Loading...
361 Six-Year Street Plan 98-03 CITY OF YELM RESOLUTION N0. 361 SIX-YEAR STREET PLAN 1998-2003 WHEREAS, pursuant to the requirements of RCW 35.77.010, the City of Yelm has adopted a Comprehensive Six-Year Transportation Program for the City; and WHEREAS, by Resolution duly adopted by the City Council of the City of Yelm, the said comprehensive Six-Year Transportation Program has been revised and extended from time to time; and WHEREAS, the City Council has determined that the Yelm Comprehensive Six-Year Transportation Program as presently revised and extended, should be further amended as provided in the document annexed hereto in order to accommodate recent changes in circumstances which were not anticipated when the Program was last revised and extended. NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Yelm that the Comprehensive Six-Year Transportation Program for the ensuing six years be, and the same is hereby amended as provided in the document annexed hereto which is by this reference thereto incorporated herein as though fully set forth herein; and RESOLVED that a copy of this Resolution be filed by the City Clerk with the Director of Transportation of the State of. Washington. ADOPTED this 11th day of June 1997. y Kathryn Wolf, Mayo ATTEST: 9 Ag s P. Bennick, City Clerk PASSED and APPROVED: June 11, 1997 ab\mso\resol\6yr98-03.doc Ylmtip97 MPO :None City :Yelm 1495 County :Thurston 34 Funo Project Imp Total Util Six Year Transportation Program (1998-2003) sns/s7 1 Hearing Date 6Il 1197 Adoption Date 6/11/97 Resolution Number 361 CI Pri Identi6catIon Type Statue Length Codex Expenditure Schedule Fed Proj. Only Phase Federal RAP, Eto. Local/ ~ (Local Agency Use) Env. RNV Req. Start Date Fund Code Coet Code Cost State Total let 2nd 3rd 4th-6th Type Y/N; Date Agency YELM 3 F 0.230 GCPTW PE 30 16 1 Edwards Street Improvements RW 26 Edwards Street CN 280 Yehn Avenue W to Coates Street NW Total 336 Widen roadway and improve to urban standards CN 01/1998 SCA 275 60 336 TOTAL 275 60 335 Agency YELM 1 S 3.000 GCPTW PE 150 600 14 2 SR 610 to SR 607 North Loop Study (Y-3) RW New Alignment CN SR 610 to SR b07 Total 160 600 EIS, corridor analysis, pre-design engineering PE 01/1998 Other 662 98 660 TOTAL 662 98 650 Agency YELM 3 S 0.210 GCPTW PE 26 16 3 Stevens Avenue Improvements RW 76 Stevens Avenue CN 110 100 First Street to West Road Total 210 100 Widen roadway and improve to minor urban arterial • CN 0111998 - SCA 243 67 310 TOTAL 243 67 310 Agency YELM 3 S 0.190 GCPTW PE 26 17 4 Mosman Street Realignment ` RW 10 Mosman Street SE CN 110 106 SR 607 to Third Street Total 146 106 Realign rdwy, repair shldrs, pave, drainage, partial walks, and lighting CN 01/1998 SCA 200 60 250 ' TOTAL 200 60 260 Agency YELM 1 F 1.600 O PE 210 14 6 SR 607/Flve Corners Connector (Y-2) - RW EIS NO New Alignment CN SR 607 to Five Corners intersection Total 210 EIS, corridor analysis, pre-design engineering PE 01/1998 STP(1J) 186 26 210 TOTAL 185 26 210 Ylmtip97 Six Year Transportation Program 6/19/97 (1998-2003) 2 MPO :None City :Yebn 1496 County :Thurston 34 Hearing Date 6/11/97 Adoption Date 6/11/97 Resolution Number 361 Funa Project Imp Total Util Cl Pri Identification Type 'Statue Length Codea Eapenditure Soheduie Fed Proj. Only Phase Federal RAP, Eto. Local/ (Local Agency Uae) Env. R/W Req. Start Date ,Fund Code Cost Code Cost State Total let 2nd Srd 4th~th Type Y/N; Date Agency YELM 3 S 0.740 GCPTW PE 60 14 6 Yelm Avenue Improvements RW 76 Yehn Avenue CN 100 316 4th Street to Five Corners Total 236 316 Widen to 3141anes, urban arterial standards CN 01/1999 SCA 476 76 650 TOTAL 476 76 650 Agency YELM 3 S 0.360 GCPTW PE 70 17 7 West Road Improvements RW 80 West Road CN 260 160 4th Street to 103rd Avenue Total 400 160 Widen to minor arterial standards CN 01/2000 SCA 440 110 650 TOTAL 440 110 650 Agency YELM 3 S 0.660 TW PE 30 17 8 Railroad Street Improvements RW 10 Railroad Street NW (NP Road) CN 290 Railway to northeastern City Limits Total 330 Widen roadway, railroad crossing, new intersection alignment and lighting CN 01/2000 SCA 297 33 330 " TOTAL 297 33 330 Agency YELM 3 S 1.000 GCPTW PE 80 17 9 Yehn Avenue West Improvements RW 60 Yehn Avenue West CN 690 Yehn H.S. to First Street Total 130 690 Widen roadway to urban arterial standards ("core" rdwy only) ' CN 01/2000 Other 610 210 720 TOTAL 610 210 720 Agency YELM 3 S 0.230 GCPTW PE 36 17 10 Mosman Street Improvements RW 16 Mosman Street CN 100 200 SR 607 to Solberg Street Total 160 200 Widen Roadway to neighborhood collector standards CN 01/2000 SCA 280 70 350 TOTAL . 280 70 350 Yhntip97 MPO :None City :Yelm 1496 County :Thurston 34 Six Year Transportation Program (1998-2003) 6/19/97 3 Hearing Date 6/11/97 Adoption Dats 6111197 Resolution Number 361 Func Project Imp Total Util Cl Pri Identification Type Status Length Codes Eapenditure Sohedule Fed Proj. Only Phase Federal RAP, Eto. Local/ (Local Agency Use) Env. RIW Req. Start Date Fund Code Cost Code Cost State Total 1st 2nd 8rd 4th-6th Type Y/N; Date Agency YELM 3 S 0.170 GCPTW PE 26 17 11 Solberg Street Improvements RW 10 Solberg Street CN 100 140 Mosman Street to Yehn Avenue West Total 136 140 Widen Roadway to neighborhood collector standards CN 01/2000 SCA 245 30 276 TOTAL 245 30 276 Agency YELM 3 S 0.180 GCPTW PE 20 17 12 Second, Street Improvements RW 10 Second Street SE CN 160 SR 607 to Mosman Street Tots/ 180 Repair shoulders, pave, drainage, walks and lighting CN 01/2000 SCA 160 20 180 TOTAL 160 20 180 Agency YELM 1 S 0.140 O PE ~ 26 16 13 Stevens Avenue RW 106 New Alignment CN 80 80 Edwards Street to First Street Total 210 80 Construct new minor urban arterial segment _ CN O1I2000 SCA 276 16 290 TOTAL 275 15 290 Agency YELM 3 S 0.740 GCPTW PE ~ 35 17 14 ~ Rhoton Road Improvements RW 16 Rhoton Road NW CN 340 Railroad Avenue to north City Limita Total 60 340 Widen roadway, drainage, lighting and resurfacing CN 01/2000 SCA 361 39 390 TOTAL 351 39 390 Agency YELM 12 3 0.000 GCPTW PE 20 1? 16 Yelm Avenue W/Killion Road Intersection RW Intersection realignment CN 130 Widen roadway, safety improvements Total 160 CN 0112001 Other 136 16 160 TOTAL 136 16 160 Ylmtip97 MPO :None City :Yehn 1495 County :Thurston 34 Six Year Transportation Program (1998-2003) s/ls/s7 4 Hearing Date 6111/97 Adoption Date 6/11/97 Resolution Number 361 Funo Project Imp Total Utll Cl Pri Identification Type Status Length Codes Expenditure Schedule Fed Proj: Only Phase Federal RAP, Eto. Local/ (Local Agency Uae) Env. R/W Req. Start Date Fund Code Cost Code Cost State Total 1st 2nd 8rd 4th-6th Type Y/N; Date Agency YELM 12 S 0.000 GCPTW PE 20 17 16 Yelm Avenue W/93rd Avenue Intersection RW 10 Intersection Realignment CN 160 Widen roadways, safety improvements Total 180 CN 01/2001 Other 106 75 180 TOTAL 105 76 180 Agency YELM 3 S 0.110 GCPTW PE 20 17 17 Railroad Street SW RW 10 Railroad Street SW CN 130 Mosman Road to Washington Avenue Total 160 Realign, pave, drainage, sidewalks and lighting CN 01/2001 SCA 144 16 160 TOTAL 144 16 160 Agency YELM 7 F 0.000 O PE 0 18 City-wide Roadway Re-surfacing RW M~,y CN 10 10 lb 46 NIA Total 10 10 16 4b Resurface with chip seal CN 01/1998 80 80 TOTAL 80 80 - Totals by Year: 1060 960. 1916 2036