Loading...
372 Six-Year Street Plan 99-04CITY OF YELM RESOLUTION N0.372 SIX-YEAR STREET PLAN 1999-2004 WHEREAS, pursuant to the requirements of RCW 35.77.010, the City of Yelm has adopted a Comprehensive Six-Year Transportation Program for the City; and WHEREAS, by Resolution duly adopted by the City Council of the City of Yelm, the said comprehensive Six-Year Transportation Program has been revised and extended from time to time; and WHEREAS, the City Council has determined that the Yelm Comprehensive Six-Year Transportation Program as presently revised and extended, should be further amended as provided in the document annexed hereto in order to accommodate recent changes in circumstances which were not anticipated when the Program was last revised and extended. NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Yelm that the Comprehensive Six-Year Transportation Program for the ensuing six years be, and the same is hereby amended as provided in the document annexed hereto which is by this reference thereto incorporated herein as though fully set forth herein; and RESOLVED that a copy of this Resolution be filed by the City Clerk with the Director of Transportation of the State of Washington. ADOPTED this 24th day of June 1998. Kathryn M. olf, Mayor ATTEST: Agn P. Bernick, City Clerk PASSED and APPROVED: June 24, 1998 ab\mso\resol\6yr99-04. doc Six Year Transportation Program (1999-2004) MPO :None qty ;yew 1496 County :Thurston 34 Funo Project Itnp Total Utll Cl PrI Identl6oatlon Type Status Length Codea Phase Federal RAP, Eta. Looal/ Start Date Fund Code Cost Code Coat State Total Agency . YELM 3 F 0.230 GCPTW r~ 16 Edwards Street Improvements FUNDED -CONSTRUCTION LATE SUMMER 199$ . CN Edwards Street Total Yehn Avenue W to Coates Street NW d ' to urban standards 1 Hearing Date 6/24/98 Adoption Date 624198 Resolution Number 372 Fbcpendlture Schedule Fed Proj. Only (Loos/ Agenoy Use) Env. RNV Req. lat 2nd 8rd 4th-6th Type YIN; Date 30 26 280 336 Widen roadway an unprove CN 0111998 SCA 276 60 336 TOTAL 276 60 336 Agency YELM 1 S 8.000 GCPTW PE 160 600 14 2 SR 610 to SR 607 North Loop Study (Y-3) R'W CN New Alignment FUNDED STUDY 1998-99. Total 160 600 SR 610 to SR 607 EIS, corridor analysis,pra-design engineering rj PE 01/1998 TOTAL Agency YELM 3 3 0.210 GI 16 3 Stevens Avenue Improvements Stevens Avenue First Street to West Road d ' to minor urban arterial YL' zo RW 76 CN 110 100 Total 210 100 Widen roadway an unprove CN 01/1998 SCA 243 67 310 2 243 67 310 ,1,~~ PE 26 Agency 3 3 0.190 GCPTW YELM RW 10 17 4 Mosman Street Realignment CN 110 106 Mosman Street SE Total 146 106 SR 607 to Third Street repair shldrs, pave, drainage, partial walks, and lighting Realign rdwy , CN 01/1998 SCA 200 60 260 7 200 60 250 TOTAL .,T, n • ^ 14 6 1 F 1.600 O SR 607/FSve Corners Connector (Y•2) New Alignment SR 607 to Five Corners intersection 'd saa~y ' e-desi engineering Other 652 98 660 662 98 660 RW FUNDED STUDY 1997-1998 CN Total 210 EI3 NO EIS, oorri or sts, pr gn 26 210 6 PE 01/1998 STP(U) 186 TOTAL 186 26 210 Six Year Transportation Program (1999-2004) MPO :None City :Yebn 1496 County :Thurston 34 Hearing Date 6/24/98 Adoption Date 6!24/98 Resolution Number 3j2 Funo Project Imp Total UtII Iapendlture Schedule Fed Prof. Only Cl PrI IdentlIIoatlon Type Status Length Codes Eto. Looall deral RAP F (Local Agency Use) Env. RNV Req. Phase Start Date , e Fund Code Coat Code Cost State Total 1st 2nd 3rd 4th-6th Typa YIN; Date Agency YELM 3 S 0.740 (3CPTW PE RW 60 76 14 6 Yehn Avenue Improvements PLANNED CONSTRUCTION 1999 CN DOT 100 31B Yelm Avenue Total 236 S16 CITY 4th Street to ]eve Corners DEVELOPER Widen to 3/4 lanes, urban arterial standards 1 CN 01/1999 SCA 476 76 660 76 650 17 TOT. 3 West Road Improvements West Road 4th Street to 103rd Avenue 'al tend ds rr; RW ~ 80 CN 260 160 Total 400 160 Widen to minor amen a ar CN 01/2000 SCA 440 110 660 4 TOTAL 440 110 650 30 Agency YELM 3 3 0.660 TW - PE RW 10 17 8 Railroad Street Improvements CN 290 - Railroad Street NW (NP Road) Total 330 Railway to northeastern City Limits Widen roadway, railroad crossing, new intersection ali3nment and li¢htin~ 11 CN 01/2000 SCA 297 33 330 330 TOTAL 297 33 PE 80 Ag~„~y yEj,~j 3 S 1.000 c3CPTW RW 60 1? 9 Yehn Avenue West Improvements CN 690 Yeha Avenue West Total 130 690 10 17 10 Yehn H.S. to brat Street Widen roadway to urban arterial standards ("core" rdwy only) 720 CN 01/2000 TOTAL 3 S Mosman Street Improvements Moaman Street SR 607 to Solber3 Street 'd Rod to aei hborhood collector standards 476 Other 610 210 zlo PE 36 RW 16 CN 100 Total 160 200 200 Wi ea away Q CN 01/2000 SCA 280 70 360 3 TOTAL 280 70 360 Six Year Transportation Program (1999-2004) 3 ' Bearing Date 6/!4/98 MPO :None Adoption Date 6!24/98 City :Yelm 1496 Resolution Number 372 County :Thurston 34 Funo Project Imp Total Util ~ , cpenditure Schedule Fed Proj. Only CI Pri Identification Type Status Length Codes deral F RAP Eto. Local/ (I,oaal Agency Uee) Env. lt/W Req. e Phase Start Date Fund Code Cost , Code Coat State Total 1st 2nd 8rd 4th-6th Typa YIN; Date Agency YELM 3 3 0.170 GCPTW PE RW ~ 10 17 11 Solberg Street Improvements CN 100 140 Solberg Street Total 136 140 Mosman Street to Yeim Avenue West Widen Roadway to neighborhood collector standards CN O1/2000 SCA 246 30 276 g TOTAL 246 30 276 20 Agency YELM 3 3 0.180 GCPTW ~ PE RW 10 17 12 Second Street Improvements CN 160 Second Staest SE Total 180 SR 607,to Moaman Street Repair shoulders, pave, drainage, walks and lighting 12 CN O1I2000 SCA 160 20 180 TOTAL 160 20 180 Agency YELM 1 S 0.140 O PE RW ~ 106 16 13 Stevens Avenue CN 80 80 New Alignment Total 210 80 Edwards Street to First Street Construct new minor urban arterial segment 9 CN 01/2000 ~ SCA 276 16 290 TOTAL 276 16 290 PE ~ Agency YELM 3 S 0.740 GCPTW RW 16 17 14 Rhoton Road Improvements CN 340 Rhoton Road NW Total 60 340 Railroad Avenue to north G4ty I,umts Widen roadway, drainage, lighting and resurfacing 1~ CN 01/2000 SCA 361 39 390 TOTAL 361 39 390 gency YELM 12 3 0.000 GCPTW rrr ~~ 17 16 Yelm Avenue W/Killioa Road Intersection R'W CN 130 Intersection realignment Total 160 Widen roadway, safety improvements CN 01/2001 Other 136 16 160 14 TOTAL 136 16 160 Six Year Transportation Program 4 (1999-2004) ' Hearing Date 6/24/98 MPO :None Adoption Date 624/98 City :Yehn ' 1496 Resolution Number 372 County .'Phurston 34 Funo project Imp Total Util Ezpenditure Schedule Fed Proj. Only Cl Pri Identif[aatlon Type Status Length Codes Phaae Federal RAP, Etc. LooaU (I.ooal Agency Uae) Env. R/W Req. Start Date Fund Code Coat Code Cost State Total lat 2nd Erd 4th-6th Type Y/N; Date Agency YELM 12 3 0.000 (3CPTW PE 20 10 17 16 Yehn Avenue W/98rd Avenue Intersection RW Intersection Realignment ' CN 160 Widen roadways, safety improvements Total 180 CN 01/2001 Other 106 76 180 15 TOTAL 106 76 180 Agency YELM 3 S 0.110 (3CPTW PE 20 17 17 Railroad Street SW RW 10 130 Railroad Street SW CN Total 160 Mosman Road to Washington Avenue Realign, pave, drainage, sidewalks and lighting CN 01/2001 SCA 144 16 160 16 TOTAL 144 16 160 Agency YELM 7 F 0.000 O PE 0 18 City-wide Roadway Re-surfacing RW CN 10 10 16 46 Many Total 10 10 16 46 N/A Resurface with chip seal " CN 01/1998 80 80 17 TOTAL 80 80 Totals by Year: 1060 960 1916 2086 Yelm ~ IOS Yelm Avenue West P. D. Box 479 L~~oN Yelm, Washington 98597 (360) 458-3244. PUBLIC NOTICE SIX-YEAR TRANSPORTATION PROGRAM The City of Yelm will hold a Public Hearing on the 1999-2004 Six-Year Transportation Program as an agenda item at the regular City Council meeting held at 7:30 pm on Wednesday, June 24, 1998 at Yelm City Hall, 105 Yelm Avenue West. The Transportation Program prioritizes street improvement projects within Yelm City limits and identifies funding sources. The public is invited to attend with any questions or comments. Written comments may be sent to Yelm City Hall, P:O. Box 479, and Yelm, WA 98597. If you need reasonable accommodations to attend or participate in this meeting, please contact Agnes Bernick at 458-8404 at least 72 hours before the meeting. ~~~~~, .~~z~/ ~L~J~1Gi~c~~-- Agnes Bernick City Clerk Published: Nisqually Valley News, June 11, 1998 DO NOT PUBLISH BELOW THIS LINE cc: Perry Shea, SCA Engineering Ken Garmann Bulletin Board 6/24/98 CC Mailing Rerycled paper