Loading...
447 Code Permit Fees CITY OF YELM RESOLUTION NO. 447 WHEREAS. the Yelm City Council adopted the International Fire Code. the International Building Code, the International Residential Code, the International Mechanical Code, the International Fuel Gas Code. the Uniform Plumbing Code. and the Washington State Energy Code via Ordinance Number 808 on July 14. 2004; and . WHEREAS, the International Building Code and other Codes pertaining to building do not contain provisions for establishing permit fees for building. mechanical, and plumbing permits; and WHEREAS, Ordinance Number 808 indicates that permit fees will be established by resolution of the Yelm City Council; and WH EREAS, the Yelm City Council desires to readopt the fees established under the previous building codes; and WHEREAS. the City does not currently pass the cost of public hearings before the Hearing Examiner on to developers, .' Now therefore, BE IT RESOLVED. by the City Council of the City of Yelm that commencing on September 23, 2004 the fees as set forth in the accompanying Attachment A shall be charged and collected by the City upon submission of the respective applications. BE IT FURTHER RESOLVED that applicants that receive permits, approvals, or appeals before the Hearing Examiner shall be billed for the actual costs of the Hearing. Adopted by the City Council of the Yelm at a regular meeting held on September 22. 2004. Dated this 2~Day a; September, 2004 ~ , ~. Adam Riv s. Mayor, City of Yelm ATTEST: ..., ~Ø&M1ILJ/ Agnes B~nick, City ClerklTreasurer PASSED AND APPROVED: September 22. 2004 PUBLISHED: October 1. 2004, Nisqually Valley News Attachment A Building Permit and Plan Review Fees Total Valuation Fee $1.00 to $500.00 $23.50 $23.50 for the first $500.00 and $3.05 for $501.00 to $2,000.00 each additional $100.00 or fraction thereof, to and including $2,000.00. $69.25 for the first $2,000.00 and $14.00 $2,001.00 to $25,000.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. $391.25 for the first $25,000.00 and $10.10 $25,001.00 to $50,000.00 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $643.75 for the first $50,000.00 and $7.00 $50,001.00 to $100,000.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $993.75 for the first $100,000.00 and $5.60 $100,001.00 to $500,000.00 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $3,233.75for the first $500,000.00 and $500,000.00 to $1,000,000.00 $4.75 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $5,608.75 for the first $1,000,000.00 and $1,000,001.00 and up $3.15 for each additional $1,000.00 or fraction thereof. Plan Review 65% of Building Permit Fee 65% of Building Permit Fee for the first Stock Plan Review Fee plan, 65% of first plan fee for subsequent plans with no revisions Signs $20.00 per approved sign Other Inspection Fees 1) Inspections outside of $47.00 normal business Hours 2) Re-inspection Fees $47.00 Plumbing Permit Fees Unit Unit Fee Plumbing Permit $20.00 Plumbing Fixture $7.00 per Fixture Gas Piping $5.00 up to 5 fixtures, $1.00 for each additional Backflow device over 2 inches $15.00 Medical Gas Piping $50.00 up to 5 inlets for each gas type, $5.00 for each additional Mechanical Permit Fees Unit Unit Fee Mechanical Permit $20.00 Furnace 1) Installation or relocation of $13.25 each forced air furnace including ducts and vents up to and including 100,000 Btu/h 2) Installation or relocation of $16.25 each forced air furnace including ducts and vents over 100,000 Btu/h 3) Installation or relocation of $13.25 each floor furnace and vent 4) Installation or relocation of $13.25 each suspended heater, recessed wall heater or floor mounted unit heater Appliance Vents $7.00 Repairs or Additions $12.25 For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code Boilers, Compressors and Absorption Systems 1. Installation or relocation of each boiler or compressor to and including 3 hp, or each absorption system to and including 100,000 Btu/h 2. Installation or relocation of each boiler or compressor over 3 hp to and including 15 hp, or each absorption system over 500,000 Btu/h 3. Installation or relocation of each boiler or compressor over 15 hp to and including 30 hp, or each absorption system over 1,000,000 Btu/h 4. Installation or relocation of each boiler or compressor over 30 hp to and including 50 hp, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h 5. Installation or relocation of each boiler or compressor over 50 hp or each absorption system over 1,750,000 Btu/h Air Handlers and Evaporative Coolers Up to 10,000 cfm Over 10,000 cfm Evaporative cooler other than portable Ventilation and Exhaust Each fan connected to a single duct Each system not a portion of any heating or a/c system authorized by a permit Installation of each hood $13.15 $24.25 $33.25 $49.50 $82.75 $9.50 $16.15 $9.50 $6.50 $9.50 $9.50 Incinerators Each domestic type Each industrial type Fuel Gas Piping Gas piping system, 1 - 5 outlets Each additional system, per outlet Process piping Hazardous process piping system (HPP), 1 - 4 outlets HHP system, 5 or more outlets, per outlet Non-hazardous process piping system (NPP, 1 - 4 outlets NPP system, 5 or more outlets, per outlet Miscellaneous Each appliance other than those listed above $16.25 $66.50 $5.00 $1.00 $5.00 $1.00 $2.00 $0.50 $9.50