL vtnoo5 ~ TIA ~ 1aa 16 ; 160
O6 C No
Railroad Street SW P
T
Mosman Road to Washington Ave. W
Re-align, pave, drainage, sidewalks, lighting Totals 144 16 160
Washington State Department of Transportation
Agency Yelm
County No. 34
City No. 1495
MPO TRPC
Page 5 Six Year Transportation Improvement Program
From 2000 to 2005
Hearing Date 7/28/99
Adoption Date 7/28/99
Resolution No. 386
~ Project Identification Project Costs in Thousands of Dollars Federally Funded
m A. Federal Aid No.
B
id
B
N c
m z
t'u m
m
Fund Source Information Expenditure Schedule Pro ects Onl
1 Y
;~ m .
r
ge
o.
m= v
o
(Local Agency)
y
g y ~- a C. Project Title , n Y m
~ v Federal Funding i ~ R/VV
U ~° ~ D. StreeUCounty Road Name or Number n~ ai ~ ~ Phase Federal Federal State ~ 4th Required
~ a Z E. Terminal Beginning and End E ~ ~ Project
Ph Start Fund Cost b Fund i State
F
d Local ~ Total
F
1st
2nd
3rd Envir.
T Date
F. Describe Work to be Done ase (m~d~,yyl,) Code Phase un
s
Code i unds Funds 6lh ype (M~,Y)
1 2 ~ 3 4 5 6 7 8 9 10 11 12 ~ 13 14 i 15 . 16 17 18 19 20 21
06
17
1 Phases in Project
04
P
1.00
G i i i
ALL 01/01/2001 TIA I 900 100' 1000
06 C No
Mill Road 07 P
SR 507 to 109th Street 12 T
W
Align, pave, drainage, sidewalks, lighting Totals 900 100 1000
00 18 1 Phases in Project 32 S 17.0 RW 1!1/2000 STP(R) I 340 ~ 60 4001
Yes
"Prairie Line"
Yelm to Lakeview
6/1 /2000
~ Totals Sao so aoo
00 19 1 Phases in Project 07 S 0.00 O CN 1/1/2000 TIA 60 60
No
City wide roadway resurtacing
Re-surface with chip seal TOtaIS 60 60
Grand Totals for Yelm 1115 5085 1o7a 727a