372 Six-Year Street Plan 99-04CITY OF YELM
RESOLUTION N0.372
SIX-YEAR STREET PLAN 1999-2004
WHEREAS, pursuant to the requirements of RCW 35.77.010, the City of Yelm has adopted a
Comprehensive Six-Year Transportation Program for the City; and
WHEREAS, by Resolution duly adopted by the City Council of the City of Yelm, the said
comprehensive Six-Year Transportation Program has been revised and extended from time to time; and
WHEREAS, the City Council has determined that the Yelm Comprehensive Six-Year
Transportation Program as presently revised and extended, should be further amended as provided in the
document annexed hereto in order to accommodate recent changes in circumstances which were not
anticipated when the Program was last revised and extended.
NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Yelm that
the Comprehensive Six-Year Transportation Program for the ensuing six years be, and the same is hereby
amended as provided in the document annexed hereto which is by this reference thereto incorporated herein
as though fully set forth herein; and
RESOLVED that a copy of this Resolution be filed by the City Clerk with the Director of
Transportation of the State of Washington.
ADOPTED this 24th day of June 1998.
Kathryn M. olf, Mayor
ATTEST:
Agn P. Bernick, City Clerk
PASSED and APPROVED: June 24, 1998
ab\mso\resol\6yr99-04. doc
Six Year Transportation Program
(1999-2004)
MPO :None
qty ;yew 1496
County :Thurston 34
Funo Project Itnp Total Utll
Cl PrI Identl6oatlon Type Status Length Codea
Phase Federal RAP, Eta. Looal/
Start Date Fund Code Cost Code Coat State Total
Agency . YELM 3 F 0.230 GCPTW r~
16 Edwards Street Improvements FUNDED -CONSTRUCTION LATE SUMMER 199$ . CN
Edwards Street Total
Yehn Avenue W to Coates Street NW
d ' to urban standards
1
Hearing Date 6/24/98
Adoption Date 624198
Resolution Number 372
Fbcpendlture Schedule Fed Proj. Only
(Loos/ Agenoy Use) Env. RNV Req.
lat 2nd 8rd 4th-6th Type YIN; Date
30
26
280
336
Widen roadway an unprove
CN 0111998 SCA 276 60 336
TOTAL 276 60 336
Agency YELM 1 S 8.000 GCPTW PE 160 600
14 2 SR 610 to SR 607 North Loop Study (Y-3) R'W
CN
New Alignment FUNDED STUDY 1998-99. Total 160 600
SR 610 to SR 607
EIS, corridor analysis,pra-design engineering
rj PE 01/1998
TOTAL
Agency YELM 3 3 0.210 GI
16 3 Stevens Avenue Improvements
Stevens Avenue
First Street to West Road
d ' to minor urban arterial
YL' zo
RW 76
CN 110 100
Total 210 100
Widen roadway an unprove
CN 01/1998
SCA 243
67
310
2 243 67 310
,1,~~ PE 26
Agency 3 3 0.190 GCPTW
YELM RW 10
17 4 Mosman Street Realignment CN 110 106
Mosman Street SE Total 146 106
SR 607 to Third Street
repair shldrs, pave, drainage, partial walks, and lighting
Realign rdwy
,
CN 01/1998 SCA 200 60 260
7 200 60 250
TOTAL .,T, n • ^
14 6
1 F 1.600 O
SR 607/FSve Corners Connector (Y•2)
New Alignment
SR 607 to Five Corners intersection
'd saa~y ' e-desi engineering
Other 652 98 660
662 98 660
RW
FUNDED STUDY 1997-1998 CN
Total 210
EI3 NO
EIS, oorri or sts, pr gn 26 210
6 PE 01/1998 STP(U) 186
TOTAL 186 26 210
Six Year Transportation Program
(1999-2004)
MPO :None
City :Yebn 1496
County :Thurston 34
Hearing Date 6/24/98
Adoption Date 6!24/98
Resolution Number 3j2
Funo Project Imp Total UtII
Iapendlture Schedule Fed Prof. Only
Cl PrI IdentlIIoatlon Type Status Length Codes Eto. Looall
deral RAP
F (Local Agency Use) Env. RNV Req.
Phase
Start Date ,
e
Fund Code Coat Code Cost State Total 1st 2nd 3rd 4th-6th Typa YIN; Date
Agency YELM 3 S 0.740 (3CPTW PE
RW 60
76
14 6 Yehn Avenue Improvements
PLANNED CONSTRUCTION 1999
CN DOT
100 31B
Yelm Avenue Total 236 S16 CITY
4th Street to ]eve Corners DEVELOPER
Widen to 3/4 lanes, urban arterial standards
1 CN 01/1999 SCA 476 76 660
76 650
17
TOT.
3
West Road Improvements
West Road
4th Street to 103rd Avenue
'al tend ds
rr;
RW ~ 80
CN 260 160
Total 400 160
Widen to minor amen a ar
CN 01/2000
SCA 440
110
660
4 TOTAL 440 110 650
30
Agency YELM 3 3 0.660 TW - PE
RW 10
17 8 Railroad Street Improvements CN 290 -
Railroad Street NW (NP Road) Total 330
Railway to northeastern City Limits
Widen roadway, railroad crossing, new intersection ali3nment and li¢htin~
11 CN 01/2000 SCA 297 33 330
330
TOTAL 297 33 PE 80
Ag~„~y yEj,~j 3 S 1.000 c3CPTW RW 60
1? 9 Yehn Avenue West Improvements CN 690
Yeha Avenue West Total 130 690
10
17 10
Yehn H.S. to brat Street
Widen roadway to urban arterial standards ("core" rdwy only) 720
CN 01/2000
TOTAL
3 S
Mosman Street Improvements
Moaman Street
SR 607 to Solber3 Street
'd Rod to aei hborhood collector standards
476
Other 610
210
zlo
PE 36
RW 16
CN 100
Total 160
200
200
Wi ea away Q
CN 01/2000 SCA 280 70 360
3 TOTAL 280 70 360
Six Year Transportation Program
(1999-2004)
3
' Bearing Date 6/!4/98
MPO :None Adoption Date 6!24/98
City :Yelm 1496 Resolution Number 372
County :Thurston 34
Funo Project Imp Total Util ~ , cpenditure Schedule Fed Proj. Only
CI Pri Identification Type Status Length Codes
deral
F
RAP
Eto.
Local/
(I,oaal Agency Uee) Env.
lt/W Req.
e
Phase
Start Date Fund Code Cost ,
Code Coat State Total 1st 2nd 8rd 4th-6th Typa YIN; Date
Agency YELM 3 3 0.170 GCPTW PE
RW ~
10
17 11 Solberg Street Improvements CN 100 140
Solberg Street
Total
136 140
Mosman Street to Yeim Avenue West
Widen Roadway to neighborhood collector standards
CN O1/2000 SCA 246 30 276
g TOTAL 246 30 276
20
Agency YELM 3 3 0.180 GCPTW ~ PE
RW 10
17 12 Second Street Improvements CN 160
Second Staest SE Total 180
SR 607,to Moaman Street
Repair shoulders, pave, drainage, walks and lighting
12 CN O1I2000 SCA 160 20 180
TOTAL 160 20 180
Agency YELM 1 S 0.140 O PE
RW ~
106
16 13 Stevens Avenue CN 80 80
New Alignment
Total 210 80
Edwards Street to First Street
Construct new minor urban arterial segment
9 CN 01/2000 ~ SCA 276 16 290
TOTAL 276 16 290
PE
~
Agency YELM 3 S 0.740 GCPTW RW 16
17 14 Rhoton Road Improvements CN 340
Rhoton Road NW
Total 60 340
Railroad Avenue to north G4ty I,umts
Widen roadway, drainage, lighting and resurfacing
1~ CN 01/2000 SCA 361 39 390
TOTAL 361 39 390
gency YELM 12 3 0.000 GCPTW rrr ~~
17 16 Yelm Avenue W/Killioa Road Intersection R'W
CN 130
Intersection realignment Total 160
Widen roadway, safety improvements
CN 01/2001 Other 136 16 160
14 TOTAL 136 16 160
Six Year Transportation Program 4
(1999-2004) '
Hearing Date 6/24/98
MPO :None Adoption Date 624/98
City :Yehn ' 1496 Resolution Number 372
County .'Phurston 34
Funo project Imp Total Util
Ezpenditure Schedule Fed Proj. Only
Cl Pri Identif[aatlon Type Status Length Codes
Phaae Federal RAP, Etc. LooaU (I.ooal Agency Uae) Env. R/W Req.
Start Date Fund Code Coat Code Cost State Total lat 2nd Erd 4th-6th Type Y/N; Date
Agency YELM 12 3 0.000 (3CPTW PE 20
10
17 16 Yehn Avenue W/98rd Avenue Intersection RW
Intersection Realignment ' CN 160
Widen roadways, safety improvements Total 180
CN 01/2001 Other 106 76 180
15 TOTAL 106 76 180
Agency YELM 3 S 0.110 (3CPTW PE 20
17 17 Railroad Street SW RW 10
130
Railroad Street SW CN
Total 160
Mosman Road to Washington Avenue
Realign, pave, drainage, sidewalks and lighting
CN 01/2001 SCA 144 16 160
16 TOTAL 144 16 160
Agency YELM 7 F 0.000 O PE
0 18 City-wide Roadway Re-surfacing RW
CN 10 10 16 46
Many Total 10 10 16 46
N/A
Resurface with chip seal "
CN 01/1998 80 80
17 TOTAL 80 80
Totals by Year: 1060 960 1916 2086
Yelm
~ IOS Yelm Avenue West
P. D. Box 479
L~~oN Yelm, Washington 98597
(360) 458-3244.
PUBLIC NOTICE
SIX-YEAR TRANSPORTATION PROGRAM
The City of Yelm will hold a Public Hearing on the 1999-2004 Six-Year
Transportation Program as an agenda item at the regular City Council meeting held at
7:30 pm on Wednesday, June 24, 1998 at Yelm City Hall, 105 Yelm Avenue West. The
Transportation Program prioritizes street improvement projects within Yelm City limits
and identifies funding sources. The public is invited to attend with any questions or
comments. Written comments may be sent to Yelm City Hall, P:O. Box 479, and Yelm,
WA 98597.
If you need reasonable accommodations to attend or participate in this meeting,
please contact Agnes Bernick at 458-8404 at least 72 hours before the meeting.
~~~~~,
.~~z~/ ~L~J~1Gi~c~~--
Agnes Bernick
City Clerk
Published: Nisqually Valley News, June 11, 1998
DO NOT PUBLISH BELOW THIS LINE
cc: Perry Shea, SCA Engineering
Ken Garmann
Bulletin Board
6/24/98 CC Mailing
Rerycled paper